SlideShare una empresa de Scribd logo
1 de 64
Descargar para leer sin conexión
C o n v e r g e n z e p a r a l l e l e
l a b o r a t o r i d a l b a s s o
Lecce / Brindisi - Mesagne, 10 -11 luglio 2013
Progetti e realizzazioni
dispositivi, strutture ed applicazioni di sistemi statici innovativi
Filippo Broggini arch.EPFL
BlueOffice Architecture, Bellinzona (Suisse)
B. U l t r a L i g h t , S u p e r S t r o n g
1. Le concept
Matière, information, évolution
How does life make the most of things ? By adding information to matter.
Janine Benyus, dans « Twelve sustainable design ideas from nature »
1.1
1. Le concept
Notre recherche se nourrit du questionnement entre ces trois entités.
En y intégrant la fonction et l’usage, l’équilibre entre ces paramètres produit
notre projet architectural.
1.2
1. Le concept
Force, forme et matière
2.3
2. Premières recherches
Trois réalisations « hyper light »
1. Le concept
2.4
F. Broggini, W.Janach - Alboo Tower, hyper light structure
hauteur 10 m, poids 17 kg, ép.parois 0,2 mm
Horw-LU (Suisse), 1998-1999
2. Premières recherches
Trois réalisations « hyper light »
1. Le concept
2.5
F. Broggini, W.Janach - Alboo Torus, hyper light structure
Ø 7.5 m, poids 22 kg, ép.parois 0,1 mm
Horw-LU (Suisse), 1999
2. Premières recherches
Trois réalisations « hyper light »
1. Le concept
2.6
F. Broggini, W.Janach - Alboo Tower & Torus, hyper light structure
Joint de connection entre barres, FRP
Horw-LU (Suisse), 1999
2. Premières recherches
Trois réalisations « hyper light »
1. Le concept
2.7
F. Broggini, R.Wunderlin (BWB)- Iglhouse, hyper compactable structure
Prototype scale 1/2: hauteur 2,7 m, ø 3,5 m, poids 35 kg, ép.parois 1,5 mm
Bellinzona, Stans-Oberdorf (Suisse), 2000
2. Premières recherches
Trois réalisations « hyper light »
Appréhender l’espace en plaçant la matière là où il le faut.
3.8
Etapes de la recherche
Step n°1: rechercher l’epression et de la force à travers la forme.
(Gare Louvain, Gare Cornavain)
Step n°2: rechercher l’expression esthétique des éléments constituant la
structure.
(Digital Sky- Sky Led)
Step n°3: recomposer les éléments esthétiques en structures de plus grandes
dimensions.
(Jakob Tensegrity Torus)
3. Tensegrity
Une methode de conception
3.9R.Lüscher, F. Broggini, architectes - Passera & Pedretti ingénieurs
Gare de Louvain (Belgique), concours sur invitation
Lausanne, Bellinzona, Lugano (Suisse), 1999
3. Tensegrity
Step n°1: une nouvelle esthétique; l’air comme élément de stabilisation
Gare Louvain (B)
3.10R.Lüscher, F. Broggini, architectes - Passera & Pedretti ingénieurs
Gare Cornavain Genève (Suisse), concours sur invitation
Lausanne, Bellinzona, Lugano (Suisse), 2000
3. Tensegrity
Step n°1: une nouvelle esthétique; l’air comme élément de stabilisation
Gare Cornavain
3.11F. Broggini, architecte - Passera & Pedretti ingénieurs - Metis Lighting design
Digital Sky Bellinzona (Suisse), concours sur invitation
Bellinzona, Lugano (Suisse), Milano (Italie), 2001
3. Tensegrity
Step n°2: rechercher l’expression esthétique des éléments constituant la structure.
Digital Sky
1.2
3.12
Esthétique et détails
Joint sur barre à section triangulaire et effets lumineux
Digital Sky
3.13F. Broggini, architecte - Passera & Pedretti ingénieurs - Metis Lighting design
SkyLed Bahnhofstrasse Zürich (Suisse), concours sur invitation
Bellinzona, Lugano (Suisse), Milano (Italie), 2003
3. Tensegrity
Step n°2: rechercher l’expression esthétique des éléments constituant la structure.
Sky Led
3.14F. Broggini, architecte - Airlight ltd, ingénieurs
Jakob Tensegrity Torus, Trubschachen (Suisse)
Bellinzona, Biasca (Suisse), 2007-2010
3. Tensegrity
Step n°3: recomposer les éléments esthétiques en structures de grandes dimensions.
Jakob Tensegrity Torus
Jakob Tensegrity Torus
2
3.15
Production en série des éléments composant le joint:
axe central, visses radiales, tête en fusion d’aluminium, demi-sphere
2
3.16
Assemblage des éléments:
cinq têtes sont fixées à un axe central. L’élément de liaison qui contiendra la
partie éléctronique permet la fixation à la longue barre extrudée.
Jakob Tensegrity Torus
2
3.17
L’assemblage de la structure se fait d’abord par unités stuctutrelles (quatre
barres) et ensuite entre 21 unités. Le reglage des câble nécessite une
précision de +/- 1 mm.
Jakob Tensegrity Torus
2
3.18
Hissage de la structure et pose dans son emplacement final.
Jakob Tensegrity Torus
2
3.19
Lors du montage au sol, les ingénieurs détectent des problèmes de fléxion et
de torsion entre les parties en fusion et celles en extrusion. On doit dessiner
des éléments supplémentaires pour contrôler ces efforts.
Jakob Tensegrity Torus
4.20
4. Tensairity
L’air comme élément de stabilisation structurelle
Etapes de la recherche
Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation au
flambage.
(Espace Piccard, Little Air Bridge)
2
4.21
F. Broggini architecte, Airlight ltd ingénieurs
Espace Piccard - Tensairity Pavillon au Château de Penthes - Pregny Chambésy (Suisse)
Bellinzona, Biasca (Suisse) 2006-2007
4. Tensairity
Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation
Espace Piccard
2
4.22
F. Broggini architecte, Airlight ltd ingénieurs
L.A.B.- Tensairity Bridge- Giubiasco (Suisse)
Bellinzona, Biasca (Suisse) 2006-2007
4. Tensairity
Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation
Little Air Bridge
5.23
5. Tensegrity dream
«Concept » pour les villes du futur
Etapes de la recherche
Step n°5: appliquer ces principes à des structures à l’échelle urbaine
(Tens-city)
5.24
3.7
5. Tensegrity dream
F. Broggini, architecte - Airlight ltd ingénieurs
Tens-city
Bellinzona, Biasca (Suisse), 2003
Step n°5: appliquer ces principes à des structures à l’échelle urbaine
Tens-city
5.25
3.7
La superposition des fonctions, l’espacement des blocs. Une ville tensègre !
5. Piles et parapets
Tens-city
5.26
3.7
Le feu, l’eau et la terre se croisent en créant un jeu de couleurs.
Tens-city
5.27
3.7
Les détails de fixation sur la maquette de concept.
5. Piles et parapets
Tens-city
6.28
6. Tensegrity suite
Structures autocontraintes de nouvelle génération
L’utilisation d’éléments comprimés (partiellement) continus garantit aux structures
une déformabilité réduite. On peut donc envisager des applications qui respectent
entièrement les normatives en vigueur.
6.29
6. Tensegrity suite
Structures autocontraintes de nouvelle génération
Etapes de la recherche
Step n°6: croiser et stabiliser; les toitures en « lianes ».
(Tensegrity Green Pavillon)
Step n°7: l’espace dans la structure, infiltration poétique
(Spindle Tensegrity, Rueil Malmaison Bridge, Dorigny Bridge)
Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique
(Chavannes Bridge, TensyTable)
Step n°9: la matière se fait à nouveau lumière. La recherche du détail
pertinent !
(Villa Cedri Pavillon)
2
4 . 6. Tensegrity suiteionnement
F. Broggini, V.Raducanu architectes – ABACA Nicolas Pauli, ingénieur
Tensegrity Green Pavillon, Bellinzona (Suisse)
Bellinzona (Suisse), Montpellier (France) 2009
6.30Step n°6: croiser et stabiliser; les toitures en « lianes ».
Tensegrity Green Pavillon
2
Une nappe composée d’éléments courbes est mise en tension par deux
systèmes deux couches de câbles qui sont tendus par un élément vertical.
4. Dimensionnement
Tensegrity Green Pavillon
6.31
2
Afin de réduire l’épaisseur du système statique on utilisera plusieurs câbles
parallèles qui seront bloqués par des plaques métalliques. Plusieurs formes
sont testées.
Tensegrity Green Pavillon
6.32
2
L’élément courbe est imaginé avec une section variable. La production de cet
élément est garantie par la technique de la fusion en aluminium
4. Dimensionnement
Tensegrity Green Pavillon
6.33
2
Les deux premières plaques n’arrivent pas à garantir le blocage des câbles; la
version ronde oui.
4. Dimensionnement
Tensegrity Green Pavillon
6.34
6.35
3.7
6. Tensegrity suite
F. Broggini, architecte – EPFL-IMAC prof.I.C.F.Smith, L.Rhode Barbarigos, N.Bel Adji Ali
LMGC Uni Montpellier prof.René Motro, P.M.M. F.Gernei, Gioana & Gravina ingénieurs
Spindle tensegrity, Prato (Italie) - concours
Bellinzona, Lausanne (Suisse), Montpellier, Dole (France), Torino (Italie) - 2010
Step n°7: l’espace à l’intérieur de la structure, infiltration poétique
Spindle Tensegrity
6.36
3.7
Entre les piles du vieu Pont Manetti (1834), la Spindle Tensegrity affiche son
espace.
Spindle tensegrity
6.37
3.7
6. Tensegrity suite
F. Broggini, architecte - P.M.M. F.Gernei ingénieur
Tensegrity Bridge, Rueil Malmaison (France) - concours
Bellinzona (Suisse), Dole (France) 2006
Step n°7: l’espace à l’intérieur de la structure, infiltration poétique
Rueil Malmaison
6.38
3.7
Un tablier suspendu à un grand cercle assure le franchissement. Un espace se
dégage: celui de la traversée.
6. Le projet et son lieu
Rueil-Malmaison
6.39
3.7
F. Broggini + ASS architectes – MP ingénieurs+ Freyssinet Suisse
Passerelle à mobilité douce, Dorigny-Lausanne (Suisse) - concours
Bellinzona, Genève, Crissier (Suisse) 2013
Step n°7: l’espace à l’intérieur de la structure, infiltration poétique
Dorigny Bridge
6. Tensegrity suite
6.40
3.7
F. Broggini + ASS architectes – MP ingénieurs+ Robert E. Skelton
Passerelle à mobilité douce, Chavannes-Lausanne (Suisse) - concours
Bellinzona, Genève, Crissier (Suisse), La Yolla-California (USA) 2013
Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique
Chavannes Bridge
6. Tensegrity suite
6.41
3.7
Maquette et dispositif statique
Chavannes Bridge
6.42
3.7
Principe statique, maquette de concept
Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique
TensyTable
6. Tensegrity suite
6.43
3.7
F. Broggini architecte
Projet de table par éléments tendus-comprimés
Bellinzona (Suisse), 2013-’14
TensyTable
6.44
3.7
F. Broggini architecte – EPFL-IMAC + ABACA Nicolas Pauli ingénieurs
Pavillon temporaire, Bellinzona (Suisse) – mandat d’étude
Bellinzona, Lausanne (Suisse), Montpellier (France) 2013 -’14
Step n°9: la matière se fait à nouveau lumière. La recherche du détail pertinent !
Villa Cedri Pavillon
6. Tensegrity suite
6.45
3.7
Entre la végétation du parc, le pavillon apparaît. Mâts, câbles et membranes se
disposent dans une configuration audacieuse.
Villa Cedri Pavillon
6.46
3.7
La structure se fait lumière et transorme la matière. La technologie revient …
Villa Cedri Pavillon
6.47
3.7
… et matérialise l’intuition: mâts en fibres translucides (GRFP).
Villa Cedri Pavillon
6.48
3.7
Etudes géométriques et …
Villa Cedri Pavillon
6.49
3.7
détails du joint entre mâts et câbles (études et dimensionnement en cours):
connection entre mâts par anneau central
Villa Cedri Pavillon
6.49
3.7
colliers extérieurs (supérieur et inférieur)
Villa Cedri Pavillon
6.49
3.7
câbles continus avec sphère de blocage
Villa Cedri Pavillon
6.49
3.7
serrage des colliers par vis
Villa Cedri Pavillon
6.49
3.7
positionnement des colliers intérieurs
Villa Cedri Pavillon
6.49
3.7
Serrage des colliers intérieurs pas vis.
Le joint peut être mis en service.
Villa Cedri Pavillon
7.50
Etapes de la recherche
Step n°10: la coque porteuse, l’union des forces
(Twin Shape Composed Beam)
7. Carbon Fiber
Coques porteuses
7.51
F. Broggini, architecte – Airlight ltd.+ Thomas Keller, SUPSI-ICIMSI ingénieurs, Michi Composites
Twin Shape Composed Beam, Bissone (Suisse)
Bellinzona, Biasca, Lausanne, Lugano (Suisse), 2008-2014
Step n°10: la coque porteuse, l’union des forces
Twin Shape Composed Beam
7.52
N e x t m e e t i n g !
Sala Angelo Marino – CETMA – Cittadella della Ricerca
Twin Shape Composed Beam
© Filippo Broggini blueoffice.broggini@bluewin.ch
BlueOffice Architecture - Piazza Governo 3, 6500 Bellinzona (Suisse) Juillet 2013

Más contenido relacionado

Destacado

Ldb Convergenze Parallele_De barros_02
Ldb Convergenze Parallele_De barros_02Ldb Convergenze Parallele_De barros_02
Ldb Convergenze Parallele_De barros_02laboratoridalbasso
 
Ldb Convergenze Parallele_De barros_03
Ldb Convergenze Parallele_De barros_03Ldb Convergenze Parallele_De barros_03
Ldb Convergenze Parallele_De barros_03laboratoridalbasso
 
Ldb Convergenze Parallele_mazzara_01
Ldb Convergenze Parallele_mazzara_01Ldb Convergenze Parallele_mazzara_01
Ldb Convergenze Parallele_mazzara_01laboratoridalbasso
 
Ldb Convergenze Parallele_Mantovani_02
Ldb Convergenze Parallele_Mantovani_02Ldb Convergenze Parallele_Mantovani_02
Ldb Convergenze Parallele_Mantovani_02laboratoridalbasso
 
Ldb Convergenze Parallele_unningham_01
Ldb Convergenze Parallele_unningham_01Ldb Convergenze Parallele_unningham_01
Ldb Convergenze Parallele_unningham_01laboratoridalbasso
 
Ldb Convergenze Parallele_sorba_01
Ldb Convergenze Parallele_sorba_01Ldb Convergenze Parallele_sorba_01
Ldb Convergenze Parallele_sorba_01laboratoridalbasso
 
Ldb Convergenze Parallele_De barros_01
Ldb Convergenze Parallele_De barros_01Ldb Convergenze Parallele_De barros_01
Ldb Convergenze Parallele_De barros_01laboratoridalbasso
 
Ldb Convergenze Parallele_lamezia_01
Ldb Convergenze Parallele_lamezia_01Ldb Convergenze Parallele_lamezia_01
Ldb Convergenze Parallele_lamezia_01laboratoridalbasso
 
Ldb Convergenze Parallele_trueblood_02
Ldb Convergenze Parallele_trueblood_02Ldb Convergenze Parallele_trueblood_02
Ldb Convergenze Parallele_trueblood_02laboratoridalbasso
 
Ldb Convergenze Parallele_sozzolabbasso_01
Ldb Convergenze Parallele_sozzolabbasso_01Ldb Convergenze Parallele_sozzolabbasso_01
Ldb Convergenze Parallele_sozzolabbasso_01laboratoridalbasso
 
Ldb Convergenze Parallele_stanziola_01
Ldb Convergenze Parallele_stanziola_01Ldb Convergenze Parallele_stanziola_01
Ldb Convergenze Parallele_stanziola_01laboratoridalbasso
 
Ldb Convergenze Parallele_Mantovani_03
Ldb Convergenze Parallele_Mantovani_03Ldb Convergenze Parallele_Mantovani_03
Ldb Convergenze Parallele_Mantovani_03laboratoridalbasso
 

Destacado (20)

Ldb Convergenze Parallele_De barros_02
Ldb Convergenze Parallele_De barros_02Ldb Convergenze Parallele_De barros_02
Ldb Convergenze Parallele_De barros_02
 
Ldb Convergenze Parallele_De barros_03
Ldb Convergenze Parallele_De barros_03Ldb Convergenze Parallele_De barros_03
Ldb Convergenze Parallele_De barros_03
 
Ldb Convergenze Parallele_15
Ldb Convergenze Parallele_15Ldb Convergenze Parallele_15
Ldb Convergenze Parallele_15
 
Ldb Convergenze Parallele_mazzara_01
Ldb Convergenze Parallele_mazzara_01Ldb Convergenze Parallele_mazzara_01
Ldb Convergenze Parallele_mazzara_01
 
Ldb Convergenze Parallele_Mantovani_02
Ldb Convergenze Parallele_Mantovani_02Ldb Convergenze Parallele_Mantovani_02
Ldb Convergenze Parallele_Mantovani_02
 
Ldb Convergenze Parallele_unningham_01
Ldb Convergenze Parallele_unningham_01Ldb Convergenze Parallele_unningham_01
Ldb Convergenze Parallele_unningham_01
 
Ldb Convergenze Parallele_sorba_01
Ldb Convergenze Parallele_sorba_01Ldb Convergenze Parallele_sorba_01
Ldb Convergenze Parallele_sorba_01
 
Ldb Convergenze Parallele_De barros_01
Ldb Convergenze Parallele_De barros_01Ldb Convergenze Parallele_De barros_01
Ldb Convergenze Parallele_De barros_01
 
Ldb Convergenze Parallele_lamezia_01
Ldb Convergenze Parallele_lamezia_01Ldb Convergenze Parallele_lamezia_01
Ldb Convergenze Parallele_lamezia_01
 
Ldb Convergenze Parallele_trueblood_02
Ldb Convergenze Parallele_trueblood_02Ldb Convergenze Parallele_trueblood_02
Ldb Convergenze Parallele_trueblood_02
 
Ldb Convergenze Parallele_sozzolabbasso_01
Ldb Convergenze Parallele_sozzolabbasso_01Ldb Convergenze Parallele_sozzolabbasso_01
Ldb Convergenze Parallele_sozzolabbasso_01
 
Ldb Convergenze Parallele_stanziola_01
Ldb Convergenze Parallele_stanziola_01Ldb Convergenze Parallele_stanziola_01
Ldb Convergenze Parallele_stanziola_01
 
Ldb Convergenze Parallele_13
Ldb Convergenze Parallele_13Ldb Convergenze Parallele_13
Ldb Convergenze Parallele_13
 
Ldb Convergenze Parallele_05
Ldb Convergenze Parallele_05Ldb Convergenze Parallele_05
Ldb Convergenze Parallele_05
 
Ldb Convergenze Parallele_Mantovani_03
Ldb Convergenze Parallele_Mantovani_03Ldb Convergenze Parallele_Mantovani_03
Ldb Convergenze Parallele_Mantovani_03
 
Ldb Convergenze Parallele_12
Ldb Convergenze Parallele_12Ldb Convergenze Parallele_12
Ldb Convergenze Parallele_12
 
Ldb Convergenze Parallele_11
Ldb Convergenze Parallele_11Ldb Convergenze Parallele_11
Ldb Convergenze Parallele_11
 
Ldb Convergenze Parallele_07
Ldb Convergenze Parallele_07Ldb Convergenze Parallele_07
Ldb Convergenze Parallele_07
 
Ldb Convergenze Parallele_17
Ldb Convergenze Parallele_17Ldb Convergenze Parallele_17
Ldb Convergenze Parallele_17
 
Ldb Convergenze Parallele_18
Ldb Convergenze Parallele_18Ldb Convergenze Parallele_18
Ldb Convergenze Parallele_18
 

Más de laboratoridalbasso

Ldb Rural in Action_CurandiKatz
Ldb Rural in Action_CurandiKatz Ldb Rural in Action_CurandiKatz
Ldb Rural in Action_CurandiKatz laboratoridalbasso
 
Ldb Rural in Action_Coppola 01
Ldb Rural in Action_Coppola 01Ldb Rural in Action_Coppola 01
Ldb Rural in Action_Coppola 01laboratoridalbasso
 
Ldb Rural in Action_Coppola 02
Ldb Rural in Action_Coppola 02Ldb Rural in Action_Coppola 02
Ldb Rural in Action_Coppola 02laboratoridalbasso
 
Ldb Asola, non Verba_Santanocito02
Ldb Asola, non Verba_Santanocito02Ldb Asola, non Verba_Santanocito02
Ldb Asola, non Verba_Santanocito02laboratoridalbasso
 
Ldb Asola, non Verba_Santanocito01
Ldb Asola, non Verba_Santanocito01Ldb Asola, non Verba_Santanocito01
Ldb Asola, non Verba_Santanocito01laboratoridalbasso
 
#LdbStorytelling_Rural in Action
#LdbStorytelling_Rural in Action#LdbStorytelling_Rural in Action
#LdbStorytelling_Rural in Actionlaboratoridalbasso
 
Tre anni di Laboratori dal Basso
Tre anni di Laboratori dal BassoTre anni di Laboratori dal Basso
Tre anni di Laboratori dal Bassolaboratoridalbasso
 
Ldb valecoricerca_indolfi_brevetti_3
Ldb valecoricerca_indolfi_brevetti_3Ldb valecoricerca_indolfi_brevetti_3
Ldb valecoricerca_indolfi_brevetti_3laboratoridalbasso
 

Más de laboratoridalbasso (20)

Ldb Rural in Action_CurandiKatz
Ldb Rural in Action_CurandiKatz Ldb Rural in Action_CurandiKatz
Ldb Rural in Action_CurandiKatz
 
Ldb Rural in Action_Coppola 01
Ldb Rural in Action_Coppola 01Ldb Rural in Action_Coppola 01
Ldb Rural in Action_Coppola 01
 
Ldb Rural in Action_Coppola 02
Ldb Rural in Action_Coppola 02Ldb Rural in Action_Coppola 02
Ldb Rural in Action_Coppola 02
 
Ldb neetneedeu panetta 08
Ldb neetneedeu panetta 08 Ldb neetneedeu panetta 08
Ldb neetneedeu panetta 08
 
Ldb neetneedeu panetta 07
Ldb neetneedeu panetta 07 Ldb neetneedeu panetta 07
Ldb neetneedeu panetta 07
 
Ldb neetneedeu panetta 06
Ldb neetneedeu panetta 06 Ldb neetneedeu panetta 06
Ldb neetneedeu panetta 06
 
Ldb neetneedeu panetta 05
Ldb neetneedeu panetta 05 Ldb neetneedeu panetta 05
Ldb neetneedeu panetta 05
 
Ldb neetneedeu panetta 04
Ldb neetneedeu panetta 04 Ldb neetneedeu panetta 04
Ldb neetneedeu panetta 04
 
Ldb neetneedeu panetta 03
Ldb neetneedeu panetta 03 Ldb neetneedeu panetta 03
Ldb neetneedeu panetta 03
 
Ldb neetneedeu cavalhro 01
Ldb neetneedeu cavalhro 01Ldb neetneedeu cavalhro 01
Ldb neetneedeu cavalhro 01
 
Ldb neetneedeu panetta 01
Ldb neetneedeu panetta 01 Ldb neetneedeu panetta 01
Ldb neetneedeu panetta 01
 
Ldb neetneedeu_mola 01
Ldb neetneedeu_mola 01Ldb neetneedeu_mola 01
Ldb neetneedeu_mola 01
 
Ldb neetneedeu panetta 02
Ldb neetneedeu panetta 02Ldb neetneedeu panetta 02
Ldb neetneedeu panetta 02
 
Ldb Asola, non Verba_Santanocito02
Ldb Asola, non Verba_Santanocito02Ldb Asola, non Verba_Santanocito02
Ldb Asola, non Verba_Santanocito02
 
Ldb Asola, non Verba_Santanocito01
Ldb Asola, non Verba_Santanocito01Ldb Asola, non Verba_Santanocito01
Ldb Asola, non Verba_Santanocito01
 
Ldb Asola Non Verba_Attanasio
Ldb Asola Non Verba_AttanasioLdb Asola Non Verba_Attanasio
Ldb Asola Non Verba_Attanasio
 
#LdbStorytelling_Rural in Action
#LdbStorytelling_Rural in Action#LdbStorytelling_Rural in Action
#LdbStorytelling_Rural in Action
 
Tre anni di Laboratori dal Basso
Tre anni di Laboratori dal BassoTre anni di Laboratori dal Basso
Tre anni di Laboratori dal Basso
 
Ldb valecoricerca_lentini_web
Ldb valecoricerca_lentini_webLdb valecoricerca_lentini_web
Ldb valecoricerca_lentini_web
 
Ldb valecoricerca_indolfi_brevetti_3
Ldb valecoricerca_indolfi_brevetti_3Ldb valecoricerca_indolfi_brevetti_3
Ldb valecoricerca_indolfi_brevetti_3
 

Ldb Convergenze Parallele_14

  • 1. C o n v e r g e n z e p a r a l l e l e l a b o r a t o r i d a l b a s s o Lecce / Brindisi - Mesagne, 10 -11 luglio 2013 Progetti e realizzazioni dispositivi, strutture ed applicazioni di sistemi statici innovativi Filippo Broggini arch.EPFL BlueOffice Architecture, Bellinzona (Suisse) B. U l t r a L i g h t , S u p e r S t r o n g
  • 2. 1. Le concept Matière, information, évolution How does life make the most of things ? By adding information to matter. Janine Benyus, dans « Twelve sustainable design ideas from nature » 1.1
  • 3. 1. Le concept Notre recherche se nourrit du questionnement entre ces trois entités. En y intégrant la fonction et l’usage, l’équilibre entre ces paramètres produit notre projet architectural. 1.2 1. Le concept Force, forme et matière
  • 4. 2.3 2. Premières recherches Trois réalisations « hyper light »
  • 5. 1. Le concept 2.4 F. Broggini, W.Janach - Alboo Tower, hyper light structure hauteur 10 m, poids 17 kg, ép.parois 0,2 mm Horw-LU (Suisse), 1998-1999 2. Premières recherches Trois réalisations « hyper light »
  • 6. 1. Le concept 2.5 F. Broggini, W.Janach - Alboo Torus, hyper light structure Ø 7.5 m, poids 22 kg, ép.parois 0,1 mm Horw-LU (Suisse), 1999 2. Premières recherches Trois réalisations « hyper light »
  • 7. 1. Le concept 2.6 F. Broggini, W.Janach - Alboo Tower & Torus, hyper light structure Joint de connection entre barres, FRP Horw-LU (Suisse), 1999 2. Premières recherches Trois réalisations « hyper light »
  • 8. 1. Le concept 2.7 F. Broggini, R.Wunderlin (BWB)- Iglhouse, hyper compactable structure Prototype scale 1/2: hauteur 2,7 m, ø 3,5 m, poids 35 kg, ép.parois 1,5 mm Bellinzona, Stans-Oberdorf (Suisse), 2000 2. Premières recherches Trois réalisations « hyper light »
  • 9.
  • 10. Appréhender l’espace en plaçant la matière là où il le faut. 3.8 Etapes de la recherche Step n°1: rechercher l’epression et de la force à travers la forme. (Gare Louvain, Gare Cornavain) Step n°2: rechercher l’expression esthétique des éléments constituant la structure. (Digital Sky- Sky Led) Step n°3: recomposer les éléments esthétiques en structures de plus grandes dimensions. (Jakob Tensegrity Torus) 3. Tensegrity Une methode de conception
  • 11. 3.9R.Lüscher, F. Broggini, architectes - Passera & Pedretti ingénieurs Gare de Louvain (Belgique), concours sur invitation Lausanne, Bellinzona, Lugano (Suisse), 1999 3. Tensegrity Step n°1: une nouvelle esthétique; l’air comme élément de stabilisation Gare Louvain (B)
  • 12. 3.10R.Lüscher, F. Broggini, architectes - Passera & Pedretti ingénieurs Gare Cornavain Genève (Suisse), concours sur invitation Lausanne, Bellinzona, Lugano (Suisse), 2000 3. Tensegrity Step n°1: une nouvelle esthétique; l’air comme élément de stabilisation Gare Cornavain
  • 13. 3.11F. Broggini, architecte - Passera & Pedretti ingénieurs - Metis Lighting design Digital Sky Bellinzona (Suisse), concours sur invitation Bellinzona, Lugano (Suisse), Milano (Italie), 2001 3. Tensegrity Step n°2: rechercher l’expression esthétique des éléments constituant la structure. Digital Sky
  • 14. 1.2 3.12 Esthétique et détails Joint sur barre à section triangulaire et effets lumineux Digital Sky
  • 15. 3.13F. Broggini, architecte - Passera & Pedretti ingénieurs - Metis Lighting design SkyLed Bahnhofstrasse Zürich (Suisse), concours sur invitation Bellinzona, Lugano (Suisse), Milano (Italie), 2003 3. Tensegrity Step n°2: rechercher l’expression esthétique des éléments constituant la structure. Sky Led
  • 16. 3.14F. Broggini, architecte - Airlight ltd, ingénieurs Jakob Tensegrity Torus, Trubschachen (Suisse) Bellinzona, Biasca (Suisse), 2007-2010 3. Tensegrity Step n°3: recomposer les éléments esthétiques en structures de grandes dimensions. Jakob Tensegrity Torus
  • 17. Jakob Tensegrity Torus 2 3.15 Production en série des éléments composant le joint: axe central, visses radiales, tête en fusion d’aluminium, demi-sphere
  • 18. 2 3.16 Assemblage des éléments: cinq têtes sont fixées à un axe central. L’élément de liaison qui contiendra la partie éléctronique permet la fixation à la longue barre extrudée. Jakob Tensegrity Torus
  • 19. 2 3.17 L’assemblage de la structure se fait d’abord par unités stuctutrelles (quatre barres) et ensuite entre 21 unités. Le reglage des câble nécessite une précision de +/- 1 mm. Jakob Tensegrity Torus
  • 20. 2 3.18 Hissage de la structure et pose dans son emplacement final. Jakob Tensegrity Torus
  • 21. 2 3.19 Lors du montage au sol, les ingénieurs détectent des problèmes de fléxion et de torsion entre les parties en fusion et celles en extrusion. On doit dessiner des éléments supplémentaires pour contrôler ces efforts. Jakob Tensegrity Torus
  • 22.
  • 23. 4.20 4. Tensairity L’air comme élément de stabilisation structurelle Etapes de la recherche Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation au flambage. (Espace Piccard, Little Air Bridge)
  • 24. 2 4.21 F. Broggini architecte, Airlight ltd ingénieurs Espace Piccard - Tensairity Pavillon au Château de Penthes - Pregny Chambésy (Suisse) Bellinzona, Biasca (Suisse) 2006-2007 4. Tensairity Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation Espace Piccard
  • 25. 2 4.22 F. Broggini architecte, Airlight ltd ingénieurs L.A.B.- Tensairity Bridge- Giubiasco (Suisse) Bellinzona, Biasca (Suisse) 2006-2007 4. Tensairity Step n°4: une nouvelle esthétique; l’air comme élément de stabilisation Little Air Bridge
  • 26.
  • 27. 5.23 5. Tensegrity dream «Concept » pour les villes du futur Etapes de la recherche Step n°5: appliquer ces principes à des structures à l’échelle urbaine (Tens-city)
  • 28. 5.24 3.7 5. Tensegrity dream F. Broggini, architecte - Airlight ltd ingénieurs Tens-city Bellinzona, Biasca (Suisse), 2003 Step n°5: appliquer ces principes à des structures à l’échelle urbaine Tens-city
  • 29. 5.25 3.7 La superposition des fonctions, l’espacement des blocs. Une ville tensègre ! 5. Piles et parapets Tens-city
  • 30. 5.26 3.7 Le feu, l’eau et la terre se croisent en créant un jeu de couleurs. Tens-city
  • 31. 5.27 3.7 Les détails de fixation sur la maquette de concept. 5. Piles et parapets Tens-city
  • 32.
  • 33. 6.28 6. Tensegrity suite Structures autocontraintes de nouvelle génération L’utilisation d’éléments comprimés (partiellement) continus garantit aux structures une déformabilité réduite. On peut donc envisager des applications qui respectent entièrement les normatives en vigueur.
  • 34. 6.29 6. Tensegrity suite Structures autocontraintes de nouvelle génération Etapes de la recherche Step n°6: croiser et stabiliser; les toitures en « lianes ». (Tensegrity Green Pavillon) Step n°7: l’espace dans la structure, infiltration poétique (Spindle Tensegrity, Rueil Malmaison Bridge, Dorigny Bridge) Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique (Chavannes Bridge, TensyTable) Step n°9: la matière se fait à nouveau lumière. La recherche du détail pertinent ! (Villa Cedri Pavillon)
  • 35. 2 4 . 6. Tensegrity suiteionnement F. Broggini, V.Raducanu architectes – ABACA Nicolas Pauli, ingénieur Tensegrity Green Pavillon, Bellinzona (Suisse) Bellinzona (Suisse), Montpellier (France) 2009 6.30Step n°6: croiser et stabiliser; les toitures en « lianes ». Tensegrity Green Pavillon
  • 36. 2 Une nappe composée d’éléments courbes est mise en tension par deux systèmes deux couches de câbles qui sont tendus par un élément vertical. 4. Dimensionnement Tensegrity Green Pavillon 6.31
  • 37. 2 Afin de réduire l’épaisseur du système statique on utilisera plusieurs câbles parallèles qui seront bloqués par des plaques métalliques. Plusieurs formes sont testées. Tensegrity Green Pavillon 6.32
  • 38. 2 L’élément courbe est imaginé avec une section variable. La production de cet élément est garantie par la technique de la fusion en aluminium 4. Dimensionnement Tensegrity Green Pavillon 6.33
  • 39. 2 Les deux premières plaques n’arrivent pas à garantir le blocage des câbles; la version ronde oui. 4. Dimensionnement Tensegrity Green Pavillon 6.34
  • 40. 6.35 3.7 6. Tensegrity suite F. Broggini, architecte – EPFL-IMAC prof.I.C.F.Smith, L.Rhode Barbarigos, N.Bel Adji Ali LMGC Uni Montpellier prof.René Motro, P.M.M. F.Gernei, Gioana & Gravina ingénieurs Spindle tensegrity, Prato (Italie) - concours Bellinzona, Lausanne (Suisse), Montpellier, Dole (France), Torino (Italie) - 2010 Step n°7: l’espace à l’intérieur de la structure, infiltration poétique Spindle Tensegrity
  • 41. 6.36 3.7 Entre les piles du vieu Pont Manetti (1834), la Spindle Tensegrity affiche son espace. Spindle tensegrity
  • 42. 6.37 3.7 6. Tensegrity suite F. Broggini, architecte - P.M.M. F.Gernei ingénieur Tensegrity Bridge, Rueil Malmaison (France) - concours Bellinzona (Suisse), Dole (France) 2006 Step n°7: l’espace à l’intérieur de la structure, infiltration poétique Rueil Malmaison
  • 43. 6.38 3.7 Un tablier suspendu à un grand cercle assure le franchissement. Un espace se dégage: celui de la traversée. 6. Le projet et son lieu Rueil-Malmaison
  • 44. 6.39 3.7 F. Broggini + ASS architectes – MP ingénieurs+ Freyssinet Suisse Passerelle à mobilité douce, Dorigny-Lausanne (Suisse) - concours Bellinzona, Genève, Crissier (Suisse) 2013 Step n°7: l’espace à l’intérieur de la structure, infiltration poétique Dorigny Bridge 6. Tensegrity suite
  • 45. 6.40 3.7 F. Broggini + ASS architectes – MP ingénieurs+ Robert E. Skelton Passerelle à mobilité douce, Chavannes-Lausanne (Suisse) - concours Bellinzona, Genève, Crissier (Suisse), La Yolla-California (USA) 2013 Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique Chavannes Bridge 6. Tensegrity suite
  • 46. 6.41 3.7 Maquette et dispositif statique Chavannes Bridge
  • 47. 6.42 3.7 Principe statique, maquette de concept Step n°8: Minimal Mass Structure, une nouvelle opportunité esthétique TensyTable 6. Tensegrity suite
  • 48. 6.43 3.7 F. Broggini architecte Projet de table par éléments tendus-comprimés Bellinzona (Suisse), 2013-’14 TensyTable
  • 49. 6.44 3.7 F. Broggini architecte – EPFL-IMAC + ABACA Nicolas Pauli ingénieurs Pavillon temporaire, Bellinzona (Suisse) – mandat d’étude Bellinzona, Lausanne (Suisse), Montpellier (France) 2013 -’14 Step n°9: la matière se fait à nouveau lumière. La recherche du détail pertinent ! Villa Cedri Pavillon 6. Tensegrity suite
  • 50. 6.45 3.7 Entre la végétation du parc, le pavillon apparaît. Mâts, câbles et membranes se disposent dans une configuration audacieuse. Villa Cedri Pavillon
  • 51. 6.46 3.7 La structure se fait lumière et transorme la matière. La technologie revient … Villa Cedri Pavillon
  • 52. 6.47 3.7 … et matérialise l’intuition: mâts en fibres translucides (GRFP). Villa Cedri Pavillon
  • 53. 6.48 3.7 Etudes géométriques et … Villa Cedri Pavillon
  • 54. 6.49 3.7 détails du joint entre mâts et câbles (études et dimensionnement en cours): connection entre mâts par anneau central Villa Cedri Pavillon
  • 55. 6.49 3.7 colliers extérieurs (supérieur et inférieur) Villa Cedri Pavillon
  • 56. 6.49 3.7 câbles continus avec sphère de blocage Villa Cedri Pavillon
  • 57. 6.49 3.7 serrage des colliers par vis Villa Cedri Pavillon
  • 58. 6.49 3.7 positionnement des colliers intérieurs Villa Cedri Pavillon
  • 59. 6.49 3.7 Serrage des colliers intérieurs pas vis. Le joint peut être mis en service. Villa Cedri Pavillon
  • 60.
  • 61. 7.50 Etapes de la recherche Step n°10: la coque porteuse, l’union des forces (Twin Shape Composed Beam) 7. Carbon Fiber Coques porteuses
  • 62. 7.51 F. Broggini, architecte – Airlight ltd.+ Thomas Keller, SUPSI-ICIMSI ingénieurs, Michi Composites Twin Shape Composed Beam, Bissone (Suisse) Bellinzona, Biasca, Lausanne, Lugano (Suisse), 2008-2014 Step n°10: la coque porteuse, l’union des forces Twin Shape Composed Beam
  • 63. 7.52 N e x t m e e t i n g ! Sala Angelo Marino – CETMA – Cittadella della Ricerca Twin Shape Composed Beam
  • 64. © Filippo Broggini blueoffice.broggini@bluewin.ch BlueOffice Architecture - Piazza Governo 3, 6500 Bellinzona (Suisse) Juillet 2013