my Job profile and responsabilities

Job Purpose
To ensure that strategic material planning processes are in place to enable
operational and production continuity. Takes a co-ordinating lead, working
closely with internal and external parties to ensure supply of materials is in
place to satisfy production requirements. Able to deliver efficient, effective
and flexible solutions to meet production requirements.
Main Accountabilities / Responsibilities
What I am doing
- Ensure that material scheduling strategy and processes are in
place and work effectively in order to ensure material supply
meets production requirements with minimum stock levels, whilst
optimizing costs
- Take ownership of material planning issues that arise, including
over or under delivery and take any follow up actions especially in
the event of material shortages that affect production
- Team leading during the new vehicle launching “ET, PT
“preparation & SOP on time confirmation.
- KPIs setting for MRP to conduct with the PC&SCM and NMEG
direction form QCT point of view
- Setting MRP strategy” stock level, lead time, etc.” based on PC&
SCM direction
- Make C&T for MRP team and assure the synchronization with
NMEG target
- New IS system “SAP” review and validation from MRP point of
view
- Ensure the integrity of Bill of Materials (BOM) and inventory accuracy
at all times and manage and control inventory levels and movements
- Take overall responsibility for obsolete parts process and ensure
business is left with minimum liability and minimal waste
- Manage, coach and develop a high performing team that meets
agreed objectives and which delivers best practice results, added
value and continuous improvements
Mohamed Hemdan,
How
- 1)Team assignment for overseas orders considering the lead time
and guarantee
Parts availability within the agreed delivery time
2) Follow up the order cycle process “payment transfer for
overseas supplier, doc receiving to submit to treasury and
logistic, production needs due date for this shipments” to assure
the parts available on time with no delay
3)Measure the supplier performance through lead time KPI and
SYNCO KPI
4) Team assignment for local parts ordering and delivery plan
issuance for local suppliers considering the production needs,
supplier lead time and safety stock
5) Review and validate the monthly supplier performance KPI
report.
- 1) Review and validate the new projects master plan and send
concerns to the related function “ILN”
2)Review the BOM for each phase ET,PT and SOP
3) Review the new suppliers list and follow up the quotation
process
4) follow up the project progress per each phase
5) Review and prepare PC report during PPCM meeting
6) local suppliers rump up plan review and follow up
- 1) Write the C&T for MRP and review with function head to
validate
2) Develop MRP KPIs to conduct with PC & SCM objective

Recomendados

Production planningProduction planning
Production planningSarkar Jayo
41.9K vistas17 diapositivas
Production planning & controlProduction planning & control
Production planning & controlamirthakarthi
158.7K vistas21 diapositivas
Production control presentationProduction control presentation
Production control presentationkieran122
2.9K vistas8 diapositivas
Production planning & control (ppc)Production planning & control (ppc)
Production planning & control (ppc)VARUN MODI
23.3K vistas22 diapositivas
Production controlProduction control
Production controlsadia saeed
3.7K vistas7 diapositivas

Más contenido relacionado

La actualidad más candente

Production Planning and ControlProduction Planning and Control
Production Planning and Controllearnito
4.7K vistas10 diapositivas
James_Yi_Resume_2016.10.13James_Yi_Resume_2016.10.13
James_Yi_Resume_2016.10.13James Yi
52 vistas2 diapositivas

La actualidad más candente(20)

Production planning & controlProduction planning & control
Production planning & control
Faizan Akhtar432 vistas
Production Planning and ControlProduction Planning and Control
Production Planning and Control
learnito4.7K vistas
Production planning and controlProduction planning and control
Production planning and control
Gerald Michael4.5K vistas
Production Planning And ControlProduction Planning And Control
Production Planning And Control
Avinash Verma551 vistas
James_Yi_Resume_2016.10.13James_Yi_Resume_2016.10.13
James_Yi_Resume_2016.10.13
James Yi52 vistas
Production planning & controlProduction planning & control
Production planning & control
Chetan Jha296 vistas
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
haitham shehata5.3K vistas
Production planning control pptProduction planning control ppt
Production planning control ppt
sudhir pawar78.2K vistas
Production controlProduction control
Production control
ankit tiwari397 vistas
Production planning and controlProduction planning and control
Production planning and control
Dacanay Elmer454 vistas
Production planning and schedulingProduction planning and scheduling
Production planning and scheduling
New Nabin Shrestha10.2K vistas
VISHAL RESUME updated.docxVISHAL RESUME updated.docx
VISHAL RESUME updated.docx
vishal londhe615 vistas
Production planning and controlProduction planning and control
Production planning and control
Balaji Naik1.4K vistas
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap51K vistas
Production planning and control (ala)Production planning and control (ala)
Production planning and control (ala)
Sonal Upadhyay161 vistas
Operations Management and QualityOperations Management and Quality
Operations Management and Quality
Mahbuba Yeasmin Era128 vistas

Similar a my Job profile and responsabilities

Material controller cv  anasMaterial controller cv  anas
Material controller cv anasAjeeb Hamsa
316 vistas12 diapositivas
Resume_Mrs.Intra BahischResume_Mrs.Intra Bahisch
Resume_Mrs.Intra BahischIntra Kartoon
121 vistas3 diapositivas
Pom unit 3Pom unit 3
Pom unit 3riyavidya
1.7K vistas35 diapositivas
CV Gabor VighCV Gabor Vigh
CV Gabor VighG Vigh
36 vistas3 diapositivas

Similar a my Job profile and responsabilities(20)

Material controller cv  anasMaterial controller cv  anas
Material controller cv anas
Ajeeb Hamsa316 vistas
Resume_Mrs.Intra BahischResume_Mrs.Intra Bahisch
Resume_Mrs.Intra Bahisch
Intra Kartoon121 vistas
Pom unit 3Pom unit 3
Pom unit 3
riyavidya1.7K vistas
CV Gabor VighCV Gabor Vigh
CV Gabor Vigh
G Vigh36 vistas
Vivek GVivek G
Vivek G
Vivek G390 vistas
CvCv
Cv
Gaurav Sharma135 vistas
NewNew
New
Mahmoud Farag96 vistas
Resume -TARAKResume -TARAK
Resume -TARAK
Tarak Mukherjee91 vistas
CV BabuCV Babu
CV Babu
Babu S Kanti234 vistas
Resume J.MartinezResume J.Martinez
Resume J.Martinez
Jesus Martinez239 vistas
Cv  suresh  kale updatedCv  suresh  kale updated
Cv suresh kale updated
SURESH KALE192 vistas
PPC 114.pptxPPC 114.pptx
PPC 114.pptx
SakshiSonawane615 vistas
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
Roxanne Smith93 vistas
7+yrs of experience in SCM7+yrs of experience in SCM
7+yrs of experience in SCM
arunkumar natarajan126 vistas
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
Abu Bashar43.1K vistas
PPC-Unit-1Godwin.pptPPC-Unit-1Godwin.ppt
PPC-Unit-1Godwin.ppt
GODWINPITHALISNE11 vistas

my Job profile and responsabilities

  • 1. Job Purpose To ensure that strategic material planning processes are in place to enable operational and production continuity. Takes a co-ordinating lead, working closely with internal and external parties to ensure supply of materials is in place to satisfy production requirements. Able to deliver efficient, effective and flexible solutions to meet production requirements. Main Accountabilities / Responsibilities What I am doing - Ensure that material scheduling strategy and processes are in place and work effectively in order to ensure material supply meets production requirements with minimum stock levels, whilst optimizing costs - Take ownership of material planning issues that arise, including over or under delivery and take any follow up actions especially in the event of material shortages that affect production - Team leading during the new vehicle launching “ET, PT “preparation & SOP on time confirmation. - KPIs setting for MRP to conduct with the PC&SCM and NMEG direction form QCT point of view - Setting MRP strategy” stock level, lead time, etc.” based on PC& SCM direction - Make C&T for MRP team and assure the synchronization with NMEG target - New IS system “SAP” review and validation from MRP point of view - Ensure the integrity of Bill of Materials (BOM) and inventory accuracy at all times and manage and control inventory levels and movements - Take overall responsibility for obsolete parts process and ensure business is left with minimum liability and minimal waste - Manage, coach and develop a high performing team that meets agreed objectives and which delivers best practice results, added value and continuous improvements Mohamed Hemdan,
  • 2. How - 1)Team assignment for overseas orders considering the lead time and guarantee Parts availability within the agreed delivery time 2) Follow up the order cycle process “payment transfer for overseas supplier, doc receiving to submit to treasury and logistic, production needs due date for this shipments” to assure the parts available on time with no delay 3)Measure the supplier performance through lead time KPI and SYNCO KPI 4) Team assignment for local parts ordering and delivery plan issuance for local suppliers considering the production needs, supplier lead time and safety stock 5) Review and validate the monthly supplier performance KPI report. - 1) Review and validate the new projects master plan and send concerns to the related function “ILN” 2)Review the BOM for each phase ET,PT and SOP 3) Review the new suppliers list and follow up the quotation process 4) follow up the project progress per each phase 5) Review and prepare PC report during PPCM meeting 6) local suppliers rump up plan review and follow up - 1) Write the C&T for MRP and review with function head to validate 2) Develop MRP KPIs to conduct with PC & SCM objective