SlideShare a Scribd company logo
1 of 5
Download to read offline
[Type text]
Mohamed Atef Abbas
askmohamed007@gmail.com EL-Nozha, Cairo, Egypt +201279221350
Personal Information:
 Marital status : Married.
 Nationality : Egyptian.
 Place of Birth : Egypt.
 Date of Birth : 01/09/1978.
 Military status : Exempted.
Objective:
I’m truly passionate about my work and always eager to connect with other construction
professional. While I enjoy all aspects of my job, I think my favorite stage of a project is
executing, when I see that a set of drawings becomes a tangible asset and met the initiating
objectives for my client. As I go through that collaborative process, not only did I have fun
managing the project, but also I found it rewarding to see the results.
Education:
 2012, PMP preparation course in MENA CHAPER Institute.
 June 2003, Shubra Faculty of engineering, Zagazig University Bachelor of Civil
Engineer, Construction designing section.
 June 1996, Ahmad El-Besher El- Romey, Kuwait.
High school degree in science of mathematics
Degree: Excellent / Major: Mathematics.
Introduction:
I’m +13 Years’ experience in construction field. PMP preparation course and IASP course
certified.
Work in MEGA Projects and high rise building in Gulf and Egypt .And now working in Nile
Corniche Project (St.Regis Hotel) as Senior Quality Control.
Experience in:
- Steel structure (Trusses, Frames, etc.).

- Concrete work ( Bridges ,Frames ,Precast concrete ,all Types Of slabs : Solid ,Hollow ,Flat,
Waffle ,etc.) and high rise building.

- Finish work. (Nile Corniche Project (St. Regis Hotel), Mall Of Egypt, Commercial Towers,
Clinic Tower).

- Foundation. (Shallow foundation, Shoring system, Bored piles, diaphragm
walls, dewatering system).
Languages:
Arabic: Native Language.
English: Writing: Excellent Speaking: Excellent Reading: Excellent.
[Type text]
Working Experience:
 CCC Senior Quality Control Engineer : April 2016 –Present
Owner: Qatari Diar Real estate and Tourism Investment Company. Egypt. LLC
Owner: Majid Al futtaim properties
 WSP Senior Inspector Engineer: Sep.2013- March 2016
The Project: Mall Of Egypt one of Majid Al futtaim
properties (MAF) projects
Project management:
 Davis Langdon (An AECOM Company)
 MACE
Contractor: Besix & Orascom Joint venture
(BOJV).
Designer: WSP Group
Consultant:
 Medhat Abu Zayed Egyptian
Consultant House (MZECH)
 WSP Group.
 Raafat& Miller partners Consultant.(RMC)
Budget: 400 Million$
Project brief:
GLA: 162,500 M
2
Shops: 400
Opening: February 2017
Mall of Egypt is a super-regional mall of 162,500
sq. that will dominate the western half of the
greater Cairo Metropolis and The 6th of October
City.
Scheduled to open in 2017, the mall will be a
sister brand to Mall of the Emirates, combining a
powerful range of retailers with the most
comprehensive leisure offer in North Africa.
The Project: The Nile Corniche Project (NCP)(ST Regis
Hotel) one of Qatari Diar properties projects.
Project management: Turner Construction Company.
Contractor: Consolidated Contractors Company (CCC).
Consultant: Engineering Consultants Group S.A (ECG).
Designer: MGA-HKS, LLC.
Budget: 800 Million$.
[Type text]
Owner: Housing & Development Real Estate
Investment.
0.
WARA PROJECT Engineer
The Project: Qadissia Club Complex construction
project. (7 million KD)
Project management: AL-NOOR COMPANY.
Investor: PEARL REAL ESTATE CO.
Owner: Qadissia Club
 WORK WITH WARA Construction Company .
May 2005 - Sep 2008
 Consultant Site Engineer
Sep2008 - June2010
DarSoor Engineering Bearu, Al. Sharq, Kuwait.
The Project: Clover Medical Clinics construction
project (7 million KD).
Owner: MAZAYA REAL ESTATE EVELOPMENT CO.
 CONSTRUCTIOM MANAGER July 2010-Sep.2013.
Al-Banna Construction Company. Egypt.
The Project: Housing &Development Towers construction
project
(200 million EGP)
Owner: Housing & Development Real Estate Investment.
Experience in Gulf: Apr 2005- June2010
[Type text]
Computer Skills:
 Operating Systems: Windows (All editions).
 Applications: Microsoft office (Word, Excel, PowerPoint, Outlook)
 SAP2000.
 Primavera.
 AutoCAD.
 Tekla Structures BIM software.
Accreditations and Licenses :
 Member in Kuwait Society of Engineers.
 Member in International Association of Safety Professionals (IASP).
 Member in Egypt Society of Engineers.
 Kuwaiti driving license. International Driving license.
Wara Site Engineer:
 Project: AREC Head Quarter Tower.
 DESIGNER: Emad Bo Khamsein
Consutanat Office
 Owner: ARAB REAL ESTATE CO.
 Consultant: Osama Bo Khamsein
Consutanat Office
 Contractor: WARA Construction Company.
Site Engineer: Oct. 2004- Apr 2005
 Project: Buildings and Villas in New Cairo.
 Designer& consultant: AL-Fager
Consultant Office
 Contractor: Sara Construction Company.
[Type text]
Skills :
 Effective work prioritization and time management required to ensure all
related activity is performed to ensure operational efficiency is maintained.
 Able to generate all required documentation, included but not limited to
procedures, protocols, maintenance schedules etc.
 Must work to a high standard and accuracy in completion of all related
documentation.
 High degree of attention to detail and diligence.
 Excellent written and oral communication skills for concise and accurate reporting.
 Time management and planning.
 Hands-on attitude.
 Disciplined detail conscious and self-motivated.
Knowledge:
 Understanding and ability to apply working knowledge of maintenance systems in a
regulated GMP environment required.
 Experience in a similar role, ideally in a regulated industry
 Experienced in working to IS013485 and/or ISO 9001 quality systems
 Good practical and theoretical knowledge of LEAN principles and application in a
Manufacturing environment
 Knowledge of Process and/or Equipment Validation, theory and application, in the medical
device industry
 Key Strengths: Achiever, Arranger, Discipline, Restorative, Focus

More Related Content

What's hot (20)

Youssef CV pdf
Youssef CV pdfYoussef CV pdf
Youssef CV pdf
 
civil engr Ali elmahdyC. V
civil engr Ali elmahdyC. Vcivil engr Ali elmahdyC. V
civil engr Ali elmahdyC. V
 
abdelrazik ahmed CV
abdelrazik ahmed CVabdelrazik ahmed CV
abdelrazik ahmed CV
 
Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-
 
eng_mohamed_eid
eng_mohamed_eideng_mohamed_eid
eng_mohamed_eid
 
CV - Engr Tamer Ali 2015
CV - Engr Tamer Ali 2015CV - Engr Tamer Ali 2015
CV - Engr Tamer Ali 2015
 
My Portfolio - 2014 - updated
My Portfolio - 2014 - updated  My Portfolio - 2014 - updated
My Portfolio - 2014 - updated
 
Talal CV - English
Talal CV - EnglishTalal CV - English
Talal CV - English
 
Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014
Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014
Alaa Tawfiq | Architect and Interior Designer | Portfolio 2014
 
Eng. amr taha c.v
Eng. amr taha   c.vEng. amr taha   c.v
Eng. amr taha c.v
 
Mostafa Younes cv
Mostafa Younes cvMostafa Younes cv
Mostafa Younes cv
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover web
 
CV
CVCV
CV
 
AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
 
Raed Tahabsem cv+
Raed Tahabsem cv+Raed Tahabsem cv+
Raed Tahabsem cv+
 
CV
CVCV
CV
 
John Samy
John SamyJohn Samy
John Samy
 
Design and Presentation Portfolio
Design and Presentation PortfolioDesign and Presentation Portfolio
Design and Presentation Portfolio
 
Resume
ResumeResume
Resume
 
Ahmed Magdy Hassan CV modified
Ahmed Magdy Hassan CV modifiedAhmed Magdy Hassan CV modified
Ahmed Magdy Hassan CV modified
 

Similar to Mohamed Atef Abbas C.V (20)

ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 
islam ibrahim younes
islam ibrahim younesislam ibrahim younes
islam ibrahim younes
 
Karim Absawi
Karim AbsawiKarim Absawi
Karim Absawi
 
CV.Mohammed
CV.MohammedCV.Mohammed
CV.Mohammed
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016Arch. Ahmed Gaber Taaleb 2016
Arch. Ahmed Gaber Taaleb 2016
 
CV-ARCHITECT-kariim
CV-ARCHITECT-kariimCV-ARCHITECT-kariim
CV-ARCHITECT-kariim
 
C V -
C V -C V -
C V -
 
mohamed dakrory cv
mohamed dakrory cvmohamed dakrory cv
mohamed dakrory cv
 
Mohamed-mahmoud-CV
Mohamed-mahmoud-CVMohamed-mahmoud-CV
Mohamed-mahmoud-CV
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
haitham cv
haitham cvhaitham cv
haitham cv
 
Sherif Nabil CV
Sherif Nabil CVSherif Nabil CV
Sherif Nabil CV
 
mona
monamona
mona
 
Ahmed Mostafa Yosri CV
Ahmed Mostafa Yosri CVAhmed Mostafa Yosri CV
Ahmed Mostafa Yosri CV
 
Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv
 
Mohamed Sabry CV
Mohamed Sabry CVMohamed Sabry CV
Mohamed Sabry CV
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
04-2016
04-201604-2016
04-2016
 

Mohamed Atef Abbas C.V

  • 1. [Type text] Mohamed Atef Abbas askmohamed007@gmail.com EL-Nozha, Cairo, Egypt +201279221350 Personal Information:  Marital status : Married.  Nationality : Egyptian.  Place of Birth : Egypt.  Date of Birth : 01/09/1978.  Military status : Exempted. Objective: I’m truly passionate about my work and always eager to connect with other construction professional. While I enjoy all aspects of my job, I think my favorite stage of a project is executing, when I see that a set of drawings becomes a tangible asset and met the initiating objectives for my client. As I go through that collaborative process, not only did I have fun managing the project, but also I found it rewarding to see the results. Education:  2012, PMP preparation course in MENA CHAPER Institute.  June 2003, Shubra Faculty of engineering, Zagazig University Bachelor of Civil Engineer, Construction designing section.  June 1996, Ahmad El-Besher El- Romey, Kuwait. High school degree in science of mathematics Degree: Excellent / Major: Mathematics. Introduction: I’m +13 Years’ experience in construction field. PMP preparation course and IASP course certified. Work in MEGA Projects and high rise building in Gulf and Egypt .And now working in Nile Corniche Project (St.Regis Hotel) as Senior Quality Control. Experience in: - Steel structure (Trusses, Frames, etc.).  - Concrete work ( Bridges ,Frames ,Precast concrete ,all Types Of slabs : Solid ,Hollow ,Flat, Waffle ,etc.) and high rise building.  - Finish work. (Nile Corniche Project (St. Regis Hotel), Mall Of Egypt, Commercial Towers, Clinic Tower).  - Foundation. (Shallow foundation, Shoring system, Bored piles, diaphragm walls, dewatering system). Languages: Arabic: Native Language. English: Writing: Excellent Speaking: Excellent Reading: Excellent.
  • 2. [Type text] Working Experience:  CCC Senior Quality Control Engineer : April 2016 –Present Owner: Qatari Diar Real estate and Tourism Investment Company. Egypt. LLC Owner: Majid Al futtaim properties  WSP Senior Inspector Engineer: Sep.2013- March 2016 The Project: Mall Of Egypt one of Majid Al futtaim properties (MAF) projects Project management:  Davis Langdon (An AECOM Company)  MACE Contractor: Besix & Orascom Joint venture (BOJV). Designer: WSP Group Consultant:  Medhat Abu Zayed Egyptian Consultant House (MZECH)  WSP Group.  Raafat& Miller partners Consultant.(RMC) Budget: 400 Million$ Project brief: GLA: 162,500 M 2 Shops: 400 Opening: February 2017 Mall of Egypt is a super-regional mall of 162,500 sq. that will dominate the western half of the greater Cairo Metropolis and The 6th of October City. Scheduled to open in 2017, the mall will be a sister brand to Mall of the Emirates, combining a powerful range of retailers with the most comprehensive leisure offer in North Africa. The Project: The Nile Corniche Project (NCP)(ST Regis Hotel) one of Qatari Diar properties projects. Project management: Turner Construction Company. Contractor: Consolidated Contractors Company (CCC). Consultant: Engineering Consultants Group S.A (ECG). Designer: MGA-HKS, LLC. Budget: 800 Million$.
  • 3. [Type text] Owner: Housing & Development Real Estate Investment. 0. WARA PROJECT Engineer The Project: Qadissia Club Complex construction project. (7 million KD) Project management: AL-NOOR COMPANY. Investor: PEARL REAL ESTATE CO. Owner: Qadissia Club  WORK WITH WARA Construction Company . May 2005 - Sep 2008  Consultant Site Engineer Sep2008 - June2010 DarSoor Engineering Bearu, Al. Sharq, Kuwait. The Project: Clover Medical Clinics construction project (7 million KD). Owner: MAZAYA REAL ESTATE EVELOPMENT CO.  CONSTRUCTIOM MANAGER July 2010-Sep.2013. Al-Banna Construction Company. Egypt. The Project: Housing &Development Towers construction project (200 million EGP) Owner: Housing & Development Real Estate Investment. Experience in Gulf: Apr 2005- June2010
  • 4. [Type text] Computer Skills:  Operating Systems: Windows (All editions).  Applications: Microsoft office (Word, Excel, PowerPoint, Outlook)  SAP2000.  Primavera.  AutoCAD.  Tekla Structures BIM software. Accreditations and Licenses :  Member in Kuwait Society of Engineers.  Member in International Association of Safety Professionals (IASP).  Member in Egypt Society of Engineers.  Kuwaiti driving license. International Driving license. Wara Site Engineer:  Project: AREC Head Quarter Tower.  DESIGNER: Emad Bo Khamsein Consutanat Office  Owner: ARAB REAL ESTATE CO.  Consultant: Osama Bo Khamsein Consutanat Office  Contractor: WARA Construction Company. Site Engineer: Oct. 2004- Apr 2005  Project: Buildings and Villas in New Cairo.  Designer& consultant: AL-Fager Consultant Office  Contractor: Sara Construction Company.
  • 5. [Type text] Skills :  Effective work prioritization and time management required to ensure all related activity is performed to ensure operational efficiency is maintained.  Able to generate all required documentation, included but not limited to procedures, protocols, maintenance schedules etc.  Must work to a high standard and accuracy in completion of all related documentation.  High degree of attention to detail and diligence.  Excellent written and oral communication skills for concise and accurate reporting.  Time management and planning.  Hands-on attitude.  Disciplined detail conscious and self-motivated. Knowledge:  Understanding and ability to apply working knowledge of maintenance systems in a regulated GMP environment required.  Experience in a similar role, ideally in a regulated industry  Experienced in working to IS013485 and/or ISO 9001 quality systems  Good practical and theoretical knowledge of LEAN principles and application in a Manufacturing environment  Knowledge of Process and/or Equipment Validation, theory and application, in the medical device industry  Key Strengths: Achiever, Arranger, Discipline, Restorative, Focus