SlideShare una empresa de Scribd logo
1 de 3
Page 1
Mahmoud Niem
Full Name Nationality Date of Birth National ID
Mahmoud El-Sayed Niem Egyptian 15th
September , 1990 29009151806577
Home Address ContactDetails E-mail
Egypt-Cairo (Ain shams )
Mobile: +201063730023
:+201203357261
Mahmoud.niem@gmail.com
Career Objective
to apply a know ledge in electrical pow er system Engineering, to w ork as a electrical Engineer in a major respectable company and to w ork in a
highly technical and professional organization w here I have plenty of opportunities to develop, Strong ability to learn, strong communication skills to
ensure the success for the company .
Sep 2009 – June 2014
Faculty / Institute
University
B.Sc. Electrical Pow er & Machines Engineering
2014 w ith generalgrade (very good w ith honor).
Engineering Faculty Helwan, University
Sep 2015
Faculty / Institute
University
Master degree student Engineering Faculty Helwan, University
8/2014 till Now Company/Firm
1 -Quality Engineer
Quality management at EQMA group for 3 months
2- Electrical Design Engineer
Engineering design, deal w ith Engineering Softw ares as (Autocad 2D – Etap - Bentley
Microstation & Cym grid for Earthing calculation design –EMTP - DIALUX (Interior & Exterior
Lighting Design)).
Scope of Work:
 Prepare design data input request
 Prepare AC LOAD SCHEDULE & AUX. TR. SIZING CALCULATION
 Prepare LV AC CB SIZING CALCULATIONS
 Prepare LV AC CABLE SIZING CALCULATION
 Prepare DC LOAD SCHEDULE, 125V DC BATTERY & CHARGER SIZING
CALCULATION
 DC CB SIZING CALCULATION
 Prepare DC CABLE SIZING CALCULATION
 Prepare EARTHING DESIGN CALCULATION
 Prepare INDOOR LIGHTING SYSTEM DESIGN
 Prepare OUTDOOR LIGHTING SYSTEM DESIGN
 Prepare POWER CABLE SCHEDULE (FOR AC CABLES)
 Prepare POWER CABLE SCHEDULE (DC CABLES)
 Prepare SHIELDING SYSTEM DESIGN CALCULATION
 Prepare BRANCH CABLE SIZING FOR INDOOR AND OUTDOOR LIGHTING
 Prepare POWER CABLE SCHEDULE (FOR LIGHTING)
 Prepare bill of quantity for cables & trays & lighting fixtures
 Prepare OPERATIONAL SINGLE LINE DIAGRAM
 Prepare GENERAL EQUIPMENT LAYOUT OF 132/13.8kV SUBSTATION
 Prepare 400V/230V AC SINGLE LINE DIAGRAM
MEECO Substation Consulting Firm
Page 2
 Prepare 125V DC SINGLE LINE DIAGRAM
 Prepare 132kV GIS ROOM - EQUIPMENT LAYOUT -PLAN & SECTIONS
 Prepare TRANSFORMER ROOM: EQUIPMENT LAYOUT- PLAN & SECTIONS
 Prepare CAPACITOR BANK AREA : EQUIPMENT LAYOUT- PLAN & SECTIONS
 Prepare CONTROL ROOM - EQUIPMENT LAYOUT- PLAN & SECTIONS
 Prepare TELECOM ROOM - EQUIPMENT LAYOUT- PLAN & SECTIONS
 Prepare BATTERY ROOM - EQUIPMENT LAYOUT -PLAN & SECTIONS
 Prepare AUXILIARY TRANSFORMER ROOM LAYOUT- PLAN & SECTIONS
 Prepare OVERALL SUBSTATION PLOT LAYOUT
 Prepare H.V CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT PLAN &
SECTIONS
 Prepare M.V CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT PLAN &
SECTIONS
 Prepare L.V & CONTOR CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT
PLAN & SECTION
 Prepare 13.8KV OUTGOING FEEDER CABLE
 Prepare HV CABLE LADDER LAYOUT -PLAN & SECTIONS
 Prepare MV CABLE TRAY LAYOUT -PLAN & SECTIONS
 Prepare CONTROL CABLE TRAY/LADDER LAYOUT - PLAN & SECTIONS
 Prepare OVERALL EARTHMAT LAYOUT & DETAILS
 Prepare SUBSTATION EQUIPMENT EARTHING LAYOUT & DETAILS
 Prepare SUBSTATION RE-INFORCEMENT EARTHING LAYOUT & DETAILS
 Prepare SUBSTATION SHIELDING LAYOUT & DETAILS
 Prepare INDOOR NORMAL LIGHTING & DETAILS
 Prepare INDOOR EMERGENCY & EXIT LIGHTING LAYOUT & DETAIL
 Prepare OUTDOOR , SECURITY LIGHTING & AUX. POWER - LAYOUT & DETAIL
 Prepare INDOOR AUXULAIRY POWER
 Prepare OUTDOOR AUXULAIRY POWER
 Prepare INDOOR LIGHTING & AUX. POWER DETAILS
 Prepare SINGLE LINE DIAGRAM FOR INDOOR & OUTDOOR LIGHTING PANELS
 Prepare SINGLE LINE DIAGRAM FOR EMERGENY LIGHTING PANELS
Experience Projects:
 Construction of new 33/13.8kV S/S 7821
 Construction of new 132/33KV S/S 8860 (Abu Al w orood)
 Construction of new 132/13.8KV S/S 8163
 Construction of new 132/13.8KV S/S 8168
 Construction of new 132/13.8KV S/S 8211
 Construction of new 132/13.8KV S/S 8256
 Construction of new 132/13.8KV S/S 8841
 Construction of new 132/13.8KV S/S 8845
 Construction of new 132/33KV S/S 8525
 Construction of new 132/33/13.8KV S/S 8925
 Reinforcement of 132/33KV S/S 8810 & 8814
 Reinforcement of 380KV S/S 9004
20/12/2014 till now Company/Firm
Electrical Design Engineer
 Coordinator for SS#8163, 8211, 8168, 8256 (ACC)
 Coordinator for SS#8841,8845,8525,8925,8810,8814 (ABC)
MEECO Substation Consulting Firm
Foreign Languages
Very good English reading and writing.
Summer training
Course/Training name Place
1-The Arab Contractors
2-Lube Oil Blending Plant
3-Egyptian electricaltransmission company (protection department)
4-Egyptian electricaltransmission company (maintenance)
5-El-Attef pow er station
Page 3
Overall grade: very good with honors
Grade of project: excellent
Graduation Project:
Substation Protection & Control
COURSES AND TECHNICAL SKILLS
Course/Training name Place
 Good Know ledge w ith C& C++ programming Language.
 Distribution course (36 hours) –EUC center; Helw an.
 PLC course (36 hours) .
 Human resources development course at; Maadi
 ICDL course at Faculty of engineering, Helw an University.
.
Leisure Activities
Enjoy reading, sketching, watching movies, and Enjoying listening to music.
I am hard working and enjoy working as part of a team, I am punctual lively and very pleasant towards my fellow colleagues. I
enjoy working with people and meeting new faces. I am reliable, friendly and well organized.

Más contenido relacionado

La actualidad más candente

Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CValaa ibrahim
 
Syntech electromech private limited
Syntech electromech private limitedSyntech electromech private limited
Syntech electromech private limitedakkiakhila1
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)Sunrator Technologies LLP
 
Resume_Amos_Bandt_11-14
Resume_Amos_Bandt_11-14Resume_Amos_Bandt_11-14
Resume_Amos_Bandt_11-14Amos Bandt
 
CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9Hamdy Ismail
 
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...SUNDARAM BALAGURUNATHAN
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016dil mus
 
Sami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum VitaeSami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum Vitaesami abulouz
 
Mark Eastman Resume (1)
Mark Eastman Resume (1)Mark Eastman Resume (1)
Mark Eastman Resume (1)Mark Eastman
 
Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell
 

La actualidad más candente (19)

Electrical17OCT
Electrical17OCTElectrical17OCT
Electrical17OCT
 
cv
cvcv
cv
 
Mohammed ABDELGHANI2015
Mohammed  ABDELGHANI2015Mohammed  ABDELGHANI2015
Mohammed ABDELGHANI2015
 
Athavulla new resume
Athavulla new resumeAthavulla new resume
Athavulla new resume
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Syntech electromech private limited
Syntech electromech private limitedSyntech electromech private limited
Syntech electromech private limited
 
cv umar
cv umarcv umar
cv umar
 
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
 
Frank randazzo resume
Frank randazzo resumeFrank randazzo resume
Frank randazzo resume
 
Resume_Amos_Bandt_11-14
Resume_Amos_Bandt_11-14Resume_Amos_Bandt_11-14
Resume_Amos_Bandt_11-14
 
CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9
 
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...
SUCCESSFUL REPLACEMENT OF SPIKE OR BARBED EMITTERS OF CHINESE-MAKE ELECTROSTA...
 
Samuel C RESUME
Samuel C RESUMESamuel C RESUME
Samuel C RESUME
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
 
Sami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum VitaeSami Abu Louz, Curriculum Vitae
Sami Abu Louz, Curriculum Vitae
 
final resume -engg
final resume -enggfinal resume -engg
final resume -engg
 
Mark Eastman Resume (1)
Mark Eastman Resume (1)Mark Eastman Resume (1)
Mark Eastman Resume (1)
 
Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015
 
The last Curriculum Vitae CV
The last Curriculum Vitae CVThe last Curriculum Vitae CV
The last Curriculum Vitae CV
 

Destacado

City of Markham - Annual Report 2015
City of Markham - Annual Report 2015City of Markham - Annual Report 2015
City of Markham - Annual Report 2015Asare Kester-Akrofi
 
Food in China
Food in ChinaFood in China
Food in ChinaBianka H.
 
DIRECTHandout (1)
DIRECTHandout (1)DIRECTHandout (1)
DIRECTHandout (1)Katie Utter
 
JOURNALISM
JOURNALISMJOURNALISM
JOURNALISMAvik Roy
 
Year 1 al 29
Year 1 al   29Year 1 al   29
Year 1 al 29dmirbe
 
Armored SWAT Suburban 2500
Armored SWAT Suburban 2500Armored SWAT Suburban 2500
Armored SWAT Suburban 2500yameenkhattak
 
Welcome to year 1 ppt
Welcome to year 1 pptWelcome to year 1 ppt
Welcome to year 1 pptdmirbe
 
ใบความรู้ เรื่อง แอลเคน
ใบความรู้ เรื่อง แอลเคนใบความรู้ เรื่อง แอลเคน
ใบความรู้ เรื่อง แอลเคนkkrunuch
 
Videal overview
Videal overviewVideal overview
Videal overviewVideal
 
Places at different times of day
Places at different times of dayPlaces at different times of day
Places at different times of daymarciamediastudies
 
01 10 new understanding - going with purpose, doing with power mark 3 14-15
01 10 new understanding - going with purpose, doing with power mark 3 14-1501 10 new understanding - going with purpose, doing with power mark 3 14-15
01 10 new understanding - going with purpose, doing with power mark 3 14-15SSMC
 
О результатах реализации государственной программы «Столичное образование» в ...
О результатах реализации государственной программы «Столичное образование» в ...О результатах реализации государственной программы «Столичное образование» в ...
О результатах реализации государственной программы «Столичное образование» в ...The webportal of the Mayor and the Government of Moscow
 

Destacado (13)

City of Markham - Annual Report 2015
City of Markham - Annual Report 2015City of Markham - Annual Report 2015
City of Markham - Annual Report 2015
 
Food in China
Food in ChinaFood in China
Food in China
 
CSP consultancy 2015
CSP consultancy 2015CSP consultancy 2015
CSP consultancy 2015
 
DIRECTHandout (1)
DIRECTHandout (1)DIRECTHandout (1)
DIRECTHandout (1)
 
JOURNALISM
JOURNALISMJOURNALISM
JOURNALISM
 
Year 1 al 29
Year 1 al   29Year 1 al   29
Year 1 al 29
 
Armored SWAT Suburban 2500
Armored SWAT Suburban 2500Armored SWAT Suburban 2500
Armored SWAT Suburban 2500
 
Welcome to year 1 ppt
Welcome to year 1 pptWelcome to year 1 ppt
Welcome to year 1 ppt
 
ใบความรู้ เรื่อง แอลเคน
ใบความรู้ เรื่อง แอลเคนใบความรู้ เรื่อง แอลเคน
ใบความรู้ เรื่อง แอลเคน
 
Videal overview
Videal overviewVideal overview
Videal overview
 
Places at different times of day
Places at different times of dayPlaces at different times of day
Places at different times of day
 
01 10 new understanding - going with purpose, doing with power mark 3 14-15
01 10 new understanding - going with purpose, doing with power mark 3 14-1501 10 new understanding - going with purpose, doing with power mark 3 14-15
01 10 new understanding - going with purpose, doing with power mark 3 14-15
 
О результатах реализации государственной программы «Столичное образование» в ...
О результатах реализации государственной программы «Столичное образование» в ...О результатах реализации государственной программы «Столичное образование» в ...
О результатах реализации государственной программы «Столичное образование» в ...
 

Similar a updated Mahmoud Niem CV (20)

Mostafa Yunis_original
Mostafa Yunis_originalMostafa Yunis_original
Mostafa Yunis_original
 
Mostafa Yunis_original
Mostafa Yunis_originalMostafa Yunis_original
Mostafa Yunis_original
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
M Adel CV 2016
M Adel CV 2016M Adel CV 2016
M Adel CV 2016
 
Abdelrahman Elsayed CV
Abdelrahman Elsayed CVAbdelrahman Elsayed CV
Abdelrahman Elsayed CV
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
noorCV
noorCVnoorCV
noorCV
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Elec Eng Karim CV
Elec Eng Karim CVElec Eng Karim CV
Elec Eng Karim CV
 
Mohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque ResumeMohammad Yeamin Hoque Resume
Mohammad Yeamin Hoque Resume
 
Mohamed A.Razaq
Mohamed A.RazaqMohamed A.Razaq
Mohamed A.Razaq
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in Egypt
 
ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Saladin c.v
Saladin c.vSaladin c.v
Saladin c.v
 
KEVIN DAVID MORTON cv
KEVIN DAVID MORTON cvKEVIN DAVID MORTON cv
KEVIN DAVID MORTON cv
 
MujibCV
MujibCVMujibCV
MujibCV
 

updated Mahmoud Niem CV

  • 1. Page 1 Mahmoud Niem Full Name Nationality Date of Birth National ID Mahmoud El-Sayed Niem Egyptian 15th September , 1990 29009151806577 Home Address ContactDetails E-mail Egypt-Cairo (Ain shams ) Mobile: +201063730023 :+201203357261 Mahmoud.niem@gmail.com Career Objective to apply a know ledge in electrical pow er system Engineering, to w ork as a electrical Engineer in a major respectable company and to w ork in a highly technical and professional organization w here I have plenty of opportunities to develop, Strong ability to learn, strong communication skills to ensure the success for the company . Sep 2009 – June 2014 Faculty / Institute University B.Sc. Electrical Pow er & Machines Engineering 2014 w ith generalgrade (very good w ith honor). Engineering Faculty Helwan, University Sep 2015 Faculty / Institute University Master degree student Engineering Faculty Helwan, University 8/2014 till Now Company/Firm 1 -Quality Engineer Quality management at EQMA group for 3 months 2- Electrical Design Engineer Engineering design, deal w ith Engineering Softw ares as (Autocad 2D – Etap - Bentley Microstation & Cym grid for Earthing calculation design –EMTP - DIALUX (Interior & Exterior Lighting Design)). Scope of Work:  Prepare design data input request  Prepare AC LOAD SCHEDULE & AUX. TR. SIZING CALCULATION  Prepare LV AC CB SIZING CALCULATIONS  Prepare LV AC CABLE SIZING CALCULATION  Prepare DC LOAD SCHEDULE, 125V DC BATTERY & CHARGER SIZING CALCULATION  DC CB SIZING CALCULATION  Prepare DC CABLE SIZING CALCULATION  Prepare EARTHING DESIGN CALCULATION  Prepare INDOOR LIGHTING SYSTEM DESIGN  Prepare OUTDOOR LIGHTING SYSTEM DESIGN  Prepare POWER CABLE SCHEDULE (FOR AC CABLES)  Prepare POWER CABLE SCHEDULE (DC CABLES)  Prepare SHIELDING SYSTEM DESIGN CALCULATION  Prepare BRANCH CABLE SIZING FOR INDOOR AND OUTDOOR LIGHTING  Prepare POWER CABLE SCHEDULE (FOR LIGHTING)  Prepare bill of quantity for cables & trays & lighting fixtures  Prepare OPERATIONAL SINGLE LINE DIAGRAM  Prepare GENERAL EQUIPMENT LAYOUT OF 132/13.8kV SUBSTATION  Prepare 400V/230V AC SINGLE LINE DIAGRAM MEECO Substation Consulting Firm
  • 2. Page 2  Prepare 125V DC SINGLE LINE DIAGRAM  Prepare 132kV GIS ROOM - EQUIPMENT LAYOUT -PLAN & SECTIONS  Prepare TRANSFORMER ROOM: EQUIPMENT LAYOUT- PLAN & SECTIONS  Prepare CAPACITOR BANK AREA : EQUIPMENT LAYOUT- PLAN & SECTIONS  Prepare CONTROL ROOM - EQUIPMENT LAYOUT- PLAN & SECTIONS  Prepare TELECOM ROOM - EQUIPMENT LAYOUT- PLAN & SECTIONS  Prepare BATTERY ROOM - EQUIPMENT LAYOUT -PLAN & SECTIONS  Prepare AUXILIARY TRANSFORMER ROOM LAYOUT- PLAN & SECTIONS  Prepare OVERALL SUBSTATION PLOT LAYOUT  Prepare H.V CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT PLAN & SECTIONS  Prepare M.V CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT PLAN & SECTIONS  Prepare L.V & CONTOR CABLE SLEEVES, OPENING & DUCT BANK - LAYOUT PLAN & SECTION  Prepare 13.8KV OUTGOING FEEDER CABLE  Prepare HV CABLE LADDER LAYOUT -PLAN & SECTIONS  Prepare MV CABLE TRAY LAYOUT -PLAN & SECTIONS  Prepare CONTROL CABLE TRAY/LADDER LAYOUT - PLAN & SECTIONS  Prepare OVERALL EARTHMAT LAYOUT & DETAILS  Prepare SUBSTATION EQUIPMENT EARTHING LAYOUT & DETAILS  Prepare SUBSTATION RE-INFORCEMENT EARTHING LAYOUT & DETAILS  Prepare SUBSTATION SHIELDING LAYOUT & DETAILS  Prepare INDOOR NORMAL LIGHTING & DETAILS  Prepare INDOOR EMERGENCY & EXIT LIGHTING LAYOUT & DETAIL  Prepare OUTDOOR , SECURITY LIGHTING & AUX. POWER - LAYOUT & DETAIL  Prepare INDOOR AUXULAIRY POWER  Prepare OUTDOOR AUXULAIRY POWER  Prepare INDOOR LIGHTING & AUX. POWER DETAILS  Prepare SINGLE LINE DIAGRAM FOR INDOOR & OUTDOOR LIGHTING PANELS  Prepare SINGLE LINE DIAGRAM FOR EMERGENY LIGHTING PANELS Experience Projects:  Construction of new 33/13.8kV S/S 7821  Construction of new 132/33KV S/S 8860 (Abu Al w orood)  Construction of new 132/13.8KV S/S 8163  Construction of new 132/13.8KV S/S 8168  Construction of new 132/13.8KV S/S 8211  Construction of new 132/13.8KV S/S 8256  Construction of new 132/13.8KV S/S 8841  Construction of new 132/13.8KV S/S 8845  Construction of new 132/33KV S/S 8525  Construction of new 132/33/13.8KV S/S 8925  Reinforcement of 132/33KV S/S 8810 & 8814  Reinforcement of 380KV S/S 9004 20/12/2014 till now Company/Firm Electrical Design Engineer  Coordinator for SS#8163, 8211, 8168, 8256 (ACC)  Coordinator for SS#8841,8845,8525,8925,8810,8814 (ABC) MEECO Substation Consulting Firm Foreign Languages Very good English reading and writing. Summer training Course/Training name Place 1-The Arab Contractors 2-Lube Oil Blending Plant 3-Egyptian electricaltransmission company (protection department) 4-Egyptian electricaltransmission company (maintenance) 5-El-Attef pow er station
  • 3. Page 3 Overall grade: very good with honors Grade of project: excellent Graduation Project: Substation Protection & Control COURSES AND TECHNICAL SKILLS Course/Training name Place  Good Know ledge w ith C& C++ programming Language.  Distribution course (36 hours) –EUC center; Helw an.  PLC course (36 hours) .  Human resources development course at; Maadi  ICDL course at Faculty of engineering, Helw an University. . Leisure Activities Enjoy reading, sketching, watching movies, and Enjoying listening to music. I am hard working and enjoy working as part of a team, I am punctual lively and very pleasant towards my fellow colleagues. I enjoy working with people and meeting new faces. I am reliable, friendly and well organized.