Transportation Operations inTransportation Operations in
Action: Financing OperationsAction: Financing Operations
Institute of Transportation Engineers
2009 Technical Conference and Exhibit
Dr. Margaret M. Cusack, PMP
Congestion: Solution = ITSCongestion: Solution = ITS
 Incident detection & rapid clearance
 HELP Programs
 Advanced Traveler Information Systems (ATIS)
 Automated Traffic Management Systems (ATMS)
 Congestion management/congestion pricing
 Managed lanes/HOV/HOT
– Limited access, eligibility requirements, etc.
 ORT
 Forecast models
The real reason for ITS:The real reason for ITS:
CRASH PREVENTIONCRASH PREVENTION
 6,420,000 auto accidents in the United States in
2005.
 The financial cost of these crashes is more than
230 Billion dollars.
 2.9 million people were injured and 42,636 people
killed.
 About 115 people die every day in vehicle crashes
in the United States -- one death every 13 minutes.
Context: What makes ITSContext: What makes ITS
hard to plan for and fund?hard to plan for and fund?
 For transportation
agencies it is a foreign
concept that there is a
type of project that
does not end.
 Transportation and
infrastructure
financing is typically
rigid and habitual.
 Software development
expertise, and
communications
design – both required
elements of ITS
systems – are typically
not found in a
department of
transportation.
SCALESCALE
Federal ITS Programs
Statewide/Regional ITS Programs
Local ITS Programs
– New York
– Los Angeles
– Salt Lake City
– Atlanta
– Etc………….
American Recovery andAmerican Recovery and
Reinvestment Act (ARRA)Reinvestment Act (ARRA)
“Stimulus Package”“Stimulus Package”
 $787 billion in federal funding for initiatives to
help stimulate America’s economy.
 $48.76 billion in transportation.
– Highways $27.5 (3% to Enhancements)
– Public Transportation $8.4
– Nationwide Grant Program $1.5
– Aviation $1.3
– Rail $9.3
• Source: VDRPT
Tuesday, March 3, 2009Tuesday, March 3, 2009
President Barack Obama, joined by Vice
President Joe Biden and U.S. Transportation
Secretary Ray LaHood, (at the USDOT in
Washington) today marked the release of $26.6
billion from the American Recovery and
Reinvestment Act (ARRA) to states and local
transportation authorities to repair and build
highways, roads and bridges.
TIGER TeamTIGER Team
At the ceremony the President unveiled new
logos for government-wide projects completed
under the ARRA and the Transportation
Investments Generating Economic Recovery
(TIGER) logo for transportation projects
completed under the ARRA.
TIGER TeamTIGER Team
 According to Calvin Scovel, USDOT Inspector
General, the TIGER Team is dealing with a large
infusion of money, which must be distributed
quickly and using only existing staff resources.
 This will force the department (USDOT) to limit
its focus on its mission of transportation safety.
• http://www.transportgooru.com
Transportation funds:Transportation funds:
Not just for USDOT…..Not just for USDOT…..
 142M to Coast Guard for alteration or removal of
obstructive bridges
 150M to FEMA for Public Transportation (rail)
Security; and 150M for Port Security
 180M to Bureau of Land Management for roads,
bridges, trails, etc…
 165M to US Fish & Wildlife for construction and
repair of roads, bridges, etc….
 589M to National Park Service for critical
infrastructure projects ……
 USGS, BIA, Dept. of Agriculture…..
A good question:A good question:
(found on www.recovery.gov)(found on www.recovery.gov)
Q: I heard I'd be able to track recovery
funds. Why can't I do that?
A: You aren't able to track funds yet because we
have not yet started receiving information from
Federal agencies on how they are going to allocate
the money. It takes a little bit of time for them to
make sure your money is going to be spent wisely.
…. You will have access to data as soon as we begin
receiving it from agencies.
USDOTUSDOT
$1.5B through September 30, 2011
– 20 to 300M grants
– Significant impact on the Nation; a
metropolitan area; or a region
$27.5B through September 30, 2010
– Projects funded at 50%
– Projects that have to be completed in 3 years
– Isn’t that past the 2010 deadline????
Other OpportunitiesOther Opportunities
Amtrak – 1,300M
FTA – 6,900M
FCC – no amount stated
– Broadband Technology Opportunities Program
– (4) improve access to and use of broadband
service by public safety agencies
– 80% or higher available match
What happened to Title 23?What happened to Title 23?
ISTEA – 1993 to 1997
TEA-21 – 1999 to 2003
SAFET-LU – 2003 to 2009…….
CAA - 1990
CAAA - 1991
FY 2009FY 2009
 IM $4,700 M
 NHS $5,500 M
 Bridge $4,000 M
 STP $5,807 M
 CMAQ $1,600 M
 Safety $1,500 M
 ITS Performance Incentive?? $135 M
 http://www.fhwa.dot.gov/reauthorization/authorizations.htm
SAFET-LU 2003 to 2009SAFET-LU 2003 to 2009
Apportionment Category Total for 6 years
IM 25,379,640,000
NHS 30,124,368,000
STP 31,484,699,740
Bridges 21,767,922,000
CMAQ 8,607,299,917
Safety 7,321,050,000
TOTAL (Above categories only) 105,093,849,857
17,515,641,642 per year
Title 23 FundingTitle 23 Funding
If it will be re-authorized, at what levels?
Does the stimulus package diminish the
perception of a need for funding?
The ARRA does not authorize spending in
many important areas
The ARRA does not even mention ITS
ARRA model vs. ISTEA modelARRA model vs. ISTEA model
ARRA = Federal agency staff determines
allocation
– By program?
– By project?
Surface Transportation Legislation =
State Governments determine programming
policies for funding, following established
programming processes
Onward and UpwardOnward and Upward
We have elevated the traveler’s
expectations to the point where ceasing the
operations activities we now have
developed would be unheard of.
Only embellishment and improvement to
ITS programs will be accepted.
State GovernmentsState Governments
 47 states are facing
shortfalls in their budgets
 New gaps of $53B have
opened up (on top of
$48B) in the budgets of 42
states plus D.C.
 44 states anticipate
deficits for fiscal year
2010 and beyond.
 Total gap of $105 billion
— 17 percent of budgets
in 38 states that estimated
these gapsSource: http://www.cbpp.org
City GovernmentsCity Governments
 New York: Estimates
a budget gap of $1.2
billion in 2010. Budget
gap projection for
2011 is now $4.8
billion.
 San Diego: The total
budget for Fiscal Year
2009 is $3.13 billion
(no gap reported).
Horse goes before the cartHorse goes before the cart
 Have a defensible plan for building the ITS
infrastructure.
– Traffic flow studies
– Identify target areas or corridors
– Cost benefit analysis of implementation
– Communications plan
– Maintenance and replacement plan
– Central software (ATIS/ATMS) acquisition and
development plan
Best approach for funding ITSBest approach for funding ITS
 Have project listed on the
TIP/STIP
 Convert (divert!) typical
highway funding into
multi-year program for
ITS implementation
– STP Flex/CMAQ?
 Collaborate with County
and City governments on
regional ITS solutions
Patience is a virtuePatience is a virtue
 Learn the funding cycles (Is you agency on a
fiscal year? Calendar year?)
 Learn the names and garner the support of those
who write the checks (equivalent to accounts
payable), pay the bills, manage the programs, and
know their way around the funding cycles
 Learn your own accounting system (PIN numbers,
funding categories, coding, etc….)
Be aware of political processBe aware of political process
 Elections can be show stoppers
 Approvals just after an election can be good for
stability (four years to carry out an
implementation)
 Work hard for cross-jurisdictional projects
– State DOT and State Police
– State DOT and Tolling Authority
– State DOT and County of City government
– Highway and transit
Monitor ongoing maintenanceMonitor ongoing maintenance
and construction projectsand construction projects
Integrating ITS elements into planned
construction projects is typically a fraction
of project costs
One person can monitor all planned
construction projects as part of their duties
Bury fiber whenever possible
Maintenance contracts can also be
monitored for additions to your ITS
network
ConclusionConclusion
 There is a lot of Federal money out there right
now, strike while the iron is HOT!!!
 It will be spent rapidly
 If you can’t get your stand alone ITS project
funded on this cycle, find projects that are
receiving funding on your priority corridors and
collaborate
 Have your plans summarized at different levels
 Publish your plans in news letters or white papers

More Related Content

What's hot

1.4 widner panel presentation
1.4 widner panel presentation1.4 widner panel presentation
1.4 widner panel presentation
KSI Koniag
 
Galen updike2055 (2)
Galen updike2055 (2)Galen updike2055 (2)
Galen updike2055 (2)
Nnonaaaaa
 
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
WRI Ross Center for Sustainable Cities
 
Sociales Concept Map
Sociales Concept MapSociales Concept Map
Sociales Concept Map
camilacepeda
 
Nic 2012 statereport_fec
Nic 2012 statereport_fecNic 2012 statereport_fec
Nic 2012 statereport_fec
NIC Inc | EGOV
 

What's hot (19)

Infrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomicsInfrastructure Development in South Africa, Stephen Labson slEconomics
Infrastructure Development in South Africa, Stephen Labson slEconomics
 
E-government services for ICT development in Iraq
E-government services for ICT development in IraqE-government services for ICT development in Iraq
E-government services for ICT development in Iraq
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road Projects
 
1.4 widner panel presentation
1.4 widner panel presentation1.4 widner panel presentation
1.4 widner panel presentation
 
Ec102 may 08
Ec102 may 08Ec102 may 08
Ec102 may 08
 
Infrastructure, Regulation and Development: Evidence from Brazil
Infrastructure, Regulation and Development: Evidence from BrazilInfrastructure, Regulation and Development: Evidence from Brazil
Infrastructure, Regulation and Development: Evidence from Brazil
 
05-ARNOLD
05-ARNOLD05-ARNOLD
05-ARNOLD
 
Consolidation report august192005
Consolidation report august192005Consolidation report august192005
Consolidation report august192005
 
Galen updike2055 (2)
Galen updike2055 (2)Galen updike2055 (2)
Galen updike2055 (2)
 
PPP’s Options in Roads Sector - August, 2010
PPP’s Options in Roads Sector - August, 2010PPP’s Options in Roads Sector - August, 2010
PPP’s Options in Roads Sector - August, 2010
 
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
Sustainable Urban Transport Financing in China - Daniel Bongardt - GIZ China ...
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations
 
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
Smart Commute Initiative: Establishment of a Multijurisdictional Workplace-ba...
 
Challenges and Opportunities
Challenges and OpportunitiesChallenges and Opportunities
Challenges and Opportunities
 
SPEEDA INSIGHTS_Will foreign funds take away from private investment as the p...
SPEEDA INSIGHTS_Will foreign funds take away from private investment as the p...SPEEDA INSIGHTS_Will foreign funds take away from private investment as the p...
SPEEDA INSIGHTS_Will foreign funds take away from private investment as the p...
 
Sociales Concept Map
Sociales Concept MapSociales Concept Map
Sociales Concept Map
 
Ec102 may 09
Ec102 may 09Ec102 may 09
Ec102 may 09
 
Dan reuter 061410
Dan reuter 061410Dan reuter 061410
Dan reuter 061410
 
Nic 2012 statereport_fec
Nic 2012 statereport_fecNic 2012 statereport_fec
Nic 2012 statereport_fec
 

Viewers also liked

Three steps to improve your transportation operations
Three steps to improve your transportation operationsThree steps to improve your transportation operations
Three steps to improve your transportation operations
Dispatching Solutions, Inc.
 
Transportation operations
Transportation operationsTransportation operations
Transportation operations
Scarlett Voughn
 
Nursing home law_v4
Nursing home law_v4Nursing home law_v4
Nursing home law_v4
Neal Axton
 
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het RijkAmbtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
Anita Smit
 
SIGPL Action Research Grant
SIGPL Action Research GrantSIGPL Action Research Grant
SIGPL Action Research Grant
miztech
 
FOREX PROFITABLE SYSTEM
FOREX PROFITABLE SYSTEMFOREX PROFITABLE SYSTEM
FOREX PROFITABLE SYSTEM
Cak Matfx
 
Sierra sur times
Sierra sur timesSierra sur times
Sierra sur times
yorogo74
 

Viewers also liked (20)

DSi's Handy Hours-of-Service & eLogs Guide
DSi's Handy Hours-of-Service & eLogs GuideDSi's Handy Hours-of-Service & eLogs Guide
DSi's Handy Hours-of-Service & eLogs Guide
 
Three steps to improve your transportation operations
Three steps to improve your transportation operationsThree steps to improve your transportation operations
Three steps to improve your transportation operations
 
Choosing Your Transportation Career
Choosing Your Transportation CareerChoosing Your Transportation Career
Choosing Your Transportation Career
 
Presentacion Requerimientos Logisticos
Presentacion Requerimientos LogisticosPresentacion Requerimientos Logisticos
Presentacion Requerimientos Logisticos
 
Transportation operations
Transportation operationsTransportation operations
Transportation operations
 
DhiLogics Transportation Management System
DhiLogics Transportation Management SystemDhiLogics Transportation Management System
DhiLogics Transportation Management System
 
Workflow
WorkflowWorkflow
Workflow
 
Nursing home law_v4
Nursing home law_v4Nursing home law_v4
Nursing home law_v4
 
OneOne Hundred - Using Joomla
OneOne Hundred - Using JoomlaOneOne Hundred - Using Joomla
OneOne Hundred - Using Joomla
 
New Demo Request Flow
New Demo Request FlowNew Demo Request Flow
New Demo Request Flow
 
Society of Women Engineers
Society of Women EngineersSociety of Women Engineers
Society of Women Engineers
 
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het RijkAmbtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
Ambtenaar Voor De Toekomst - Het Nieuwe Werken bij het Rijk
 
SIGPL Action Research Grant
SIGPL Action Research GrantSIGPL Action Research Grant
SIGPL Action Research Grant
 
אלבום תמונות
אלבום תמונותאלבום תמונות
אלבום תמונות
 
FOREX PROFITABLE SYSTEM
FOREX PROFITABLE SYSTEMFOREX PROFITABLE SYSTEM
FOREX PROFITABLE SYSTEM
 
Wisefx EA | Simple. Efektif. Profitable
Wisefx EA | Simple. Efektif. ProfitableWisefx EA | Simple. Efektif. Profitable
Wisefx EA | Simple. Efektif. Profitable
 
Digital Audiences by Caroline Greener
Digital Audiences by Caroline GreenerDigital Audiences by Caroline Greener
Digital Audiences by Caroline Greener
 
Sierra sur times
Sierra sur timesSierra sur times
Sierra sur times
 
Nieuwsbrief
NieuwsbriefNieuwsbrief
Nieuwsbrief
 
Facebook in 10 minutes jan 2011 nn
Facebook in 10 minutes jan 2011 nnFacebook in 10 minutes jan 2011 nn
Facebook in 10 minutes jan 2011 nn
 

Similar to Transportation Operations In Action

Public Private Partnerships - State of the Market and the Future of P3's
Public Private Partnerships - State of the Market and the Future of P3'sPublic Private Partnerships - State of the Market and the Future of P3's
Public Private Partnerships - State of the Market and the Future of P3's
Jonathan Hunt
 
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docxStrategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
florriezhamphrey3065
 
ITS National Update 2011 3-01-11 SIU
ITS National Update 2011  3-01-11 SIUITS National Update 2011  3-01-11 SIU
ITS National Update 2011 3-01-11 SIU
raymurphy9533
 
_FINAL TIP FY2017 R with Endorsements
_FINAL TIP FY2017 R with Endorsements_FINAL TIP FY2017 R with Endorsements
_FINAL TIP FY2017 R with Endorsements
Alice Bojanowski
 
2010-1-27-ITS_Leadership
2010-1-27-ITS_Leadership2010-1-27-ITS_Leadership
2010-1-27-ITS_Leadership
David Pickeral
 
Roadways_and_Bridges
Roadways_and_BridgesRoadways_and_Bridges
Roadways_and_Bridges
Abby Davidson
 
The West Coast Transit Marketing Project
The West Coast Transit Marketing ProjectThe West Coast Transit Marketing Project
The West Coast Transit Marketing Project
Rachel Davis
 

Similar to Transportation Operations In Action (20)

Transportation Spending Under an Earmark Ban
Transportation Spending Under an Earmark BanTransportation Spending Under an Earmark Ban
Transportation Spending Under an Earmark Ban
 
Surface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & IssuesSurface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & Issues
 
2011 National ITS Update - 2 25-11 public version
2011 National ITS Update - 2 25-11 public version2011 National ITS Update - 2 25-11 public version
2011 National ITS Update - 2 25-11 public version
 
Public Private Partnerships - State of the Market and the Future of P3's
Public Private Partnerships - State of the Market and the Future of P3'sPublic Private Partnerships - State of the Market and the Future of P3's
Public Private Partnerships - State of the Market and the Future of P3's
 
Headings - 2015 Volume I
Headings - 2015 Volume IHeadings - 2015 Volume I
Headings - 2015 Volume I
 
ARTBA Comments on DOT Geographic Based Preferences Pilot Program
ARTBA Comments on DOT Geographic Based Preferences Pilot ProgramARTBA Comments on DOT Geographic Based Preferences Pilot Program
ARTBA Comments on DOT Geographic Based Preferences Pilot Program
 
2014 ARTBA Annual Report
2014 ARTBA Annual Report2014 ARTBA Annual Report
2014 ARTBA Annual Report
 
The $2Billion Question_Final
The $2Billion Question_FinalThe $2Billion Question_Final
The $2Billion Question_Final
 
Department of Transportation Fiscal Year 2012 Budget Highlights
Department of Transportation Fiscal Year 2012 Budget HighlightsDepartment of Transportation Fiscal Year 2012 Budget Highlights
Department of Transportation Fiscal Year 2012 Budget Highlights
 
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docxStrategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
Strategic Plan Part 2 SWOT Analysis PaperJon Thompson.docx
 
ITS National Update 2011 3-01-11 SIU
ITS National Update 2011  3-01-11 SIUITS National Update 2011  3-01-11 SIU
ITS National Update 2011 3-01-11 SIU
 
_FINAL TIP FY2017 R with Endorsements
_FINAL TIP FY2017 R with Endorsements_FINAL TIP FY2017 R with Endorsements
_FINAL TIP FY2017 R with Endorsements
 
2010-1-27-ITS_Leadership
2010-1-27-ITS_Leadership2010-1-27-ITS_Leadership
2010-1-27-ITS_Leadership
 
Roadways_and_Bridges
Roadways_and_BridgesRoadways_and_Bridges
Roadways_and_Bridges
 
Interfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation fundingInterfacing with the State and Local levels on transportation funding
Interfacing with the State and Local levels on transportation funding
 
Transportation Industry Roundtable
Transportation Industry RoundtableTransportation Industry Roundtable
Transportation Industry Roundtable
 
Dotd
DotdDotd
Dotd
 
The West Coast Transit Marketing Project
The West Coast Transit Marketing ProjectThe West Coast Transit Marketing Project
The West Coast Transit Marketing Project
 
Rapoport Testimony Pa 1 14 10
Rapoport Testimony   Pa 1 14 10Rapoport Testimony   Pa 1 14 10
Rapoport Testimony Pa 1 14 10
 
GIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_HughesGIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_Hughes
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 

Transportation Operations In Action

  • 1. Transportation Operations inTransportation Operations in Action: Financing OperationsAction: Financing Operations Institute of Transportation Engineers 2009 Technical Conference and Exhibit Dr. Margaret M. Cusack, PMP
  • 2. Congestion: Solution = ITSCongestion: Solution = ITS  Incident detection & rapid clearance  HELP Programs  Advanced Traveler Information Systems (ATIS)  Automated Traffic Management Systems (ATMS)  Congestion management/congestion pricing  Managed lanes/HOV/HOT – Limited access, eligibility requirements, etc.  ORT  Forecast models
  • 3. The real reason for ITS:The real reason for ITS: CRASH PREVENTIONCRASH PREVENTION  6,420,000 auto accidents in the United States in 2005.  The financial cost of these crashes is more than 230 Billion dollars.  2.9 million people were injured and 42,636 people killed.  About 115 people die every day in vehicle crashes in the United States -- one death every 13 minutes.
  • 4. Context: What makes ITSContext: What makes ITS hard to plan for and fund?hard to plan for and fund?  For transportation agencies it is a foreign concept that there is a type of project that does not end.  Transportation and infrastructure financing is typically rigid and habitual.  Software development expertise, and communications design – both required elements of ITS systems – are typically not found in a department of transportation.
  • 5. SCALESCALE Federal ITS Programs Statewide/Regional ITS Programs Local ITS Programs – New York – Los Angeles – Salt Lake City – Atlanta – Etc………….
  • 6. American Recovery andAmerican Recovery and Reinvestment Act (ARRA)Reinvestment Act (ARRA) “Stimulus Package”“Stimulus Package”  $787 billion in federal funding for initiatives to help stimulate America’s economy.  $48.76 billion in transportation. – Highways $27.5 (3% to Enhancements) – Public Transportation $8.4 – Nationwide Grant Program $1.5 – Aviation $1.3 – Rail $9.3 • Source: VDRPT
  • 7. Tuesday, March 3, 2009Tuesday, March 3, 2009 President Barack Obama, joined by Vice President Joe Biden and U.S. Transportation Secretary Ray LaHood, (at the USDOT in Washington) today marked the release of $26.6 billion from the American Recovery and Reinvestment Act (ARRA) to states and local transportation authorities to repair and build highways, roads and bridges.
  • 8. TIGER TeamTIGER Team At the ceremony the President unveiled new logos for government-wide projects completed under the ARRA and the Transportation Investments Generating Economic Recovery (TIGER) logo for transportation projects completed under the ARRA.
  • 9. TIGER TeamTIGER Team  According to Calvin Scovel, USDOT Inspector General, the TIGER Team is dealing with a large infusion of money, which must be distributed quickly and using only existing staff resources.  This will force the department (USDOT) to limit its focus on its mission of transportation safety. • http://www.transportgooru.com
  • 10. Transportation funds:Transportation funds: Not just for USDOT…..Not just for USDOT…..  142M to Coast Guard for alteration or removal of obstructive bridges  150M to FEMA for Public Transportation (rail) Security; and 150M for Port Security  180M to Bureau of Land Management for roads, bridges, trails, etc…  165M to US Fish & Wildlife for construction and repair of roads, bridges, etc….  589M to National Park Service for critical infrastructure projects ……  USGS, BIA, Dept. of Agriculture…..
  • 11. A good question:A good question: (found on www.recovery.gov)(found on www.recovery.gov) Q: I heard I'd be able to track recovery funds. Why can't I do that? A: You aren't able to track funds yet because we have not yet started receiving information from Federal agencies on how they are going to allocate the money. It takes a little bit of time for them to make sure your money is going to be spent wisely. …. You will have access to data as soon as we begin receiving it from agencies.
  • 12. USDOTUSDOT $1.5B through September 30, 2011 – 20 to 300M grants – Significant impact on the Nation; a metropolitan area; or a region $27.5B through September 30, 2010 – Projects funded at 50% – Projects that have to be completed in 3 years – Isn’t that past the 2010 deadline????
  • 13. Other OpportunitiesOther Opportunities Amtrak – 1,300M FTA – 6,900M FCC – no amount stated – Broadband Technology Opportunities Program – (4) improve access to and use of broadband service by public safety agencies – 80% or higher available match
  • 14. What happened to Title 23?What happened to Title 23? ISTEA – 1993 to 1997 TEA-21 – 1999 to 2003 SAFET-LU – 2003 to 2009……. CAA - 1990 CAAA - 1991
  • 15. FY 2009FY 2009  IM $4,700 M  NHS $5,500 M  Bridge $4,000 M  STP $5,807 M  CMAQ $1,600 M  Safety $1,500 M  ITS Performance Incentive?? $135 M  http://www.fhwa.dot.gov/reauthorization/authorizations.htm
  • 16. SAFET-LU 2003 to 2009SAFET-LU 2003 to 2009 Apportionment Category Total for 6 years IM 25,379,640,000 NHS 30,124,368,000 STP 31,484,699,740 Bridges 21,767,922,000 CMAQ 8,607,299,917 Safety 7,321,050,000 TOTAL (Above categories only) 105,093,849,857 17,515,641,642 per year
  • 17. Title 23 FundingTitle 23 Funding If it will be re-authorized, at what levels? Does the stimulus package diminish the perception of a need for funding? The ARRA does not authorize spending in many important areas The ARRA does not even mention ITS
  • 18. ARRA model vs. ISTEA modelARRA model vs. ISTEA model ARRA = Federal agency staff determines allocation – By program? – By project? Surface Transportation Legislation = State Governments determine programming policies for funding, following established programming processes
  • 19. Onward and UpwardOnward and Upward We have elevated the traveler’s expectations to the point where ceasing the operations activities we now have developed would be unheard of. Only embellishment and improvement to ITS programs will be accepted.
  • 20. State GovernmentsState Governments  47 states are facing shortfalls in their budgets  New gaps of $53B have opened up (on top of $48B) in the budgets of 42 states plus D.C.  44 states anticipate deficits for fiscal year 2010 and beyond.  Total gap of $105 billion — 17 percent of budgets in 38 states that estimated these gapsSource: http://www.cbpp.org
  • 21. City GovernmentsCity Governments  New York: Estimates a budget gap of $1.2 billion in 2010. Budget gap projection for 2011 is now $4.8 billion.  San Diego: The total budget for Fiscal Year 2009 is $3.13 billion (no gap reported).
  • 22. Horse goes before the cartHorse goes before the cart  Have a defensible plan for building the ITS infrastructure. – Traffic flow studies – Identify target areas or corridors – Cost benefit analysis of implementation – Communications plan – Maintenance and replacement plan – Central software (ATIS/ATMS) acquisition and development plan
  • 23. Best approach for funding ITSBest approach for funding ITS  Have project listed on the TIP/STIP  Convert (divert!) typical highway funding into multi-year program for ITS implementation – STP Flex/CMAQ?  Collaborate with County and City governments on regional ITS solutions
  • 24. Patience is a virtuePatience is a virtue  Learn the funding cycles (Is you agency on a fiscal year? Calendar year?)  Learn the names and garner the support of those who write the checks (equivalent to accounts payable), pay the bills, manage the programs, and know their way around the funding cycles  Learn your own accounting system (PIN numbers, funding categories, coding, etc….)
  • 25. Be aware of political processBe aware of political process  Elections can be show stoppers  Approvals just after an election can be good for stability (four years to carry out an implementation)  Work hard for cross-jurisdictional projects – State DOT and State Police – State DOT and Tolling Authority – State DOT and County of City government – Highway and transit
  • 26. Monitor ongoing maintenanceMonitor ongoing maintenance and construction projectsand construction projects Integrating ITS elements into planned construction projects is typically a fraction of project costs One person can monitor all planned construction projects as part of their duties Bury fiber whenever possible Maintenance contracts can also be monitored for additions to your ITS network
  • 27. ConclusionConclusion  There is a lot of Federal money out there right now, strike while the iron is HOT!!!  It will be spent rapidly  If you can’t get your stand alone ITS project funded on this cycle, find projects that are receiving funding on your priority corridors and collaborate  Have your plans summarized at different levels  Publish your plans in news letters or white papers