SlideShare a Scribd company logo
1 of 31
SEMINAR
On
CRITICAL PATHWAY
Mr Kulthe Vikrant R
06-03-2019 1
INTRODUCTION
Successful case management relies on critical
pathway to guide care. Critical pathway refers to the
expected outcomes and care strategies developed by
collaborative practice team. Critical pathways and health
care reforms are two separate entities. Critical pathways
are also known as critical paths, clinical pathways, or care
paths, are management plans that display goals for
patients and provide the sequences and timing of actions
necessary to achieve these goals with optimal efficiency.
06-03-2019 2Mr kulthe Vikrant
DEFINITION
 “Critical paths are guides that outline the critical or key events expected to happen each
day of patient’s hospitalization.”
--Cohen & Cesta,2001.
 “A critical pathway are management plans that display goals for patients and provide the
corresponding ideal sequences and timing of staff action to achieve those goals with
optimal efficiency.”
 “A critical pathway is an interdisciplinary plan of care that outlines the optimal
sequencing and timing of interventions for patients with a particular condition, procedure
and symptom’s.”
-- Ignatavicious &hausman, 1995.
 “A critical pathway is the sequence of events in a process that takes the greatest length
of time.”
06-03-2019 3Mr kulthe Vikrant
SYNONYMOUS
 Integrated Care, Pathways Multidisciplinary
pathways of care, Maps Collaborative Care,
Pathways Clinical pathway, Critical
pathway, Care track Care pathway
Anticipated recovery path Managed care
plans.
06-03-2019 4Mr kulthe Vikrant
HISTORY
The concept od critical pathways is borrowed from the
theories of Continuous Quality Improvement (CQI). Critical
pathways are first developed for the use in industry as a tool
to identify and manage the rate limiting steps in production
processes. In health care, critical pathways were first
developed and applied in 1980s to improve hospital
efficiency. Most of the first critical pathway in the hospital
are develop by nurses for nursing care alone. Later on these
have been developed by other disciplines covering all the
aspects.
06-03-2019 5Mr kulthe Vikrant
FEATURES
 Predetermined course of progress,
 Variance analysis,
 Fiscal planning,
 Directing,
 Orientation,
 Identifies outcome.
06-03-2019 6Mr kulthe Vikrant
GOALS OF CRITICAL PATHWAYS
 Selecting a best practice when practice style varies unnecessarily.
 Defining the standards for the expected duration of hospital stay and
for the use of tests and treatment.
 Examining the interrelations among the different steps in the care
process to find ways to co-ordinate or decrease the time in the rate-
limiting step.
 Giving all hospital staff a common game plan from which to view and
understand their various role in the overall care process.
 Providing a framework for the collecting data on the care process so
that providers can learn how often and why patients do not follow
an expected course during their hospitalization.
 Decreasing documentation burden.
 Improving patient satisfaction with care by educating patients and
their families about the plan of care.
06-03-2019 7Mr kulthe Vikrant
PURPOSES
 To monitor quality of patient care.
 To reduce variation in care, decreasing resource utilization and
potentially improve healthcare quality when used as a method.
 To achieved specified patient’s outcomes by a pre-set time
frame.
 To know the predetermine times frames for initiation of
treatment, generalized treatment protocols, and discharged
timelines for specific conditions.
 To shorten the hospital stay, more efficient use of resources,
more communication between discipline, and use of less
expensive method of treatment without compromising quality
of care. 06-03-2019 8Mr kulthe Vikrant
CHARACTERISTICS OF CRITICAL PATHWAYS
 It should be structured multidisciplinary care plan.
 It supports multidisciplinary care and evidence based clinical practice.
 The goal and key elements of care based on evidence and best practice
should be defined and stated.
 It should guide the management for a well-defined group of patients for a
well-defined period of time.
 It sequences the action of multidisciplinary team.
 It facilitates variance managements and allows documenting, monitoring and
evaluating the variance.
 The essential step in care of patients with specific clinical problem is
detailed.
 It should help communication with patient by providing a clearly summary of
care.
06-03-2019 9Mr kulthe Vikrant
BENEFITS OF CRITICAL PATHWAYS
 Improve patients care.
 Increase use of recommended medical acre.
 Decrease use of unnecessary tests.
 Decrease increase lengths of stay of patients.
 Reduce costs.
 Increase participation in clinical research
protocols.
06-03-2019 10Mr kulthe Vikrant
CONTAINS
 Specific medical diagnosis the expected length of stay Patient
identification data
Appropriate time frames (in days, hours, minutes or visits) for intervention
1. Patient outcomes
2. Interventions presented in modality groups (medications, nursing activity
& so on)
3. Nursing diagnosis.
06-03-2019 11Mr kulthe Vikrant
COMPONENTS
1.A timeline
1.The categories of care or activities
and their interventions
1.Intermediate and long-term outcome
criteria and the variance record.
06-03-2019 12Mr kulthe Vikrant
CRITICAL PATHWAY PROFESSIONAL
 Physician
 Nurse manager
 Staff nurse
 Social worker
 Dietician
 Occupational therapist
 pharmacist
06-03-2019 13Mr kulthe Vikrant
DEVELOP CRITICAL PATHWAY
 Retrospective chart review or concurrent chart review
 identify costs associated with the treatment
 Pathway development teams are organized to develop the
tool.
 Patient care expectations and critical events are identified for
incorporation into the path
 Small groups within the development to refine the elements of
the path
 Newly developed tools can be tested on previously admitted
patient
 Implementation with collaboration with other professionals
06-03-2019 14Mr kulthe Vikrant
Methods of Critical Pathway
 Critical path method is based on mathematical calculations
and it is used for scheduling project
 activities. This method was first introduced in 1950s as a joint
venture between Remington Rand Corporation and DuPont
Corporation.
 The initial critical path method was used for managing plant
maintenance projects. Although the original method was
developed for construction work, this method can be used for
any project where there are interdependent activities. In the
critical path method, the critical activities of a program or a
project are identified. These are the activities that have a
direct impact on the completion date of the project.
06-03-2019 15Mr kulthe Vikrant
06-03-2019 16Mr kulthe Vikrant
Key Steps in Critical Path Method
Step 1: Activity specification
Step 2: Activity
sequence establishment
Step 3: Network diagram
Step 4: Estimates for each
activity
Step 5: Identification of the
critical path
Step 6: Critical path diagram to show
project progresses
06-03-2019 17Mr kulthe Vikrant
Step 1: Activity specification
 You can use the Work Breakdown Structure WBS to
identify the activities involved in the project. This is
the main input for the critical path method. In activity
specification, only the higher-level activities are
selected for critical path method. When detailed
activities are used, the critical path method may
become too complex to manage and maintain.
06-03-2019 18Mr kulthe Vikrant
Step 2: Activity sequence establishment
 In this step, the correct activity sequence is established.
For that, you need to ask three questions for each task of
your list.
 Which tasks should take place before this task happens?
 Which tasks should be completed at the same time as this
task?
 Which tasks should happen immediately after this task?
06-03-2019 19Mr kulthe Vikrant
Step 3: Network diagram
 Once the activity sequence is correctly identified, the
network diagram can be drawn
 Refertothesample diagram above. Although the early
diagrams were drawn on paper, there are a number of
computer softwares, such as Primavera, for this purpose
nowadays.
06-03-2019 20Mr kulthe Vikrant
Step 4: Estimates for each activity
 This could be a direct input from the WBS based
estimation sheet. Most of the companies use 3-
point estimation method or COCOMO based
function points based estimation methods for
tasks estimation. You can use such estimation
information for this step of the process.
06-03-2019 21Mr kulthe Vikrant
STEP 5: IDENTIFICATION OF THE CRITICAL PATH
For this, you need to determine four parameters of each activity of the network.
 Earliest start time ES - The earliest time an activity can start once the previous dependent
 activities are over.
 Earliest finish time EF - ES + activity duration.
 Latest finish time LF - The latest time an activity can finish without delaying the project.
 Latest start time LS - LF = activity duration.
 The float time for an activity is the time between the earliest ES and the latest LS start
time or
 between the earliest EF and latest LF finish times.
 During the float time, an activity can be delayed without delaying the project finish
date.The critical path is the longest path of the network diagram. The activities in the
critical path have an effect on the deadline of the project. If an activity of this path is
delayed, the project will be delayed. In case if the project management needs to
accelerate the project, the times for critical path activities should be reduced.
06-03-2019 22Mr kulthe Vikrant
STEP 6: CRITICAL PATH DIAGRAM TO SHOW
PROJECT PROGRESSES
 Critical path diagram is a live artefact. Therefore, this
diagram should be updated with actual
 values once the task is completed. This gives more
realistic figure for the deadline and the project
management can know whether they are on track
regarding the deliverables.
06-03-2019 23Mr kulthe Vikrant
06-03-2019 24Mr kulthe Vikrant
ADVANTAGES OF CRITICAL PATH METHOD
Following are advantages of critical path methods:
 Offers a visual representation of the project activities.
 Presents the time to complete the tasks and the overall
project.
 Tracking of critical activities.
06-03-2019 25Mr kulthe Vikrant
CRITICAL PATHWAY ANALYSIS
 • Analyse the effectiveness
 • Variance analysis Positive variance Negative
variance
 • Consult with other professionals
 • Make change accordingly
06-03-2019 26Mr kulthe Vikrant
ROLE AS NURSE MANAGER:
 Assess quality improvement Effective planning
Evaluate quality Interdepartmental Communication
Educating the staff of other departments about the
pathway role and responsibilities.
 Provides patient care Follow critical pathway Inform
any deviance Collaborate with other professionals
06-03-2019 27Mr kulthe Vikrant
ADVANTAGES
 • Provides standardizing medical care for patients with
similar diagnosis
 • Use resources appropriate to the care needed
 • Reduce cost
 • Reduce length of stay
 • Improve the quality of care
 • Change practice pattern to increase efficiency
06-03-2019 28Mr kulthe Vikrant
DISADVANTAGES
Differences between unique patients One more paper work
Overburdened with administrative cost Problems of
introduction of new technology
• Require commitment from staff and establishment of an
adequate organizational structure
• May take time to be accepted in the workplace
• Need to ensure variance and outcomes are properly
recorded, audited and acted upon.
06-03-2019 29Mr kulthe Vikrant
CONCLUSION
Critical path identification is required for any project-
planning phase. This gives the project management the
correct completion date of the overall project and the
flexibility to float activities. A critical path diagram should
be constantly updated with actual information when the
project progresses in order to refine the activity
length/project duration predictions.
06-03-2019 30Mr kulthe Vikrant
06-03-2019 31Mr kulthe Vikrant

More Related Content

What's hot

Organization and functions of nursing srvices and education
Organization and functions of nursing srvices and educationOrganization and functions of nursing srvices and education
Organization and functions of nursing srvices and educationMahesh Chand
 
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM - Define, Objectives, Impl...
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM  - Define, Objectives, Impl...MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM  - Define, Objectives, Impl...
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM - Define, Objectives, Impl...sonal patel
 
Progressive Patient Care
Progressive Patient CareProgressive Patient Care
Progressive Patient CareNc Das
 
supervision in nursing
supervision in nursing supervision in nursing
supervision in nursing Glory Supriya
 
critical pathway & health care reforms
critical pathway & health care reformscritical pathway & health care reforms
critical pathway & health care reformssangeetha antoe
 
Controlling in nursing management
Controlling in nursing managementControlling in nursing management
Controlling in nursing managementMohanPatel20
 
Quality assurance in nursing
Quality assurance in nursingQuality assurance in nursing
Quality assurance in nursingfrank jc
 
Ppt of nursing audit
Ppt of nursing auditPpt of nursing audit
Ppt of nursing auditAkanshaJohn1
 
Role of the nurse manager.pdf
Role of the nurse manager.pdfRole of the nurse manager.pdf
Role of the nurse manager.pdfreenavincent111
 
Role of nursing personnel in material management
Role of nursing personnel in material managementRole of nursing personnel in material management
Role of nursing personnel in material managementIndra Mani Mishra
 
Innovations in nursing
Innovations in nursingInnovations in nursing
Innovations in nursingJalpa Patel
 
Fiscal planning in nursing management
Fiscal planning in nursing managementFiscal planning in nursing management
Fiscal planning in nursing managementViji Pn
 
Current trends and issues in nursing education
Current trends and issues in nursing educationCurrent trends and issues in nursing education
Current trends and issues in nursing educationJays George
 
Evaluation in nursing education
Evaluation in nursing educationEvaluation in nursing education
Evaluation in nursing educationAaron Gogate
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation systemGagan Preet
 

What's hot (20)

Organization and functions of nursing srvices and education
Organization and functions of nursing srvices and educationOrganization and functions of nursing srvices and education
Organization and functions of nursing srvices and education
 
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM - Define, Objectives, Impl...
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM  - Define, Objectives, Impl...MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM  - Define, Objectives, Impl...
MIES-MANAGEMENT INFORMATION AND EVALUATION SYSTEM - Define, Objectives, Impl...
 
Progressive Patient Care
Progressive Patient CareProgressive Patient Care
Progressive Patient Care
 
supervision in nursing
supervision in nursing supervision in nursing
supervision in nursing
 
critical pathway & health care reforms
critical pathway & health care reformscritical pathway & health care reforms
critical pathway & health care reforms
 
Controlling in nursing management
Controlling in nursing managementControlling in nursing management
Controlling in nursing management
 
Organizing nursing services
Organizing nursing servicesOrganizing nursing services
Organizing nursing services
 
Quality assurance in nursing
Quality assurance in nursingQuality assurance in nursing
Quality assurance in nursing
 
Ppt of nursing audit
Ppt of nursing auditPpt of nursing audit
Ppt of nursing audit
 
Trends and issues in nursing
Trends and issues in nursing Trends and issues in nursing
Trends and issues in nursing
 
Role of the nurse manager.pdf
Role of the nurse manager.pdfRole of the nurse manager.pdf
Role of the nurse manager.pdf
 
Role of nursing personnel in material management
Role of nursing personnel in material managementRole of nursing personnel in material management
Role of nursing personnel in material management
 
Innovations in nursing
Innovations in nursingInnovations in nursing
Innovations in nursing
 
Fiscal planning in nursing management
Fiscal planning in nursing managementFiscal planning in nursing management
Fiscal planning in nursing management
 
quality of nursing care and services
quality of nursing care and servicesquality of nursing care and services
quality of nursing care and services
 
Current trends and issues in nursing education
Current trends and issues in nursing educationCurrent trends and issues in nursing education
Current trends and issues in nursing education
 
Evaluation in nursing education
Evaluation in nursing educationEvaluation in nursing education
Evaluation in nursing education
 
Estimating of nursing staff requirement
Estimating of nursing staff requirementEstimating of nursing staff requirement
Estimating of nursing staff requirement
 
Innovations in nursing
Innovations in nursingInnovations in nursing
Innovations in nursing
 
Management information and evaluation system
Management information and evaluation systemManagement information and evaluation system
Management information and evaluation system
 

Similar to CRITICAL PATHWAY FOR NURSING ADMINISTRATION.

Imagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in tImagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in tLizbethQuinonez813
 
Applicability of lean strategies in public sector service
Applicability of lean strategies in public sector serviceApplicability of lean strategies in public sector service
Applicability of lean strategies in public sector serviceRanga Sabhapathige
 
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...Walter Wodchis: the PRISMA model - approaches to supporting older people to m...
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...The King's Fund
 
Clinical Assignment Quality Improvement Final Project Goal
Clinical Assignment Quality Improvement Final Project GoalClinical Assignment Quality Improvement Final Project Goal
Clinical Assignment Quality Improvement Final Project GoalWilheminaRossi174
 
In 750-1,000 words, develop an evaluation plan to be included in y
In 750-1,000 words, develop an evaluation plan to be included in yIn 750-1,000 words, develop an evaluation plan to be included in y
In 750-1,000 words, develop an evaluation plan to be included in yLizbethQuinonez813
 
On April 18, 2016, The United States Supreme Court denied a petiti.docx
On April 18, 2016, The United States Supreme Court denied a petiti.docxOn April 18, 2016, The United States Supreme Court denied a petiti.docx
On April 18, 2016, The United States Supreme Court denied a petiti.docxvannagoforth
 
Implementing and Evaluating the Hospital Guide to Reducing Medicaid Readmissions
Implementing and Evaluating the Hospital Guide to Reducing Medicaid ReadmissionsImplementing and Evaluating the Hospital Guide to Reducing Medicaid Readmissions
Implementing and Evaluating the Hospital Guide to Reducing Medicaid ReadmissionsJSI
 
Develop a schedule for a healthcare website redesign project. Where .pdf
Develop a schedule for a healthcare website redesign project. Where .pdfDevelop a schedule for a healthcare website redesign project. Where .pdf
Develop a schedule for a healthcare website redesign project. Where .pdfSALES97
 
Evaluation of a Multi-EMR web-based Form
Evaluation of a Multi-EMR web-based FormEvaluation of a Multi-EMR web-based Form
Evaluation of a Multi-EMR web-based FormKarim Keshavjee
 
The Impact of Proposed MU Rule Changes 2015 2017
The Impact of Proposed MU Rule Changes 2015 2017The Impact of Proposed MU Rule Changes 2015 2017
The Impact of Proposed MU Rule Changes 2015 2017MassEHealth
 
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docx
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docxRunning Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docx
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docxtoltonkendal
 
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...Joe Andelija
 
Developing an Evaluation Plan and Disseminating Evidence.docx
Developing an Evaluation Plan and Disseminating Evidence.docxDeveloping an Evaluation Plan and Disseminating Evidence.docx
Developing an Evaluation Plan and Disseminating Evidence.docx4934bk
 
The CfWI Care Pathways Toolkit
The CfWI Care Pathways ToolkitThe CfWI Care Pathways Toolkit
The CfWI Care Pathways ToolkitC4WI
 
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docx
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docxMarita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docx
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docxinfantsuk
 
7 day services is only part of a whole system transformation
7 day services is only part of a whole system transformation7 day services is only part of a whole system transformation
7 day services is only part of a whole system transformationNHS Improving Quality
 
Practical Guide to Benefits Driven Change
Practical Guide to Benefits Driven ChangePractical Guide to Benefits Driven Change
Practical Guide to Benefits Driven ChangeMinney org Ltd
 

Similar to CRITICAL PATHWAY FOR NURSING ADMINISTRATION. (20)

Imagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in tImagine that you are talking to a friend about pursuing a job in t
Imagine that you are talking to a friend about pursuing a job in t
 
Applicability of lean strategies in public sector service
Applicability of lean strategies in public sector serviceApplicability of lean strategies in public sector service
Applicability of lean strategies in public sector service
 
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...Walter Wodchis: the PRISMA model - approaches to supporting older people to m...
Walter Wodchis: the PRISMA model - approaches to supporting older people to m...
 
Clinical Assignment Quality Improvement Final Project Goal
Clinical Assignment Quality Improvement Final Project GoalClinical Assignment Quality Improvement Final Project Goal
Clinical Assignment Quality Improvement Final Project Goal
 
In 750-1,000 words, develop an evaluation plan to be included in y
In 750-1,000 words, develop an evaluation plan to be included in yIn 750-1,000 words, develop an evaluation plan to be included in y
In 750-1,000 words, develop an evaluation plan to be included in y
 
On April 18, 2016, The United States Supreme Court denied a petiti.docx
On April 18, 2016, The United States Supreme Court denied a petiti.docxOn April 18, 2016, The United States Supreme Court denied a petiti.docx
On April 18, 2016, The United States Supreme Court denied a petiti.docx
 
Implementing and Evaluating the Hospital Guide to Reducing Medicaid Readmissions
Implementing and Evaluating the Hospital Guide to Reducing Medicaid ReadmissionsImplementing and Evaluating the Hospital Guide to Reducing Medicaid Readmissions
Implementing and Evaluating the Hospital Guide to Reducing Medicaid Readmissions
 
Develop a schedule for a healthcare website redesign project. Where .pdf
Develop a schedule for a healthcare website redesign project. Where .pdfDevelop a schedule for a healthcare website redesign project. Where .pdf
Develop a schedule for a healthcare website redesign project. Where .pdf
 
Gp commissioning kinetik
Gp commissioning  kinetikGp commissioning  kinetik
Gp commissioning kinetik
 
Evaluation of a Multi-EMR web-based Form
Evaluation of a Multi-EMR web-based FormEvaluation of a Multi-EMR web-based Form
Evaluation of a Multi-EMR web-based Form
 
The Impact of Proposed MU Rule Changes 2015 2017
The Impact of Proposed MU Rule Changes 2015 2017The Impact of Proposed MU Rule Changes 2015 2017
The Impact of Proposed MU Rule Changes 2015 2017
 
Creating and Automating Care Plans
Creating and Automating Care PlansCreating and Automating Care Plans
Creating and Automating Care Plans
 
QIPP end of life care event report
QIPP end of life care event reportQIPP end of life care event report
QIPP end of life care event report
 
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docx
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docxRunning Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docx
Running Head PRACTICUM PROJECT PLAN1PRACTICUM PROJECT PLAN.docx
 
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...
A LEAN SIX SIGMA APPROACH TO REDUCE WAITING AND REPORTING TIME IN THE RADIOLO...
 
Developing an Evaluation Plan and Disseminating Evidence.docx
Developing an Evaluation Plan and Disseminating Evidence.docxDeveloping an Evaluation Plan and Disseminating Evidence.docx
Developing an Evaluation Plan and Disseminating Evidence.docx
 
The CfWI Care Pathways Toolkit
The CfWI Care Pathways ToolkitThe CfWI Care Pathways Toolkit
The CfWI Care Pathways Toolkit
 
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docx
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docxMarita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docx
Marita Schifalacqua, RN, MSN, NEA-BC, FAAN,Chris Costello, M.docx
 
7 day services is only part of a whole system transformation
7 day services is only part of a whole system transformation7 day services is only part of a whole system transformation
7 day services is only part of a whole system transformation
 
Practical Guide to Benefits Driven Change
Practical Guide to Benefits Driven ChangePractical Guide to Benefits Driven Change
Practical Guide to Benefits Driven Change
 

More from VIKRANT KULTHE

Nursing Education Objectives
Nursing Education Objectives Nursing Education Objectives
Nursing Education Objectives VIKRANT KULTHE
 
Accupressure and Accupunture therapy
Accupressure and Accupunture therapyAccupressure and Accupunture therapy
Accupressure and Accupunture therapyVIKRANT KULTHE
 
Behaviour therapy of Psychiatriy
Behaviour therapy of PsychiatriyBehaviour therapy of Psychiatriy
Behaviour therapy of PsychiatriyVIKRANT KULTHE
 
Substance use disorders 2020
Substance use disorders 2020Substance use disorders 2020
Substance use disorders 2020VIKRANT KULTHE
 
Ethics of nursing 2020
Ethics of nursing 2020Ethics of nursing 2020
Ethics of nursing 2020VIKRANT KULTHE
 
Lesson plan short introduction.
Lesson plan short introduction.Lesson plan short introduction.
Lesson plan short introduction.VIKRANT KULTHE
 
Equipment and supply of material
Equipment and supply of materialEquipment and supply of material
Equipment and supply of materialVIKRANT KULTHE
 
Eating and impulse control disorders1
Eating and impulse control disorders1Eating and impulse control disorders1
Eating and impulse control disorders1VIKRANT KULTHE
 
National Mental Health Program
National Mental Health ProgramNational Mental Health Program
National Mental Health ProgramVIKRANT KULTHE
 
Application of reserch theory in Nursing
Application of reserch theory in NursingApplication of reserch theory in Nursing
Application of reserch theory in NursingVIKRANT KULTHE
 
Educational preparation and continuing nursing education
Educational preparation and continuing nursing educationEducational preparation and continuing nursing education
Educational preparation and continuing nursing educationVIKRANT KULTHE
 
Psychiatry emergencies PPT presentation
Psychiatry emergencies PPT presentationPsychiatry emergencies PPT presentation
Psychiatry emergencies PPT presentationVIKRANT KULTHE
 
Anxiety Disorders PPT Presentation.
Anxiety Disorders PPT Presentation.Anxiety Disorders PPT Presentation.
Anxiety Disorders PPT Presentation.VIKRANT KULTHE
 

More from VIKRANT KULTHE (20)

Nursing Education Objectives
Nursing Education Objectives Nursing Education Objectives
Nursing Education Objectives
 
Group therapy 2020
Group therapy 2020Group therapy 2020
Group therapy 2020
 
Mental illness 2020
Mental illness 2020Mental illness 2020
Mental illness 2020
 
Accupressure and Accupunture therapy
Accupressure and Accupunture therapyAccupressure and Accupunture therapy
Accupressure and Accupunture therapy
 
Behaviour therapy of Psychiatriy
Behaviour therapy of PsychiatriyBehaviour therapy of Psychiatriy
Behaviour therapy of Psychiatriy
 
Substance use disorders 2020
Substance use disorders 2020Substance use disorders 2020
Substance use disorders 2020
 
Ethics of nursing 2020
Ethics of nursing 2020Ethics of nursing 2020
Ethics of nursing 2020
 
Lesson plan short introduction.
Lesson plan short introduction.Lesson plan short introduction.
Lesson plan short introduction.
 
Child psychiatry 2020
Child psychiatry 2020Child psychiatry 2020
Child psychiatry 2020
 
Equipment and supply of material
Equipment and supply of materialEquipment and supply of material
Equipment and supply of material
 
Eating and impulse control disorders1
Eating and impulse control disorders1Eating and impulse control disorders1
Eating and impulse control disorders1
 
National Mental Health Program
National Mental Health ProgramNational Mental Health Program
National Mental Health Program
 
Application of reserch theory in Nursing
Application of reserch theory in NursingApplication of reserch theory in Nursing
Application of reserch theory in Nursing
 
Educational preparation and continuing nursing education
Educational preparation and continuing nursing educationEducational preparation and continuing nursing education
Educational preparation and continuing nursing education
 
Psychiatry emergencies PPT presentation
Psychiatry emergencies PPT presentationPsychiatry emergencies PPT presentation
Psychiatry emergencies PPT presentation
 
Anxiety Disorders PPT Presentation.
Anxiety Disorders PPT Presentation.Anxiety Disorders PPT Presentation.
Anxiety Disorders PPT Presentation.
 
Memory
MemoryMemory
Memory
 
Sigmund freud theory.
Sigmund freud theory.Sigmund freud theory.
Sigmund freud theory.
 
Milieu therapy
Milieu therapyMilieu therapy
Milieu therapy
 
LECTURE METHOD
LECTURE METHODLECTURE METHOD
LECTURE METHOD
 

Recently uploaded

Call Girl in Indore 8827247818 {Low Price}👉 Nitya Indore Call Girls * ITRG...
Call Girl in Indore 8827247818 {Low Price}👉   Nitya Indore Call Girls  * ITRG...Call Girl in Indore 8827247818 {Low Price}👉   Nitya Indore Call Girls  * ITRG...
Call Girl in Indore 8827247818 {Low Price}👉 Nitya Indore Call Girls * ITRG...mahaiklolahd
 
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...Sheetaleventcompany
 
Call Girls in Udaipur Girija Udaipur Call Girl ✔ VQRWTO ❤️ 100% offer with...
Call Girls in Udaipur  Girija  Udaipur Call Girl  ✔ VQRWTO ❤️ 100% offer with...Call Girls in Udaipur  Girija  Udaipur Call Girl  ✔ VQRWTO ❤️ 100% offer with...
Call Girls in Udaipur Girija Udaipur Call Girl ✔ VQRWTO ❤️ 100% offer with...mahaiklolahd
 
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...Sheetaleventcompany
 
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Service
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort ServiceSexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Service
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Servicejaanseema653
 
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali Punjab
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali PunjabGorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali Punjab
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali PunjabSheetaleventcompany
 
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Service
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort ServiceSexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Service
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Servicejaanseema653
 
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Service
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort ServiceSexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Service
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Servicejaanseema653
 
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsEscorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsAhmedabad Call Girls
 
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...Joya Singh
 
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...Escorts In Kolkata
 
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetVip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetAhmedabad Call Girls
 
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...Sheetaleventcompany
 
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetsurat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Chandigarh
 
Top 20 Famous Indian Female Pornstars Name List 2024
Top 20 Famous Indian Female Pornstars Name List 2024Top 20 Famous Indian Female Pornstars Name List 2024
Top 20 Famous Indian Female Pornstars Name List 2024Sheetaleventcompany
 
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...Sheetaleventcompany
 
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...Sheetaleventcompany
 
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetvisakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real MeetCall Girls Chandigarh
 
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking Models
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking ModelsRishikesh Call Girls Service 6398383382 Real Russian Girls Looking Models
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking ModelsRupali Sharma
 
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...Sheetaleventcompany
 

Recently uploaded (20)

Call Girl in Indore 8827247818 {Low Price}👉 Nitya Indore Call Girls * ITRG...
Call Girl in Indore 8827247818 {Low Price}👉   Nitya Indore Call Girls  * ITRG...Call Girl in Indore 8827247818 {Low Price}👉   Nitya Indore Call Girls  * ITRG...
Call Girl in Indore 8827247818 {Low Price}👉 Nitya Indore Call Girls * ITRG...
 
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...
💚Chandigarh Call Girls Service 💯Jiya 📲🔝8868886958🔝Call Girls In Chandigarh No...
 
Call Girls in Udaipur Girija Udaipur Call Girl ✔ VQRWTO ❤️ 100% offer with...
Call Girls in Udaipur  Girija  Udaipur Call Girl  ✔ VQRWTO ❤️ 100% offer with...Call Girls in Udaipur  Girija  Udaipur Call Girl  ✔ VQRWTO ❤️ 100% offer with...
Call Girls in Udaipur Girija Udaipur Call Girl ✔ VQRWTO ❤️ 100% offer with...
 
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...
Call Girls In Indore 📞9235973566📞Just Call Inaaya📲 Call Girls Service In Indo...
 
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Service
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort ServiceSexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Service
Sexy Call Girl Tiruvannamalai Arshi 💚9058824046💚 Tiruvannamalai Escort Service
 
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali Punjab
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali PunjabGorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali Punjab
Gorgeous Call Girls Mohali {7435815124} ❤️VVIP ANGEL Call Girls in Mohali Punjab
 
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Service
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort ServiceSexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Service
Sexy Call Girl Dharmapuri Arshi 💚9058824046💚 Dharmapuri Escort Service
 
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Service
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort ServiceSexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Service
Sexy Call Girl Villupuram Arshi 💚9058824046💚 Villupuram Escort Service
 
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance PaymentsEscorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
Escorts Service Ahmedabad🌹6367187148 🌹 No Need For Advance Payments
 
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...
(Big Boobs Indian Girls) 💓 9257276172 💓High Profile Call Girls Jaipur You Can...
 
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...
Ludhiana Call Girls Service Just Call 6367187148 Top Class Call Girl Service ...
 
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real MeetVip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
Vip Call Girls Makarba 👙 6367187148 👙 Genuine WhatsApp Number for Real Meet
 
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...
Indore Call Girl Service 📞9235973566📞Just Call Inaaya📲 Call Girls In Indore N...
 
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetsurat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
surat Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Top 20 Famous Indian Female Pornstars Name List 2024
Top 20 Famous Indian Female Pornstars Name List 2024Top 20 Famous Indian Female Pornstars Name List 2024
Top 20 Famous Indian Female Pornstars Name List 2024
 
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
Premium Call Girls Bangalore {7304373326} ❤️VVIP POOJA Call Girls in Bangalor...
 
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...
Independent Call Girls Service Chandigarh | 8868886958 | Call Girl Service Nu...
 
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meetvisakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
visakhapatnam Call Girls 👙 6297143586 👙 Genuine WhatsApp Number for Real Meet
 
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking Models
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking ModelsRishikesh Call Girls Service 6398383382 Real Russian Girls Looking Models
Rishikesh Call Girls Service 6398383382 Real Russian Girls Looking Models
 
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...
Call Girls Service Chandigarh Sexy Video ❤️🍑 8511114078 👄🫦 Independent Escort...
 

CRITICAL PATHWAY FOR NURSING ADMINISTRATION.

  • 1. SEMINAR On CRITICAL PATHWAY Mr Kulthe Vikrant R 06-03-2019 1
  • 2. INTRODUCTION Successful case management relies on critical pathway to guide care. Critical pathway refers to the expected outcomes and care strategies developed by collaborative practice team. Critical pathways and health care reforms are two separate entities. Critical pathways are also known as critical paths, clinical pathways, or care paths, are management plans that display goals for patients and provide the sequences and timing of actions necessary to achieve these goals with optimal efficiency. 06-03-2019 2Mr kulthe Vikrant
  • 3. DEFINITION  “Critical paths are guides that outline the critical or key events expected to happen each day of patient’s hospitalization.” --Cohen & Cesta,2001.  “A critical pathway are management plans that display goals for patients and provide the corresponding ideal sequences and timing of staff action to achieve those goals with optimal efficiency.”  “A critical pathway is an interdisciplinary plan of care that outlines the optimal sequencing and timing of interventions for patients with a particular condition, procedure and symptom’s.” -- Ignatavicious &hausman, 1995.  “A critical pathway is the sequence of events in a process that takes the greatest length of time.” 06-03-2019 3Mr kulthe Vikrant
  • 4. SYNONYMOUS  Integrated Care, Pathways Multidisciplinary pathways of care, Maps Collaborative Care, Pathways Clinical pathway, Critical pathway, Care track Care pathway Anticipated recovery path Managed care plans. 06-03-2019 4Mr kulthe Vikrant
  • 5. HISTORY The concept od critical pathways is borrowed from the theories of Continuous Quality Improvement (CQI). Critical pathways are first developed for the use in industry as a tool to identify and manage the rate limiting steps in production processes. In health care, critical pathways were first developed and applied in 1980s to improve hospital efficiency. Most of the first critical pathway in the hospital are develop by nurses for nursing care alone. Later on these have been developed by other disciplines covering all the aspects. 06-03-2019 5Mr kulthe Vikrant
  • 6. FEATURES  Predetermined course of progress,  Variance analysis,  Fiscal planning,  Directing,  Orientation,  Identifies outcome. 06-03-2019 6Mr kulthe Vikrant
  • 7. GOALS OF CRITICAL PATHWAYS  Selecting a best practice when practice style varies unnecessarily.  Defining the standards for the expected duration of hospital stay and for the use of tests and treatment.  Examining the interrelations among the different steps in the care process to find ways to co-ordinate or decrease the time in the rate- limiting step.  Giving all hospital staff a common game plan from which to view and understand their various role in the overall care process.  Providing a framework for the collecting data on the care process so that providers can learn how often and why patients do not follow an expected course during their hospitalization.  Decreasing documentation burden.  Improving patient satisfaction with care by educating patients and their families about the plan of care. 06-03-2019 7Mr kulthe Vikrant
  • 8. PURPOSES  To monitor quality of patient care.  To reduce variation in care, decreasing resource utilization and potentially improve healthcare quality when used as a method.  To achieved specified patient’s outcomes by a pre-set time frame.  To know the predetermine times frames for initiation of treatment, generalized treatment protocols, and discharged timelines for specific conditions.  To shorten the hospital stay, more efficient use of resources, more communication between discipline, and use of less expensive method of treatment without compromising quality of care. 06-03-2019 8Mr kulthe Vikrant
  • 9. CHARACTERISTICS OF CRITICAL PATHWAYS  It should be structured multidisciplinary care plan.  It supports multidisciplinary care and evidence based clinical practice.  The goal and key elements of care based on evidence and best practice should be defined and stated.  It should guide the management for a well-defined group of patients for a well-defined period of time.  It sequences the action of multidisciplinary team.  It facilitates variance managements and allows documenting, monitoring and evaluating the variance.  The essential step in care of patients with specific clinical problem is detailed.  It should help communication with patient by providing a clearly summary of care. 06-03-2019 9Mr kulthe Vikrant
  • 10. BENEFITS OF CRITICAL PATHWAYS  Improve patients care.  Increase use of recommended medical acre.  Decrease use of unnecessary tests.  Decrease increase lengths of stay of patients.  Reduce costs.  Increase participation in clinical research protocols. 06-03-2019 10Mr kulthe Vikrant
  • 11. CONTAINS  Specific medical diagnosis the expected length of stay Patient identification data Appropriate time frames (in days, hours, minutes or visits) for intervention 1. Patient outcomes 2. Interventions presented in modality groups (medications, nursing activity & so on) 3. Nursing diagnosis. 06-03-2019 11Mr kulthe Vikrant
  • 12. COMPONENTS 1.A timeline 1.The categories of care or activities and their interventions 1.Intermediate and long-term outcome criteria and the variance record. 06-03-2019 12Mr kulthe Vikrant
  • 13. CRITICAL PATHWAY PROFESSIONAL  Physician  Nurse manager  Staff nurse  Social worker  Dietician  Occupational therapist  pharmacist 06-03-2019 13Mr kulthe Vikrant
  • 14. DEVELOP CRITICAL PATHWAY  Retrospective chart review or concurrent chart review  identify costs associated with the treatment  Pathway development teams are organized to develop the tool.  Patient care expectations and critical events are identified for incorporation into the path  Small groups within the development to refine the elements of the path  Newly developed tools can be tested on previously admitted patient  Implementation with collaboration with other professionals 06-03-2019 14Mr kulthe Vikrant
  • 15. Methods of Critical Pathway  Critical path method is based on mathematical calculations and it is used for scheduling project  activities. This method was first introduced in 1950s as a joint venture between Remington Rand Corporation and DuPont Corporation.  The initial critical path method was used for managing plant maintenance projects. Although the original method was developed for construction work, this method can be used for any project where there are interdependent activities. In the critical path method, the critical activities of a program or a project are identified. These are the activities that have a direct impact on the completion date of the project. 06-03-2019 15Mr kulthe Vikrant
  • 17. Key Steps in Critical Path Method Step 1: Activity specification Step 2: Activity sequence establishment Step 3: Network diagram Step 4: Estimates for each activity Step 5: Identification of the critical path Step 6: Critical path diagram to show project progresses 06-03-2019 17Mr kulthe Vikrant
  • 18. Step 1: Activity specification  You can use the Work Breakdown Structure WBS to identify the activities involved in the project. This is the main input for the critical path method. In activity specification, only the higher-level activities are selected for critical path method. When detailed activities are used, the critical path method may become too complex to manage and maintain. 06-03-2019 18Mr kulthe Vikrant
  • 19. Step 2: Activity sequence establishment  In this step, the correct activity sequence is established. For that, you need to ask three questions for each task of your list.  Which tasks should take place before this task happens?  Which tasks should be completed at the same time as this task?  Which tasks should happen immediately after this task? 06-03-2019 19Mr kulthe Vikrant
  • 20. Step 3: Network diagram  Once the activity sequence is correctly identified, the network diagram can be drawn  Refertothesample diagram above. Although the early diagrams were drawn on paper, there are a number of computer softwares, such as Primavera, for this purpose nowadays. 06-03-2019 20Mr kulthe Vikrant
  • 21. Step 4: Estimates for each activity  This could be a direct input from the WBS based estimation sheet. Most of the companies use 3- point estimation method or COCOMO based function points based estimation methods for tasks estimation. You can use such estimation information for this step of the process. 06-03-2019 21Mr kulthe Vikrant
  • 22. STEP 5: IDENTIFICATION OF THE CRITICAL PATH For this, you need to determine four parameters of each activity of the network.  Earliest start time ES - The earliest time an activity can start once the previous dependent  activities are over.  Earliest finish time EF - ES + activity duration.  Latest finish time LF - The latest time an activity can finish without delaying the project.  Latest start time LS - LF = activity duration.  The float time for an activity is the time between the earliest ES and the latest LS start time or  between the earliest EF and latest LF finish times.  During the float time, an activity can be delayed without delaying the project finish date.The critical path is the longest path of the network diagram. The activities in the critical path have an effect on the deadline of the project. If an activity of this path is delayed, the project will be delayed. In case if the project management needs to accelerate the project, the times for critical path activities should be reduced. 06-03-2019 22Mr kulthe Vikrant
  • 23. STEP 6: CRITICAL PATH DIAGRAM TO SHOW PROJECT PROGRESSES  Critical path diagram is a live artefact. Therefore, this diagram should be updated with actual  values once the task is completed. This gives more realistic figure for the deadline and the project management can know whether they are on track regarding the deliverables. 06-03-2019 23Mr kulthe Vikrant
  • 25. ADVANTAGES OF CRITICAL PATH METHOD Following are advantages of critical path methods:  Offers a visual representation of the project activities.  Presents the time to complete the tasks and the overall project.  Tracking of critical activities. 06-03-2019 25Mr kulthe Vikrant
  • 26. CRITICAL PATHWAY ANALYSIS  • Analyse the effectiveness  • Variance analysis Positive variance Negative variance  • Consult with other professionals  • Make change accordingly 06-03-2019 26Mr kulthe Vikrant
  • 27. ROLE AS NURSE MANAGER:  Assess quality improvement Effective planning Evaluate quality Interdepartmental Communication Educating the staff of other departments about the pathway role and responsibilities.  Provides patient care Follow critical pathway Inform any deviance Collaborate with other professionals 06-03-2019 27Mr kulthe Vikrant
  • 28. ADVANTAGES  • Provides standardizing medical care for patients with similar diagnosis  • Use resources appropriate to the care needed  • Reduce cost  • Reduce length of stay  • Improve the quality of care  • Change practice pattern to increase efficiency 06-03-2019 28Mr kulthe Vikrant
  • 29. DISADVANTAGES Differences between unique patients One more paper work Overburdened with administrative cost Problems of introduction of new technology • Require commitment from staff and establishment of an adequate organizational structure • May take time to be accepted in the workplace • Need to ensure variance and outcomes are properly recorded, audited and acted upon. 06-03-2019 29Mr kulthe Vikrant
  • 30. CONCLUSION Critical path identification is required for any project- planning phase. This gives the project management the correct completion date of the overall project and the flexibility to float activities. A critical path diagram should be constantly updated with actual information when the project progresses in order to refine the activity length/project duration predictions. 06-03-2019 30Mr kulthe Vikrant