SlideShare una empresa de Scribd logo
1 de 72
Descargar para leer sin conexión
May 12th, 2009



Leadership in Energy and Environmental Design




LEED CERTIFICATION OVERVIEW
MONTREAL, QUEBEC
WHO WE ARE        50 YEARS OF EXPERIENCE IN INDUSTRIAL ARCHITECTURE




• Founded in 1959 by M.D. Gross (since retired). Formed Gross Kaplin
  Coviensky Architects in 1986.
• Specialize in Commercial & Industrial design.
• Construct 1-2M sq.ft. per year.
• Recently moved to our LEED GOLD offices (in certification process).




                                                                        1
WHAT WE DO         CANADIAN TIRE DISTRIBUTION CENTRE, COTEAU DU LAC.




1,600,000 sq.ft.
167 Acres


                                                                       2
WHAT WE DO          RONA HEAD OFFICE, BOUCHERVILLE




3 expansions totaling
1,200,000 sq.ft.




                                                     3
WHAT WE DO           ALDO HEAD OFFICE, ST-LAURENT.




Distribution Centre
Head Office                                          ALDO

500,000 sq.ft.
250,000
Including 300,000 sq.ft. of platforms

                                                            4
WHAT WE DO           SOBEYS, VAUGHAN.




500,000 sq.ft.
70’ High Warehouse
Will be amongst the most automated facilities in North America




                                                                 5
WHAT WE DO           SUSTAINABLE INDUSTRIAL ARCHITECTURE.




• Outdoor Gear Canada – Québec’s First LEED Certified Industrial Building

• Sobeys Trois-Rivières – First LEED* certified Refrigerated Warehouse

• Sunlife Multi-Tenant – LEED Certified* – Core and Shell

• SICO – LEED Certified Industrial Building*

• GKC Offices – LEED Gold* – Commercial Interior

                                                                                            6
                                                             * LEED Certification pending
WHAT IS LEED?

•The Leadership in Energy and Environmental Design (LEED) Green Building
Rating System™ encourages and accelerates global adoption of sustainable
green building and development practices through the creation and
implementation of universally understood and accepted tools and performance
criteria.

•LEED is a third-party certification program and an internationally accepted
benchmark for the design, construction and operation of high performance green
buildings. It provides building owners and operators the tools they need to have
an immediate and measurable impact on their buildings’ performance.




                                                                                   7
WHAT IS LEED?

LEED promotes a whole-building approach to
sustainability by recognizing performance in
five key areas of human and environmental
health:

•sustainable site
development

•water efficiency

•energy efficiency

•materials selection

•indoor environmental quality


INTEGRATED DESIGN PROCESS



                                               8
LEED CHECKLIST




                 9
DISTRIBUTION OF POINTS

                         Innovation &
                        Design Process
                                           Sustainable
                               7%             Site
                                         14%
      Indoor
   Environmental
      Quality
                   21%
                                               7%   Water Efficiency




                        20%              24%
          Materials &                           Energy &
          Resources                            Atmosphere

                        LEED for New Construction

                                                                       10
FOUR LEVELS OF CERTIFICATION

 70 prerequisites and credits available for LEED NC




    26-32           33-38            39-51            52+


 Perfect score is impossible as many credits are mutually
 exclusive (i.e. cannot get a credit for re-use if it is a new
 building)


                                                                 11
DIFFERENT TYPES OF CERTIFICATION




      for
     for                   for
                          for                   for
                                               for                      for
                                                                      for                 for
                                                                                         for                 for
                                                                                                            for
     New
    New                Commercial
                      Commercial             Core and
                                            Core and                Existing
                                                                   Existing             Homes
                                                                                       Homes            Neighborhood
                                                                                                       Neighborhood
  Construction
 Construction           Interiors
                       Interiors               Shell
                                              Shell                 Buildings
                                                                   Buildings                            Developments
                                                                                                       Developments

                    **No specific category for Industrial Buildings. Certain
                     **No specific category for Industrial Buildings. residential
                                                                            Certain
  for building          for building    for developers   for building   for                              for residential
for building
  owners and        points are out offorreach(ex. 90%owners and Humidity Control)
                     points are out ofreach (ex. 90%views, Humidity Control)
                      for building
                        owners, tenants
                                          developers
                                        and design
                                                       for building
                                                            views,    for residential
                                                                        building
                                                                                                       for residential
                                                                                                         building
owners and           owners, tenants     and design              owners and        building            building
  design teams
design teams           and design
                     and design            teams that             service
                                                                 service             owners,
                                                                                   owners,               owners,
                                                                                                       owners,
                                         teams that
  that address
that address           teams that
                     teams that            address new            providers that
                                                                 providers that      developers and
                                                                                   developers and        developers and
                                                                                                       developers and
                                         address new
  new building
new building           address new
                     address new           building design        address
                                                                 address             design teams
                                                                                   design teams          design teams
                                                                                                       design teams
                                         building design
  design and
design and             building design
                     building design       and                    building
                                                                 building            that address
                                                                                   that address          that address
                                                                                                       that address
                                         and
  construction or
construction or        and
                     and                   construction           operation and
                                                                 operation and       the new
                                                                                   the new               the new
                                                                                                       the new
                                         construction
  major
major                  construction or
                     construction or       where building         on-going
                                                                 on-going            residential
                                                                                   residential           residential
                                                                                                       residential
                                         where building
  renovations.
renovations.           major
                     major                 interiors are not      upgrades and
                                                                 upgrades and        building design
                                                                                   building design       building design
                                                                                                       building design
                                         interiors are not
                       renovations
                     renovations           part of the initial    performance
                                                                 performance         and
                                                                                   and                   and
                                                                                                       and
                                         part of the initial
                                           design process.        improvements.
                                                                 improvements.       construction
                                                                                   construction          construction
                                                                                                       construction
                                         design process.
                                                                                     process.
                                                                                   process.              process.
                                                                                                       process.



                                                                                                                           12
WHY CERTIFY?




               13
WHY CERTIFY?


 IMPACTS OF
 BUILDINGS ON
 RESOURCES




                14
WHY CERTIFY?




               15
WHY CERTIFY?




               16
WHY CERTIFY?


 BUSINESS
 BENIFITS OF
 BUILDING
 GREEN




               Great Marketing Tool
               ex: Mountain Equipment Coop.



                                              17
GROWING LEED AP MEMBERSHIP




                             18
REGISTERED PROJECTS




                      19
AVAILABLE GRANTS



                   Many Grants exist for energy
                   efficiency initiatives


                   • No direct grants for LEED
                   Certification


                   • Pursuing LEED certification and
                   environmental initiatives does
                   however facilitate negotiations
                   with Municipal Authorities




                                                       20
CASE STUDY




                                 Finalist


                                 Sustainable Architecture
SOBEYS Distribution Centre, Trois-Rivières (Québec)

                                                            21
SUSTAINABLE SITE




                   22
SUSTAINABLE SITE




                   23
FLOOR PLAN




             24
SUSTAINABLE SITE   EROSION & SEDIMENT CONTROL




                                      Erosion & Sediment Control
                                      Erosion & Sediment Control
                                      ••Control erosion to reduce
                                         Control erosion to reduce
                                      negative impacts on water and
                                       negative impacts on water and
                                      air quality
                                       air quality
                                      ••Prevent loss of soil during
                                         Prevent loss of soil during
                                      construction
                                       construction
                                      ••Prevent sedimentation of
                                         Prevent sedimentation of
                                      storm sewer or receiving
                                       storm sewer or receiving
                                      streams
                                       streams


                                                                       25
SUSTAINABLE SITE   EROSION & SEDIMENT CONTROL




                                                26




SUSTAINABLE SITE   EROSION & SEDIMENT CONTROL




                                                27




                                                     1
SUSTAINABLE SITE   REDUCED PARKING AND ALTERNATIVES




                                                      28
SUSTAINABLE SITE              STORM WATER MANAGEMENT: Rate and Quantity




Storm water Management
Storm water Management
••Limit disruption and pollution of natural water
   Limit disruption and pollution of natural water
flows by managing storm water runoff on-site.
 flows by managing storm water runoff on-site.
••This retention basin was designed for aa100 year
   This retention basin was designed for 100 year
storm event
 storm event



                                                                              29
SUSTAINABLE SITE    HEAT ISLAND EFFECT (NON-ROOF)




RCC (Rolled Compacted Concrete)
RCC (Rolled Compacted Concrete)
••97-99% MODIFIED PROCTOR
   97-99% MODIFIED PROCTOR
••Reflective Surface
   Reflective Surface



                                                        30
SUSTAINABLE SITE   HEAT ISLAND EFFECT (ROOF)




                                         White TPO Membrane
                                         White TPO Membrane
                                         ••Highly-Reflective
                                            Highly-Reflective
                                         ••120,000 sq.ft. with no openings!
                                            120,000 sq.ft. with no openings!



                                                                          31
SUSTAINABLE SITE             HEAT ISLAND EFFECT (ROOF)




100% Sedum Roof
 100% Sedum Roof
••Low Maintenance
   Low Maintenance
••Added Insulation Values
   Added Insulation Values
••Added Storm Water Retention Capabilities
   Added Storm Water Retention Capabilities


                                                         32
SUSTAINABLE SITE   LIGHT POLLUTION REDUCTION




                                               33
WATER EFFICIENCY




                   34
WATER EFFICIENCY            WATER EFFICIENT LANDSCAPE

100% Indigenous Species
 100% Indigenous Species
••Drought Resistant
   Drought Resistant
••Low Maintenance
   Low Maintenance
••No Need for Irrigation System
   No Need for Irrigation System




                                                        35
WATER EFFICIENCY   INNOVATIVE WASTEWATER TECHNOLOGIES




                                           Reed Purifying System
                                            Reed Purifying System
                                           100% of Wastewater
                                            100% of Wastewater
                                           Treated On Site
                                            Treated On Site




                                                                    36
WATER EFFICIENCY       WATER USE REDUCTION


47% Water Use
 47% Water Use
Reduction
 Reduction
••Waterless Urinals
  Waterless Urinals
••Automatic Faucets
   Automatic Faucets
••Low-flow Toilets
   Low-flow Toilets
••Low-flow Showers
   Low-flow Showers




                                             37
ENERGY & ATMOSPHERE




                      38
ENERGY & ATMOSPHERE   MINIMUM ENERGY PERFORMANCE




                                                   39
ENERGY & ATMOSPHERE



BEST PRACTICE COMMISSIONING
Intent
Verify and ensure that the entire building is designed, constructed and
calibrated to operate as intended.



MEASURMENT AND VERIFICATION
Intent
Provide for the ongoing accountability and optimization of building
energy and water consumption performance over time.




                                                                          40
ENERGY & ATMOSPHERE                  OPTIMIZE ENERGY PERFORMANCE

61% Savings in Energy
 61% Savings in Energy
••Savings of 55419 309 MJ
   Savings of 419 309 MJ
••Reduction of 660,4 tonnes of CO2
   Reduction of 660,4 tonnes of CO2
••Projected savings of
   Projected savings of
140,000$/year in energy costs
 140,000$/year in energy costs


State of the Art Refrigeration
 State of the Art Refrigeration
System
 System
••Glycol loop, indirect use of
  Glycol loop, indirect use of
Ammonia
 Ammonia
••Utilizes principles of Free Cooling
   Utilizes principles of Free Cooling
••Free of CFCs
   Free of CFCs




                                                                   41
ENERGY & ATMOSPHERE        OPTIMIZE ENERGY PERFORMANCE

61% Savings in Energy
 61% Savings in Energy
••High Output T5 Fluorescents
   High Output T5 Fluorescents
••Motion detectors in aisles
  Motion detectors in aisles
••Daylight sensors
   Daylight sensors




                                                               42
ENERGY & ATMOSPHERE               OPTIMIZE ENERGY PERFORMANCE

Radiant In-Slab Heating in
Radiant In-Slab Heating in
Offices and Lockerooms
Offices and Lockerooms


••Heat recovery from
   Heat recovery from
compressors used to heat Office
 compressors used to heat Office
areas and Service Block
 areas and Service Block
(Lockeroom, Cafeteria, etc..)
 (Lockeroom, Cafeteria, etc..)




                                                                 43
MATERIALS & RESOURCES




                        44
MATERIALS & RESOURCES COLLECTION OF RECYCLABLES




Recycling Plan

                                                  45
MATERIALS & RESOURCES CONSTRUCTION WASTE MANAGEMENT
Strict Construction Waste
Strict Construction Waste
Management Plan
Management Plan


••Diverted 51,280.6 cu.m. from
   Diverted 51,280.6 cu.m. from
landfills
 landfills
••Out of aatotal of 52,152.2 cu.m
  Out of total of 52,152.2 cu.m
evacuated from site
 evacuated from site
••Resulting in 98% of
   Resulting in 98% of
construction waste and debris
 construction waste and debris
••Granting aatotal of 22LEED
  Granting total of LEED
Points
 Points
••MR Cr. 2.1 (1 point) ≥≥50%
  MR Cr. 2.1 (1 point) 50%
••MR Cr. 2.2 (1 point) ≥≥75%
  MR Cr. 2.2 (1 point) 75%




                                                      46
MATERIALS & RESOURCES RECYCLED CONTENT & REGIONAL MAT’LS
Recycled Content
Recycled Content
••27,54% of recycled content
   27,54% of recycled content
used in the project
 used in the project
••MR Cr. 4.1 (1 point) ≥≥7.5%
  MR Cr. 4.1 (1 point) 7.5%
••MR Cr. 4.2 (1 point) ≥≥15%
  MR Cr. 4.2 (1 point) 15%


Regionally Extracted and
Regionally Extracted and
Manufactured Materials
Manufactured Materials
••53.08% Materials
   53.08% Materials
Manufactured Regionally
 Manufactured Regionally
(<800km radius)
 (<800km radius)
••50.54% Materials Extracted
   50.54% Materials Extracted
Regionally
 Regionally
••MR Cr. 5.1 (1 point) ≥≥10%
  MR Cr. 5.1 (1 point) 10%
••MR Cr. 5.2 (1 point) ≥≥20%
  MR Cr. 5.2 (1 point) 20%


                                                           47
MATERIALS & RESOURCES                CERTIFIED WOODS

Use of Certified Wood
Use of Certified Wood
••93.65% Certified Wood
   93.65% Certified Wood
••MR Cr. 7.1 (1 point) ≥≥50%
  MR Cr. 7.1 (1 point) 50%




Forest Stewardship Council
 Forest Stewardship Council
••FSC is an international
   FSC is an international
certification and labeling system
 certification and labeling system
that guarantees that the forest
 that guarantees that the forest
products you purchase come
 products you purchase come
from responsibly managed
 from responsibly managed
forests and verified recycled
 forests and verified recycled
sources.
 sources.




                                                       48
INDOOR ENVIRONMENTAL QUALITY




                               49
INDOOR ENVIRONMENTAL QUALITY              MEASURES




Prerequisite 1
•Minimum Indoor Air Quality Performance – ASHRAE 62-2001


Prerequisite 2
• Environmental Tobacco Smoke (ETS) Control


Credit 1
• Carbon Dioxide (CO2 ) Monitoring



Credit 7
• Thermal Comfort: Compliance and Monitoring




                                                           50
INDOOR ENVIRONMENTAL QUALITY         CONST. MANAGEMENT PLAN


  IAQ Plan during Construction
   IAQ Plan during Construction
  ••Protect Absorptive Materials
     Protect Absorptive Materials
  from Moisture Damage
   from Moisture Damage
  ••Protect Ventilation Ducts and
     Protect Ventilation Ducts and
  Other Contamination Pathways
   Other Contamination Pathways
  ••Inspect Building and HVAC
     Inspect Building and HVAC
  Systems (eg. Moisture, water
   Systems (eg. Moisture, water
  damage, construction debris in
   damage, construction debris in
  ceiling space, etc.)
   ceiling space, etc.)
  ••Testing Air Quality Before
     Testing Air Quality Before
  Occupancy
   Occupancy




                                                              51
INDOOR ENVIRONMENTAL QUALITY     LOW EMITTING MATERIALS


Low Volatile Organic
 Low Volatile Organic
Compound (VOC) Materials
 Compound (VOC) Materials
••Adhesives & Sealants
   Adhesives & Sealants
••Paints & Coatings
   Paints & Coatings
••Carpet
   Carpet
••Composite Wood and Laminate
   Composite Wood and Laminate
Adhesives
 Adhesives




                                                          52
INDOOR ENVIRONMENTAL QUALITY
INDOOR CHEMICAL & POLLUTANT SOURCE CONTROL


Indoor Chemical & Pollutant
 Indoor Chemical & Pollutant
Source Control
 Source Control


••Use of foot grilles to capture dirt
   Use of foot grilles to capture dirt
and particles from entering the
 and particles from entering the
building
 building
••Provide segregated areas with
   Provide segregated areas with
separate outside exhaust for
 separate outside exhaust for
copy/printing rooms
 copy/printing rooms
••Replace all air filters
   Replace all air filters
immediately prior to occupancy
 immediately prior to occupancy
(MERV 13), as determined by
 (MERV 13), as determined by
ASHRAE 52.2-1997
 ASHRAE 52.2-1997




                                             53
INDOOR ENVIRONMENTAL QUALITY   75% DAYLIGHTS & 90% VIEWS




                                                           54
INDOOR ENVIRONMENTAL QUALITY   75% DAYLIGHTS & 90% VIEWS




                                                           55
INDOOR ENVIRONMENTAL QUALITY   75% DAYLIGHTS & 90% VIEWS




                                                           56
INDOOR ENVIRONMENTAL QUALITY   75% DAYLIGHTS & 90% VIEWS




                                                           57
INNOVATION & DESIGN PROCESS




                              58
INNOVATION & DESIGN PROCESS
1 to 4 Points awarded for exceptional performance above the
requirements set by the LEED Green Building Rating System and
Innovative Performance in categories not specifically addressed

• Exceptional performance in Water Reduction      47% Reduction
                                                  vs. 30% required
• Exceptional performance in Regional Materials   53% Local
                                                  vs. 20% required

• ESPR Simulation to reduce Refrigeration Load


• Educational Measures




                                                                     59
CASE STUDY




SICO Distribution Centre, St-Hubert (Québec)
                                               60
FLOOR PLAN




             61
SUSTAINABLE SITE   REDEVELOPMENT OF CONTAMINATED SITES



                          1 Point for Redevelopment of a
                           1 Point for Redevelopment of a
                          Contaminated Site
                           Contaminated Site
                          •Site contaminated by Metals
                           •Site contaminated by Metals
                          •2,400 cubic meters removed
                           •2,400 cubic meters removed




                                                            62
SUSTAINABLE SITE          STORMWATER MANAGEMENT: Treatment




Stormceptor
Stormceptor
••The stormceptor separates any oils or
   The stormceptor separates any oils or
other contaminants from the storm water,
 other contaminants from the storm water,
prior to draining into perimeter ditches
 prior to draining into perimeter ditches



                                                             63
SUSTAINABLE SITE          SPILL OVERFLOW CONTROL




Spill Overflow Control
Spill Overflow Control
••Depressed loading area acts as aacontainment area for any solvents that may
   Depressed loading area acts as containment area for any solvents that may
spill during aafire, via aasystem of automatic valves.
 spill during fire, via system of automatic valves.
••Eliminated the construction of aamassive underground reservoir.
   Eliminated the construction of massive underground reservoir.




                                                                                64
ENERGY & ATMOSPHERE                 OPTIMIZE ENERGY PERFORMANCE

37% Savings in Energy
 37% Savings in Energy
••Savings of 55703 000 MJ
   Savings of 703 000 MJ
••Reduction of 404,7 tons of CO2
   Reduction of 404,7 tons of CO2
••Projected savings of 68,000$/year
   Projected savings of 68,000$/year
in energy costs
 in energy costs


Solar Wall System with Heat
Solar Wall System with Heat
Wheel Recovery System
Wheel Recovery System




                                                                  65
ENERGY & ATMOSPHERE                     SOLAR WALL + HEAT WHEEL




How does it work?
How does it work?
••Exterior air passes behind dark
   Exterior air passes behind dark
perforated panels, which passively
 perforated panels, which passively
heat the fresh air prior to entering
 heat the fresh air prior to entering
the building.
 the building.
••Heat wheel exchangers further
   Heat wheel exchangers further
augment the efficiency of the
 augment the efficiency of the
system by mixing the fresh air with
 system by mixing the fresh air with
the ambient air.
 the ambient air.

                                                                  66
ENERGY & ATMOSPHERE                 SOLAR WALL + HEAT WHEEL




••These ducts feed the Roof top units with pre-heated air from the Solar Wall
   These ducts feed the Roof top units with pre-heated air from the Solar Wall
••Ducts are coordinated to pass through the racking.
   Ducts are coordinated to pass through the racking.

                                                                                 67
MATERIALS & RESOURCES CONSTRUCTION WASTE MANAGEMENT
Strict Construction Waste
Strict Construction Waste
Management Plan
Management Plan

Diverted 160,206 kg. from
 Diverted 160,206 kg. from
landfills
 landfills
••Out of aatotal of 166,539 kg.
  Out of total of 166,539 kg.
evacuated from site
 evacuated from site
••Resulting in 96% of
   Resulting in 96% of
construction waste and debris
 construction waste and debris
••Granting aatotal of 22LEED
  Granting total of LEED
Points
 Points
••MR Cr. 2.1 (1 point) ≥≥50%
  MR Cr. 2.1 (1 point) 50%
••MR Cr. 2.2 (1 point) ≥≥75%
  MR Cr. 2.2 (1 point) 75%




                                                      68
INDOOR ENVIRONMENTAL QUALITY     LOW EMITTING MATERIALS


Low Volatile Organic
 Low Volatile Organic
Compound (VOC) Materials
 Compound (VOC) Materials
••Adhesives & Sealants
   Adhesives & Sealants
••Paints & Coatings
   Paints & Coatings
••Carpet
   Carpet
••Composite Wood and Laminate
   Composite Wood and Laminate
Adhesives
 Adhesives




                                                          69
INNOVATION & DESIGN PROCESS




                              70
TO CONCLUDE…


• LEED Certification is Attainable for Industrial Buildings

• It Can be Done Economically

• LEED Improves Worker Morale and Productivity


• Most Importantly…. HELPS OUR ENVIRONMENT




                                                              71
TO FIND OUT MORE…


            United States Green Building Council (USGBC)
            www.usgbc.org



          Visit us at: www.gkc.ca
            Canadian Green Building Council (CaGBC)
            www.cagbc.org




                                                           72

Más contenido relacionado

La actualidad más candente

Orange22 Starbucks Project Part 03: Final Deliverables
Orange22 Starbucks Project Part 03: Final DeliverablesOrange22 Starbucks Project Part 03: Final Deliverables
Orange22 Starbucks Project Part 03: Final Deliverablesdarioantonioni
 
Etablir Designs : Company Portfolio
Etablir Designs : Company PortfolioEtablir Designs : Company Portfolio
Etablir Designs : Company PortfolioEtablirDesigns
 
Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010Hayley Pallister
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008mklein5156
 
Callison Theme Park Projects
Callison Theme Park ProjectsCallison Theme Park Projects
Callison Theme Park Projectskevinsherbrooke
 
DESIGNERS Consultants\' CV of Hotels &amp; Resorts
DESIGNERS Consultants\'  CV of Hotels &amp; ResortsDESIGNERS Consultants\'  CV of Hotels &amp; Resorts
DESIGNERS Consultants\' CV of Hotels &amp; Resortssherine_2011
 
Lessons in Project Management - 6 - Requirements Engineering
Lessons in Project Management - 6 - Requirements Engineering Lessons in Project Management - 6 - Requirements Engineering
Lessons in Project Management - 6 - Requirements Engineering Habermann Frank
 
Allison Byrd Portfolio Updated 2.9.11
Allison Byrd Portfolio Updated 2.9.11Allison Byrd Portfolio Updated 2.9.11
Allison Byrd Portfolio Updated 2.9.11AllisonByrd
 
Master Project File
Master Project FileMaster Project File
Master Project FileStevegrund
 
Denny Dellinger, AIA Architect Portfolio (1)
Denny Dellinger, AIA Architect Portfolio (1)Denny Dellinger, AIA Architect Portfolio (1)
Denny Dellinger, AIA Architect Portfolio (1)DennyDellinger
 
Callison Renovation & Repositioning
Callison Renovation & RepositioningCallison Renovation & Repositioning
Callison Renovation & RepositioningCallison
 
Selected Commercial Projects Ries Architecture
Selected Commercial Projects   Ries ArchitectureSelected Commercial Projects   Ries Architecture
Selected Commercial Projects Ries Architectureprries
 
Hkr Residential Portfolio
Hkr Residential PortfolioHkr Residential Portfolio
Hkr Residential PortfolioHKR Dublin
 
SEM Brochure
SEM BrochureSEM Brochure
SEM Brochurekford
 

La actualidad más candente (15)

Orange22 Starbucks Project Part 03: Final Deliverables
Orange22 Starbucks Project Part 03: Final DeliverablesOrange22 Starbucks Project Part 03: Final Deliverables
Orange22 Starbucks Project Part 03: Final Deliverables
 
Etablir Designs : Company Portfolio
Etablir Designs : Company PortfolioEtablir Designs : Company Portfolio
Etablir Designs : Company Portfolio
 
Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010Kathleen English Gulf Coast Green 2010
Kathleen English Gulf Coast Green 2010
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008
 
Callison Theme Park Projects
Callison Theme Park ProjectsCallison Theme Park Projects
Callison Theme Park Projects
 
DESIGNERS Consultants\' CV of Hotels &amp; Resorts
DESIGNERS Consultants\'  CV of Hotels &amp; ResortsDESIGNERS Consultants\'  CV of Hotels &amp; Resorts
DESIGNERS Consultants\' CV of Hotels &amp; Resorts
 
Lessons in Project Management - 6 - Requirements Engineering
Lessons in Project Management - 6 - Requirements Engineering Lessons in Project Management - 6 - Requirements Engineering
Lessons in Project Management - 6 - Requirements Engineering
 
Allison Byrd Portfolio Updated 2.9.11
Allison Byrd Portfolio Updated 2.9.11Allison Byrd Portfolio Updated 2.9.11
Allison Byrd Portfolio Updated 2.9.11
 
Master Project File
Master Project FileMaster Project File
Master Project File
 
Denny Dellinger, AIA Architect Portfolio (1)
Denny Dellinger, AIA Architect Portfolio (1)Denny Dellinger, AIA Architect Portfolio (1)
Denny Dellinger, AIA Architect Portfolio (1)
 
Callison Renovation & Repositioning
Callison Renovation & RepositioningCallison Renovation & Repositioning
Callison Renovation & Repositioning
 
Selected Commercial Projects Ries Architecture
Selected Commercial Projects   Ries ArchitectureSelected Commercial Projects   Ries Architecture
Selected Commercial Projects Ries Architecture
 
Hkr Residential Portfolio
Hkr Residential PortfolioHkr Residential Portfolio
Hkr Residential Portfolio
 
Prefab company profile nw
Prefab company profile nwPrefab company profile nw
Prefab company profile nw
 
SEM Brochure
SEM BrochureSEM Brochure
SEM Brochure
 

Destacado

AME Champions Meeting Montreal
AME Champions Meeting  MontrealAME Champions Meeting  Montreal
AME Champions Meeting Montrealnaoums
 
Heavenly Andaman Aseem
Heavenly Andaman  AseemHeavenly Andaman  Aseem
Heavenly Andaman AseemIndian Travel
 
Wirt iz-Zejtun symposium
Wirt iz-Zejtun symposiumWirt iz-Zejtun symposium
Wirt iz-Zejtun symposiumAnthea Barbara
 
Whats The Value Of My Marketing Investments?
Whats The Value Of My Marketing Investments?Whats The Value Of My Marketing Investments?
Whats The Value Of My Marketing Investments?toddmz
 
NFE Power
NFE PowerNFE Power
NFE Powerjdugan
 
Presentation asiatech qc 2009
Presentation asiatech qc 2009Presentation asiatech qc 2009
Presentation asiatech qc 2009naoums
 
Jade brochure
Jade brochureJade brochure
Jade brochurenaoums
 
UXConfBR - Apresentação
UXConfBR - ApresentaçãoUXConfBR - Apresentação
UXConfBR - ApresentaçãoThiago Esser
 

Destacado (8)

AME Champions Meeting Montreal
AME Champions Meeting  MontrealAME Champions Meeting  Montreal
AME Champions Meeting Montreal
 
Heavenly Andaman Aseem
Heavenly Andaman  AseemHeavenly Andaman  Aseem
Heavenly Andaman Aseem
 
Wirt iz-Zejtun symposium
Wirt iz-Zejtun symposiumWirt iz-Zejtun symposium
Wirt iz-Zejtun symposium
 
Whats The Value Of My Marketing Investments?
Whats The Value Of My Marketing Investments?Whats The Value Of My Marketing Investments?
Whats The Value Of My Marketing Investments?
 
NFE Power
NFE PowerNFE Power
NFE Power
 
Presentation asiatech qc 2009
Presentation asiatech qc 2009Presentation asiatech qc 2009
Presentation asiatech qc 2009
 
Jade brochure
Jade brochureJade brochure
Jade brochure
 
UXConfBR - Apresentação
UXConfBR - ApresentaçãoUXConfBR - Apresentação
UXConfBR - Apresentação
 

Similar a Leed Forum 2009

Leed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteLeed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteJon Boggiano
 
a2d architecture
a2d architecturea2d architecture
a2d architecturea2d
 
Explore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayExplore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayTorkBetterBusiness
 
Establishing a service factory
Establishing a service factoryEstablishing a service factory
Establishing a service factorydavemayo
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochuremcgrawrpm
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011Hans Goetze
 
IBA Service Offerings
IBA Service OfferingsIBA Service Offerings
IBA Service Offeringstjakab
 
DESIGN INFINITY COMPANY PROFILE
DESIGN INFINITY COMPANY PROFILEDESIGN INFINITY COMPANY PROFILE
DESIGN INFINITY COMPANY PROFILEAnoopVarghese27
 
BBR Design
BBR DesignBBR Design
BBR DesignmikY9451
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationStanford University
 
BEE Company Presentation 中英文
BEE Company Presentation 中英文BEE Company Presentation 中英文
BEE Company Presentation 中英文Lucas Wang
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conferencecassie111
 
Affix interiors catalog
Affix interiors catalogAffix interiors catalog
Affix interiors catalogMOHAMMAD AHSAN
 
In fer india pofile presentation for genpact 12.7.12
In fer india pofile presentation for genpact 12.7.12In fer india pofile presentation for genpact 12.7.12
In fer india pofile presentation for genpact 12.7.12gauravlumb
 
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 UpdateGBC Finland
 

Similar a Leed Forum 2009 (20)

Leed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteLeed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training Institute
 
Mysilo Corporate Profile
Mysilo Corporate Profile Mysilo Corporate Profile
Mysilo Corporate Profile
 
a2d architecture
a2d architecturea2d architecture
a2d architecture
 
Explore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayExplore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market Today
 
Establishing a service factory
Establishing a service factoryEstablishing a service factory
Establishing a service factory
 
Bldg Maint Brochure
Bldg Maint BrochureBldg Maint Brochure
Bldg Maint Brochure
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Ngsurvey profile
Ngsurvey profileNgsurvey profile
Ngsurvey profile
 
IBA Service Offerings
IBA Service OfferingsIBA Service Offerings
IBA Service Offerings
 
DESIGN INFINITY COMPANY PROFILE
DESIGN INFINITY COMPANY PROFILEDESIGN INFINITY COMPANY PROFILE
DESIGN INFINITY COMPANY PROFILE
 
BBR Design
BBR DesignBBR Design
BBR Design
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal Presentation
 
BEE Company Presentation 中英文
BEE Company Presentation 中英文BEE Company Presentation 中英文
BEE Company Presentation 中英文
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conference
 
Portfolio
PortfolioPortfolio
Portfolio
 
Affix interiors catalog
Affix interiors catalogAffix interiors catalog
Affix interiors catalog
 
In fer india pofile presentation for genpact 12.7.12
In fer india pofile presentation for genpact 12.7.12In fer india pofile presentation for genpact 12.7.12
In fer india pofile presentation for genpact 12.7.12
 
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
[Nordic GBC Conference 2013] Ryan Zizzo: LEED v4 Update
 

Más de naoums

Alexandra
AlexandraAlexandra
Alexandranaoums
 
éLections hscm final e_version
éLections hscm final e_versionéLections hscm final e_version
éLections hscm final e_versionnaoums
 
Responsable logistique 2010rev1
Responsable logistique 2010rev1Responsable logistique 2010rev1
Responsable logistique 2010rev1naoums
 
Logistics coordinator mmc 2010 e
Logistics coordinator mmc 2010  eLogistics coordinator mmc 2010  e
Logistics coordinator mmc 2010 enaoums
 
Certains aspects légaux du commerce international laval techno final affiliat...
Certains aspects légaux du commerce international laval techno final affiliat...Certains aspects légaux du commerce international laval techno final affiliat...
Certains aspects légaux du commerce international laval techno final affiliat...naoums
 
Conference laval dd 101028
Conference laval dd 101028Conference laval dd 101028
Conference laval dd 101028naoums
 
Ibs report sample machined valve
Ibs report sample machined valveIbs report sample machined valve
Ibs report sample machined valvenaoums
 
Presentation laval technopole 16 juin 2010 jade
Presentation laval technopole 16 juin 2010 jadePresentation laval technopole 16 juin 2010 jade
Presentation laval technopole 16 juin 2010 jadenaoums
 
Entrepot classe mondiale GCL 05132010
Entrepot classe mondiale  GCL 05132010Entrepot classe mondiale  GCL 05132010
Entrepot classe mondiale GCL 05132010naoums
 
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04CAILT présentation YD Gagnon Propulsion MPA Transport 15.04
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04naoums
 
Plan Directeur Logistique Laval Technopole Bcsp
Plan Directeur Logistique   Laval Technopole BcspPlan Directeur Logistique   Laval Technopole Bcsp
Plan Directeur Logistique Laval Technopole Bcspnaoums
 
Plan directeur logistique
Plan directeur logistique Plan directeur logistique
Plan directeur logistique naoums
 
Reseau CAILT Chaine Appro Édition 2010
Reseau CAILT Chaine Appro Édition 2010Reseau CAILT Chaine Appro Édition 2010
Reseau CAILT Chaine Appro Édition 2010naoums
 
Invitation Reseau CAILT CA
Invitation Reseau CAILT CAInvitation Reseau CAILT CA
Invitation Reseau CAILT CAnaoums
 

Más de naoums (14)

Alexandra
AlexandraAlexandra
Alexandra
 
éLections hscm final e_version
éLections hscm final e_versionéLections hscm final e_version
éLections hscm final e_version
 
Responsable logistique 2010rev1
Responsable logistique 2010rev1Responsable logistique 2010rev1
Responsable logistique 2010rev1
 
Logistics coordinator mmc 2010 e
Logistics coordinator mmc 2010  eLogistics coordinator mmc 2010  e
Logistics coordinator mmc 2010 e
 
Certains aspects légaux du commerce international laval techno final affiliat...
Certains aspects légaux du commerce international laval techno final affiliat...Certains aspects légaux du commerce international laval techno final affiliat...
Certains aspects légaux du commerce international laval techno final affiliat...
 
Conference laval dd 101028
Conference laval dd 101028Conference laval dd 101028
Conference laval dd 101028
 
Ibs report sample machined valve
Ibs report sample machined valveIbs report sample machined valve
Ibs report sample machined valve
 
Presentation laval technopole 16 juin 2010 jade
Presentation laval technopole 16 juin 2010 jadePresentation laval technopole 16 juin 2010 jade
Presentation laval technopole 16 juin 2010 jade
 
Entrepot classe mondiale GCL 05132010
Entrepot classe mondiale  GCL 05132010Entrepot classe mondiale  GCL 05132010
Entrepot classe mondiale GCL 05132010
 
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04CAILT présentation YD Gagnon Propulsion MPA Transport 15.04
CAILT présentation YD Gagnon Propulsion MPA Transport 15.04
 
Plan Directeur Logistique Laval Technopole Bcsp
Plan Directeur Logistique   Laval Technopole BcspPlan Directeur Logistique   Laval Technopole Bcsp
Plan Directeur Logistique Laval Technopole Bcsp
 
Plan directeur logistique
Plan directeur logistique Plan directeur logistique
Plan directeur logistique
 
Reseau CAILT Chaine Appro Édition 2010
Reseau CAILT Chaine Appro Édition 2010Reseau CAILT Chaine Appro Édition 2010
Reseau CAILT Chaine Appro Édition 2010
 
Invitation Reseau CAILT CA
Invitation Reseau CAILT CAInvitation Reseau CAILT CA
Invitation Reseau CAILT CA
 

Último

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 

Último (20)

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

Leed Forum 2009

  • 1. May 12th, 2009 Leadership in Energy and Environmental Design LEED CERTIFICATION OVERVIEW MONTREAL, QUEBEC
  • 2. WHO WE ARE 50 YEARS OF EXPERIENCE IN INDUSTRIAL ARCHITECTURE • Founded in 1959 by M.D. Gross (since retired). Formed Gross Kaplin Coviensky Architects in 1986. • Specialize in Commercial & Industrial design. • Construct 1-2M sq.ft. per year. • Recently moved to our LEED GOLD offices (in certification process). 1
  • 3. WHAT WE DO CANADIAN TIRE DISTRIBUTION CENTRE, COTEAU DU LAC. 1,600,000 sq.ft. 167 Acres 2
  • 4. WHAT WE DO RONA HEAD OFFICE, BOUCHERVILLE 3 expansions totaling 1,200,000 sq.ft. 3
  • 5. WHAT WE DO ALDO HEAD OFFICE, ST-LAURENT. Distribution Centre Head Office ALDO 500,000 sq.ft. 250,000 Including 300,000 sq.ft. of platforms 4
  • 6. WHAT WE DO SOBEYS, VAUGHAN. 500,000 sq.ft. 70’ High Warehouse Will be amongst the most automated facilities in North America 5
  • 7. WHAT WE DO SUSTAINABLE INDUSTRIAL ARCHITECTURE. • Outdoor Gear Canada – Québec’s First LEED Certified Industrial Building • Sobeys Trois-Rivières – First LEED* certified Refrigerated Warehouse • Sunlife Multi-Tenant – LEED Certified* – Core and Shell • SICO – LEED Certified Industrial Building* • GKC Offices – LEED Gold* – Commercial Interior 6 * LEED Certification pending
  • 8. WHAT IS LEED? •The Leadership in Energy and Environmental Design (LEED) Green Building Rating System™ encourages and accelerates global adoption of sustainable green building and development practices through the creation and implementation of universally understood and accepted tools and performance criteria. •LEED is a third-party certification program and an internationally accepted benchmark for the design, construction and operation of high performance green buildings. It provides building owners and operators the tools they need to have an immediate and measurable impact on their buildings’ performance. 7
  • 9. WHAT IS LEED? LEED promotes a whole-building approach to sustainability by recognizing performance in five key areas of human and environmental health: •sustainable site development •water efficiency •energy efficiency •materials selection •indoor environmental quality INTEGRATED DESIGN PROCESS 8
  • 11. DISTRIBUTION OF POINTS Innovation & Design Process Sustainable 7% Site 14% Indoor Environmental Quality 21% 7% Water Efficiency 20% 24% Materials & Energy & Resources Atmosphere LEED for New Construction 10
  • 12. FOUR LEVELS OF CERTIFICATION 70 prerequisites and credits available for LEED NC 26-32 33-38 39-51 52+ Perfect score is impossible as many credits are mutually exclusive (i.e. cannot get a credit for re-use if it is a new building) 11
  • 13. DIFFERENT TYPES OF CERTIFICATION for for for for for for for for for for for for New New Commercial Commercial Core and Core and Existing Existing Homes Homes Neighborhood Neighborhood Construction Construction Interiors Interiors Shell Shell Buildings Buildings Developments Developments **No specific category for Industrial Buildings. Certain **No specific category for Industrial Buildings. residential Certain for building for building for developers for building for for residential for building owners and points are out offorreach(ex. 90%owners and Humidity Control) points are out ofreach (ex. 90%views, Humidity Control) for building owners, tenants developers and design for building views, for residential building for residential building owners and owners, tenants and design owners and building building design teams design teams and design and design teams that service service owners, owners, owners, owners, teams that that address that address teams that teams that address new providers that providers that developers and developers and developers and developers and address new new building new building address new address new building design address address design teams design teams design teams design teams building design design and design and building design building design and building building that address that address that address that address and construction or construction or and and construction operation and operation and the new the new the new the new construction major major construction or construction or where building on-going on-going residential residential residential residential where building renovations. renovations. major major interiors are not upgrades and upgrades and building design building design building design building design interiors are not renovations renovations part of the initial performance performance and and and and part of the initial design process. improvements. improvements. construction construction construction construction design process. process. process. process. process. 12
  • 15. WHY CERTIFY? IMPACTS OF BUILDINGS ON RESOURCES 14
  • 18. WHY CERTIFY? BUSINESS BENIFITS OF BUILDING GREEN Great Marketing Tool ex: Mountain Equipment Coop. 17
  • 19. GROWING LEED AP MEMBERSHIP 18
  • 21. AVAILABLE GRANTS Many Grants exist for energy efficiency initiatives • No direct grants for LEED Certification • Pursuing LEED certification and environmental initiatives does however facilitate negotiations with Municipal Authorities 20
  • 22. CASE STUDY Finalist Sustainable Architecture SOBEYS Distribution Centre, Trois-Rivières (Québec) 21
  • 26. SUSTAINABLE SITE EROSION & SEDIMENT CONTROL Erosion & Sediment Control Erosion & Sediment Control ••Control erosion to reduce Control erosion to reduce negative impacts on water and negative impacts on water and air quality air quality ••Prevent loss of soil during Prevent loss of soil during construction construction ••Prevent sedimentation of Prevent sedimentation of storm sewer or receiving storm sewer or receiving streams streams 25
  • 27. SUSTAINABLE SITE EROSION & SEDIMENT CONTROL 26 SUSTAINABLE SITE EROSION & SEDIMENT CONTROL 27 1
  • 28. SUSTAINABLE SITE REDUCED PARKING AND ALTERNATIVES 28
  • 29. SUSTAINABLE SITE STORM WATER MANAGEMENT: Rate and Quantity Storm water Management Storm water Management ••Limit disruption and pollution of natural water Limit disruption and pollution of natural water flows by managing storm water runoff on-site. flows by managing storm water runoff on-site. ••This retention basin was designed for aa100 year This retention basin was designed for 100 year storm event storm event 29
  • 30. SUSTAINABLE SITE HEAT ISLAND EFFECT (NON-ROOF) RCC (Rolled Compacted Concrete) RCC (Rolled Compacted Concrete) ••97-99% MODIFIED PROCTOR 97-99% MODIFIED PROCTOR ••Reflective Surface Reflective Surface 30
  • 31. SUSTAINABLE SITE HEAT ISLAND EFFECT (ROOF) White TPO Membrane White TPO Membrane ••Highly-Reflective Highly-Reflective ••120,000 sq.ft. with no openings! 120,000 sq.ft. with no openings! 31
  • 32. SUSTAINABLE SITE HEAT ISLAND EFFECT (ROOF) 100% Sedum Roof 100% Sedum Roof ••Low Maintenance Low Maintenance ••Added Insulation Values Added Insulation Values ••Added Storm Water Retention Capabilities Added Storm Water Retention Capabilities 32
  • 33. SUSTAINABLE SITE LIGHT POLLUTION REDUCTION 33
  • 35. WATER EFFICIENCY WATER EFFICIENT LANDSCAPE 100% Indigenous Species 100% Indigenous Species ••Drought Resistant Drought Resistant ••Low Maintenance Low Maintenance ••No Need for Irrigation System No Need for Irrigation System 35
  • 36. WATER EFFICIENCY INNOVATIVE WASTEWATER TECHNOLOGIES Reed Purifying System Reed Purifying System 100% of Wastewater 100% of Wastewater Treated On Site Treated On Site 36
  • 37. WATER EFFICIENCY WATER USE REDUCTION 47% Water Use 47% Water Use Reduction Reduction ••Waterless Urinals Waterless Urinals ••Automatic Faucets Automatic Faucets ••Low-flow Toilets Low-flow Toilets ••Low-flow Showers Low-flow Showers 37
  • 39. ENERGY & ATMOSPHERE MINIMUM ENERGY PERFORMANCE 39
  • 40. ENERGY & ATMOSPHERE BEST PRACTICE COMMISSIONING Intent Verify and ensure that the entire building is designed, constructed and calibrated to operate as intended. MEASURMENT AND VERIFICATION Intent Provide for the ongoing accountability and optimization of building energy and water consumption performance over time. 40
  • 41. ENERGY & ATMOSPHERE OPTIMIZE ENERGY PERFORMANCE 61% Savings in Energy 61% Savings in Energy ••Savings of 55419 309 MJ Savings of 419 309 MJ ••Reduction of 660,4 tonnes of CO2 Reduction of 660,4 tonnes of CO2 ••Projected savings of Projected savings of 140,000$/year in energy costs 140,000$/year in energy costs State of the Art Refrigeration State of the Art Refrigeration System System ••Glycol loop, indirect use of Glycol loop, indirect use of Ammonia Ammonia ••Utilizes principles of Free Cooling Utilizes principles of Free Cooling ••Free of CFCs Free of CFCs 41
  • 42. ENERGY & ATMOSPHERE OPTIMIZE ENERGY PERFORMANCE 61% Savings in Energy 61% Savings in Energy ••High Output T5 Fluorescents High Output T5 Fluorescents ••Motion detectors in aisles Motion detectors in aisles ••Daylight sensors Daylight sensors 42
  • 43. ENERGY & ATMOSPHERE OPTIMIZE ENERGY PERFORMANCE Radiant In-Slab Heating in Radiant In-Slab Heating in Offices and Lockerooms Offices and Lockerooms ••Heat recovery from Heat recovery from compressors used to heat Office compressors used to heat Office areas and Service Block areas and Service Block (Lockeroom, Cafeteria, etc..) (Lockeroom, Cafeteria, etc..) 43
  • 45. MATERIALS & RESOURCES COLLECTION OF RECYCLABLES Recycling Plan 45
  • 46. MATERIALS & RESOURCES CONSTRUCTION WASTE MANAGEMENT Strict Construction Waste Strict Construction Waste Management Plan Management Plan ••Diverted 51,280.6 cu.m. from Diverted 51,280.6 cu.m. from landfills landfills ••Out of aatotal of 52,152.2 cu.m Out of total of 52,152.2 cu.m evacuated from site evacuated from site ••Resulting in 98% of Resulting in 98% of construction waste and debris construction waste and debris ••Granting aatotal of 22LEED Granting total of LEED Points Points ••MR Cr. 2.1 (1 point) ≥≥50% MR Cr. 2.1 (1 point) 50% ••MR Cr. 2.2 (1 point) ≥≥75% MR Cr. 2.2 (1 point) 75% 46
  • 47. MATERIALS & RESOURCES RECYCLED CONTENT & REGIONAL MAT’LS Recycled Content Recycled Content ••27,54% of recycled content 27,54% of recycled content used in the project used in the project ••MR Cr. 4.1 (1 point) ≥≥7.5% MR Cr. 4.1 (1 point) 7.5% ••MR Cr. 4.2 (1 point) ≥≥15% MR Cr. 4.2 (1 point) 15% Regionally Extracted and Regionally Extracted and Manufactured Materials Manufactured Materials ••53.08% Materials 53.08% Materials Manufactured Regionally Manufactured Regionally (<800km radius) (<800km radius) ••50.54% Materials Extracted 50.54% Materials Extracted Regionally Regionally ••MR Cr. 5.1 (1 point) ≥≥10% MR Cr. 5.1 (1 point) 10% ••MR Cr. 5.2 (1 point) ≥≥20% MR Cr. 5.2 (1 point) 20% 47
  • 48. MATERIALS & RESOURCES CERTIFIED WOODS Use of Certified Wood Use of Certified Wood ••93.65% Certified Wood 93.65% Certified Wood ••MR Cr. 7.1 (1 point) ≥≥50% MR Cr. 7.1 (1 point) 50% Forest Stewardship Council Forest Stewardship Council ••FSC is an international FSC is an international certification and labeling system certification and labeling system that guarantees that the forest that guarantees that the forest products you purchase come products you purchase come from responsibly managed from responsibly managed forests and verified recycled forests and verified recycled sources. sources. 48
  • 50. INDOOR ENVIRONMENTAL QUALITY MEASURES Prerequisite 1 •Minimum Indoor Air Quality Performance – ASHRAE 62-2001 Prerequisite 2 • Environmental Tobacco Smoke (ETS) Control Credit 1 • Carbon Dioxide (CO2 ) Monitoring Credit 7 • Thermal Comfort: Compliance and Monitoring 50
  • 51. INDOOR ENVIRONMENTAL QUALITY CONST. MANAGEMENT PLAN IAQ Plan during Construction IAQ Plan during Construction ••Protect Absorptive Materials Protect Absorptive Materials from Moisture Damage from Moisture Damage ••Protect Ventilation Ducts and Protect Ventilation Ducts and Other Contamination Pathways Other Contamination Pathways ••Inspect Building and HVAC Inspect Building and HVAC Systems (eg. Moisture, water Systems (eg. Moisture, water damage, construction debris in damage, construction debris in ceiling space, etc.) ceiling space, etc.) ••Testing Air Quality Before Testing Air Quality Before Occupancy Occupancy 51
  • 52. INDOOR ENVIRONMENTAL QUALITY LOW EMITTING MATERIALS Low Volatile Organic Low Volatile Organic Compound (VOC) Materials Compound (VOC) Materials ••Adhesives & Sealants Adhesives & Sealants ••Paints & Coatings Paints & Coatings ••Carpet Carpet ••Composite Wood and Laminate Composite Wood and Laminate Adhesives Adhesives 52
  • 53. INDOOR ENVIRONMENTAL QUALITY INDOOR CHEMICAL & POLLUTANT SOURCE CONTROL Indoor Chemical & Pollutant Indoor Chemical & Pollutant Source Control Source Control ••Use of foot grilles to capture dirt Use of foot grilles to capture dirt and particles from entering the and particles from entering the building building ••Provide segregated areas with Provide segregated areas with separate outside exhaust for separate outside exhaust for copy/printing rooms copy/printing rooms ••Replace all air filters Replace all air filters immediately prior to occupancy immediately prior to occupancy (MERV 13), as determined by (MERV 13), as determined by ASHRAE 52.2-1997 ASHRAE 52.2-1997 53
  • 54. INDOOR ENVIRONMENTAL QUALITY 75% DAYLIGHTS & 90% VIEWS 54
  • 55. INDOOR ENVIRONMENTAL QUALITY 75% DAYLIGHTS & 90% VIEWS 55
  • 56. INDOOR ENVIRONMENTAL QUALITY 75% DAYLIGHTS & 90% VIEWS 56
  • 57. INDOOR ENVIRONMENTAL QUALITY 75% DAYLIGHTS & 90% VIEWS 57
  • 58. INNOVATION & DESIGN PROCESS 58
  • 59. INNOVATION & DESIGN PROCESS 1 to 4 Points awarded for exceptional performance above the requirements set by the LEED Green Building Rating System and Innovative Performance in categories not specifically addressed • Exceptional performance in Water Reduction 47% Reduction vs. 30% required • Exceptional performance in Regional Materials 53% Local vs. 20% required • ESPR Simulation to reduce Refrigeration Load • Educational Measures 59
  • 60. CASE STUDY SICO Distribution Centre, St-Hubert (Québec) 60
  • 62. SUSTAINABLE SITE REDEVELOPMENT OF CONTAMINATED SITES 1 Point for Redevelopment of a 1 Point for Redevelopment of a Contaminated Site Contaminated Site •Site contaminated by Metals •Site contaminated by Metals •2,400 cubic meters removed •2,400 cubic meters removed 62
  • 63. SUSTAINABLE SITE STORMWATER MANAGEMENT: Treatment Stormceptor Stormceptor ••The stormceptor separates any oils or The stormceptor separates any oils or other contaminants from the storm water, other contaminants from the storm water, prior to draining into perimeter ditches prior to draining into perimeter ditches 63
  • 64. SUSTAINABLE SITE SPILL OVERFLOW CONTROL Spill Overflow Control Spill Overflow Control ••Depressed loading area acts as aacontainment area for any solvents that may Depressed loading area acts as containment area for any solvents that may spill during aafire, via aasystem of automatic valves. spill during fire, via system of automatic valves. ••Eliminated the construction of aamassive underground reservoir. Eliminated the construction of massive underground reservoir. 64
  • 65. ENERGY & ATMOSPHERE OPTIMIZE ENERGY PERFORMANCE 37% Savings in Energy 37% Savings in Energy ••Savings of 55703 000 MJ Savings of 703 000 MJ ••Reduction of 404,7 tons of CO2 Reduction of 404,7 tons of CO2 ••Projected savings of 68,000$/year Projected savings of 68,000$/year in energy costs in energy costs Solar Wall System with Heat Solar Wall System with Heat Wheel Recovery System Wheel Recovery System 65
  • 66. ENERGY & ATMOSPHERE SOLAR WALL + HEAT WHEEL How does it work? How does it work? ••Exterior air passes behind dark Exterior air passes behind dark perforated panels, which passively perforated panels, which passively heat the fresh air prior to entering heat the fresh air prior to entering the building. the building. ••Heat wheel exchangers further Heat wheel exchangers further augment the efficiency of the augment the efficiency of the system by mixing the fresh air with system by mixing the fresh air with the ambient air. the ambient air. 66
  • 67. ENERGY & ATMOSPHERE SOLAR WALL + HEAT WHEEL ••These ducts feed the Roof top units with pre-heated air from the Solar Wall These ducts feed the Roof top units with pre-heated air from the Solar Wall ••Ducts are coordinated to pass through the racking. Ducts are coordinated to pass through the racking. 67
  • 68. MATERIALS & RESOURCES CONSTRUCTION WASTE MANAGEMENT Strict Construction Waste Strict Construction Waste Management Plan Management Plan Diverted 160,206 kg. from Diverted 160,206 kg. from landfills landfills ••Out of aatotal of 166,539 kg. Out of total of 166,539 kg. evacuated from site evacuated from site ••Resulting in 96% of Resulting in 96% of construction waste and debris construction waste and debris ••Granting aatotal of 22LEED Granting total of LEED Points Points ••MR Cr. 2.1 (1 point) ≥≥50% MR Cr. 2.1 (1 point) 50% ••MR Cr. 2.2 (1 point) ≥≥75% MR Cr. 2.2 (1 point) 75% 68
  • 69. INDOOR ENVIRONMENTAL QUALITY LOW EMITTING MATERIALS Low Volatile Organic Low Volatile Organic Compound (VOC) Materials Compound (VOC) Materials ••Adhesives & Sealants Adhesives & Sealants ••Paints & Coatings Paints & Coatings ••Carpet Carpet ••Composite Wood and Laminate Composite Wood and Laminate Adhesives Adhesives 69
  • 70. INNOVATION & DESIGN PROCESS 70
  • 71. TO CONCLUDE… • LEED Certification is Attainable for Industrial Buildings • It Can be Done Economically • LEED Improves Worker Morale and Productivity • Most Importantly…. HELPS OUR ENVIRONMENT 71
  • 72. TO FIND OUT MORE… United States Green Building Council (USGBC) www.usgbc.org Visit us at: www.gkc.ca Canadian Green Building Council (CaGBC) www.cagbc.org 72