COST ANALYSIS CEBU INTERNATIONAL CONVENTION CENTER (CICC)
CICC FLOOR PLAN
LOWER GROUND FLOOR PLAN (Area=8,058.42 sq. m.)
UPPER GROUND FLOOR PLAN (Area=8,968.36 sq. m.)
SECOND FLOOR PLAN (Area=5,256.66 sq. m.)
TOTAL FLOOR AREA 73.04 5.41 13.50 1 18.28 9.62 1.90 1 450.00 25.00 18.00 1 I.  CANOPY 28.00 2.00 14.00 1 25,691.45 TOTAL 289.00 17.00 17.00 1 J.  HELIPAD 321.30 23.80 13.50 1 96.00 12.00 8.00 1 H.  POWER HOUSE 58.80 10.50 5.60 1 G.  MEZZANINE @ PLENARY HALL 19.00 4.75 4.00 1 F.  PUMP ROOM  2.56 1.60 1.60 1 E.  GUARD HOUSE 2,052.04 D.  ROOF DECK 5,256.66 C.  SECOND FLOOR 8,968.36 B.  UPPER GROUND FLOOR PLAN 8,058.42 A.  LOWER GROUND FLOOR PLAN AREA (m ²) WIDTH (m) LENGTH (m) QTY DESCRIPTION
TOTAL CICC LAND AREA :  43,185.00 sq. m. CICC FOOTPRINT :  8,968.34 sq. m. 34,216.66 sq. m. CICC OPEN SPACE :  (Carpark, Landscaping, Perimeter Fence, etc.)
CEBU INTERNATIONAL CONVENTION CENTER (CICC) CONSTRUCTION COST
P 573,309,499.99 CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO) ADDITIONAL CLAIMS OF  WT CONSTRUCTION UNDER LITIGATION P261,217,866.66
P 573,309,499.99 “ WT CONSTRUCTION, INC.  vs.  PROVINCE OF CEBU ” (Civil Case No. CEB-34012  For: Sum of Money) This is a case for  Sum of Money  filed by plaintiff WT Construction, Inc. against defendant Province of Cebu for the payment of its alleged extra works, in the total amount of  P261,217,866.66 plus interests, damages, litigation expenses and attorney’s fees , in connection with the construction of the Cebu International Convention Center (CICC) owned by defendant Province of Cebu.  CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO)
P 573,309,499.99 CASE STATUS Still pending before the Regional Trial Court, Branch 6, Cebu City. CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO)
P 573,309,499.99 P 261,217,866.66 CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO) WT Claims under litigation (If granted) P 834,527,366.65 TOTAL CONSTRUCTION COST
BREAKDOWN OF COST (BUILDING & OPEN SPACE) 834,527,366.65 CICC BUILDING STRUCTURE COST:  SITE DEVELOPMENT 779,527,113.65 55,000,253.00 TOTAL CONSTRUCTION COST:
COST PER SQ. M.  (BUILDING & OPEN SPACE) FLOOR AREA: 25,691.45 sq. m. BUILDING STRUCTURE COST:  P779,527,113.65 COST/SQ. M. :  P30,341.88 SITE DEVELOPMENT COST:  P55,000,253.00 OPEN SPACE AREA: 34,216.66 sq. m. COST/SQ. M. : P1,607.41
OVER PRICED?
COMPARATIVE ANALYSIS
 
ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC)
PERSPECTIVE PLAN ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC)
ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
Total Land Area = 4.1 has Source of Fund: DBP Loan (P 475 M) 6,512,564.83 Kiosk 581,371.73 Multi-Purpose Area 5,640,553.41 Chapel 33,390,888.46 Dormitories 2,322,102.36 Entrance Pavilion 59,011,386.61 Convention Center (flr. area = 2,095 sq. m.) 223,955,301.82 Hotel Building 453,750.00 Demolition of Existing Structures 65,830,994.38 Site Development Works 409,998,880.00 TOTAL 12,299,966.40 Pre-Planning & Engineering Design
97% COMPLETED PRESENT STATUS OF ILOCOS NORTE CONVENTION CENTER FEB. 26, 2009 P 410,000,000.00 STRUCTURES 65,000,000.00 EQUIPMENT P 475,000,000.00 TOTAL
 
 
 
INHCC CICC ITEMS Spread footing w/ tie beam Concrete Piles w/ tie beam Foundation Conventional reinforced concrete Structural steel Building Structure 0 4  Elevator 0 2 Escalator 0 1 Helipad 0 2,000 kva Backup Generator Set 1 1 Centralized Air-conditioned 1 1 Fire Alarm System 1 1 Closed Circuit Television (CCTV) System 1 1 Public Address/ Background Music COMPARISON OF STRUCTURES & FACILITIES
INHCC CICC ITEMS 4.1 has 4.3 has Total Land Area 1 3 No. of Storeys 71,311,353.01 779,527,113.65 Total Cost 2,095 sq.m. 25,691.45 sq.m. Total Floor Area 34,038.83  30,341.88 Cost per sq.m. 2 yrs. 12/’06 – 12/’08 8 mos. 05/’06 – 12/’06 Completion Period COMPARATIVE COST PER SQ. M.  SITE DEVELOPMENT 65,830,994.38 55,000,253.00 Total Cost 29,158 sq. m. 34,216.66 sq. m. Total Area 2,257.73 1,607.41 Cost per sq.m. BUILDING STRUCTURE
BASED ON CONSTRUCTION COST HANDBOOK PHILIPPINES 2006
CICC COST PER SQ. M. P 30,341.88
Construction Cost Handbook Philippines 2006 by “Davis Langdon & Seah”  27,400 - 31,550 29,600 - 36,300 17,400 - 22,400 7,400 – 9,550 8,600 – 13,300 6,400 – 10,400 20,000 – 22,000 21,000 – 23,000 11,000 – 12,000 OFFICE/COMMERCIALS Average standard office, high rise Prestige office, high rise Shopping Centers 11,900 – 15,100 3,100 – 4,900 8,800 – 10,200 OTHERS Carparks, above ground 26,850 - 30,600 33,850 - 39,900 17,100 - 20,970  33,200 - 42,150 4,550 – 7,100 7,450 – 11,700 2,100 – 2,970 6,200 – 9,950 22,300 – 23,500 26,400 – 28,200 15,000 – 18,000 27,000 – 32,200 DOMESTIC Average standard apartments, high rise Luxury apartments, high rise Town houses Individuals prestige houses TOTAL SERVICES BUILDING DESCRIPTION PESO/m²
700 - 1,000 1,000 - 1,550 550  - 1,000 1,600 - 2,200 1,900 - 2,900 700 - 1,700 500 - 700 500 - 700 450 - 650 2,100 - 2,650 2,400 - 3,250 2,100 - 3,200 2,500 - 3,000 2,800 - 4,900 2,600 - 3,800 7,400 - 9,550 8,600 - 13,300 6,400 - 10,400 OFFICE/COMMERCIALS Average standard office, high rise Prestige office, high rise Shopping Centers 500 - 900 1,100 – 1,700 400 - 650 - 1,100 – 1,650 3,100 – 4,900 OTHERS Carparks, above ground 1,000 - 1,750 1,300 - 2,400 700 - 1,200 2,400 - 3,700 600 - 1,500 800 - 1,500 - - 450 - 750 450 - 750 - - - 1,900 - 2,950 - 2,100 - 2,750 2,500 - 3,100 3,000 - 4,100 ,400 - 1,770 1,700 - 3,500 4,550 - 7,100 7,450 - 11,700 2,100 - 2,970 6,200 - 9,950 DOMESTIC Average standard apartments, high rise Luxury apartments, high rise Town houses Individuals prestige houses PLUMBING SERVICES LIFTS / ESCALATOR FIRE SERVICES MECHANICAL SERVICES ELECTRICAL  SERVICES TOTAL SERVICES DESCRIPTION PESO/M² Construction Cost Handbook Philippines 2006 by “Davis Langdon & Seah”
Using the Construction Cost Handbook Philippines 2006  by “Davis Langdon & Seah”  * On carparks, only electrical services where considered  @ 9,900  –  11,850 338,738,400-405,459,600 @  *  1,100  –  1,650 37,637,600 – 56,456,400   @ 8,800 –  10,200 301,100,800 – 349,003,200 Carparks ground level Area = 34,216 1,042,651,800 – 1,216,010,650 227,751,000 – 301,805,450 814,900,800 – 914,205,200 OVERALL TOTAL  @ 27,400 –  31,550 703,913,400 – 810,551,050 @ 7,400 –  9,550 190,113,400 – 245,349,050 @ 20,000 –  22,000 513,800,000 – 565,202,000 Cebu International Convention Center (CICC) Floor Area = 25,691 PESO/m² TOTAL COST SERVICES BUILDING DESCRIPTION
Based on the Certification of Peter Hackman, Director  of Davis Langdon & Seah Philippines, Inc. The prevailing unit rates for the following construction projects: Total Floor Area of CICC Cost per sq.m. 25,691 sq.m. Php 26,900.00 to Php 33,150.00 Total Cost of CICC Php 691,087,900.00 to  Php 851,656,650.00  Note: Excluding Carpark
CICC CONSTRUCTION COST COST CICC CONSTRUCTION COST  BASED ON CONSTRUCTION COST HANDBOOK PHILIPPINES 2006 P 1,042,651,800 – P 1,216,010,650 Based on the Certification of Peter Hackman P 834,527,366.65 Php 691,087,900 - Php 851,656,650  Excluding Carpark
PROPERLY BIDDED?
PUBLICATION OF INVITATION TO BID
PUBLICATION OF INVITATION TO BID
BIDDING RESULT DATED FEB. 13, 2006 LOWEST BIDDER
WHY REVISE THE CICC FOUNDATION?
 
The following are justifications and comparative analysis of the change in foundation design from the original mat foundation design of the Megadome to the new Cebu International Convention Center (CICC); to wit:
SUBSTRUCTURE COMPARATIVE ANALYSIS MEGADOME DESIGN CICC DESIGN Mat (Ring) Foundation at 6 meter in depth 1. Pile Foundation 1. Requires large deep excavation; massive soil disposal; environmentally harmful, expensive; equipment extensive 3. Not costly; simpler construction; low risk; shorter construction time 3. Requires massive dewatering; massive water disposal thus environmentally harmful and expensive 2. No dewatering, no deep excavation, no slope protection, no disposal of soil and water 2. Requires large excavation slop protection, very expensive; risky; takes very long time 4. Environmentally friendly; no damage to adjacent utilities, roads, structures 4. Likelihood of damage to adjacent lots/utilities/road if slope protection fails or ineffective, or due to dewatering process 5. More noise due to piling works 5. Less noise 6. In summary, lesser cost, faster and simpler construction, environment friendly 6. In summary, very expensive, more complicated, takes longer construction duration; environmentally harmful 7.
ALLOCATION = P100,000,000.00 ORIGINAL DESIGN CONTRACT  = P  84,487,185.65   (MATTING FOUNDATION) REVISED DESIGN = P  59,611,997.92   (CONCRETE PILES) SAVINGS  = P  24,875,187.73
AMENDED SCOPE OF WORKS
CONTIGUOUS CONTRACT - SCOPE OF WORKS
Republic of the Philippines Congress of the Philippines Metro Manila Twelfth Congress Second Regular Session Begun and held in Metro Manila, on Monday, the twenty-second day of July, two thousand two. Republic Act No. 9184             January 10, 2003 AN ACT PROVIDING FOR THE MODERNIZATION, STANDARIZATION AND REGULATION OF THE PROCUREMENT ACTIVITIES OF THE GOVERNMENT AND FOR OTHER PURPOSES
ARTICLE XVI ALTERNATIVE METHODS OF PROCUREMENT Section 48.  Alternative Methods. -  Subject to the prior approval of the Head of the Procuring Entity or his duly authorized representative, and whenever justified by the conditions provided in this Act, the Procuring Entity may, in order to promote economy and efficiency, resort to any of the following alternative methods of Procurement: a.  Limited Source Bidding, otherwise known as Selective Bidding -  a method of  Procurement that involves direct invitation to bid by the Procuring Entity from a set of pre-selected suppliers or consultants with known experience and proven capability relative to the requirements of a particular contract; e.  Negotiated Procurement -  a method of Procurement that may be resorted under the extraordinary circumstances provided for in Section 53 of this Act and other instances that shall be specified in the IRR, whereby the Procuring Entity directly negotiates a contract with a technically, legally and financially capable supplier, contractor or consultant. In all instances, the Procuring Entity shall ensure that the most advantageous price for the government is obtained.
[object Object],[object Object],[object Object]
Section 53.  Negotiated Procurement. -  Negotiated Procurement shall be allowed only in the following instances: a. In case of two (2) failed bidding as provided in Section 35 hereof; b. In case of imminent danger to life or property during a state of calamity, or when time is of the essence arising from natural or man-made calamities or other causes where immediate action is necessary to prevent damage to or loss of life or property, or to restore vital public services, infrastructure facilities and other public utilities; c. Take-over of contracts, which have been rescinded or terminated for causes provided for in the contract and existing laws, where immediate action is necessary to prevent damage to or loss of life or property, or to restore vital public services, infrastructure facilities and other public utilities;
Section 53.  Negotiated Procurement. -  Negotiated Procurement shall be allowed only in the following instances: d.   Where the subject contract is adjacent or contiguous to an on-going infrastructure project, as defined in the IRR: Provided, however, That the original contract is the result of a Competitive Bidding; the subject contract to be negotiated has similar or related scopes of work; it is within the contracting capacity of the contractor; the contractor uses the same prices or lower unit prices as in the original contract less mobilization cost;  the amount involved does not exceed the amount of the ongoing project ; and, the contractor has no negative slippage: Provided, further, That negotiations for the procurement are commenced before the expiry of the original contract. Wherever applicable, the principle shall also govern consultancy contract, where the consultants have unique experience and expertise to deliver the required service; or, e. Subject to the guidelines specified in the IRR, purchases of Goods from another agency of the government, such as the Procurement Service of the DBM, which is tasked with a centralized procurement of commonly used Goods for the government in accordance with Letters of Instruction No. 755 and Executive Order No. 359, series of 1989.
WAS THERE A SPLITTING OF CONTRACTS?
While Art. 54.1 of the IRR of RA 9184, on splitting of contracts, provides as follows: “ Splitting of Government Contracts is not allowed. Splitting of Government Contracts means the division or breaking up of Government Contracts into smaller quantities and amounts, or dividing contract implementation into artificial phases or sub-contracts for the purpose of evading or circumventing the requirements of law and this IRR-A, especially the necessity of public bidding and the requirements for the alternative methods of procurement.”
In the First Place, there is no division or breaking up of Government Contracts into smaller quantities and amounts or dividing contract implementation into artificial phases or sub-contracts . As earlier shown, as far as the CICC is concerned, there is no single contract covering its procurement or implementation. Since there is no single contract, there could not be any splitting of said single contract. There is also no division of contract implementation into artificial phases or sub-contracts because individual contracts were entered into with the concerned suppliers or contractors, which contracts are not artificial or sub-contracts.
In the Second Place, there is no evading or circumventing of the requirements of law, especially the necessity of public bidding and the requirements for the alternative methods of procurement.  It is of note that, as earlier shown, bidding, although limited ones, were conducted by the Province of Cebu in the procurement of said items / works.  Besides, the requirements, as provided under Section 48 (a), in relation to Section 49 of Republic Act (RA) No. 9184 and its Implementing Rules and Regulations (IRR), for Limited Source Bidding, as an alternative method of procurement, have been duly complied with, as shown in the report in this regard.
SAMPLE COMPUTATION: SPECIALTY CONTRACTOR/SUPPLIER (KPI ELEVATOR, INC) TOTAL COST   = P 7,270,140.00 Breakdown: Basic Equipment    =  P 5,310,140.00 Installation & Locally supplied Materials  =  P 1,960,000.00 (12% VAT Inclusive)   ----------------------   P 7,270,140.00 MAIN CONTRACTOR (ALL-IN) COST FROM SPECIALTY CONTRACTOR  = P 7,270,140.00 Plus: Indirect Cost, 30% (OCM, VAT/Tax, Profit) = P 2,181,042.00   ------------------------   P 9,451,182.00 IN EFFECT DIFFERENCE =   P 2,181,042.00
COA OBSERVATION REPORT
 
Report on the Installation of CCTV
 
 
 
Saavedra's Charge
 
Said charge, however, has no basis in fact and in law. Sections 47 and 65 par. 5 of R.A. 9184 (Government Procurement and Reform Act) prohibit only the participation and award of government contracts to a relative of the Governor within the 3 rd  civil degree. Karen Fiel Tio, however, is not a relative of the Governor within the said prohibited degree, as provided under Art. 966 of the Civil Code of the Philippines.
Gov. Gwen F. Garcia Judge Esperanza Fiel Garcia married to Gov. Pablo P. Garcia Antero Fiel married to Veronica S. Fiel Dr. Eutiquiano Fiel Consuelo T. Fiel Karen Fiel Tio 1st Civil Degree 3rd Civil Degree 2nd Civil Degree 4th Civil Degree “ Art. 966. xxx xxx xxx. Thus, a person is two degrees removed from his brother, three from  his uncle, who is the brother of his father,  four from his first cousin,  and so forth.” ( Underscoring and emphasis supplied )
INCOME ON CICC 2007 & 2008
Payment -  12TH Asean Summit  = P12,000,000.00
12,048,097.97 TOTAL INCOME CICC  YEAR 2008 12TH ASEAN SUMMIT PAYMENT 12,000,000.00 13,598,821.40 YEAR 2007 TOTAL  37,638,919.37
 
SOME OF THE MAJOR EVENTS HELD IN CICC 1. 12th ASEAN SUMMIT 4. Women's Congress 5. PMPMI Sales Conference 6. Rotary International District Convention 7. PAMET Annual Convention 9. Auto / Food / Construction Show by Worldbex 10. Go Negosyo 8. Business World Forum 2. Farmers - Scientist Congress 3. CBM - ICT Summit & Exhibit
SOME OF THE MAJOR EVENTS HELD IN CICC 11. UP Centenial Celebration 12. PCL National Assembly 13. Trade Fair / Bazaar (Cebu Prov. & Mandaue Chamber) 14. Avon Conference 15. PNA Convention 17. National Federation of Hog Farmers Convention 19. Pasigarbo sa Sugbo 20. Miss Mandaue 2008 18. Vice Mayor's League 16. Philippine Institute of Chemical Engineer's Convention
ENGR. PELAYRE REPORT
PRESENT STATUS OF CEBU PROVINCE  BASED ON COA FINANCIAL STATEMENT  OF 80 PROVINCES AND 135 CITIES FOR FISCAL YEAR 2007
CEBU PROVINCE is NO. 1 TOTAL ASSETS Php 16,108,421,000.00 TOTAL EQUITY Php 15,549,543,000.00 CASH IN BANK Php  1,006,260,000.00
 
 
 
 
PRESENT STATUS OF CEBU PROVINCE  OFFICE OF THE PROVINCIAL TREASURER CASH IN BANK DAILY CASH REPORT AS OF DEC. 31, 2008 P 76,370,166.29 SPECIAL SAVINGS DEPOSIT 987,291,098.29 TOTAL 1,063,661,264.58 TOTAL INCOME (AS OF DEC. 2008) 1,461,523,328.50
THANK YOU
 

Más contenido relacionado

La actualidad más candente

Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)SQSY
 
Housing typologies report
Housing typologies reportHousing typologies report
Housing typologies reportakicinder
 
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)Michelle Calamba
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)SQSY
 
Architectural Design Studio 2: Project 2 Site Analysis
Architectural Design Studio 2: Project 2 Site AnalysisArchitectural Design Studio 2: Project 2 Site Analysis
Architectural Design Studio 2: Project 2 Site AnalysisKohSungJie
 
Presentation ald eco beach resort proposal - rev. 5
Presentation ald eco beach resort   proposal - rev. 5Presentation ald eco beach resort   proposal - rev. 5
Presentation ald eco beach resort proposal - rev. 5alida rahman
 
Site selection and justification
Site selection and justificationSite selection and justification
Site selection and justificationAnupama Krishnan
 
Joseph De Chiara - Time-Saver Standards for Building Types - libgen.lc.pdf
Joseph De Chiara - Time-Saver Standards for Building Types  - libgen.lc.pdfJoseph De Chiara - Time-Saver Standards for Building Types  - libgen.lc.pdf
Joseph De Chiara - Time-Saver Standards for Building Types - libgen.lc.pdfPavaniKaja
 
Quezon Memorial Circle Case Study
Quezon Memorial Circle Case StudyQuezon Memorial Circle Case Study
Quezon Memorial Circle Case Studyrktkp816
 
Bp 344 act to enhance the mobility of disabled persons
Bp 344 act to enhance the mobility of disabled personsBp 344 act to enhance the mobility of disabled persons
Bp 344 act to enhance the mobility of disabled personsAkkapp Pasig
 
Standards resort
Standards resortStandards resort
Standards resortAjila shiny
 
Housing in the Philippines
Housing in the PhilippinesHousing in the Philippines
Housing in the Philippinesjoems_angel2000
 
Case Study of Tropical Design of an Architect
Case Study of Tropical Design of an ArchitectCase Study of Tropical Design of an Architect
Case Study of Tropical Design of an ArchitectBryll Edison Par
 
research methodologies in architecture
research methodologies in architectureresearch methodologies in architecture
research methodologies in architectureSamanth kumar
 
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir Wilson
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir WilsonPermatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir Wilson
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir WilsonDiegoFooter
 
Proposal on recreational activity center
Proposal on recreational activity centerProposal on recreational activity center
Proposal on recreational activity centerDiLip ChauDhary
 

La actualidad más candente (20)

Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)
 
Civic center
Civic centerCivic center
Civic center
 
Housing typologies report
Housing typologies reportHousing typologies report
Housing typologies report
 
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)
NATIONAL BUILDING CODE OF THE PHILIPPINES(Bp344)
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
 
Site analysis
Site analysisSite analysis
Site analysis
 
Architectural Design Studio 2: Project 2 Site Analysis
Architectural Design Studio 2: Project 2 Site AnalysisArchitectural Design Studio 2: Project 2 Site Analysis
Architectural Design Studio 2: Project 2 Site Analysis
 
Presentation ald eco beach resort proposal - rev. 5
Presentation ald eco beach resort   proposal - rev. 5Presentation ald eco beach resort   proposal - rev. 5
Presentation ald eco beach resort proposal - rev. 5
 
Site selection and justification
Site selection and justificationSite selection and justification
Site selection and justification
 
Joseph De Chiara - Time-Saver Standards for Building Types - libgen.lc.pdf
Joseph De Chiara - Time-Saver Standards for Building Types  - libgen.lc.pdfJoseph De Chiara - Time-Saver Standards for Building Types  - libgen.lc.pdf
Joseph De Chiara - Time-Saver Standards for Building Types - libgen.lc.pdf
 
Quezon Memorial Circle Case Study
Quezon Memorial Circle Case StudyQuezon Memorial Circle Case Study
Quezon Memorial Circle Case Study
 
Bp 344 act to enhance the mobility of disabled persons
Bp 344 act to enhance the mobility of disabled personsBp 344 act to enhance the mobility of disabled persons
Bp 344 act to enhance the mobility of disabled persons
 
Standards resort
Standards resortStandards resort
Standards resort
 
Housing in the Philippines
Housing in the PhilippinesHousing in the Philippines
Housing in the Philippines
 
Agritecture: Fusion of Agriculture and Architecture
Agritecture: Fusion of Agriculture and ArchitectureAgritecture: Fusion of Agriculture and Architecture
Agritecture: Fusion of Agriculture and Architecture
 
Case Study of Tropical Design of an Architect
Case Study of Tropical Design of an ArchitectCase Study of Tropical Design of an Architect
Case Study of Tropical Design of an Architect
 
research methodologies in architecture
research methodologies in architectureresearch methodologies in architecture
research methodologies in architecture
 
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir Wilson
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir WilsonPermatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir Wilson
Permatecture: PERMAculture + archiTECTURE - Presented by Stuart Muir Wilson
 
Proposal on recreational activity center
Proposal on recreational activity centerProposal on recreational activity center
Proposal on recreational activity center
 
Site analysis
Site analysisSite analysis
Site analysis
 

Similar a CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009

City Council March 20, 2012 City Hall Complex 2012
City Council March 20, 2012 City Hall Complex 2012City Council March 20, 2012 City Hall Complex 2012
City Council March 20, 2012 City Hall Complex 2012City of San Angelo Texas
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
cost appraisal
cost appraisalcost appraisal
cost appraisalahmong4
 
Q3 2014 industrial market report
Q3 2014 industrial market reportQ3 2014 industrial market report
Q3 2014 industrial market reportdevengriffin
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Priyanka Singh
 
Save St. Pauls Presentation
Save St. Pauls PresentationSave St. Pauls Presentation
Save St. Pauls PresentationJamie Cohen
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidentialHaris Memon
 
City Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity of San Angelo Texas
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity of San Angelo Texas
 
Comparison of Low Cost Housing Esti.pptx
Comparison of Low Cost Housing Esti.pptxComparison of Low Cost Housing Esti.pptx
Comparison of Low Cost Housing Esti.pptxNoumanMohsin3
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development ProjectAshley Garvey
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial AppraisalKai Yun Pang
 
District Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailDistrict Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailJaygopal Kottilil
 

Similar a CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009 (20)

City Council March 20, 2012 City Hall Complex 2012
City Council March 20, 2012 City Hall Complex 2012City Council March 20, 2012 City Hall Complex 2012
City Council March 20, 2012 City Hall Complex 2012
 
LGC PP-ABC Int
LGC PP-ABC IntLGC PP-ABC Int
LGC PP-ABC Int
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
Q3 2014 industrial market report
Q3 2014 industrial market reportQ3 2014 industrial market report
Q3 2014 industrial market report
 
Structural Design Project
Structural Design ProjectStructural Design Project
Structural Design Project
 
Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)Environmental Impact Assessment( EIA)
Environmental Impact Assessment( EIA)
 
Save St. Pauls Presentation
Save St. Pauls PresentationSave St. Pauls Presentation
Save St. Pauls Presentation
 
The watergate confidential
The watergate confidentialThe watergate confidential
The watergate confidential
 
City Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction Update
 
UFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy CenterUFI Operations Award 2010 - Direct Energy Center
UFI Operations Award 2010 - Direct Energy Center
 
ECA form
ECA formECA form
ECA form
 
City Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget PresentationCity Council July 20, 2012 Budget Presentation
City Council July 20, 2012 Budget Presentation
 
Comparison of Low Cost Housing Esti.pptx
Comparison of Low Cost Housing Esti.pptxComparison of Low Cost Housing Esti.pptx
Comparison of Low Cost Housing Esti.pptx
 
Daycare: Urban Land Development Project
Daycare: Urban Land Development ProjectDaycare: Urban Land Development Project
Daycare: Urban Land Development Project
 
2015 Savings Achieved
2015 Savings Achieved2015 Savings Achieved
2015 Savings Achieved
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
District Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar RailDistrict Cooling Service - Presentation to Qatar Rail
District Cooling Service - Presentation to Qatar Rail
 

Último

How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersMakena Coast Charters
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelTime for Sicily
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)Mazie Garcia
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodKasia Chojecki
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxDitasDelaCruz
 
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)Escort Service
 
Where to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdWhere to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdusmanghaniwixpatriot
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldParagliding Billing Bir
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Updatejoymorrison10
 
question 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationquestion 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationcaminantesdaauga
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxGregory DeShields
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.moritzmieg
 

Último (15)

How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s Waters
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and Food
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptx
 
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
 
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
 
Where to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdWhere to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasd
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The World
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Update
 
question 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationquestion 2: airplane vocabulary presentation
question 2: airplane vocabulary presentation
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal Pardesh
 
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptx
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.
 

CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009

  • 1. COST ANALYSIS CEBU INTERNATIONAL CONVENTION CENTER (CICC)
  • 3. LOWER GROUND FLOOR PLAN (Area=8,058.42 sq. m.)
  • 4. UPPER GROUND FLOOR PLAN (Area=8,968.36 sq. m.)
  • 5. SECOND FLOOR PLAN (Area=5,256.66 sq. m.)
  • 6. TOTAL FLOOR AREA 73.04 5.41 13.50 1 18.28 9.62 1.90 1 450.00 25.00 18.00 1 I. CANOPY 28.00 2.00 14.00 1 25,691.45 TOTAL 289.00 17.00 17.00 1 J. HELIPAD 321.30 23.80 13.50 1 96.00 12.00 8.00 1 H. POWER HOUSE 58.80 10.50 5.60 1 G. MEZZANINE @ PLENARY HALL 19.00 4.75 4.00 1 F. PUMP ROOM 2.56 1.60 1.60 1 E. GUARD HOUSE 2,052.04 D. ROOF DECK 5,256.66 C. SECOND FLOOR 8,968.36 B. UPPER GROUND FLOOR PLAN 8,058.42 A. LOWER GROUND FLOOR PLAN AREA (m ²) WIDTH (m) LENGTH (m) QTY DESCRIPTION
  • 7. TOTAL CICC LAND AREA : 43,185.00 sq. m. CICC FOOTPRINT : 8,968.34 sq. m. 34,216.66 sq. m. CICC OPEN SPACE : (Carpark, Landscaping, Perimeter Fence, etc.)
  • 8. CEBU INTERNATIONAL CONVENTION CENTER (CICC) CONSTRUCTION COST
  • 9. P 573,309,499.99 CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO) ADDITIONAL CLAIMS OF WT CONSTRUCTION UNDER LITIGATION P261,217,866.66
  • 10. P 573,309,499.99 “ WT CONSTRUCTION, INC. vs. PROVINCE OF CEBU ” (Civil Case No. CEB-34012 For: Sum of Money) This is a case for Sum of Money filed by plaintiff WT Construction, Inc. against defendant Province of Cebu for the payment of its alleged extra works, in the total amount of P261,217,866.66 plus interests, damages, litigation expenses and attorney’s fees , in connection with the construction of the Cebu International Convention Center (CICC) owned by defendant Province of Cebu. CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO)
  • 11. P 573,309,499.99 CASE STATUS Still pending before the Regional Trial Court, Branch 6, Cebu City. CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO)
  • 12. P 573,309,499.99 P 261,217,866.66 CONSTRUCTION COST (As of Dec. 2008, As Certified by PAO) WT Claims under litigation (If granted) P 834,527,366.65 TOTAL CONSTRUCTION COST
  • 13. BREAKDOWN OF COST (BUILDING & OPEN SPACE) 834,527,366.65 CICC BUILDING STRUCTURE COST: SITE DEVELOPMENT 779,527,113.65 55,000,253.00 TOTAL CONSTRUCTION COST:
  • 14. COST PER SQ. M. (BUILDING & OPEN SPACE) FLOOR AREA: 25,691.45 sq. m. BUILDING STRUCTURE COST: P779,527,113.65 COST/SQ. M. : P30,341.88 SITE DEVELOPMENT COST: P55,000,253.00 OPEN SPACE AREA: 34,216.66 sq. m. COST/SQ. M. : P1,607.41
  • 17.  
  • 18. ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC)
  • 19. PERSPECTIVE PLAN ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC)
  • 20. ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
  • 21. ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
  • 22. ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
  • 23. ILOCOS NORTE HOTEL & CONVENTION CENTER (INHCC) Accomplishment as of April 23, 2007 (19%)
  • 24. Total Land Area = 4.1 has Source of Fund: DBP Loan (P 475 M) 6,512,564.83 Kiosk 581,371.73 Multi-Purpose Area 5,640,553.41 Chapel 33,390,888.46 Dormitories 2,322,102.36 Entrance Pavilion 59,011,386.61 Convention Center (flr. area = 2,095 sq. m.) 223,955,301.82 Hotel Building 453,750.00 Demolition of Existing Structures 65,830,994.38 Site Development Works 409,998,880.00 TOTAL 12,299,966.40 Pre-Planning & Engineering Design
  • 25. 97% COMPLETED PRESENT STATUS OF ILOCOS NORTE CONVENTION CENTER FEB. 26, 2009 P 410,000,000.00 STRUCTURES 65,000,000.00 EQUIPMENT P 475,000,000.00 TOTAL
  • 26.  
  • 27.  
  • 28.  
  • 29. INHCC CICC ITEMS Spread footing w/ tie beam Concrete Piles w/ tie beam Foundation Conventional reinforced concrete Structural steel Building Structure 0 4 Elevator 0 2 Escalator 0 1 Helipad 0 2,000 kva Backup Generator Set 1 1 Centralized Air-conditioned 1 1 Fire Alarm System 1 1 Closed Circuit Television (CCTV) System 1 1 Public Address/ Background Music COMPARISON OF STRUCTURES & FACILITIES
  • 30. INHCC CICC ITEMS 4.1 has 4.3 has Total Land Area 1 3 No. of Storeys 71,311,353.01 779,527,113.65 Total Cost 2,095 sq.m. 25,691.45 sq.m. Total Floor Area 34,038.83 30,341.88 Cost per sq.m. 2 yrs. 12/’06 – 12/’08 8 mos. 05/’06 – 12/’06 Completion Period COMPARATIVE COST PER SQ. M. SITE DEVELOPMENT 65,830,994.38 55,000,253.00 Total Cost 29,158 sq. m. 34,216.66 sq. m. Total Area 2,257.73 1,607.41 Cost per sq.m. BUILDING STRUCTURE
  • 31. BASED ON CONSTRUCTION COST HANDBOOK PHILIPPINES 2006
  • 32. CICC COST PER SQ. M. P 30,341.88
  • 33. Construction Cost Handbook Philippines 2006 by “Davis Langdon & Seah” 27,400 - 31,550 29,600 - 36,300 17,400 - 22,400 7,400 – 9,550 8,600 – 13,300 6,400 – 10,400 20,000 – 22,000 21,000 – 23,000 11,000 – 12,000 OFFICE/COMMERCIALS Average standard office, high rise Prestige office, high rise Shopping Centers 11,900 – 15,100 3,100 – 4,900 8,800 – 10,200 OTHERS Carparks, above ground 26,850 - 30,600 33,850 - 39,900 17,100 - 20,970 33,200 - 42,150 4,550 – 7,100 7,450 – 11,700 2,100 – 2,970 6,200 – 9,950 22,300 – 23,500 26,400 – 28,200 15,000 – 18,000 27,000 – 32,200 DOMESTIC Average standard apartments, high rise Luxury apartments, high rise Town houses Individuals prestige houses TOTAL SERVICES BUILDING DESCRIPTION PESO/m²
  • 34. 700 - 1,000 1,000 - 1,550 550 - 1,000 1,600 - 2,200 1,900 - 2,900 700 - 1,700 500 - 700 500 - 700 450 - 650 2,100 - 2,650 2,400 - 3,250 2,100 - 3,200 2,500 - 3,000 2,800 - 4,900 2,600 - 3,800 7,400 - 9,550 8,600 - 13,300 6,400 - 10,400 OFFICE/COMMERCIALS Average standard office, high rise Prestige office, high rise Shopping Centers 500 - 900 1,100 – 1,700 400 - 650 - 1,100 – 1,650 3,100 – 4,900 OTHERS Carparks, above ground 1,000 - 1,750 1,300 - 2,400 700 - 1,200 2,400 - 3,700 600 - 1,500 800 - 1,500 - - 450 - 750 450 - 750 - - - 1,900 - 2,950 - 2,100 - 2,750 2,500 - 3,100 3,000 - 4,100 ,400 - 1,770 1,700 - 3,500 4,550 - 7,100 7,450 - 11,700 2,100 - 2,970 6,200 - 9,950 DOMESTIC Average standard apartments, high rise Luxury apartments, high rise Town houses Individuals prestige houses PLUMBING SERVICES LIFTS / ESCALATOR FIRE SERVICES MECHANICAL SERVICES ELECTRICAL SERVICES TOTAL SERVICES DESCRIPTION PESO/M² Construction Cost Handbook Philippines 2006 by “Davis Langdon & Seah”
  • 35. Using the Construction Cost Handbook Philippines 2006 by “Davis Langdon & Seah” * On carparks, only electrical services where considered @ 9,900 – 11,850 338,738,400-405,459,600 @ * 1,100 – 1,650 37,637,600 – 56,456,400 @ 8,800 – 10,200 301,100,800 – 349,003,200 Carparks ground level Area = 34,216 1,042,651,800 – 1,216,010,650 227,751,000 – 301,805,450 814,900,800 – 914,205,200 OVERALL TOTAL @ 27,400 – 31,550 703,913,400 – 810,551,050 @ 7,400 – 9,550 190,113,400 – 245,349,050 @ 20,000 – 22,000 513,800,000 – 565,202,000 Cebu International Convention Center (CICC) Floor Area = 25,691 PESO/m² TOTAL COST SERVICES BUILDING DESCRIPTION
  • 36. Based on the Certification of Peter Hackman, Director of Davis Langdon & Seah Philippines, Inc. The prevailing unit rates for the following construction projects: Total Floor Area of CICC Cost per sq.m. 25,691 sq.m. Php 26,900.00 to Php 33,150.00 Total Cost of CICC Php 691,087,900.00 to Php 851,656,650.00 Note: Excluding Carpark
  • 37. CICC CONSTRUCTION COST COST CICC CONSTRUCTION COST BASED ON CONSTRUCTION COST HANDBOOK PHILIPPINES 2006 P 1,042,651,800 – P 1,216,010,650 Based on the Certification of Peter Hackman P 834,527,366.65 Php 691,087,900 - Php 851,656,650 Excluding Carpark
  • 41. BIDDING RESULT DATED FEB. 13, 2006 LOWEST BIDDER
  • 42. WHY REVISE THE CICC FOUNDATION?
  • 43.  
  • 44. The following are justifications and comparative analysis of the change in foundation design from the original mat foundation design of the Megadome to the new Cebu International Convention Center (CICC); to wit:
  • 45. SUBSTRUCTURE COMPARATIVE ANALYSIS MEGADOME DESIGN CICC DESIGN Mat (Ring) Foundation at 6 meter in depth 1. Pile Foundation 1. Requires large deep excavation; massive soil disposal; environmentally harmful, expensive; equipment extensive 3. Not costly; simpler construction; low risk; shorter construction time 3. Requires massive dewatering; massive water disposal thus environmentally harmful and expensive 2. No dewatering, no deep excavation, no slope protection, no disposal of soil and water 2. Requires large excavation slop protection, very expensive; risky; takes very long time 4. Environmentally friendly; no damage to adjacent utilities, roads, structures 4. Likelihood of damage to adjacent lots/utilities/road if slope protection fails or ineffective, or due to dewatering process 5. More noise due to piling works 5. Less noise 6. In summary, lesser cost, faster and simpler construction, environment friendly 6. In summary, very expensive, more complicated, takes longer construction duration; environmentally harmful 7.
  • 46. ALLOCATION = P100,000,000.00 ORIGINAL DESIGN CONTRACT = P 84,487,185.65 (MATTING FOUNDATION) REVISED DESIGN = P 59,611,997.92 (CONCRETE PILES) SAVINGS = P 24,875,187.73
  • 48. CONTIGUOUS CONTRACT - SCOPE OF WORKS
  • 49. Republic of the Philippines Congress of the Philippines Metro Manila Twelfth Congress Second Regular Session Begun and held in Metro Manila, on Monday, the twenty-second day of July, two thousand two. Republic Act No. 9184             January 10, 2003 AN ACT PROVIDING FOR THE MODERNIZATION, STANDARIZATION AND REGULATION OF THE PROCUREMENT ACTIVITIES OF THE GOVERNMENT AND FOR OTHER PURPOSES
  • 50. ARTICLE XVI ALTERNATIVE METHODS OF PROCUREMENT Section 48. Alternative Methods. - Subject to the prior approval of the Head of the Procuring Entity or his duly authorized representative, and whenever justified by the conditions provided in this Act, the Procuring Entity may, in order to promote economy and efficiency, resort to any of the following alternative methods of Procurement: a. Limited Source Bidding, otherwise known as Selective Bidding - a method of Procurement that involves direct invitation to bid by the Procuring Entity from a set of pre-selected suppliers or consultants with known experience and proven capability relative to the requirements of a particular contract; e. Negotiated Procurement - a method of Procurement that may be resorted under the extraordinary circumstances provided for in Section 53 of this Act and other instances that shall be specified in the IRR, whereby the Procuring Entity directly negotiates a contract with a technically, legally and financially capable supplier, contractor or consultant. In all instances, the Procuring Entity shall ensure that the most advantageous price for the government is obtained.
  • 51.
  • 52. Section 53. Negotiated Procurement. - Negotiated Procurement shall be allowed only in the following instances: a. In case of two (2) failed bidding as provided in Section 35 hereof; b. In case of imminent danger to life or property during a state of calamity, or when time is of the essence arising from natural or man-made calamities or other causes where immediate action is necessary to prevent damage to or loss of life or property, or to restore vital public services, infrastructure facilities and other public utilities; c. Take-over of contracts, which have been rescinded or terminated for causes provided for in the contract and existing laws, where immediate action is necessary to prevent damage to or loss of life or property, or to restore vital public services, infrastructure facilities and other public utilities;
  • 53. Section 53. Negotiated Procurement. - Negotiated Procurement shall be allowed only in the following instances: d. Where the subject contract is adjacent or contiguous to an on-going infrastructure project, as defined in the IRR: Provided, however, That the original contract is the result of a Competitive Bidding; the subject contract to be negotiated has similar or related scopes of work; it is within the contracting capacity of the contractor; the contractor uses the same prices or lower unit prices as in the original contract less mobilization cost; the amount involved does not exceed the amount of the ongoing project ; and, the contractor has no negative slippage: Provided, further, That negotiations for the procurement are commenced before the expiry of the original contract. Wherever applicable, the principle shall also govern consultancy contract, where the consultants have unique experience and expertise to deliver the required service; or, e. Subject to the guidelines specified in the IRR, purchases of Goods from another agency of the government, such as the Procurement Service of the DBM, which is tasked with a centralized procurement of commonly used Goods for the government in accordance with Letters of Instruction No. 755 and Executive Order No. 359, series of 1989.
  • 54. WAS THERE A SPLITTING OF CONTRACTS?
  • 55. While Art. 54.1 of the IRR of RA 9184, on splitting of contracts, provides as follows: “ Splitting of Government Contracts is not allowed. Splitting of Government Contracts means the division or breaking up of Government Contracts into smaller quantities and amounts, or dividing contract implementation into artificial phases or sub-contracts for the purpose of evading or circumventing the requirements of law and this IRR-A, especially the necessity of public bidding and the requirements for the alternative methods of procurement.”
  • 56. In the First Place, there is no division or breaking up of Government Contracts into smaller quantities and amounts or dividing contract implementation into artificial phases or sub-contracts . As earlier shown, as far as the CICC is concerned, there is no single contract covering its procurement or implementation. Since there is no single contract, there could not be any splitting of said single contract. There is also no division of contract implementation into artificial phases or sub-contracts because individual contracts were entered into with the concerned suppliers or contractors, which contracts are not artificial or sub-contracts.
  • 57. In the Second Place, there is no evading or circumventing of the requirements of law, especially the necessity of public bidding and the requirements for the alternative methods of procurement. It is of note that, as earlier shown, bidding, although limited ones, were conducted by the Province of Cebu in the procurement of said items / works. Besides, the requirements, as provided under Section 48 (a), in relation to Section 49 of Republic Act (RA) No. 9184 and its Implementing Rules and Regulations (IRR), for Limited Source Bidding, as an alternative method of procurement, have been duly complied with, as shown in the report in this regard.
  • 58. SAMPLE COMPUTATION: SPECIALTY CONTRACTOR/SUPPLIER (KPI ELEVATOR, INC) TOTAL COST = P 7,270,140.00 Breakdown: Basic Equipment = P 5,310,140.00 Installation & Locally supplied Materials = P 1,960,000.00 (12% VAT Inclusive) ---------------------- P 7,270,140.00 MAIN CONTRACTOR (ALL-IN) COST FROM SPECIALTY CONTRACTOR = P 7,270,140.00 Plus: Indirect Cost, 30% (OCM, VAT/Tax, Profit) = P 2,181,042.00 ------------------------ P 9,451,182.00 IN EFFECT DIFFERENCE = P 2,181,042.00
  • 60.  
  • 61. Report on the Installation of CCTV
  • 62.  
  • 63.  
  • 64.  
  • 66.  
  • 67. Said charge, however, has no basis in fact and in law. Sections 47 and 65 par. 5 of R.A. 9184 (Government Procurement and Reform Act) prohibit only the participation and award of government contracts to a relative of the Governor within the 3 rd civil degree. Karen Fiel Tio, however, is not a relative of the Governor within the said prohibited degree, as provided under Art. 966 of the Civil Code of the Philippines.
  • 68. Gov. Gwen F. Garcia Judge Esperanza Fiel Garcia married to Gov. Pablo P. Garcia Antero Fiel married to Veronica S. Fiel Dr. Eutiquiano Fiel Consuelo T. Fiel Karen Fiel Tio 1st Civil Degree 3rd Civil Degree 2nd Civil Degree 4th Civil Degree “ Art. 966. xxx xxx xxx. Thus, a person is two degrees removed from his brother, three from his uncle, who is the brother of his father, four from his first cousin, and so forth.” ( Underscoring and emphasis supplied )
  • 69. INCOME ON CICC 2007 & 2008
  • 70. Payment - 12TH Asean Summit = P12,000,000.00
  • 71. 12,048,097.97 TOTAL INCOME CICC YEAR 2008 12TH ASEAN SUMMIT PAYMENT 12,000,000.00 13,598,821.40 YEAR 2007 TOTAL 37,638,919.37
  • 72.  
  • 73. SOME OF THE MAJOR EVENTS HELD IN CICC 1. 12th ASEAN SUMMIT 4. Women's Congress 5. PMPMI Sales Conference 6. Rotary International District Convention 7. PAMET Annual Convention 9. Auto / Food / Construction Show by Worldbex 10. Go Negosyo 8. Business World Forum 2. Farmers - Scientist Congress 3. CBM - ICT Summit & Exhibit
  • 74. SOME OF THE MAJOR EVENTS HELD IN CICC 11. UP Centenial Celebration 12. PCL National Assembly 13. Trade Fair / Bazaar (Cebu Prov. & Mandaue Chamber) 14. Avon Conference 15. PNA Convention 17. National Federation of Hog Farmers Convention 19. Pasigarbo sa Sugbo 20. Miss Mandaue 2008 18. Vice Mayor's League 16. Philippine Institute of Chemical Engineer's Convention
  • 76. PRESENT STATUS OF CEBU PROVINCE BASED ON COA FINANCIAL STATEMENT OF 80 PROVINCES AND 135 CITIES FOR FISCAL YEAR 2007
  • 77. CEBU PROVINCE is NO. 1 TOTAL ASSETS Php 16,108,421,000.00 TOTAL EQUITY Php 15,549,543,000.00 CASH IN BANK Php 1,006,260,000.00
  • 78.  
  • 79.  
  • 80.  
  • 81.  
  • 82. PRESENT STATUS OF CEBU PROVINCE OFFICE OF THE PROVINCIAL TREASURER CASH IN BANK DAILY CASH REPORT AS OF DEC. 31, 2008 P 76,370,166.29 SPECIAL SAVINGS DEPOSIT 987,291,098.29 TOTAL 1,063,661,264.58 TOTAL INCOME (AS OF DEC. 2008) 1,461,523,328.50
  • 84.