ESCOLA ESTADUAL CHB F1
    CAMPINAS - SP
Alunos: Bruna Facchini          A462IE-9
        Leandro Miniussi        A59CDA-8
        Lucas Gabriel           A462ID-0
        Raíssa Santana          A45068-8


Curso: Arquitetura e Urbanismo 5º s / Noturno – Unip Swift

Professores: Paula Francisca / Edilene Donadon

Disciplina: PEM (Projeto de Edifício Multifuncional)
Escola Estadual CHB F1
Local
 Vila Aparecida, Campinas / SP
Projeto
 2003
Conclusão da obra
 2004
Área construída
 2.818 m2
Arquitetura
 MMBB Arquitetos - Fernando de Mello Franco, Marta Moreira e Milton Braga
Colaboradores
   Eduardo Ferroni
   Jacques Rordorf
   Márcia Terazaki
   Marina Sabino
   Paula Cardoso
   Renata Vieira
Implantação e relação com o entorno
A escola foi construída em um conjunto habitacional que foi implantado em Campinas pelo Governo do
Estado de São Paulo. O terreno localiza-se na entrada do conjunto, em frente a uma área reservada para
a implantação de equipamentos públicos, e uma praça, ao Sul do prédio, também faz parte do projeto
de urbanização.




   Implantação
Áreas e Programa




Pavimento térreo                 Pavimento intermediário




                              Sala de aula (área 51,84m²)
                                                            Sala da coordenação
                              Cozinha / refeitório
                                                            Sala de professores
                              Banheiros
                                                            Sala da direção
                              Quadra poliesportiva
                                                            Pátio coberto
                              recepção
                                                            Secretaria
                              Depósito
Pavimento superior
                              Elevador
Fluxos internos de circulação




Pavimento térreo                   Pavimento intermediário



                                                             Circulação professores

                                                             Circulação alunos

                                                             Circulação funcionários



                                      A implantação da escola orientou as entradas
                                      de alunos e funcionários para a praça e
Pavimento superior                    localizou no outro lado do terreno, no norte,
                                      o pátio aberto.
Modulação e eixos




Pavimento térreo                Pavimento intermediário


                                                          Eixos

                                                          Pilar




                             O sistema estrutural pré-fabricado de elementos
                             de concreto armado e sistema de vigas e pilares
                             de seção retangular faz com que a estrutura pré-
                             fabricada tenha um comportamento de estrutura
Pavimento superior
                             monolítica.
Circulação Horizontal e Vertical




Pavimento térreo                       Pavimento intermediário




                                                       Circulação Horizontal (corredores)

                                                       Circulação Vertical (escadas e elevador)




Pavimento superior
Localização de Aberturas

                                               Janelas


                                               Portas




                                      Elevação A


                               Aberto em todo o térreo e fechado por
                               elementos vazados nas fachadas, este
                               espaço central, arejado, não prende nem
                               os alunos nem o som.

Foto: Fachada A
Setorização de blocos




                                 Pavimento intermediário
Pavimento térreo




                                                Bloco Administrativo

                                                Bloco de Serviço

                                                Bloco Didático



Pavimento superior

Más contenido relacionado

La actualidad más candente

Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFerit Fazliu
 
GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)Rashi Jain
 
Temple of sun modhera
Temple of sun modheraTemple of sun modhera
Temple of sun modheraSurbhi Modi
 
Precast elements
Precast elementsPrecast elements
Precast elementsShrividhyah
 
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...DhvaniR2
 
Sandal magna community primary school
Sandal magna community primary schoolSandal magna community primary school
Sandal magna community primary school16zer07
 
basilica of bom jesus, goa
basilica of bom jesus, goabasilica of bom jesus, goa
basilica of bom jesus, goaVISHAKA BOTHRA
 
Dell Children’s Medical Center of Central Texas: Charting the Path to Platinum
Dell Children’s Medical Center of Central Texas: Charting the Path to PlatinumDell Children’s Medical Center of Central Texas: Charting the Path to Platinum
Dell Children’s Medical Center of Central Texas: Charting the Path to PlatinumWSP
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207sharad_kadbhane
 
Tensile ppt
Tensile pptTensile ppt
Tensile pptwinner
 
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAIMarathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)DC Department of General Services
 
Technology materials of tall buildings highrise
Technology materials of tall buildings highriseTechnology materials of tall buildings highrise
Technology materials of tall buildings highriseBee Key Verma
 
Group 2 structure 3.1 PUC
Group 2 structure  3.1 PUC Group 2 structure  3.1 PUC
Group 2 structure 3.1 PUC promitchowdhury1
 

La actualidad más candente (20)

Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildings
 
TYPE OF STEEL TRUSS
TYPE OF STEEL TRUSSTYPE OF STEEL TRUSS
TYPE OF STEEL TRUSS
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
 
GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)
 
Acoustic Case Study
Acoustic Case Study Acoustic Case Study
Acoustic Case Study
 
Temple of sun modhera
Temple of sun modheraTemple of sun modhera
Temple of sun modhera
 
Glass partition 002
Glass partition 002Glass partition 002
Glass partition 002
 
Precast elements
Precast elementsPrecast elements
Precast elements
 
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
Pol of Ahmedabad , pol housing, traditional housing, vernacular architecture ...
 
Sandal magna community primary school
Sandal magna community primary schoolSandal magna community primary school
Sandal magna community primary school
 
basilica of bom jesus, goa
basilica of bom jesus, goabasilica of bom jesus, goa
basilica of bom jesus, goa
 
Trusses
TrussesTrusses
Trusses
 
Dell Children’s Medical Center of Central Texas: Charting the Path to Platinum
Dell Children’s Medical Center of Central Texas: Charting the Path to PlatinumDell Children’s Medical Center of Central Texas: Charting the Path to Platinum
Dell Children’s Medical Center of Central Texas: Charting the Path to Platinum
 
Tube Structure PPT.ppt
Tube Structure PPT.pptTube Structure PPT.ppt
Tube Structure PPT.ppt
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
 
Tensile ppt
Tensile pptTensile ppt
Tensile ppt
 
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAIMarathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
Marathi sahitya mandir, vashi - ACOUSTICS - AUDITORIUM - MUMBAI
 
Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)Powell Elementary School Approved Schematic Design (June 2, 2013)
Powell Elementary School Approved Schematic Design (June 2, 2013)
 
Technology materials of tall buildings highrise
Technology materials of tall buildings highriseTechnology materials of tall buildings highrise
Technology materials of tall buildings highrise
 
Group 2 structure 3.1 PUC
Group 2 structure  3.1 PUC Group 2 structure  3.1 PUC
Group 2 structure 3.1 PUC
 

Escola Estadual CHB F1

  • 1. ESCOLA ESTADUAL CHB F1 CAMPINAS - SP
  • 2. Alunos: Bruna Facchini A462IE-9 Leandro Miniussi A59CDA-8 Lucas Gabriel A462ID-0 Raíssa Santana A45068-8 Curso: Arquitetura e Urbanismo 5º s / Noturno – Unip Swift Professores: Paula Francisca / Edilene Donadon Disciplina: PEM (Projeto de Edifício Multifuncional)
  • 3. Escola Estadual CHB F1 Local Vila Aparecida, Campinas / SP Projeto 2003 Conclusão da obra 2004 Área construída 2.818 m2 Arquitetura MMBB Arquitetos - Fernando de Mello Franco, Marta Moreira e Milton Braga Colaboradores Eduardo Ferroni Jacques Rordorf Márcia Terazaki Marina Sabino Paula Cardoso Renata Vieira
  • 4. Implantação e relação com o entorno A escola foi construída em um conjunto habitacional que foi implantado em Campinas pelo Governo do Estado de São Paulo. O terreno localiza-se na entrada do conjunto, em frente a uma área reservada para a implantação de equipamentos públicos, e uma praça, ao Sul do prédio, também faz parte do projeto de urbanização. Implantação
  • 5. Áreas e Programa Pavimento térreo Pavimento intermediário Sala de aula (área 51,84m²) Sala da coordenação Cozinha / refeitório Sala de professores Banheiros Sala da direção Quadra poliesportiva Pátio coberto recepção Secretaria Depósito Pavimento superior Elevador
  • 6. Fluxos internos de circulação Pavimento térreo Pavimento intermediário Circulação professores Circulação alunos Circulação funcionários A implantação da escola orientou as entradas de alunos e funcionários para a praça e Pavimento superior localizou no outro lado do terreno, no norte, o pátio aberto.
  • 7. Modulação e eixos Pavimento térreo Pavimento intermediário Eixos Pilar O sistema estrutural pré-fabricado de elementos de concreto armado e sistema de vigas e pilares de seção retangular faz com que a estrutura pré- fabricada tenha um comportamento de estrutura Pavimento superior monolítica.
  • 8. Circulação Horizontal e Vertical Pavimento térreo Pavimento intermediário Circulação Horizontal (corredores) Circulação Vertical (escadas e elevador) Pavimento superior
  • 9. Localização de Aberturas Janelas Portas Elevação A Aberto em todo o térreo e fechado por elementos vazados nas fachadas, este espaço central, arejado, não prende nem os alunos nem o som. Foto: Fachada A
  • 10. Setorização de blocos Pavimento intermediário Pavimento térreo Bloco Administrativo Bloco de Serviço Bloco Didático Pavimento superior