MMX: CREATING CHOICES IN SEABORNE IRON
ORE SUPPLY


Rio de Janeiro | February 2013
DISCLAIMER

This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the
Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities
Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking
statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”,
“estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of
operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures
and start-up dates.

By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and
specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in
such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to
place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these
statements.

Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a
timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves,
and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on
forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events.

MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell
(which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States,
or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be
registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the
United States absent registration or an applicable exemption from such registration requirements.

This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part
without MMX’s prior written consent.
1
MMX INTRODUCTION
*
      MMXM3: SOLID CONTROLLING SHAREHOLDERS



                                                                                                                       16% Wisco

               46% Controlling
                Shareholders                                                                                       14% SK Networks

                                                                                                                       24% Others




                    94.52%                                100%                                     100%                                100%

          MMX Corumbá                                                                     Minera MMX                           Superporto
                                                 MMX Sudeste
           Mineração                                                                        do Chile                            Sudeste
        5.48% EBX




                                             Serra            Bom
                                             Azul            Sucesso


* Shareholders Ownership after capital increase: Controlling Shareholders (59.3%); Wisco (10.5%); SK Networks (8.8%); Others (21.4%)          4
HIGH QUALITY MINING ASSETS IN TRADITIONAL
  MINING DISTRICTS
 Two operating systems: Serra Azul and
Corumbá
 Current Capacity: 10.8 Mtpy
 Mining rights in traditional iron ore
districts: Brazil (Minas Gerais and Mato
Grosso do Sul)
  Production committed with strategic
consumers – China and South Korea –                            Sudeste System
through long-term contracts                                        Serra Azul Unit
                                                                 Bom Sucesso Unit
                                            Corumbá System
 Brownfield start up in Brazil
  Expanding beyond 40 Mtpy in Brazil,
through fully integrated systems: Private                    Sudeste Superport
port
  Strategic port location

                                                                                     5
INGREDIENTS FOR A SUCCESSFUL IRON ORE
BUSINESS

                    SRK certification: 3,1 billion tons of mineral resources, and further mineral
 Resource Base
                    potential of up to 1,4 billion tons. Reserves of 1 billion tons in Serra Azul.
                    Low stripping ratio
  Competitive       Competitive scale – New beneficiation plant
Production Cost
   Structure        Energy supply contract with MPX
                    Infrastructure with integrated logistics

                    Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to
  Guaranteed
                    seaborne markets
   Logistics
                    Long Term Railway Contract with MRS

Secured Off-take    59% of future production already committed through long-term contracts

Operational Track   Experience management team with implementation and operational expertise
    Record          Installed Capacity of 10 Mtpy (Serra Azul and Corumbá sites)




                                                                                                     6
A LOT HAS BEEN DELIVERED

December    Beginning of the R$ 1.4 billion capital increase process
  2012      BNDES approves allocation of long term financing for Serra Azul
            Conclusion of the offshore civil works at the Sudeste Superport
            Issuance of debentures at the amount of R$ 600 million
            Approval of the merger of PORTX into MMX
            Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste
           Superport to 100 Mtpy
            Beginning of construction of the Serra Azul Unit expansion
            Installation License authorizing the Serra Azul Unit expansion
            MMX signs contract for railway services with MRS through 2026
            SRK certified 997,4 million tons of mineral reserves at Serra Azul Unit
            EPCM contract with CNEC Worley Parsons for Serra Azul expansion
            Contract with MPX for energy supply for expansion of Serra Azul
            Financial advisory contract with Itaú BBA and Bradesco
February
  2011      Deal with Usiminas

                                                                                          7
FINANCIAL HIGHLIGHTS

                Sales (million ton)                                   Net Revenue (R$ million)
2.5                                                  300

2.0                                                  250
       0.7
1.5                                            0.6   200
                         0.6
1.0                                                  150
                                                                273
       1.5                                                                                           245
                         1.1                   1.3   100                            204
0.5

0.0                                                   50
      3Q11             2Q12               3Q12
                                                          0
       Domestic Market         Export Market                   3Q11             2Q12                 3Q12


             Gross Profit (R$ million)                                EBITDA (R$ million)
200                                                  60                                                     20%
                                                              18.4%                         17.9%
180
160                                                  50
                                                                                                            15%
140                                                  40
120
                                                     30                        6.8%                         10%
100                                                           50
 80   173                                            20                                       44
                                           148                                                              5%
 60                    113                           10
 40                                                                            14
 20                                                   0                                                     0%
  0                                                           3Q11          2Q12             3Q12
      3Q11             2Q12               3Q12                        EBITDA         EBITDA Margin

                                                                                                                  8
2
SUDESTE SYSTEM
2.1
SERRA AZUL UNIT
UNIQUE INTEGRATED LOGISTICS
Since Iron ore is a bulk commodity, an integrated logistic (mine 
railway  port) is the key factor for a successful operation




                                                                                                            Offtakers (Shareholders)



                                                                                                         Long-Term contract (20 years). Wisco will
                                                                                                         off-take at least 50% of MMX Sudeste
                                                                                                         production.


           Mine                              Railway                          Superport
                                                                                                         Long-Term contract (20 years) to trade iron
                                                                                                         ore. SK will take-off part of the Sudeste
                                                                                                         System yearly production equivalent to its
                                                                                                         participation in MMX Capital (9%).


Serra Azul unit is near to the    MMX has a long term contract       Sudeste Superport will have
MRS railway - 10 km from the      with MRS railway, which connects   50Mtpy     iron   ore    shipping
mine,   a   distance  currently   the mine with the CSN’s port and   capacity. The Superport will have           SK and Wisco will together
traversed by trucks.              the Sudeste Superport, both        a depth of 20 meters, enough to          offtake 59% of total production
                                  located in Itaguaí.                handle Capesize vessels.

                                                                                                                                                 11
Iron ore Quadrangle
     QUADRILÁTERO FERRÍFERO




                              12
RAILWAY
Railway access connecting MRS to the Sudeste Superport




                                                         13
MRS CONTRACT
MMX signed a long term contract for railway services


 Contract signed on December 28th 2011.

 Long term contract through 2026.

 Provides for a volume of up to 36 million tons of iron ore per year.

  Tariff: R$ 26.463/ton , net of tax, readjusted annually by a parametric
formula the variation in IGP-DI and in diesel oil.




                                                                            14
SERRA AZUL
Expansion project with integrated logistic and pellet feed iron ore

Highlights
 Production target: 29 Mtpy
 59% of production already committed through long-term contracts
 997.4 million tons of reserves already secured by SRK
Execution Update
 Beginning of construction of Serra Azul Unit expansion
 Construction license issued in April, 2012
 Acquisition of gyratory crushers, ball mills, SAG mills and vertical
mills for the new beneficiation plant
 Contract with CNEC WorleyParsons
 Contract with MPX to supply power for 15 years at a base-price of
R$125/MWh
Expected Quality – Ouro Preto pilot plant test work
Fe: 66.65%              P: 0.025%
SiO2: 3.23%             Mn: 0.018%
AL2O3: 0.54%            LOI: 0.75%
                                                                        15
SERRA AZUL
Growth through consolidation while leveraging existing
infrastructure




                                                         16
SERRA AZUL
Serra Azul Unit Expansion Project




           Pit     New Beneficiation Plant, transmission line and water pipelines,
                   Stockyard and Loading Terminal
                                                                                     17
Serra Azul Expansion
Beneficiation Plant    18
SERRA AZUL
        Earthwork
                                Beneficiation                Grind               Primary Crushing            Primary Crushing                    Main Access


Pump House, Sump and                                                                                                                     Maintenance Workshop
                                                Substation                   Water Storage Tank            Water Storage Tank
     Thickeners
                                                                                                                  Inc.


                Construction Site                  Grind             Piles                   Construction Site and              Administrative
                                                                                                 Warehouse                        Buildings
2.2
SUDESTE SUPERPORT
Sudeste Superport
         Location
               21
Offshore
                    Nautical Access




                                               Tunnel


                                                                                Stockyard 06

                                Stockyard 32




Sudeste Superport
Artistic View                                                  Railway Access                  22
SUDESTE SUPERPORT
Overview


Licensed to 50 Mtpy, expandable to 100 Mtpy

Licensing for 100 Mtpy underway, public

hearing held on May, 2012

Navy Approval to 100 Mtpy

Loading: 2 ship loaders of 25 Mtpy each

Construction works for the tunnel and

offshore infrastructure completed

Fully funded (BNDES)

                                              Sudeste Superport - Itaguaí

                                                                            23
USIMINAS AGREEMENT

  Pau de Vinho Joint Mining                  Sudeste Superport Handling
 SRK resources audit : 810 million tons      Handling fee: USD 12.63/ton adjusted
plus a potential of an additional 75        by US-PPI
million tons

 Pau de Vinho target production: 8 Mtpy      Volumes:

                                             ■ 12 Mtpy
 Significant synergies with       current
mining operations at Serra Azul              80% Take-or-Pay

 13.5% of production at Pau de Vinho
                                              Usiminas can renew the contract for 1
will be delivered to Usiminas
                                            to 5 years

  MMX will be responsible for the
licensing, CAPEX and operation for 30
years
                                                                                      24
Sudeste Superport
Road&Railway Access


                      Railway Access to
                      Itaguaí Port
                                          Road&Railway Access to
                                          MMX
Sudeste Superport
Road&Railway Access
Stockyard 32

                    Road Access                 Stacker Reclaimer
                                                Infrastructure



                                                             Stacker Reclaimer
                                                             Rolling Way




              Car Dumpers

                                        Car Dumpers Control Room




                                  Stockyard 6




Sudeste Superport
Stockyard Elevation 6 m
                                                                                                27
Control Room of Car
                               Dumpers




           Train Positioners



                                                     Car Dumpers




Sudeste Superport
Car Dumpers                                                        28
Tunnel Entrance

       Electric Substation
       Infrastructure




                                               Transfer House
                                               Concrete Base




Sudeste Superport
Stockyard Elevation 32 m
                                                                29
11 m




                    20.5 m


Sudeste Superport
Tunnel entrance
                             30
Tunnel Exit




                              Bridge 1 (430 m)




                       Electric Substation Building
                                                      Bridge 2 (270 m)




                                     Platform 2
Sudeste Superport
Bridges and Platform
                                                                         31
Sudeste Superport
Platform and
Substation Structure                Electric Substation Building




                       Platform 2




                                                                   32
Bridge
                      430 m



 Bridge
 270 m




                                Pier
                               766 m




Superporto Sudeste
 Sudeste Superport
Estrutura Offshore
 Offshore Structure
                                       33
Belt Conveyor Structure




                                     Defense
Superporto Sudeste                               Sudeste Superport
Estrutura Offshore                             Structure of the Belt
                                                          Conveyor
                                                                 34
Sudeste Superport
      Ship Loader
               35
Sudeste Superport
      Ship Loader
               36
3
CORUMBÁ
CORUMBÁ

Highlights

 Current Capacity: 2.1 Mtpy

 Long-term contracts signed with local and

international barge operators

 SRK audit resources report: 192 million tons

plus a potential of an additional 123 million

tons




                                                38
Investor Relations
Carlos Gonzalez – CEO and IRO
   Adriana Marques – Manager
        Daniella Maia - Analyst
     Phone + 55 21 2163-6197
           +55 21 2163-4366
               ri@mmx.com.br

More Related Content

What's hot

Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - ingles
mmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
mmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
mmxriweb
 
Corporate Presentation - May 2012
Corporate Presentation - May 2012Corporate Presentation - May 2012
Corporate Presentation - May 2012
mmxriweb
 
Mmx junho 2012 - ingles
Mmx   junho 2012 - inglesMmx   junho 2012 - ingles
Mmx junho 2012 - ingles
mmxriweb
 
Mmx março 2013 - ingles vfinal
Mmx   março 2013 - ingles vfinalMmx   março 2013 - ingles vfinal
Mmx março 2013 - ingles vfinal
mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
mmxriweb
 
Mmx março 2013 - ingles v3
Mmx   março 2013 - ingles v3Mmx   março 2013 - ingles v3
Mmx março 2013 - ingles v3
mmxriweb
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
mmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
mmxriweb
 
Mmx setembro 2012 - ingles v final 2
Mmx   setembro 2012 - ingles v final 2Mmx   setembro 2012 - ingles v final 2
Mmx setembro 2012 - ingles v final 2
mmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
mmxriweb
 
Mmx outubro 2012 - ingles - v2
Mmx   outubro 2012 - ingles - v2Mmx   outubro 2012 - ingles - v2
Mmx outubro 2012 - ingles - v2
mmxriweb
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
mmxriweb
 
Mmx setembro 2012 - ingles v. final
Mmx   setembro 2012 - ingles v. finalMmx   setembro 2012 - ingles v. final
Mmx setembro 2012 - ingles v. final
mmxriweb
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009
mmxriweb
 
Apresentação ri osources conference (merrill lynch)
Apresentação   ri osources conference (merrill lynch)Apresentação   ri osources conference (merrill lynch)
Apresentação ri osources conference (merrill lynch)
mmxriweb
 
Presentation – 2007 global resourses conference (bmo)
Presentation – 2007 global resourses conference (bmo)Presentation – 2007 global resourses conference (bmo)
Presentation – 2007 global resourses conference (bmo)
mmxriweb
 

What's hot (19)

Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - ingles
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Corporate Presentation - May 2012
Corporate Presentation - May 2012Corporate Presentation - May 2012
Corporate Presentation - May 2012
 
Mmx junho 2012 - ingles
Mmx   junho 2012 - inglesMmx   junho 2012 - ingles
Mmx junho 2012 - ingles
 
Mmx março 2013 - ingles vfinal
Mmx   março 2013 - ingles vfinalMmx   março 2013 - ingles vfinal
Mmx março 2013 - ingles vfinal
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Mmx março 2013 - ingles v3
Mmx   março 2013 - ingles v3Mmx   março 2013 - ingles v3
Mmx março 2013 - ingles v3
 
Mmx abril 2013 - ingles - v2
Mmx   abril 2013 - ingles - v2Mmx   abril 2013 - ingles - v2
Mmx abril 2013 - ingles - v2
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 
Mmx setembro 2012 - ingles v final 2
Mmx   setembro 2012 - ingles v final 2Mmx   setembro 2012 - ingles v final 2
Mmx setembro 2012 - ingles v final 2
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 
Mmx outubro 2012 - ingles - v2
Mmx   outubro 2012 - ingles - v2Mmx   outubro 2012 - ingles - v2
Mmx outubro 2012 - ingles - v2
 
Mmx outubro 2012 - ingles
Mmx   outubro 2012 - inglesMmx   outubro 2012 - ingles
Mmx outubro 2012 - ingles
 
Mmx setembro 2012 - ingles v. final
Mmx   setembro 2012 - ingles v. finalMmx   setembro 2012 - ingles v. final
Mmx setembro 2012 - ingles v. final
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009
 
Apresentação ri osources conference (merrill lynch)
Apresentação   ri osources conference (merrill lynch)Apresentação   ri osources conference (merrill lynch)
Apresentação ri osources conference (merrill lynch)
 
Presentation – 2007 global resourses conference (bmo)
Presentation – 2007 global resourses conference (bmo)Presentation – 2007 global resourses conference (bmo)
Presentation – 2007 global resourses conference (bmo)
 

Viewers also liked (8)

SHS 1986 25-Year Reunion, part 1
SHS 1986 25-Year Reunion, part 1SHS 1986 25-Year Reunion, part 1
SHS 1986 25-Year Reunion, part 1
 
Juicies pitch
Juicies pitchJuicies pitch
Juicies pitch
 
Declaracion publica mision cloc via campesina al pueblo paraguayo
Declaracion publica mision cloc via campesina al pueblo paraguayoDeclaracion publica mision cloc via campesina al pueblo paraguayo
Declaracion publica mision cloc via campesina al pueblo paraguayo
 
La Secretaria
La SecretariaLa Secretaria
La Secretaria
 
Finantsaruandluse siseelu. Audiitori kogemuslik vaade, Connect. Veiko Hintsov...
Finantsaruandluse siseelu. Audiitori kogemuslik vaade, Connect. Veiko Hintsov...Finantsaruandluse siseelu. Audiitori kogemuslik vaade, Connect. Veiko Hintsov...
Finantsaruandluse siseelu. Audiitori kogemuslik vaade, Connect. Veiko Hintsov...
 
Cliches du Monde
Cliches du Monde Cliches du Monde
Cliches du Monde
 
Audience Attraction - Question 4 & 5
Audience Attraction - Question 4 & 5Audience Attraction - Question 4 & 5
Audience Attraction - Question 4 & 5
 
Taller proyecto bimestral 2° bloque
Taller proyecto bimestral 2° bloqueTaller proyecto bimestral 2° bloque
Taller proyecto bimestral 2° bloque
 

Similar to Mmx fevereiro 2013 - ingles

Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12
mmxriweb
 
MMX Corporate Presentation - September 2011
MMX Corporate Presentation - September 2011MMX Corporate Presentation - September 2011
MMX Corporate Presentation - September 2011
mmxriweb
 
Corporate presentation – august 2009
Corporate presentation – august 2009Corporate presentation – august 2009
Corporate presentation – august 2009
mmxriweb
 
Corporate presentation june 2011
Corporate presentation   june 2011Corporate presentation   june 2011
Corporate presentation june 2011
mmxriweb
 
MMX APIMEC 2011 english
MMX APIMEC 2011 englishMMX APIMEC 2011 english
MMX APIMEC 2011 english
mmxriweb
 
Corporate presentation july 2009
Corporate presentation   july 2009Corporate presentation   july 2009
Corporate presentation july 2009
mmxriweb
 
Apresentação – 2007 global resourses conference...
Apresentação – 2007 global resourses conference...Apresentação – 2007 global resourses conference...
Apresentação – 2007 global resourses conference...
mmxriweb
 
Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009
mmxriweb
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinal
mmxriweb
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinal
mmxriweb
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinal
mmxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
mmxriweb
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
mmxriweb
 

Similar to Mmx fevereiro 2013 - ingles (13)

Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12Mmx webcast ingles 2 t12
Mmx webcast ingles 2 t12
 
MMX Corporate Presentation - September 2011
MMX Corporate Presentation - September 2011MMX Corporate Presentation - September 2011
MMX Corporate Presentation - September 2011
 
Corporate presentation – august 2009
Corporate presentation – august 2009Corporate presentation – august 2009
Corporate presentation – august 2009
 
Corporate presentation june 2011
Corporate presentation   june 2011Corporate presentation   june 2011
Corporate presentation june 2011
 
MMX APIMEC 2011 english
MMX APIMEC 2011 englishMMX APIMEC 2011 english
MMX APIMEC 2011 english
 
Corporate presentation july 2009
Corporate presentation   july 2009Corporate presentation   july 2009
Corporate presentation july 2009
 
Apresentação – 2007 global resourses conference...
Apresentação – 2007 global resourses conference...Apresentação – 2007 global resourses conference...
Apresentação – 2007 global resourses conference...
 
Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009
 
Mmx novembro 2013 - ingles - vfinal
Mmx   novembro 2013 - ingles - vfinalMmx   novembro 2013 - ingles - vfinal
Mmx novembro 2013 - ingles - vfinal
 
Mmx setembro 2013 - ingles - vfinal
Mmx   setembro 2013 - ingles - vfinalMmx   setembro 2013 - ingles - vfinal
Mmx setembro 2013 - ingles - vfinal
 
Mmx fevereiro - en - vfinal
Mmx   fevereiro - en - vfinalMmx   fevereiro - en - vfinal
Mmx fevereiro - en - vfinal
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 
Mmx janeiro - en - vfinal
Mmx   janeiro - en - vfinalMmx   janeiro - en - vfinal
Mmx janeiro - en - vfinal
 

More from mmxriweb

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
mmxriweb
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
mmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
mmxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
mmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
mmxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
mmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
mmxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
mmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
mmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
mmxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
mmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
mmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
mmxriweb
 

More from mmxriweb (20)

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 

Mmx fevereiro 2013 - ingles

  • 1. MMX: CREATING CHOICES IN SEABORNE IRON ORE SUPPLY Rio de Janeiro | February 2013
  • 2. DISCLAIMER This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent.
  • 4. * MMXM3: SOLID CONTROLLING SHAREHOLDERS 16% Wisco 46% Controlling Shareholders 14% SK Networks 24% Others 94.52% 100% 100% 100% MMX Corumbá Minera MMX Superporto MMX Sudeste Mineração do Chile Sudeste 5.48% EBX Serra Bom Azul Sucesso * Shareholders Ownership after capital increase: Controlling Shareholders (59.3%); Wisco (10.5%); SK Networks (8.8%); Others (21.4%) 4
  • 5. HIGH QUALITY MINING ASSETS IN TRADITIONAL MINING DISTRICTS Two operating systems: Serra Azul and Corumbá Current Capacity: 10.8 Mtpy Mining rights in traditional iron ore districts: Brazil (Minas Gerais and Mato Grosso do Sul) Production committed with strategic consumers – China and South Korea – Sudeste System through long-term contracts Serra Azul Unit Bom Sucesso Unit Corumbá System Brownfield start up in Brazil Expanding beyond 40 Mtpy in Brazil, through fully integrated systems: Private Sudeste Superport port Strategic port location 5
  • 6. INGREDIENTS FOR A SUCCESSFUL IRON ORE BUSINESS SRK certification: 3,1 billion tons of mineral resources, and further mineral Resource Base potential of up to 1,4 billion tons. Reserves of 1 billion tons in Serra Azul. Low stripping ratio Competitive Competitive scale – New beneficiation plant Production Cost Structure Energy supply contract with MPX Infrastructure with integrated logistics Sudeste Superport at 50 Mtpy, expandable to 100 Mtpy, provides gateway to Guaranteed seaborne markets Logistics Long Term Railway Contract with MRS Secured Off-take 59% of future production already committed through long-term contracts Operational Track Experience management team with implementation and operational expertise Record Installed Capacity of 10 Mtpy (Serra Azul and Corumbá sites) 6
  • 7. A LOT HAS BEEN DELIVERED December Beginning of the R$ 1.4 billion capital increase process 2012 BNDES approves allocation of long term financing for Serra Azul Conclusion of the offshore civil works at the Sudeste Superport Issuance of debentures at the amount of R$ 600 million Approval of the merger of PORTX into MMX Public hearings in Itaguaí and Mangaratiba for the expansion of the Sudeste Superport to 100 Mtpy Beginning of construction of the Serra Azul Unit expansion Installation License authorizing the Serra Azul Unit expansion MMX signs contract for railway services with MRS through 2026 SRK certified 997,4 million tons of mineral reserves at Serra Azul Unit EPCM contract with CNEC Worley Parsons for Serra Azul expansion Contract with MPX for energy supply for expansion of Serra Azul Financial advisory contract with Itaú BBA and Bradesco February 2011 Deal with Usiminas 7
  • 8. FINANCIAL HIGHLIGHTS Sales (million ton) Net Revenue (R$ million) 2.5 300 2.0 250 0.7 1.5 0.6 200 0.6 1.0 150 273 1.5 245 1.1 1.3 100 204 0.5 0.0 50 3Q11 2Q12 3Q12 0 Domestic Market Export Market 3Q11 2Q12 3Q12 Gross Profit (R$ million) EBITDA (R$ million) 200 60 20% 18.4% 17.9% 180 160 50 15% 140 40 120 30 6.8% 10% 100 50 80 173 20 44 148 5% 60 113 10 40 14 20 0 0% 0 3Q11 2Q12 3Q12 3Q11 2Q12 3Q12 EBITDA EBITDA Margin 8
  • 11. UNIQUE INTEGRATED LOGISTICS Since Iron ore is a bulk commodity, an integrated logistic (mine  railway  port) is the key factor for a successful operation Offtakers (Shareholders) Long-Term contract (20 years). Wisco will off-take at least 50% of MMX Sudeste production. Mine Railway Superport Long-Term contract (20 years) to trade iron ore. SK will take-off part of the Sudeste System yearly production equivalent to its participation in MMX Capital (9%). Serra Azul unit is near to the MMX has a long term contract Sudeste Superport will have MRS railway - 10 km from the with MRS railway, which connects 50Mtpy iron ore shipping mine, a distance currently the mine with the CSN’s port and capacity. The Superport will have SK and Wisco will together traversed by trucks. the Sudeste Superport, both a depth of 20 meters, enough to offtake 59% of total production located in Itaguaí. handle Capesize vessels. 11
  • 12. Iron ore Quadrangle QUADRILÁTERO FERRÍFERO 12
  • 13. RAILWAY Railway access connecting MRS to the Sudeste Superport 13
  • 14. MRS CONTRACT MMX signed a long term contract for railway services Contract signed on December 28th 2011. Long term contract through 2026. Provides for a volume of up to 36 million tons of iron ore per year. Tariff: R$ 26.463/ton , net of tax, readjusted annually by a parametric formula the variation in IGP-DI and in diesel oil. 14
  • 15. SERRA AZUL Expansion project with integrated logistic and pellet feed iron ore Highlights Production target: 29 Mtpy 59% of production already committed through long-term contracts 997.4 million tons of reserves already secured by SRK Execution Update Beginning of construction of Serra Azul Unit expansion Construction license issued in April, 2012 Acquisition of gyratory crushers, ball mills, SAG mills and vertical mills for the new beneficiation plant Contract with CNEC WorleyParsons Contract with MPX to supply power for 15 years at a base-price of R$125/MWh Expected Quality – Ouro Preto pilot plant test work Fe: 66.65% P: 0.025% SiO2: 3.23% Mn: 0.018% AL2O3: 0.54% LOI: 0.75% 15
  • 16. SERRA AZUL Growth through consolidation while leveraging existing infrastructure 16
  • 17. SERRA AZUL Serra Azul Unit Expansion Project Pit New Beneficiation Plant, transmission line and water pipelines, Stockyard and Loading Terminal 17
  • 19. SERRA AZUL Earthwork Beneficiation Grind Primary Crushing Primary Crushing Main Access Pump House, Sump and Maintenance Workshop Substation Water Storage Tank Water Storage Tank Thickeners Inc. Construction Site Grind Piles Construction Site and Administrative Warehouse Buildings
  • 21. Sudeste Superport Location 21
  • 22. Offshore Nautical Access Tunnel Stockyard 06 Stockyard 32 Sudeste Superport Artistic View Railway Access 22
  • 23. SUDESTE SUPERPORT Overview Licensed to 50 Mtpy, expandable to 100 Mtpy Licensing for 100 Mtpy underway, public hearing held on May, 2012 Navy Approval to 100 Mtpy Loading: 2 ship loaders of 25 Mtpy each Construction works for the tunnel and offshore infrastructure completed Fully funded (BNDES) Sudeste Superport - Itaguaí 23
  • 24. USIMINAS AGREEMENT Pau de Vinho Joint Mining Sudeste Superport Handling SRK resources audit : 810 million tons Handling fee: USD 12.63/ton adjusted plus a potential of an additional 75 by US-PPI million tons Pau de Vinho target production: 8 Mtpy Volumes: ■ 12 Mtpy Significant synergies with current mining operations at Serra Azul 80% Take-or-Pay 13.5% of production at Pau de Vinho Usiminas can renew the contract for 1 will be delivered to Usiminas to 5 years MMX will be responsible for the licensing, CAPEX and operation for 30 years 24
  • 25. Sudeste Superport Road&Railway Access Railway Access to Itaguaí Port Road&Railway Access to MMX
  • 27. Stockyard 32 Road Access Stacker Reclaimer Infrastructure Stacker Reclaimer Rolling Way Car Dumpers Car Dumpers Control Room Stockyard 6 Sudeste Superport Stockyard Elevation 6 m 27
  • 28. Control Room of Car Dumpers Train Positioners Car Dumpers Sudeste Superport Car Dumpers 28
  • 29. Tunnel Entrance Electric Substation Infrastructure Transfer House Concrete Base Sudeste Superport Stockyard Elevation 32 m 29
  • 30. 11 m 20.5 m Sudeste Superport Tunnel entrance 30
  • 31. Tunnel Exit Bridge 1 (430 m) Electric Substation Building Bridge 2 (270 m) Platform 2 Sudeste Superport Bridges and Platform 31
  • 32. Sudeste Superport Platform and Substation Structure Electric Substation Building Platform 2 32
  • 33. Bridge 430 m Bridge 270 m Pier 766 m Superporto Sudeste Sudeste Superport Estrutura Offshore Offshore Structure 33
  • 34. Belt Conveyor Structure Defense Superporto Sudeste Sudeste Superport Estrutura Offshore Structure of the Belt Conveyor 34
  • 35. Sudeste Superport Ship Loader 35
  • 36. Sudeste Superport Ship Loader 36
  • 38. CORUMBÁ Highlights Current Capacity: 2.1 Mtpy Long-term contracts signed with local and international barge operators SRK audit resources report: 192 million tons plus a potential of an additional 123 million tons 38
  • 39. Investor Relations Carlos Gonzalez – CEO and IRO Adriana Marques – Manager Daniella Maia - Analyst Phone + 55 21 2163-6197 +55 21 2163-4366 ri@mmx.com.br