MANAGERIAL ACCOUNTING
“LUCENT TECHNOLOGY”
“THEORY OF CONSTRAINTS”
By:
Eka Darmadi Lim 3094802
May Eka Saputri 3094814
Steven Auryn Hendro 3105812
Class: Y
University of Surabaya
Faculty of Business and Economics
International Class
2012
STATEMENT OF AUTHORSHIP
This article about “Lucent Technology - TOC” created by our team ideas and
opinion, and this paper pure from our understanding not copy or paste from the
resource that “available”, we use the appendix and references to describe everything.
The person who signs this authorship statement, everything in this paper just for
internal use only, we consider as a student we have limitation, and mistakes, so the
whole paper is our group opinion for internal use only, for our case study. And we
consider if there is plagiarism in this paper, we as the team member, we are ready for
the consequences, that as our agreement before, and we understand that we must
deliver on-time as scheduled.
The Authors,
Eka Darmadi Lim May Eka Saputri
(3094802) (3094814)
Steven Auryn Hendro
(3105812)
Introduction:
Each firm faces limited resources and limited demand for each product. These
limitations called “Constraint”, theory of constraint admit that the performance
of the company is limited by constraints. If the company wants to improve
their performance, a company must identify the constraints, exploit the
constraints in the short term and long term, and then find ways to overcome
them.
Theory of constraints focus on 3 activities, they are Throughput, Inventory and
operating expenses. Management goals are increasing throughput; minimize
inventory and decreasing operating cost.
1. Throughput: rate at which an organization generates money through sales.
2. Inventory: all the money the organizations spend in turning materials into
throughput.
3. Operating expense: all the money the organization spends in turning
inventories into throughput.
By increasing throughput, minimize inventory, and decrease operating
expense will give any impact on increasing finance performance, profit, return
on investment, and cash flow.
In traditional viewpoint, pressing in increasing throughput and decreasing operating
expense are very important, and minimize inventory are not really important.
TOC recognize that lowering inventory decreases carrying costs and thus 
decreasing operating costs expenses and improves net income. More deeper, TOC
recognize lowering inventory helps produce a competitive edge by having, better
products and lower price and responsiveness to customer’s needs.
1. Better products  higher quality
Company able to improve their products / product innovation, by
lowering inventory  there is innovation, company can market their
product before their competitor market the same products, without
waiting for last stock.
2. Lower prices
3. Responsiveness
TOC Steps:
1. Identify the organization’s constraint(s)
The constraints:
 External constraints – limiting factors imposed on firm from external sources
( such as market demand )
 Internal constraints – limiting factors on firm from internal sources
(Such as: product capacity, machine-time availability, etc.)
 Loose constraints – constraints whose availability resources are not fully
utilized.
 Binding constraints – constraints whose availability resources are fully
utilized.
Constraints are used to optimal mix reveals which is will maximize throughput
and how much of each constrained resources is used and which of the
organizations are binding.
For example
Hello company produce 2 component of machine x and y, margin contribution for
each $ 300 for x and $ 600 for y. Operation work 5 days in a week.
In here we can said that Hello Company better produce and sell component y
because y has a biggest MC/Unit. But this solution is not hundred percent good.
One binding internal constraints:
X Y
Hour/unit 1 hour 3 hour
MC/Unit $ 300 $ 600
Constraints : work processes 120 hours / weak
We can produce 120/1 = 120 units 120/3 = 40 units
MC total $ 36,000 / weak $ 24,000 / weak
MC resources $ 300/1 = $ 300 ( TOP ) $ 600/3 = $ 200
Shown: Better just produce and sell product x, because x produce higher
MC/weak ( $ 36,000 for x and $ 24,000 for y ) its because MC/unit rare from
resources or constraints of product x higher than constraints of product y,
although MC/unit product y  2x bigger than MC/unit product x  MC/unit
product is doesn’t matter but MC/unit unavailability resources is important.
Internal binding constraint and external binding constraint:
If hello company can sell maximum 30 units component x and 100 units
component y, so optimal mix will be:
Component x  because MC/highest resources  maximize first  30 X 1
hour unit = 30 hours, and 90 hours for component y  90 hours: 3 hours = 30
units.
2. Exploit the binding constraint(S)
In many companies there is some binding constraint, the main binding
constraint is drummer, whereas level of productivity drummer constraint are
level of production in all factory.
TOC add 2 more feature:
 Rope
 Buffer
Rope = actions taken to tie the rate at which material is released into the plant
(at the first operation) to the production rate of the constrained resource.
The standard of the process that have constraint continued upriver to
synchronize the basic materials used in accordance with the optimal product
mix  eliminate raw materials unneeded.
Buffer : are made to ensure resource constraint that have kept busy, so for
scheduling, operations must produce the component required by the resource
drummer two days earlier before drummer constraints.
For example:
Hello Company has 3 processes
Drilling – Grinding – Polishing
Assumption: the only internal binding constraint is grinding which
spend 120 hours grinding/weak  grinding process is drummer.
With optimal mix (calculation before)  30 x and 30 y  maximum grinding
And, grinding and polishing loose constraints  can produce more than of
product mix required.
3. Subordinate everything else to the decision made in step 2
The drummer constraint essentially sets the capacity for the entire plant. Which
make the company will change their way to think. This make the use of efficiency
measures at the department level may no longer be appropriate. Consider that
confer company once again. Encouraging maximum productive efficiency for the
grinding department would produce excess work-in process inventories. For
example assume that the capacity of the grinding department is 80 units per week.
Assuming the 2 day buffer is in place, the grinding department would add 20 units
per week to the buffer in front of the drilling department. Then there will be a
large work-in process inventories. Polishing will produce at the rate of drilling
since the polishing follows drilling in the sequential production process.
4. Elevate the binding constraints.
Once actions have been taken to make the best possible use of the existing
constraint, the next step is to embark on a program of continuous improvement by
reducing the limitations that the binding constraints gave on the organizations
performance. Assume that the polishing has 160 hours available. Part X uses 1
hours and part Y uses 3 hours and we want to produce 30 part x and 30 part Y.
The total hours we spend is 120 hours ((30x1)+(30x3)). If we want to add more
production to the product Y by 20 (from 30 to 50) is possible. Since the increase
of production of part Y by 20 will increase the throughput by 12000 (20 x $600)
per week. If the cost of adding the half shift is $50 per hour. Then the incremental
cost is $3000 per week. Then the decision to add the half shift is a good choice.
5. Repeat the process
Eventually the drilling constraint will be elevated to a point where the constraint is
no longer binding. Suppose for example that the company adds a full shift for the
drilling operation. Increasing the resource availability to 240 hours. both the
drilling and polishing constraints are capable of producing more of part X. but the
grinding cannot since the maximum production of product mix is only 80 per
week. Thus the new drumming constraint is grinding. Once the new drummer
constraints identified. Then the TOC process is repeated. The main objective is to
continually improve the performance by managing constraints
Summary TOC
“Theory of Constraints” (TOC) is good theory for factory, because TOC will
help factory to manage and solve their problems. After manage and solve the
problems, are easy for factory to get more and more profit.
Actually the main problems in factory, are managing the inventories. And
TOC are really help in managing inventories. TOC has buffer and rope to
solve the inventories, rope are to tie the rate at which materials is released into
the plant to the production rate of the constrained resources. Buffer, are made
to ensure resource constraint that have kept busy, so for scheduling, operations
must produce the component required by the resource drummer earlier before
drummer constraints.
In our opinion, the main idea from TOC is Rope and Buffer, but all the
process is related each other. And it will make TOC, as a union idea to
managing inventories and be the first or main company in this or that product.
Case Study:
Lucent Technologies implement TOC
Background:
The Lucent Technology is a corporate owned by bell lab innovation, as we
know as AT&T (1970 – 2006) in United States America, but “The Lucent
Technology have different objective, “The Lucent Technology” build the
semiconductor, fiber optic, fiber cable. Means that the “Communication
Equipment”
The Lucent Technologies was built in 1970, and start producing wire, already
produce up to 107 Billion conductors that manufactured that year. The purpose
to build this company for takes a profit competing communication provider,
start from $8 / Share up to $84 / Share in 1999, and now in 2006 Lucent
bought by Alcatel and ready to start the most improvement ever, In 2011 for
implementing TOC inside.
After Lucent implement TOC inside the operational system, there are lots of
improvement that we get, for developing new product we need just half of
time needed, 100% of project can be done on time, we can 3x more for
product development capacity, 30% Revenue turnover, Multimillion dollar
profit improvement.
The Problem
1. How Lucent become more productive?
2. How Lucent can improve their performance?
3. How Lucent can win the competitor?
4. How Lucent can increase their profit?
Analysis:
By implementing TOC inside operation we can see lots of improvement that
we get, I will explain in a brief, using TOC system we can analyze which part
is our bottleneck, and the most inefficient one, before they implement TOC,
they kept producing in “continuous number” of a product, for example
Machine A Can Produce 100, Machine B can Produce 500. In the “old” time,
their flow is like that, so machine B can’t reach the maximum capacity, but
after implement TOC after Machine A produce 500, then they continue to
machine B, so machine B can maximize their capacity. When the machine A
produces 500, we improve machine B to double size, so we can increase the
overall throughput.
The Solution
Step by Step
A. Identify organization constrain
- Lack overload of some machine in production capacity
- Lack of innovation
Internal and External Factor
Internal: Lack of technology that we have
External: We can’t fulfill the request of the market, may be our competitor
can made product similar, and better. Or our production capacity is not
enough to fulfill our customer request
B. Exploit the binding constrain
Some machine need to be operated with more than 1 people, the
reason, because while this people take some rest, the production kept
going by the substitute people. And the process that breaks down
should be repaired as a priority.
Solution:
A. Help the critically machine
B. Don’t allow the critically constrained resources run out of
work.
C. Realize just enough WIP into the system
D. Remove all excess WIP from system, because WIP cost money,
clutter, and slows the flow.
C. Subordinate everything else to the decision meet in step 2
Remove all excessive WIP, then if the buffer still full, do not release
any work into the system. (Make done it first)
D. Elevate the binding constrain
After we implement step 1-3, now to elevate the constraint, get another
resource / workstation!
E. Repeat the process
Then we repeat the process to “test” if the system that already revised,
work or not. And do not let inertia become the constraint, because the
constraint becomes moved.
The Results:
1. New Product can be developed twice fast.
2. Project can be completed on time
3. More production capacity
4. Increase in revenue and profit
References:
Book of Managerial Accounting by: Maryanne M Mowen
http://en.wikipedia.org/wiki/Lucent
http://scmviews.blogspot.com/2011/04/toc-implementation-at-lucent2011.html
http://tocca.com.au/toc

More Related Content

What's hot

Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraints
shawncarner
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
mzpkn
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
Bonnie Aumann
 

What's hot (20)

Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraints
 
Theory of Constraint
Theory of ConstraintTheory of Constraint
Theory of Constraint
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of constraints -SIOM
Theory of constraints -SIOMTheory of constraints -SIOM
Theory of constraints -SIOM
 
Using Theory of Constraints in Services
Using Theory of Constraints in ServicesUsing Theory of Constraints in Services
Using Theory of Constraints in Services
 
Theory of Constraints TOC in Project Management
Theory of Constraints TOC in Project ManagementTheory of Constraints TOC in Project Management
Theory of Constraints TOC in Project Management
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraints and its types
Theory of constraints and its typesTheory of constraints and its types
Theory of constraints and its types
 
Theory of constraints(TOC)
Theory of constraints(TOC)Theory of constraints(TOC)
Theory of constraints(TOC)
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)
 
Introductionto toc
Introductionto tocIntroductionto toc
Introductionto toc
 
Toc Sample
Toc SampleToc Sample
Toc Sample
 

Similar to Theory of constraints

Epyp 15-theory of constraints
Epyp 15-theory of constraintsEpyp 15-theory of constraints
Epyp 15-theory of constraints
radicalweblabs
 
Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
MOHD ARISH
 
Chapter 3 JIT, Value Added and Waste .docx
Chapter 3 JIT, Value Added and Waste            .docxChapter 3 JIT, Value Added and Waste            .docx
Chapter 3 JIT, Value Added and Waste .docx
adkinspaige22
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systems
swati Mahajan
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Chainon
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
ARIV4
 

Similar to Theory of constraints (20)

customer relation management presentation roadmap what is known and
customer relation management presentation roadmap  what is known andcustomer relation management presentation roadmap  what is known and
customer relation management presentation roadmap what is known and
 
Epyp 15-theory of constraints
Epyp 15-theory of constraintsEpyp 15-theory of constraints
Epyp 15-theory of constraints
 
Project Management the Theory Of Constraints Way
Project Management the Theory Of Constraints WayProject Management the Theory Of Constraints Way
Project Management the Theory Of Constraints Way
 
Pomppt
PompptPomppt
Pomppt
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategy
 
Managerial economics
Managerial economicsManagerial economics
Managerial economics
 
Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
 
Chapter 3 JIT, Value Added and Waste .docx
Chapter 3 JIT, Value Added and Waste            .docxChapter 3 JIT, Value Added and Waste            .docx
Chapter 3 JIT, Value Added and Waste .docx
 
OR-I_Lecture_Note_01.pptx
OR-I_Lecture_Note_01.pptxOR-I_Lecture_Note_01.pptx
OR-I_Lecture_Note_01.pptx
 
Just in-time systems
Just in-time systemsJust in-time systems
Just in-time systems
 
DAM assignment - LPP formulation, Graphical solution and Simplex Method
DAM assignment - LPP formulation, Graphical solution and Simplex MethodDAM assignment - LPP formulation, Graphical solution and Simplex Method
DAM assignment - LPP formulation, Graphical solution and Simplex Method
 
Toyota
ToyotaToyota
Toyota
 
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1sMba 505 business_processes_operations_productivity_strategy_tutorial1s
Mba 505 business_processes_operations_productivity_strategy_tutorial1s
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 
management science
management science management science
management science
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8  sho...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A) Lecture 8 sho...
 
Lcc project
Lcc project Lcc project
Lcc project
 
Unit-7.pdf
Unit-7.pdfUnit-7.pdf
Unit-7.pdf
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Week 2 management decision making
Week 2  management decision makingWeek 2  management decision making
Week 2 management decision making
 

More from Eka Darmadi

Usa international trade
Usa international tradeUsa international trade
Usa international trade
Eka Darmadi
 
Usa international trade
Usa international tradeUsa international trade
Usa international trade
Eka Darmadi
 
The harvest cake strategy
The harvest cake strategyThe harvest cake strategy
The harvest cake strategy
Eka Darmadi
 
Strategy and environment
Strategy and environmentStrategy and environment
Strategy and environment
Eka Darmadi
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
Eka Darmadi
 
Steve jobs leadership
Steve jobs leadershipSteve jobs leadership
Steve jobs leadership
Eka Darmadi
 
Pt excelcomindo pratama tbk
Pt excelcomindo pratama tbkPt excelcomindo pratama tbk
Pt excelcomindo pratama tbk
Eka Darmadi
 
Pro xl presentation
Pro xl presentation Pro xl presentation
Pro xl presentation
Eka Darmadi
 

More from Eka Darmadi (20)

Pedoman Penulisan tesis pascasarjana fbe UBAYA
Pedoman Penulisan tesis pascasarjana fbe UBAYAPedoman Penulisan tesis pascasarjana fbe UBAYA
Pedoman Penulisan tesis pascasarjana fbe UBAYA
 
Pedoman akademik Magister Management UBAYA
Pedoman akademik Magister Management UBAYAPedoman akademik Magister Management UBAYA
Pedoman akademik Magister Management UBAYA
 
Syarat kelulusan mahasiswa Magister Management dan maksi UBAYA
Syarat kelulusan mahasiswa Magister Management dan maksi UBAYASyarat kelulusan mahasiswa Magister Management dan maksi UBAYA
Syarat kelulusan mahasiswa Magister Management dan maksi UBAYA
 
Kesempatan kerjasama pengelolaan kantin di kampus ubaya tenggilis lantai 1
Kesempatan kerjasama pengelolaan kantin di kampus ubaya tenggilis lantai 1Kesempatan kerjasama pengelolaan kantin di kampus ubaya tenggilis lantai 1
Kesempatan kerjasama pengelolaan kantin di kampus ubaya tenggilis lantai 1
 
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
Daftar Perkiraan Daftar Harga Tanah Surabaya 2016
 
Pengumuman wisuda ubaya 17 september 2016
Pengumuman wisuda ubaya 17 september 2016Pengumuman wisuda ubaya 17 september 2016
Pengumuman wisuda ubaya 17 september 2016
 
Cara pembayaran menggunakan bca virtual account universitas ubaya
Cara pembayaran menggunakan bca virtual account universitas ubayaCara pembayaran menggunakan bca virtual account universitas ubaya
Cara pembayaran menggunakan bca virtual account universitas ubaya
 
Cara Setting WiFi Ubaya Universitas Surabaya
Cara Setting WiFi Ubaya Universitas SurabayaCara Setting WiFi Ubaya Universitas Surabaya
Cara Setting WiFi Ubaya Universitas Surabaya
 
Tempat wifi cepat surabaya 2014
Tempat wifi cepat surabaya 2014Tempat wifi cepat surabaya 2014
Tempat wifi cepat surabaya 2014
 
Usa international trade
Usa international tradeUsa international trade
Usa international trade
 
Usa international trade
Usa international tradeUsa international trade
Usa international trade
 
The harvest cake strategy
The harvest cake strategyThe harvest cake strategy
The harvest cake strategy
 
Swot
SwotSwot
Swot
 
Swot analysis
Swot analysisSwot analysis
Swot analysis
 
Strategy and environment
Strategy and environmentStrategy and environment
Strategy and environment
 
Strategic planning
Strategic planningStrategic planning
Strategic planning
 
Steve jobs leadership
Steve jobs leadershipSteve jobs leadership
Steve jobs leadership
 
Sampoerna csr
Sampoerna csrSampoerna csr
Sampoerna csr
 
Pt excelcomindo pratama tbk
Pt excelcomindo pratama tbkPt excelcomindo pratama tbk
Pt excelcomindo pratama tbk
 
Pro xl presentation
Pro xl presentation Pro xl presentation
Pro xl presentation
 

Recently uploaded

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Theory of constraints

  • 1. MANAGERIAL ACCOUNTING “LUCENT TECHNOLOGY” “THEORY OF CONSTRAINTS” By: Eka Darmadi Lim 3094802 May Eka Saputri 3094814 Steven Auryn Hendro 3105812 Class: Y University of Surabaya Faculty of Business and Economics International Class 2012
  • 2. STATEMENT OF AUTHORSHIP This article about “Lucent Technology - TOC” created by our team ideas and opinion, and this paper pure from our understanding not copy or paste from the resource that “available”, we use the appendix and references to describe everything. The person who signs this authorship statement, everything in this paper just for internal use only, we consider as a student we have limitation, and mistakes, so the whole paper is our group opinion for internal use only, for our case study. And we consider if there is plagiarism in this paper, we as the team member, we are ready for the consequences, that as our agreement before, and we understand that we must deliver on-time as scheduled. The Authors, Eka Darmadi Lim May Eka Saputri (3094802) (3094814) Steven Auryn Hendro (3105812)
  • 3. Introduction: Each firm faces limited resources and limited demand for each product. These limitations called “Constraint”, theory of constraint admit that the performance of the company is limited by constraints. If the company wants to improve their performance, a company must identify the constraints, exploit the constraints in the short term and long term, and then find ways to overcome them. Theory of constraints focus on 3 activities, they are Throughput, Inventory and operating expenses. Management goals are increasing throughput; minimize inventory and decreasing operating cost. 1. Throughput: rate at which an organization generates money through sales. 2. Inventory: all the money the organizations spend in turning materials into throughput. 3. Operating expense: all the money the organization spends in turning inventories into throughput. By increasing throughput, minimize inventory, and decrease operating expense will give any impact on increasing finance performance, profit, return on investment, and cash flow. In traditional viewpoint, pressing in increasing throughput and decreasing operating expense are very important, and minimize inventory are not really important. TOC recognize that lowering inventory decreases carrying costs and thus  decreasing operating costs expenses and improves net income. More deeper, TOC recognize lowering inventory helps produce a competitive edge by having, better products and lower price and responsiveness to customer’s needs. 1. Better products  higher quality Company able to improve their products / product innovation, by lowering inventory  there is innovation, company can market their product before their competitor market the same products, without waiting for last stock. 2. Lower prices 3. Responsiveness
  • 4. TOC Steps: 1. Identify the organization’s constraint(s) The constraints:  External constraints – limiting factors imposed on firm from external sources ( such as market demand )  Internal constraints – limiting factors on firm from internal sources (Such as: product capacity, machine-time availability, etc.)  Loose constraints – constraints whose availability resources are not fully utilized.  Binding constraints – constraints whose availability resources are fully utilized. Constraints are used to optimal mix reveals which is will maximize throughput and how much of each constrained resources is used and which of the organizations are binding. For example Hello company produce 2 component of machine x and y, margin contribution for each $ 300 for x and $ 600 for y. Operation work 5 days in a week. In here we can said that Hello Company better produce and sell component y because y has a biggest MC/Unit. But this solution is not hundred percent good. One binding internal constraints: X Y Hour/unit 1 hour 3 hour MC/Unit $ 300 $ 600 Constraints : work processes 120 hours / weak We can produce 120/1 = 120 units 120/3 = 40 units MC total $ 36,000 / weak $ 24,000 / weak MC resources $ 300/1 = $ 300 ( TOP ) $ 600/3 = $ 200
  • 5. Shown: Better just produce and sell product x, because x produce higher MC/weak ( $ 36,000 for x and $ 24,000 for y ) its because MC/unit rare from resources or constraints of product x higher than constraints of product y, although MC/unit product y  2x bigger than MC/unit product x  MC/unit product is doesn’t matter but MC/unit unavailability resources is important. Internal binding constraint and external binding constraint: If hello company can sell maximum 30 units component x and 100 units component y, so optimal mix will be: Component x  because MC/highest resources  maximize first  30 X 1 hour unit = 30 hours, and 90 hours for component y  90 hours: 3 hours = 30 units. 2. Exploit the binding constraint(S) In many companies there is some binding constraint, the main binding constraint is drummer, whereas level of productivity drummer constraint are level of production in all factory. TOC add 2 more feature:  Rope  Buffer Rope = actions taken to tie the rate at which material is released into the plant (at the first operation) to the production rate of the constrained resource. The standard of the process that have constraint continued upriver to synchronize the basic materials used in accordance with the optimal product mix  eliminate raw materials unneeded. Buffer : are made to ensure resource constraint that have kept busy, so for scheduling, operations must produce the component required by the resource drummer two days earlier before drummer constraints.
  • 6. For example: Hello Company has 3 processes Drilling – Grinding – Polishing Assumption: the only internal binding constraint is grinding which spend 120 hours grinding/weak  grinding process is drummer. With optimal mix (calculation before)  30 x and 30 y  maximum grinding And, grinding and polishing loose constraints  can produce more than of product mix required. 3. Subordinate everything else to the decision made in step 2 The drummer constraint essentially sets the capacity for the entire plant. Which make the company will change their way to think. This make the use of efficiency measures at the department level may no longer be appropriate. Consider that confer company once again. Encouraging maximum productive efficiency for the grinding department would produce excess work-in process inventories. For example assume that the capacity of the grinding department is 80 units per week. Assuming the 2 day buffer is in place, the grinding department would add 20 units per week to the buffer in front of the drilling department. Then there will be a large work-in process inventories. Polishing will produce at the rate of drilling since the polishing follows drilling in the sequential production process. 4. Elevate the binding constraints. Once actions have been taken to make the best possible use of the existing constraint, the next step is to embark on a program of continuous improvement by reducing the limitations that the binding constraints gave on the organizations performance. Assume that the polishing has 160 hours available. Part X uses 1 hours and part Y uses 3 hours and we want to produce 30 part x and 30 part Y. The total hours we spend is 120 hours ((30x1)+(30x3)). If we want to add more production to the product Y by 20 (from 30 to 50) is possible. Since the increase of production of part Y by 20 will increase the throughput by 12000 (20 x $600)
  • 7. per week. If the cost of adding the half shift is $50 per hour. Then the incremental cost is $3000 per week. Then the decision to add the half shift is a good choice. 5. Repeat the process Eventually the drilling constraint will be elevated to a point where the constraint is no longer binding. Suppose for example that the company adds a full shift for the drilling operation. Increasing the resource availability to 240 hours. both the drilling and polishing constraints are capable of producing more of part X. but the grinding cannot since the maximum production of product mix is only 80 per week. Thus the new drumming constraint is grinding. Once the new drummer constraints identified. Then the TOC process is repeated. The main objective is to continually improve the performance by managing constraints Summary TOC “Theory of Constraints” (TOC) is good theory for factory, because TOC will help factory to manage and solve their problems. After manage and solve the problems, are easy for factory to get more and more profit. Actually the main problems in factory, are managing the inventories. And TOC are really help in managing inventories. TOC has buffer and rope to solve the inventories, rope are to tie the rate at which materials is released into the plant to the production rate of the constrained resources. Buffer, are made to ensure resource constraint that have kept busy, so for scheduling, operations must produce the component required by the resource drummer earlier before drummer constraints. In our opinion, the main idea from TOC is Rope and Buffer, but all the process is related each other. And it will make TOC, as a union idea to managing inventories and be the first or main company in this or that product.
  • 8. Case Study: Lucent Technologies implement TOC Background: The Lucent Technology is a corporate owned by bell lab innovation, as we know as AT&T (1970 – 2006) in United States America, but “The Lucent Technology have different objective, “The Lucent Technology” build the semiconductor, fiber optic, fiber cable. Means that the “Communication Equipment” The Lucent Technologies was built in 1970, and start producing wire, already produce up to 107 Billion conductors that manufactured that year. The purpose to build this company for takes a profit competing communication provider, start from $8 / Share up to $84 / Share in 1999, and now in 2006 Lucent bought by Alcatel and ready to start the most improvement ever, In 2011 for implementing TOC inside. After Lucent implement TOC inside the operational system, there are lots of improvement that we get, for developing new product we need just half of time needed, 100% of project can be done on time, we can 3x more for product development capacity, 30% Revenue turnover, Multimillion dollar profit improvement. The Problem 1. How Lucent become more productive? 2. How Lucent can improve their performance? 3. How Lucent can win the competitor? 4. How Lucent can increase their profit? Analysis: By implementing TOC inside operation we can see lots of improvement that we get, I will explain in a brief, using TOC system we can analyze which part is our bottleneck, and the most inefficient one, before they implement TOC, they kept producing in “continuous number” of a product, for example
  • 9. Machine A Can Produce 100, Machine B can Produce 500. In the “old” time, their flow is like that, so machine B can’t reach the maximum capacity, but after implement TOC after Machine A produce 500, then they continue to machine B, so machine B can maximize their capacity. When the machine A produces 500, we improve machine B to double size, so we can increase the overall throughput. The Solution Step by Step A. Identify organization constrain - Lack overload of some machine in production capacity - Lack of innovation Internal and External Factor Internal: Lack of technology that we have External: We can’t fulfill the request of the market, may be our competitor can made product similar, and better. Or our production capacity is not enough to fulfill our customer request B. Exploit the binding constrain Some machine need to be operated with more than 1 people, the reason, because while this people take some rest, the production kept going by the substitute people. And the process that breaks down should be repaired as a priority. Solution: A. Help the critically machine B. Don’t allow the critically constrained resources run out of work. C. Realize just enough WIP into the system D. Remove all excess WIP from system, because WIP cost money, clutter, and slows the flow. C. Subordinate everything else to the decision meet in step 2 Remove all excessive WIP, then if the buffer still full, do not release any work into the system. (Make done it first)
  • 10. D. Elevate the binding constrain After we implement step 1-3, now to elevate the constraint, get another resource / workstation! E. Repeat the process Then we repeat the process to “test” if the system that already revised, work or not. And do not let inertia become the constraint, because the constraint becomes moved. The Results: 1. New Product can be developed twice fast. 2. Project can be completed on time 3. More production capacity 4. Increase in revenue and profit References: Book of Managerial Accounting by: Maryanne M Mowen http://en.wikipedia.org/wiki/Lucent http://scmviews.blogspot.com/2011/04/toc-implementation-at-lucent2011.html http://tocca.com.au/toc