SlideShare a Scribd company logo
1 of 31
Download to read offline
0
INVESTOR PRESENTATION
April 2014
1
Forward Looking
STATEMENTS
Certain information included in this presentation constitutes ā€˜forward-looking statementsā€™ within the meaning of the ā€˜safe
harborā€™ provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The
words ā€˜expectā€™, ā€˜believeā€™, ā€˜willā€™, ā€˜intendā€™, ā€˜estimateā€™, ā€˜forecastā€™, and similar expressions identify forward-looking statements.
Such statements include, without limitation, any information as to our future exploration, financial or operating
performance, including: the Company's forward looking production guidance, projected capital expenditures, operating
cost estimates, project timelines, mining and milling rates, the methods by which ore will be extracted, projected grades,
mill recoveries, and other statements that express management's expectations or estimates of future performance.
Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered
reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and
contingencies. The factors and assumptions contained in this presentation, which may prove to be incorrect, include, but
are not limited to: metal prices assumptions, Canadian and U.S. dollar exchange rate assumptions, that there will be no
significant disruptions affecting operations, that prices for key mining and construction supplies, including labour and
transportation costs, will remain consistent with the Company's expectations, that the Company's current estimates of
mineral reserves and resources are accurate, and that there are no material delays in the timing of ongoing development
projects. The forward-looking statements are not guarantees of future performance. The Company cautions the reader
that such forward-looking statements involve known and unknown risks that may cause the actual results to be materially
different from those expressed or implied by the forward-looking statements. Such risks include, but are not limited to: the
possibility that metal prices, foreign exchange rates or operating costs may differ from management's expectations,
uncertainty of mineral reserves and resources, inherent risks associated with mining and processing, the risk that the Lac des
Iles mine may not perform as planned and that the Offset Zone and other properties may not be successfully developed,
and uncertainty of the ability of the Company to obtain financing. For more details on the factors, assumptions and risks
see the Company's most recent Form 40-F/Annual Information Form on file with the U.S. Securities and Exchange
Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or
revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly
required by law. Readers are cautioned not to put undue reliance on these forward-looking statements.
All dollar amounts are in Canadian currency unless otherwise stated, all references to production refer to payable
production, and all reference to tonnes refer to metric tonnes.
U.S. investors are encouraged to refer to the ā€œCautionary Note to U.S. Investors Concerning Estimates of Measured,
Indicated and Inferred Resourcesā€ in the appendix.
2
NAPā€™s Investment
ā€¢ Clear Growth Strategy to Increase Production & Lower Cash Costs
NAPā€™s flagship LDI mine offers production growth with a decreasing cash cost profile and
expanding operating margins
ā€¢ Leverage to Rising Palladium Prices
As one of only two primary palladium producers in the world, NAP is uniquely positioned to benefit
from the positive supply & demand fundamentals (driven by constrained mine supply & rising
global vehicle production)
ā€¢ Attractive PGM Investment Jurisdiction
NAP operates in a stable political landscape, with low geopolitical risk and moderate cost
inflation compared to peers in South Africa and Russia
ā€¢ Significant Development & Exploration Upside
Excess mill and production shaft capacity, existing infrastructure & permits, gives NAP the potential
to convert exploration success into production and cash flow on an accelerated timeline
ā€¢ Operational Expertise Reduces Operating Risk
Experienced executive management team has a strong track record in mining operations
PROPOSITION
3
Market
STATISTICS
Information as at March 31, 2014, Thomson One. Shareholder ID based only on public filings.
SECURITY SYMBOLS
NYSE MKT: PAL
TSX: PDL, PDL.DB, PDL.DB.A
MARKET CAPITALIZATION US$88 Million
RECENT SHARE PRICE US$0.32
SHARES OUTSTANDING
273,992,149 M (issued & outstanding)
(fully diluted)
52-WEEK HIGH/LOW US$1.95 / US$0.31
3-MONTH TRADING VOLUME NYSE MKT: 6.9 M / TSX: 1.5 M
ANALYST COVERAGE
1. CIBC, Leon Esterhuizen
2. Euro Pacific, Heiko Ihle
3. Mackie, Barry Allan
4. Macquarie, Daniel Greenspan
5. Raymond James, Alex Terentiew
$0.00
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
4
Financial
POSITION
Liquidity & Capital Resources:
ā€¢ $9.8 M in cash at Dec. 31, 2013
ā€¢ Credit facility was fully utilized as at Dec. 31, 2013
ā€¢ Closed $32 M financing in 7.5% convertible unsecured subordinated
debentures and associated warrants (Q1, 2014)
ā€¢ Pro-forma cash position of $41.8 M
5
ā€¢ Located north of Thunder Bay, Ontario, Canada
ā€¢ One of only two primary palladium producers in the world
ā€¢ Deposit is unique in the world:
- Strong palladium enrichment over significant widths vs. more typical PGE
reef-type deposits
- Offset Zone remains open at depth, to the west and south
ā€¢ Established palladium producer since 1993
ā€¢ Established infrastructure with excess capacity:
- 15,000 tpd mill & new 8,000 tpd shaft
ā€¢ Increasing production & decreasing operating costs:
- Mining rate of ~3,000 tpd in H1/14, up to 5,000 tpd by YE
- Cash costs expected to decline to US$450 per ounce in Q4
ā€¢ Development upside to leverage existing mine & mill infrastructure:
- Opportunity at depth, laterally & through new mining method
ā€¢ Significant exploration upside identified on the LDI property
LDI Mine & Mill Complex
A WORLD CLASS ASSET
15,000 tpd mill capacity
8,000 tpd shaft capacity
6
LDI Operations
2013 PRODUCTION
1. Non-IFRS measure. Please refer to Non-IFRS Measures in the MD&A.
Q1, 2013 Q2, 2013 Q3, 2013 Q4, 2013 FY 2013
Payable palladium produced 38,654 oz 35,428 oz 30,097 oz 30,979 oz 135,158 oz
Cash cost per ounce1 US$490 US$564 US$581 US$621 US$560
Tonnes of ore mined 540,694 433,580 542,917 576,478 2,093,669
From surface
295,038
@ 2.4 g/t
301,974
@ 2.1 g/t
334,820
@ 1.2 g/t
345,132
@ 0.98 g/t
1,276,964
@ 1.6 g/t
From underground
245,656
@ 4.1 g/t
131,606
@ 4.4 g/t
208,097
@ 4.5 g/t
231,346
@ 4.67 g/t
816,705
@ 4.4 g/t
Tonnes of ore milled 503,585 483,266 517,157 544,074 2,048,082
Avg. milled head grade 3.3 g/t Pd 3.1 g/t pd 2.5 g/t Pd 2.4 g/t Pd 2.8 g/t Pd
Palladium mill recovery 80.1% 80.7% 80.7% 81.5% 80.7%
Total cost per tonne milled C$57 C$53 C$42 C$55 C$52
7
Payable palladium produced 170,000 - 175,000 oz
Cash cost per ounce1 ~US$550/oz (expected to decline to
~$450/oz in Q4)
Tonnes of ore mined ~2.3 M
From Surface Stockpile ~1 M @ 1.0 g/t
From Underground ~1.3 M @ 4.2 g/t
Average milled head grade 3.0 g/t Pd
Palladium mill recovery ~82%
Total cost per tonne milled C$51 ā€“ C$55
Mining Rate
~3,000 tpd in 1H/14 & gradually
increase to ~5,000 tpd in 2H/14
Capital expenditure forecast ~$30 M
Exploration budget ~$4 M
LDI Operations
2014 TARGETS
1. Non-IFRS measure. Please refer to Non-IFRS Measures in the MD&A.
8
LDI Mine Expansion
ā€¢ Phase I of mine expansion completed in Q4,
2013:
ā€“ Currently transitioning from ramp haulage to
shaft hoisting (increasing shaft production)
ā€“ Targeting mining rate of ~3,000 tpd in H1/14,
up to 5,000 tpd by YE
ā€“ Current focus on material flow
improvements
ā€¢ Operations expected to benefit from increased
mining rates & decreased operating costs
through the utilization of the shaft
ā€¢ Targeting to achieve steady-state production in
2014
ā€¢ 2014 scoping study to define future growth
potential (targeted for H2/14)
PLAN FOR GROWTH
ROBY ZONE
OPEN PIT
OFFSET ZONE
825-M
Level
Surface
990-M
Level
Shaft
The underground design schematic of the
underground mine, showing the deposit and
underground ramp infrastructure, looking east. Offset
Zone remains open to the west, south & at depth.
9
Future Growth Potential
UPSIDE
Mill Complex
Nameplate capacity: 15,000 tpd mill
Shaft Infrastructure
Nameplate capacity: 8,000 tpd mill
Robust Ore Body
Offset Zone remains open at depth, to the west and south
Opportunity to optimize the ore body & utilize existing infrastructure
Growth could potentially come from:
ā€¢ Deeper Offset Zone (via shaft extension & new ore handling system)
ā€¢ New bulk mining method (potential to significantly increase mining volumes)
ā€¢ Lateral development (lateral targets near existing infrastructure)
ā€¢ Surface exploration upside
10
New Mining Method
ā€¢ Ore body suitable for lower
cost bulk mining
ā€“ Potential for increased
resources at a lower cut-
off grade
ā€¢ Reviewing viability of
changing mining method for
certain LDI deposits:
ā€“ from long-hole stoping
to higher volume bulk
mining
ā€“ targeting increased
mining volumes
ā€¢ Engaged external
engineering firm to assist with
internal analysis
OPPORTUNITY
11
LDI Property
EXPLORATION UPSIDE
ā€¢ LDI complex remains
largely
underexplored
ā€¢ New lateral targets
are under review
(near existing
infrastructure)
ā€¢ Multiple new targets
identified (surface &
underground)
ā€¢ Regional land
package covers the
most prospective
mafic complexes in
the area
12
Investment
LEVERAGE TO RISING PALLADIUM PRICES
CLEAR STRATEGY TO INCREASE
PRODUCTION & LOWER CASH COSTS
ATTRACTIVE PGM INVESTMENT
JURSIDICTION
UPSIDE IN EXPLORATION & DEVELOPMENT
THESIS
13
Investment Case for
PALLADIUM
14
Constrained
Small Market:
ā€¢ Only ~6.5 M oz in annual mine production
(unlikely to increase meaningfully)
Highly Concentrated:
ā€¢ 80% of mine supply derived from risky jurisdictions:
Russia & South Africa (mined as a by-product
metal)
Challenged Global Supply:
ā€¢ Decreased production from Russiaā€™s Norilsk Nickel
due to declining grades
ā€¢ Anticipated closures of some South African mines,
where output is affected by political issues, labour
unrest & technical challenges
ā€¢ Decreased sales from Russian stockpiles, a
historical overhang (believed to be depleted)
ā€¢ Recycling insufficient to offset demand
The palladium market is forecasted to remain in a
deficit position for the foreseeable future
SUPPLY
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
2008 2009 2010 2011 2012e 2013p 2014p 2015p
Other United States Canada South Africa Russia
NORTH AMERICA
RUSSIA
SOUTH AFRICA
36%
14%
44%
Sources: Johnson Matthey & CPM Group (excludes secondary supply)
15
Growing
ā€¢ Strong demand from automotive sector
ā€¢ Growth in demand driven by vehicle sales & environmental legislation in developing markets:
o Light vehicle production forecasted to increase by 4% annually
o Strong growth in light vehicle production driven by China (forecast ~31 M vehicles per
year by 2018)
o More stringent emission control standards mandate the use of catalytic converters
DEMAND
Automotive
(catalytic converters)
67%
Electronics
12%
5%
Dental
1%
Other
5%
Jewellery
5%
Chemical 4%
Investment
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
2011 2012 2013 2014 2015 2016 2017 2018
Global Light Vehicle Production Forecast:
(000ā€™s)
Source: IHS Automotive, February 2012
1. Other includes: Japan, Korea, Middle East and Africa
2. BRIC Economies include: Greater China, South America and South Asia
16Source: CPM Group, as at May 13, 2013
Investment
DEMAND
ā€¢ Large increase in palladium investment demand
ā€¢ Investment demand driven by supply/demand fundamentals for palladium --
constrained mine supply and growth in global vehicle production
Exchange Traded Funds' Physical Palladium Holdings
M oz. Pd. M oz. Pd.
0.0
0.5
1.0
1.5
2.0
2.5
0.0
0.5
1.0
1.5
2.0
2.5
20-Apr-07 20-Mar-08 20-Feb-09 20-Jan-10 20-Dec-10 20-Nov-11 20-Oct-12
SPPP-NYSE (Sprott)
Mitsubishi
SPAL-LSE Source
SPDM-LSE iShares
WITE-NYSE ETF Securities
GLTR-NYSE ETF Securities
Julius Baer
PALL - NYSE ETF Securities
MSL (Australia)
Palladium ZKB
PHPD LSE
17
Firm As of: 2014 2015 2016 2017
BMO Capital Markets 01-13-14 $750 $750 $800 $800
Scotia 01-09-14 $725 $725 $700 $650
CPM Group 01-08-14 $769 $830 $875 $908
Mitsui Precious Metals 01-08-14 $745 $780
CIBC World Markets 01-07-14 $800 $1,000 - -
Cormark 01-07-14 $750 $750 $750 $750
Macquarie 01-07-14 $785 $838 - -
Credit Suisse 01-06-14 $760 $840 $850 $850
Prestige Economics LLC 12-31-13 $745 $800 - -
Intesa Sanpaolo SpA 12-18-13 $800 $850 $875 -
TD Bank 12-02-13 $819 $831 - -
Societe Generale SA 11-26-13 $790 $850 $900 $950
ABN AMRO Bank NV 11-21-13 $650 $725 - -
Citigroup 11-18-13 $800 $925 $925 -
LBBW 11-07-13 $775 - - -
Standard Chartered Bank 11-04-13 $850 $800 $650 -
UBS 10-15-13 $825 $850 $825 $825
Raymond James 10-08-13 $750 $850 - -
Bank of America Merrill Lynch 09-27-13 $800 $850 $777 -
Deutsche Bank 09-25-13 $750 $850 $950 -
RBC Capital Markets 08-11-13 $850 $850 - -
Capital Economics 08-16-13 $850 - - -
CIMB Group Holdings 08-09-13 $850 $1,000 $708 $708
Barclays 07-12-13 $795 $900 - -
China International Capital 04-15-13 $800 - - -
Annual Average (US$/oz.) $786 $844 $824 $827
PalladiumPriceForecasts
(US$perounce)
18
Shareholder
INFORMATION
North American Palladiumā€™s vision is to become a low cost, mid-tier precious metals company operating in
mining friendly jurisdictions. NAP is an established precious metals producer that has been operating its Lac des
Iles mine (LDI) located in Ontario, Canada since 1993. LDI is one of only two primary producers of palladium in
the world, and is currently completing a major expansion to increase production and reduce cash costs per
ounce.
Royal Bank Plaza, South Tower
200 Bay St., Suite 2350
Toronto, ON M5J 2J2
NYSE MKTā€“ PAL
TSX ā€“ PDL, PDL.DB
www.nap.com
Investor Relations & Corporate Communications
IR@nap.com
416-360-7374
Corporate Office:
Security Symbols:
Website:
Investor Relations:
19
Appendices &
FURTHER INFORMATION
20
Senior
EXECUTIVES
Phil du Toit ā€“ President & CEO
Mr. du Toit is an accomplished mining executive with a proven track record for executing on his management mandates throughout his career.
He brings significant project management expertise to the CEO role, developed during his 37 years of global experience in the mining industry
which included senior roles for some of the world's leading mining companies, and the successful development of multiple large capital
projects. Recently, Mr. du Toit served as Executive Vice President and Head of Mining Projects and Exploration for ArcelorMittal, the world's
leading integrated steel and mining company, where he was responsible for mining strategy, exploration, project and business development.
His experience also includes serving as interim CEO of Baffinland Iron Mines Corp., as well as having held various senior management positions
for Vale, Diavik Diamond Mines (a subsidiary of Rio Tinto plc), Voest Alpine Inc., and Gencor Ltd. He holds a Bachelor of Science degree in Civil
Engineering from the University of Pretoria in South Africa.
Dave Langille ā€“ Chief Financial Officer
Mr. Langille is a seasoned finance executive with over 26 years of international public company experience. He brings a wealth of international
financial expertise to NAP, notably a solid track record of optimizing operations to improve operating margins, along with merger and
acquisition experience, and raising capital through a broad range of capital market products. Most recently, Mr. Langille served as the CFO
and Vice President, Finance of Breakwater Resources Ltd. Prior to this, he served in senior financial positions for various public companies,
including Lindsey Morden Group Inc., Capital Environmental Resource Inc., Cott Corporation, and TVX Gold Inc. Mr. Langille received an
Honours Bachelor of Business Administration from Wilfrid Laurier University in Waterloo, Ontario, Canada in 1985, and has been a member of the
Institute of Chartered Accounts of Ontario and the Society of Management Accountants of Ontario since 1987.
David Peck ā€“ Head of Exploration
Dr. Peck is a Professional Geoscientist with nearly 30 years of exploration and research experience specializing in magmatic Ni-Cu-PGE ore
deposits. Dr. Peck holds global recognition as an expert in PGE exploration after serving as a senior technical and strategic consultant to
several public and private companies and having worked on exploration and mining projects in more than a dozen countries. He was directly
involved in several significant magmatic Ni-Cu-PGE discoveries in Canada and overseas. Prior to joining NAP, Dr. Peck served as President and
Senior Technical and Strategic Consultant at Revelation Geoscience Ltd., and prior to this, he served as Global Nickel Commodity Leader at
Anglo American plc, a Senior Geologist for Falconbridge Ltd., a Senior Mineral Deposits Geologist with the Manitoba Geological Survey, held
various academic roles in Canadian universities, and was the technical lead on a multi-year mineral potential study funded by the Ontario
Geological Survey. He has authored numerous public publications addressing his area of specialization.
Jim Gallagher ā€“ Chief Operating Officer
Mr. Gallagher is a seasoned mining executive with over 30 years of experience in a series of roles spanning operations, projects, engineering,
technology and consulting. For the last seven years, Mr. Gallagher served as Global Director of Mining at Hatch Ltd., with a mandate to build
the firmā€™s global underground capability, where he led the firmā€™s global mining group involved in transitioning projects to normal operations.
Prior to Hatch, the foundational part of his experience came from his 24-year career at Falconbridge in a variety of operations and project
management roles, most of which were based in Northern Ontario. Mr. Gallagher also has a track record for identifying improvement
opportunities and building out technical capabilities. Mr. Gallagher holds a Bachelor of Mining Engineering degree from Laurentian University in
Canada.
21
Board of
DIRECTORS
C. David A. Comba ā€“ Retired Mining Executive (Director since 2006)
Mr. Comba was first appointed to the Board of Directors of the Company in March 2006. He has over four decades of experience as an
exploration advocate and senior mining executive. As Chief Exploration Geologist of Falconbridge Limited in Sudbury, Ontario, he led the
team that discovered the high-grade footwall deposit that allowed the Thayer Lindsley mine to go into production. Prior to its takeover by
Kinross Gold Corporation, Mr. Comba was Vice-President, Exploration of Falconbridge Gold Corporation. Following the takeover, he
became President and Chief Executive Officer of Pentland Firth Venture Ltd., a Kinross-controlled junior gold exploration company listed on
the TSX. Pentlandā€™s work added the first couple of million ounce resource to the Hammond Reef property Atikokan, ON. Mr. Comba was
Director of Issues Management with the Prospectors and Developers Association of Canada from 1998 to 2005, during which time he led
the successful lobby effort for the re-introduction of enhanced or ā€œsuperā€ flow-through shares. Mr. Comba has Bachelorā€™s and Masterā€™s
degrees in geology from Queenā€™s University in Kingston, Ontario.
Steven R. Berlin ā€“ Retired Financial Executive (Director since 2001)
Mr. Berlin was appointed to the Board of Directors of the Company in February 2001, and is also a director of Orchids Paper Products, an
AMEX listed company. At the end of 2005, Mr. Berlin retired from his position as Vice-President of Kaiser Francis Oil Company (KFOC) where
he worked part-time for two years following four years full-time as Vice-President and Chief Financial Officer. Prior to joining KFOC, Mr. Berlin
taught at the University of Tulsa for three years where he also served a year as acting associate Dean of the College of Business and acting
Director of the School of Accounting. Before joining the University of Tulsa, Mr. Berlin spent 25 years with Citgo Petroleum Corporation, where
he retired as Senior VP Finance and Administration and Chief Financial Officer. Mr. Berlin has a bachelorā€™s degree from Duquesne University,
an MBA from the University of Wisconsin Madison and has completed the Executive Management program at Stanford University.
Robert J. Quinn ā€“ Chairman (Director since 2006)
Mr. Quinn was first appointed to the Board of Directors of the Company in June 2006. A founding partner of the Houston mining
transactional law firm Quinn & Brooks LLP, Mr. Quinn has over 30 years of legal and management experience, including as Vice President
and General Counsel for Battle Mountain Gold Company. He has extensive experience in M&A transactions, corporate governance, public
disclosure, governmental affairs, environmental law and land management. Mr. Quinn has a Bachelor of Science in Business Administration
from the University of Denver, a Juris Doctorate degree from the University of Denver College of Law and has completed two years of
graduate work in mineral economics at the Colorado School of Mines.
22
Greg J. Van Staveren ā€“ Strategic Financial Consultant (Director since 2003)
Mr. Van Staveren was appointed to the Board of Directors of the Company in February 2003. Since September 2001, Mr. Van Staveren has
been the President of Strategic Financial Services, a private company providing business advisory services. During this period he has sat on
the board of a number of publicly traded companies. Mr. Van Staveren is a Chartered Accountant and a Certified Public Accountant
and holds a Bachelor of Math (Honours) degree from the University of Waterloo. From February 1998 until September 2001, Mr. Van
Staveren was the Chief Financial Officer of MartinRea International Inc (MRE-TSX), and prior to that he was a partner in the mining group of
KPMG, which he joined in 1980, and where he provided accounting, and advisory services to his clients.
William J. Weymark ā€“ President, Weymark Engineering Ltd. (Director since 2007)
Appointed to the Board of Directors of the Company in January 2007, Mr. Weymark is President of Weymark Engineering Ltd., a Company
providing consulting services to businesses in the private equity, construction and resource sector. He is also a director of the VGH & UBC
Hospital Foundation Board, and several private companies. Mr. Weymark is also a Member of the Industry Advisory Committee for the
Norman B. Keevil Institute of Mining Engineering at the University of British Columbia. Until June 2007, Mr. Weymark was President and CEO of
Vancouver Wharves/BCR Marine, a transportation firm located on the west coast of British Columbia. Prior to joining Vancouver Wharves in
1991, Mr. Weymark spent 14 years in the mining industry throughout western Canada working on the start-up and operation of several
mines. Mr. Weymark is a Professional Engineer and holds a Bachelor of Applied Science in Mining and Mineral Process Engineering from the
University of British Columbia and is a graduate of the Institute of Corporate Directorsā€™, Directors Education Program.
Board of
DIRECTORS (CONā€™T)
Andre Douchane ā€“ President and Chief Executive Officer, Mahdia Gold Corp. (Director since 2003)
Mr. Douchane is a seasoned mining executive with over 40 years of experience in the mining industry with a solid track record of
successfully bringing development projects into production. He was appointed to the Companyā€™s Board of Directors in April 2003, and
served as the President and CEO until January 2006. He has held senior positions with several precious and base metal international mining
companies including CEO of THEMAC Resources, President and CEO of Starfield Resources Inc., President and COO of Chief Consolidated
Mining Co., and Vice President, Operations of Franco and Euro-Nevada (Newmont Mining Corporation). He holds a Bachelorā€™s degree in
Mining Engineering from the New Mexico Institute of Mining and Technology and is a graduate of the Executive Business Program at the
Kellogg School of Business in Toronto.
23
Cautionary Note to U.S. Investors Concerning
ā€¢ Mineral reserves and mineral resources have been calculated in accordance with National Instrument
43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes,
Industry Guide 7, (under the Securities and Exchange Act of 1934), as interpreted by Staff of the Securities
Exchange Commission (SEC), applies different standards in order to classify mineralization as a reserve. In
addition, while the terms ā€œmeasuredā€, ā€œindicatedā€ and ā€œinferredā€ mineral resources are required pursuant
to National Instrument 43-101, the U.S. Securities and Exchange Commission does not recognize such
terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource
information contained herein is not comparable to similar information regarding mineral reserves
disclosed in accordance with the requirements of the U.S. Securities and Exchange Commission. U.S.
investors should understand that ā€œinferredā€ mineral resources have a great amount of uncertainty as to
their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors
are cautioned not to assume that any part or all of NAP's mineral resources constitute or will be
converted into reserves. For a more detailed description of the key assumptions, parameters and
methods used in calculating NAPā€™s mineral reserves and mineral resources, see NAPā€™s most recent Annual
Information Form/Form 40-F on file with Canadian provincial securities regulatory authorities and the SEC.
ā€¢ Please refer to North American Palladiumā€™s most current Annual Information Form and applicable
technical reports available on www.sedar.com, www.sec.gov and www.nap.com for further information.
MINERAL RESERVES AND MINERAL RESOURCE
24
LDI Palladium Mine
RESERVES & RESOURCES
See accompanying Notes on the last page.
The Company has completed an update to its LDI mineral reserves and resources. The effective date for the new reserve and resource estimates, shown
in Table 1, is December 31, 2013. The new estimates exclude material mined up until the effective date. The resource estimates provided in Table 1
were prepared by NAP Qualified Persons in accordance with NI 43-101 guidelines. The reserve estimates provided in Table 1 were prepared by qualified
persons from Tetra Tech, also in accordance with NI 43-101 guidelines. A detailed discussion of the resource and reserve estimates presented in Table 1
will be contained in a NI 43-101 technical report containing an updated pre-feasibility study for the Lac des Iles mine. This report is expected to be filed
on SEDAR on or before March 31, 2014. The following discussion provides summary information for the new resource and reserve estimates for LDI
with reference to Table 1.
TABLE 1: Mineral reserve and mineral resource estimates for the Lac des Iles mine property effective December 31st, 2013.
RESERVES & RESOURCES
NEAR SURFACE RESERVES
Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu
Pd
Contained
Proven (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Low-Grade Stockpile (RGO) 0.95 4,876 0.97 0.12 0.08 0.06 0.03 152
Roby Zone Open Pit 1.09 716 1.31 0.16 0.13 0.07 0.06 30
Total Proven - 5,592 1.01 0.13 0.09 0.06 0.03 182
Probable
Roby Zone Open Pit 1.09 293 1.39 0.18 0.15 0.08 0.07 13
Total Reserve - 5,885 1.03 0.13 0.09 0.06 0.04 195
25
LDI Palladium Mine
RESERVES & RESOURCES
See accompanying Notes on the last page.
NEAR-SURFACE RESOURCES
Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu
Pd
Contained
Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Low-Grade Stockpile (RGO) 0.95 7,679 0.97 0.12 0.08 0.06 0.03 239
Roby Zone Pit Expansion 1.00 10,476 1.60 0.21 0.12 0.07 0.05 539
Sheriff Zone 1.50 1,725 2.06 0.21 0.11 0.06 0.07 114
North VT Rim 1.00 437 2.03 0.12 0.03 0.03 0.01 28
Total Measured - 20,317 1.41 0.17 0.10 0.07 0.04 921
Indicated
Roby Zone Pit Expansion 1.00 5,393 1.53 0.21 0.11 0.07 0.05 265
Sheriff Zone 1.50 35 1.74 0.20 0.14 0.07 0.09 2
North VT Rim 1.00 14 1.75 0.12 0.03 0.03 0.01 1
Total Indicated 5,442 1.53 0.21 0.11 0.07 0.05 268
Total Measured + Indicated - 25,759 1.44 0.18 0.10 0.07 0.04 1,189
UNDERGROUND RESERVES - HANGINGWALL ZONES
Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu
Pd
Contained
Proven (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Offset Hangingwall Zone 2.60 4,499 4.06 0.28 0.28 0.11 0.08 587
Roby Hangingwall Zone 2.40 847 3.51 0.23 0.20 0.05 0.04 96
Total Proven - 5,346 3.97 0.27 0.27 0.10 0.07 683
Probable
Offset Hangingwall Zone 2.60 3,564 3.82 0.27 0.27 0.10 0.09 438
Roby Hangingwall Zone 2.40 251 3.17 0.22 0.18 0.05 0.04 26
Total Probable 3,815 3.78 0.27 0.26 0.10 0.09 463
Total Reserve - 9,161 3.89 0.27 0.27 0.10 0.08 1,146
26
LDI Palladium Mine
RESERVES & RESOURCES
See accompanying Notes on the last page.
UNDERGROUND RESOURCES - HANGINGWALL ZONES
Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained
Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Offset Hangingwall Zone 2.50 2,418 4.34 0.31 0.28 0.11 0.08 337
Indicated
Offset Hangingwall Zone 2.50 3,234 4.19 0.30 0.29 0.12 0.10 436
Total Measured + Indicated 2.50 5,652 4.25 0.30 0.29 0.12 0.09 773
Inferred
Offset Hangingwall Zone 2.50 5,942 3.75 0.23 0.23 0.10 0.09
UNDERGROUND RESOURCES - FOOTWALL ZONES
Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained
Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Offset Footwall Zone 1.50 11,011 2.24 0.23 0.16 0.08 0.06 793
Roby Footwall Zone 1.50 4,159 2.43 0.21 0.18 0.06 0.05 325
Total Measured 1.50 15,170 2.29 0.22 0.17 0.07 0.06 1,118
Indicated
Offset Footwall Zone 1.50 8,810 2.12 0.22 0.16 0.08 0.07 600
Roby Footwall Zone 1.50 2,341 2.34 0.20 0.17 0.06 0.05 176
Total Indicated 1.50 11,151 2.17 0.22 0.16 0.08 0.07 777
Total Measured + Indicated 1.50 26,321 2.24 0.22 0.16 0.08 0.07 1,895
Inferred
Offset Footwall Zone 1.50 9,530 2.16 0.15 0.12 0.06 0.05
Roby Footwall Zone 1.50 248 2.43 0.18 0.08 0.03 0.02
Total Inferred 1.50 9,778 2.17 0.15 0.12 0.06 0.05
27
LDI Palladium Mine
RESERVES & RESOURCES
See accompanying Notes on the last page.
COMBINED RESERVES AND RESOURCES - ALL SOURCES
Category/Source Tonnes Pd Pt Au Ni Cu Pd Contained
Sub-Category (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz)
Total Proven + Probable 15,046 2.77 0.21 0.20 0.08 0.06 1,341
Total Measured + Indicated 57,732 2.08 0.21 0.15 0.08 0.06 3,857
Total Inferred 15,720 2.77 0.18 0.16 0.07 0.07
28
LDI Reserves & Resources
Notes
1. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may
be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
2. Palladium ounces are stated as contained ounces. Disclosure of contained ounces is permitted under Canadian regulations; however,
the US Securities and Exchange Commission (SEC) generally permits resources to be reported only as in place tonnage and grade.
3. Resources listed in Table 1.1 are exclusive of reserves. Resources and reserves reflect depletion from mining activities to December 31,
2013.
4. Tonnages are rounded to nearest '000 tonnes. Palladium, platinum and gold grades are rounded to nearest 0.01 g/t. Nickel and
copper grades are rounded to nearest 0.01%. Rounded numbers used to calculate contained palladium (oz) and average resource
and reserve tonnage and grades.
5. All reserve and resource estimates were prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral
Projects (NI 43-101) and the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) classification system. US investors should refer
to the Annual Information Form for an overview on how Canadian Standards differ significantly from US requirements.
6. The mineral resource for the Offset hangingwall and footwall zones was estimated as of December 31, 2013 by Denis Decharte P.Eng,
an employee of North American Palladium Ltd. (NAP) and a qualified person (QP) under NI 43-101. The mineral resource calculation
uses a minimum 2.5 g/t palladium resource block cut-off for the hangingwall zone and a minimum 1.5 g/t palladium resource block cut-
off for the footwall zone. The mineral resource estimate is based on the combination of geological modeling, geostatistics, and
conventional block modelling (5 m by 5 m by 5 m blocks). 1 m composite intervals were used with a grade capping at 30 g/t for
palladium and 3 g/t for gold. Grade capping was determined not to be necessary for others metals. The Offset Zone resource models
used the ordinary kriging (OK) grade interpolation method within a 3DI block model with mineralized zones defined by wireframe solids.
The mineral resource is exclusive of mineral reserve and mined-out material as of December 31, 2013.
7. The mineral resource for the Roby footwall zone was estimated as of December 31, 2013 by Denis Decharte P.Eng, an employee of NAP
and a QP under NI 43-101. The mineral resource calculation uses a minimum 1.5 g/t palladium resource block cut-off. The mineral
resource estimate is based on the combination of geological modeling, geostatistics, and conventional block modelling (5 m by 5 m by
5 m blocks). Grade capping was determined not to be necessary, however influence of composite intervals with palladium grade
higher than 50 g/t were limited in space. The Roby Zone resource models used the OK grade interpolation method within a 3DI block
model with mineralized zones defined by wireframe solids. The mineral resource is exclusive of mineral reserve and mined-out material
as of December 31, 2013.
NOTES
29
LDI Reserves & Resources
8. Mineral resource estimates for the near-surface portion of the western part of the North VT Rim Zone (west and east deep zones) at the
Lac des Iles Mine Property was prepared by Chris Roney, P.Geo., a QP and a private consultant to the Company. This resource estimate
was based on a 1.0 g/t palladium cut-off grade. The North VT Rim Zone mineral resources were estimated from drilling completed to
April 15, 2013. The mineral resource uses a minimum 1.0 g/t palladium resource block cut-off. The mineral resource estimate is based on
the combination of geological modeling, geostatistics, and conventional block modeling (5 m by 5 m by 5 m blocks). The North VT Rim
resource models used the inverse distance squared (ID2) grade interpolation method. North American Palladium Ltd. 1-4 1496780200-
REP-R0002-01 Technical Report for Lac des Iles Mine, Ontario Incorporating Prefeasibility Study for Life of Mine Plan.
9. Mineral resource estimates for the low-grade stockpile (RGO) was prepared by David N. Penna, P.Geo., an employee of Lac des Iles
Mines Ltd. and a QP within the meaning of NI 43-101.
10. As with mineral resources, the estimate of mineral reserves may be materially affected by environmental, permitting, legal, title,
taxation, socio-political, marketing, or other relevant issues. The mineral reserves were estimated from geological block models
provided by Denis Decharte P.Eng. and from RGO stockpile resource information provided by Dave Penna, P. Geo., employees of NAP
and QPs under NI 43-101. The geological block models reflect updates that are based upon diamond drilling completed after March
31, 2012 and before December 31, 2013.
11. Mineral resources for the Sheriff Zone are based on estimates originally provided in the Companyā€™s September 5, 2013 press release.
12. The mineral reserves were estimated by William Richard McBride, P.Eng. of Tetra Tech and Wenchang Ni, P.Eng. of Tetra Tech; with input
by Dave Penna, P. Geo., an employee of NAP and QPs under NI 43-101 on allocation of indirect mining costs and John Cooney, P. Eng.,
an employee of NAP and QP under NI 43-101 on the use of the Lac Des Isle Mine 2014 budget for unit cost determinations; and with
additional input by Cam McKinnon, P.Eng. of Tetra Tech on recoveries; and Philip Bridson, P.Eng. of Tetra Tech on metal prices and
exchange rate, independent QPs within the meaning of NI 43-101.
13. Reserves were estimated to the 1065 Mine Level (4,435 m elevation), a maximum depth of 1,072.5 m.
14. The following metal price assumptions were used for reserves estimation: US$700/oz palladium, US$1,453/oz platinum, US$1,320/oz gold,
US$6.47/lb nickel, and US$3.26/lb copper. A Cdn$/US$ exchange rate of Cdn$1.00 = US$0.95 was also applied.
NOTES
30
LDI Reserves & Resources
15. An average production rate of 5,272 t/d was used to determine the reserves. The following recoveries were used in the assumptions to
determine the reserves: 86.3% palladium, 80.3% platinum, 80.4% gold, 38.8% nickel, and 88.7% copper. The effective date of NAPā€™s Lac
des Iles Mine resource models for the Offset Zone and for the Roby Zone, as prepared by NAPā€™s Denis Decharte P.Eng., is December 31,
2013 and as a result of ā€œmining depletionā€ the user of this reserve information should ensure that this is based upon the most recent
resource estimate for the Property.
16. It should also be noted that the mineral reserve estimate for the Offset Zone as provided in 2013 as part of the technical report labeled
ā€œTechnical Report Lac des Iles Mine, Ontario, Incorporating Prefeasibility Study Offset Zone Phase I, effective January 31, 2013ā€ reflected
a different mining method with a different set of economic circumstances that thereby lead to that January 2013 reserve estimate in
that prior report to be non-applicable to the unconsolidated fill mining method demonstrated as being viable by this prefeasibility study
work. It should be further noted that ā€œmining depletionā€ during 2013 is not accounted for in the reserves, as in place underground mining
developments were removed from the resource model prepared by NAPā€™s Denis Decharte P.Eng., and thereby from the reserve
numbers; and a 0% mining recovery was applied to known mined-out stopes. The projected top down, long-hole with unconsolidated fill
mining method, its potential production profile and the plans referred to in this prefeasibility study are preliminary in nature and
additional technical studies will need to be completed in order to prove out their viability. There is no certainty that this mining method
will be realized or that the production capabilities as represented will be realized. A mine production decision that is made without a
feasibility study carries additional potential risks which include but are not limited to the lack of details pertaining to geotechnical and
ventilation field study inputs for mine design, ore handling upgrades and their impact on mining schedules, metallurgical flow sheets
and process plant designs that in themselves may require additional economic analysis and internal studies to ensure satisfactory
operational conditions and decisions regarding future targeted production. Numbers may not add due to rounding.
NOTES

More Related Content

What's hot

Investor Presentation - September 2013
Investor Presentation - September 2013Investor Presentation - September 2013
Investor Presentation - September 2013North American Palladium
Ā 
Nap investor presentation january 2014
Nap investor presentation january 2014Nap investor presentation january 2014
Nap investor presentation january 2014North American Palladium
Ā 
Nap investor presentation may 2014 final
Nap investor presentation may 2014 finalNap investor presentation may 2014 final
Nap investor presentation may 2014 finalNorth American Palladium
Ā 
Investor Presentation - October 2013
Investor Presentation - October 2013Investor Presentation - October 2013
Investor Presentation - October 2013North American Palladium
Ā 
Nap investor presentation march 2014
Nap investor presentation march 2014Nap investor presentation march 2014
Nap investor presentation march 2014North American Palladium
Ā 
PVA Investor Presentation
PVA Investor PresentationPVA Investor Presentation
PVA Investor PresentationPennVirginiaCorp
Ā 
Nap investor presentation april 2013
Nap investor presentation april 2013Nap investor presentation april 2013
Nap investor presentation april 2013North American Palladium
Ā 
Sage march 2013 investor presentation current
Sage march 2013 investor presentation currentSage march 2013 investor presentation current
Sage march 2013 investor presentation currentSagegold
Ā 
PVA Investor Presentation November
PVA Investor Presentation NovemberPVA Investor Presentation November
PVA Investor Presentation NovemberPennVirginiaCorp
Ā 
Nap investor presentation may 15 2013
Nap investor presentation may 15 2013Nap investor presentation may 15 2013
Nap investor presentation may 15 2013North American Palladium
Ā 
Guyana Goldfields August 2012 Investor Presentation
Guyana Goldfields August 2012 Investor PresentationGuyana Goldfields August 2012 Investor Presentation
Guyana Goldfields August 2012 Investor Presentationjwagenaar734
Ā 
Investor Presentation August 2013
Investor Presentation August 2013Investor Presentation August 2013
Investor Presentation August 2013Sagegold
Ā 
2014 investor presentation june v3
2014 investor presentation   june v32014 investor presentation   june v3
2014 investor presentation june v3GoldenStarResources
Ā 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014Sagegold
Ā 
Nap investor presentation november 2011
Nap investor presentation november 2011Nap investor presentation november 2011
Nap investor presentation november 2011North American Palladium
Ā 
Investor presentation (oct 11)
Investor presentation (oct 11)Investor presentation (oct 11)
Investor presentation (oct 11)catalinz
Ā 

What's hot (20)

Investor Presentation - September 2013
Investor Presentation - September 2013Investor Presentation - September 2013
Investor Presentation - September 2013
Ā 
Nap investor presentation january 2014
Nap investor presentation january 2014Nap investor presentation january 2014
Nap investor presentation january 2014
Ā 
Nap investor presentation may 2014 final
Nap investor presentation may 2014 finalNap investor presentation may 2014 final
Nap investor presentation may 2014 final
Ā 
Investor Presentation - October 2013
Investor Presentation - October 2013Investor Presentation - October 2013
Investor Presentation - October 2013
Ā 
Nap investor presentation march 2014
Nap investor presentation march 2014Nap investor presentation march 2014
Nap investor presentation march 2014
Ā 
Nap Investor Presentation
Nap Investor PresentationNap Investor Presentation
Nap Investor Presentation
Ā 
Investor Presentation March 2013
Investor Presentation March 2013Investor Presentation March 2013
Investor Presentation March 2013
Ā 
PVA Investor Presentation
PVA Investor PresentationPVA Investor Presentation
PVA Investor Presentation
Ā 
Nap investor presentation april 2013
Nap investor presentation april 2013Nap investor presentation april 2013
Nap investor presentation april 2013
Ā 
Sage march 2013 investor presentation current
Sage march 2013 investor presentation currentSage march 2013 investor presentation current
Sage march 2013 investor presentation current
Ā 
PVA Investor Presentation November
PVA Investor Presentation NovemberPVA Investor Presentation November
PVA Investor Presentation November
Ā 
NAP Investor Presentation June 2014
NAP Investor Presentation June 2014NAP Investor Presentation June 2014
NAP Investor Presentation June 2014
Ā 
Nap investor presentation may 15 2013
Nap investor presentation may 15 2013Nap investor presentation may 15 2013
Nap investor presentation may 15 2013
Ā 
Guyana Goldfields August 2012 Investor Presentation
Guyana Goldfields August 2012 Investor PresentationGuyana Goldfields August 2012 Investor Presentation
Guyana Goldfields August 2012 Investor Presentation
Ā 
Investor Presentation August 2013
Investor Presentation August 2013Investor Presentation August 2013
Investor Presentation August 2013
Ā 
2014 investor presentation june v3
2014 investor presentation   june v32014 investor presentation   june v3
2014 investor presentation june v3
Ā 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014
Ā 
Investor Presentation - August 2013
Investor Presentation - August 2013Investor Presentation - August 2013
Investor Presentation - August 2013
Ā 
Nap investor presentation november 2011
Nap investor presentation november 2011Nap investor presentation november 2011
Nap investor presentation november 2011
Ā 
Investor presentation (oct 11)
Investor presentation (oct 11)Investor presentation (oct 11)
Investor presentation (oct 11)
Ā 

Viewers also liked

Ifc investor presentation_june_2011
Ifc investor presentation_june_2011Ifc investor presentation_june_2011
Ifc investor presentation_june_2011Intact
Ā 
Public Relations Management Session 6 Investor Relations
Public Relations Management   Session 6   Investor RelationsPublic Relations Management   Session 6   Investor Relations
Public Relations Management Session 6 Investor RelationsMoksh Juneja
Ā 
Nap investor presentation december 2013
Nap investor presentation december 2013Nap investor presentation december 2013
Nap investor presentation december 2013North American Palladium
Ā 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014North American Palladium
Ā 
Trup investor presentation november 2016 v final
Trup investor presentation   november 2016 v finalTrup investor presentation   november 2016 v final
Trup investor presentation november 2016 v finaltrupanion
Ā 
NYSE:PRO Analyst Day Presentation - 4Mar11
NYSE:PRO Analyst Day Presentation - 4Mar11NYSE:PRO Analyst Day Presentation - 4Mar11
NYSE:PRO Analyst Day Presentation - 4Mar11Matthew Balfour
Ā 
Intact Investor Presentation - March 2010
Intact Investor Presentation - March 2010Intact Investor Presentation - March 2010
Intact Investor Presentation - March 2010Intact
Ā 
GUY Investor Presentation March 2014
GUY Investor Presentation March 2014GUY Investor Presentation March 2014
GUY Investor Presentation March 2014jwagenaar734
Ā 
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...Kenny Ong
Ā 
Symantec investor presentation february 2015
Symantec investor presentation february 2015Symantec investor presentation february 2015
Symantec investor presentation february 2015InvestorSymantec
Ā 
Inst investor deck nov 2016pdf
Inst investor deck   nov 2016pdfInst investor deck   nov 2016pdf
Inst investor deck nov 2016pdfInstructure
Ā 
Investor presentation sept.oct_2010_r
Investor presentation sept.oct_2010_rInvestor presentation sept.oct_2010_r
Investor presentation sept.oct_2010_rIntact
Ā 

Viewers also liked (14)

Ifc investor presentation_june_2011
Ifc investor presentation_june_2011Ifc investor presentation_june_2011
Ifc investor presentation_june_2011
Ā 
Public Relations Management Session 6 Investor Relations
Public Relations Management   Session 6   Investor RelationsPublic Relations Management   Session 6   Investor Relations
Public Relations Management Session 6 Investor Relations
Ā 
Nap investor presentation december 2013
Nap investor presentation december 2013Nap investor presentation december 2013
Nap investor presentation december 2013
Ā 
Investor Presentation - June 2013
Investor Presentation - June 2013Investor Presentation - June 2013
Investor Presentation - June 2013
Ā 
Investor Presentation November 2014
Investor Presentation November 2014Investor Presentation November 2014
Investor Presentation November 2014
Ā 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
Ā 
Trup investor presentation november 2016 v final
Trup investor presentation   november 2016 v finalTrup investor presentation   november 2016 v final
Trup investor presentation november 2016 v final
Ā 
NYSE:PRO Analyst Day Presentation - 4Mar11
NYSE:PRO Analyst Day Presentation - 4Mar11NYSE:PRO Analyst Day Presentation - 4Mar11
NYSE:PRO Analyst Day Presentation - 4Mar11
Ā 
Intact Investor Presentation - March 2010
Intact Investor Presentation - March 2010Intact Investor Presentation - March 2010
Intact Investor Presentation - March 2010
Ā 
GUY Investor Presentation March 2014
GUY Investor Presentation March 2014GUY Investor Presentation March 2014
GUY Investor Presentation March 2014
Ā 
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...
(CLARIDEN) Managing Your Professional Development: Effective Strategies for C...
Ā 
Symantec investor presentation february 2015
Symantec investor presentation february 2015Symantec investor presentation february 2015
Symantec investor presentation february 2015
Ā 
Inst investor deck nov 2016pdf
Inst investor deck   nov 2016pdfInst investor deck   nov 2016pdf
Inst investor deck nov 2016pdf
Ā 
Investor presentation sept.oct_2010_r
Investor presentation sept.oct_2010_rInvestor presentation sept.oct_2010_r
Investor presentation sept.oct_2010_r
Ā 

Similar to Nap investor presentation april 2014 updated

Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDetourGold
Ā 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDetourGold
Ā 
Guy january 2018 ir presentation 1
Guy january 2018 ir presentation 1Guy january 2018 ir presentation 1
Guy january 2018 ir presentation 1guygold2016
Ā 
Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2guygold2016
Ā 
Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2guygold2016
Ā 
TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021Adnet Communications
Ā 
Tri star apr 2021 ppt-original
Tri star   apr 2021 ppt-originalTri star   apr 2021 ppt-original
Tri star apr 2021 ppt-originalAdnetNew
Ā 
Precious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, SwitzerlandPrecious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, SwitzerlandLake Shore Gold
Ā 
Tristar -mar_2021_ppt_final-v2
Tristar  -mar_2021_ppt_final-v2Tristar  -mar_2021_ppt_final-v2
Tristar -mar_2021_ppt_final-v2AdnetNew
Ā 
Tri star mar 2021 ppt final
Tri star   mar 2021 ppt finalTri star   mar 2021 ppt final
Tri star mar 2021 ppt finalAdnetNew
Ā 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDetourGold
Ā 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011Crocodile Gold
Ā 
Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold
Ā 
Young-Davidson Analyst Tour
Young-Davidson Analyst TourYoung-Davidson Analyst Tour
Young-Davidson Analyst TourAuRico Gold
Ā 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Gold Corp
Ā 
Precious Metals Summit, Zurich Switzerland
Precious Metals Summit, Zurich SwitzerlandPrecious Metals Summit, Zurich Switzerland
Precious Metals Summit, Zurich SwitzerlandLake Shore Gold
Ā 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDetourGold
Ā 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc.
Ā 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
Ā 
Young-Davidson Mine Update
Young-Davidson Mine UpdateYoung-Davidson Mine Update
Young-Davidson Mine UpdateAuRico Gold
Ā 

Similar to Nap investor presentation april 2014 updated (20)

Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conference
Ā 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conference
Ā 
Guy january 2018 ir presentation 1
Guy january 2018 ir presentation 1Guy january 2018 ir presentation 1
Guy january 2018 ir presentation 1
Ā 
Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2
Ā 
Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2Guy january 2018 ir presentation 2
Guy january 2018 ir presentation 2
Ā 
TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021TriStar Gold - Corporate Presentation April 2021
TriStar Gold - Corporate Presentation April 2021
Ā 
Tri star apr 2021 ppt-original
Tri star   apr 2021 ppt-originalTri star   apr 2021 ppt-original
Tri star apr 2021 ppt-original
Ā 
Precious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, SwitzerlandPrecious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, Switzerland
Ā 
Tristar -mar_2021_ppt_final-v2
Tristar  -mar_2021_ppt_final-v2Tristar  -mar_2021_ppt_final-v2
Tristar -mar_2021_ppt_final-v2
Ā 
Tri star mar 2021 ppt final
Tri star   mar 2021 ppt finalTri star   mar 2021 ppt final
Tri star mar 2021 ppt final
Ā 
Dgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conferenceDgc 14 12_02-03 - scotia conference
Dgc 14 12_02-03 - scotia conference
Ā 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011
Ā 
Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate Presentation
Ā 
Young-Davidson Analyst Tour
Young-Davidson Analyst TourYoung-Davidson Analyst Tour
Young-Davidson Analyst Tour
Ā 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010
Ā 
Precious Metals Summit, Zurich Switzerland
Precious Metals Summit, Zurich SwitzerlandPrecious Metals Summit, Zurich Switzerland
Precious Metals Summit, Zurich Switzerland
Ā 
DGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor ForumDGC 14_10_17 - RJ Texas Gold Investor Forum
DGC 14_10_17 - RJ Texas Gold Investor Forum
Ā 
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Claude Resources Inc. Corporate Presentation - Denver Gold Forum 2014
Ā 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
Ā 
Young-Davidson Mine Update
Young-Davidson Mine UpdateYoung-Davidson Mine Update
Young-Davidson Mine Update
Ā 

More from North American Palladium

More from North American Palladium (11)

Nap investor presentation march 2013
Nap investor presentation march 2013Nap investor presentation march 2013
Nap investor presentation march 2013
Ā 
Investor Presentation January 2013
Investor Presentation January 2013Investor Presentation January 2013
Investor Presentation January 2013
Ā 
Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013Nap investor presentation january 15, 2013
Nap investor presentation january 15, 2013
Ā 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
Ā 
Nap investor presentation november 2012
Nap investor presentation november 2012Nap investor presentation november 2012
Nap investor presentation november 2012
Ā 
Nap investor presentation oct. 2012
Nap investor presentation oct. 2012Nap investor presentation oct. 2012
Nap investor presentation oct. 2012
Ā 
NAP Investor Presentation October 2012
NAP Investor Presentation October 2012NAP Investor Presentation October 2012
NAP Investor Presentation October 2012
Ā 
NAP Investor Presentation September 2012
NAP Investor Presentation September 2012NAP Investor Presentation September 2012
NAP Investor Presentation September 2012
Ā 
Nap investor presentation august 2012
Nap investor presentation august 2012Nap investor presentation august 2012
Nap investor presentation august 2012
Ā 
Nap investor presentation august 2012
Nap investor presentation august 2012Nap investor presentation august 2012
Nap investor presentation august 2012
Ā 
Nap investor presentation_june_2012
Nap investor presentation_june_2012Nap investor presentation_june_2012
Nap investor presentation_june_2012
Ā 

Recently uploaded

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
Ā 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
Ā 
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...rajveerescorts2022
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...lizamodels9
Ā 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...amitlee9823
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...amitlee9823
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangaloreamitlee9823
Ā 
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...amitlee9823
Ā 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
Ā 
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
Ā 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
Ā 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
Ā 
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...lizamodels9
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
Ā 

Recently uploaded (20)

(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
Ā 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Ā 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
Ā 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Ā 
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
Ā 
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service In 24/7 Delh...
Ā 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Ā 
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Servi...
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Ā 
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Ā 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
Ā 
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
VVVIP Call Girls In Greater Kailash āž”ļø Delhi āž”ļø 9999965857 šŸš€ No Advance 24HRS...
Ā 
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon āž„99902@11544 ( Best price)100% Genuine Escort In 24...
Ā 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
Ā 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
Ā 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
Ā 
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
Ā 

Nap investor presentation april 2014 updated

  • 2. 1 Forward Looking STATEMENTS Certain information included in this presentation constitutes ā€˜forward-looking statementsā€™ within the meaning of the ā€˜safe harborā€™ provisions of the United States Private Securities Litigation Reform Act of 1995 and Canadian securities laws. The words ā€˜expectā€™, ā€˜believeā€™, ā€˜willā€™, ā€˜intendā€™, ā€˜estimateā€™, ā€˜forecastā€™, and similar expressions identify forward-looking statements. Such statements include, without limitation, any information as to our future exploration, financial or operating performance, including: the Company's forward looking production guidance, projected capital expenditures, operating cost estimates, project timelines, mining and milling rates, the methods by which ore will be extracted, projected grades, mill recoveries, and other statements that express management's expectations or estimates of future performance. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The factors and assumptions contained in this presentation, which may prove to be incorrect, include, but are not limited to: metal prices assumptions, Canadian and U.S. dollar exchange rate assumptions, that there will be no significant disruptions affecting operations, that prices for key mining and construction supplies, including labour and transportation costs, will remain consistent with the Company's expectations, that the Company's current estimates of mineral reserves and resources are accurate, and that there are no material delays in the timing of ongoing development projects. The forward-looking statements are not guarantees of future performance. The Company cautions the reader that such forward-looking statements involve known and unknown risks that may cause the actual results to be materially different from those expressed or implied by the forward-looking statements. Such risks include, but are not limited to: the possibility that metal prices, foreign exchange rates or operating costs may differ from management's expectations, uncertainty of mineral reserves and resources, inherent risks associated with mining and processing, the risk that the Lac des Iles mine may not perform as planned and that the Offset Zone and other properties may not be successfully developed, and uncertainty of the ability of the Company to obtain financing. For more details on the factors, assumptions and risks see the Company's most recent Form 40-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities. The Company disclaims any obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as expressly required by law. Readers are cautioned not to put undue reliance on these forward-looking statements. All dollar amounts are in Canadian currency unless otherwise stated, all references to production refer to payable production, and all reference to tonnes refer to metric tonnes. U.S. investors are encouraged to refer to the ā€œCautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resourcesā€ in the appendix.
  • 3. 2 NAPā€™s Investment ā€¢ Clear Growth Strategy to Increase Production & Lower Cash Costs NAPā€™s flagship LDI mine offers production growth with a decreasing cash cost profile and expanding operating margins ā€¢ Leverage to Rising Palladium Prices As one of only two primary palladium producers in the world, NAP is uniquely positioned to benefit from the positive supply & demand fundamentals (driven by constrained mine supply & rising global vehicle production) ā€¢ Attractive PGM Investment Jurisdiction NAP operates in a stable political landscape, with low geopolitical risk and moderate cost inflation compared to peers in South Africa and Russia ā€¢ Significant Development & Exploration Upside Excess mill and production shaft capacity, existing infrastructure & permits, gives NAP the potential to convert exploration success into production and cash flow on an accelerated timeline ā€¢ Operational Expertise Reduces Operating Risk Experienced executive management team has a strong track record in mining operations PROPOSITION
  • 4. 3 Market STATISTICS Information as at March 31, 2014, Thomson One. Shareholder ID based only on public filings. SECURITY SYMBOLS NYSE MKT: PAL TSX: PDL, PDL.DB, PDL.DB.A MARKET CAPITALIZATION US$88 Million RECENT SHARE PRICE US$0.32 SHARES OUTSTANDING 273,992,149 M (issued & outstanding) (fully diluted) 52-WEEK HIGH/LOW US$1.95 / US$0.31 3-MONTH TRADING VOLUME NYSE MKT: 6.9 M / TSX: 1.5 M ANALYST COVERAGE 1. CIBC, Leon Esterhuizen 2. Euro Pacific, Heiko Ihle 3. Mackie, Barry Allan 4. Macquarie, Daniel Greenspan 5. Raymond James, Alex Terentiew $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20
  • 5. 4 Financial POSITION Liquidity & Capital Resources: ā€¢ $9.8 M in cash at Dec. 31, 2013 ā€¢ Credit facility was fully utilized as at Dec. 31, 2013 ā€¢ Closed $32 M financing in 7.5% convertible unsecured subordinated debentures and associated warrants (Q1, 2014) ā€¢ Pro-forma cash position of $41.8 M
  • 6. 5 ā€¢ Located north of Thunder Bay, Ontario, Canada ā€¢ One of only two primary palladium producers in the world ā€¢ Deposit is unique in the world: - Strong palladium enrichment over significant widths vs. more typical PGE reef-type deposits - Offset Zone remains open at depth, to the west and south ā€¢ Established palladium producer since 1993 ā€¢ Established infrastructure with excess capacity: - 15,000 tpd mill & new 8,000 tpd shaft ā€¢ Increasing production & decreasing operating costs: - Mining rate of ~3,000 tpd in H1/14, up to 5,000 tpd by YE - Cash costs expected to decline to US$450 per ounce in Q4 ā€¢ Development upside to leverage existing mine & mill infrastructure: - Opportunity at depth, laterally & through new mining method ā€¢ Significant exploration upside identified on the LDI property LDI Mine & Mill Complex A WORLD CLASS ASSET 15,000 tpd mill capacity 8,000 tpd shaft capacity
  • 7. 6 LDI Operations 2013 PRODUCTION 1. Non-IFRS measure. Please refer to Non-IFRS Measures in the MD&A. Q1, 2013 Q2, 2013 Q3, 2013 Q4, 2013 FY 2013 Payable palladium produced 38,654 oz 35,428 oz 30,097 oz 30,979 oz 135,158 oz Cash cost per ounce1 US$490 US$564 US$581 US$621 US$560 Tonnes of ore mined 540,694 433,580 542,917 576,478 2,093,669 From surface 295,038 @ 2.4 g/t 301,974 @ 2.1 g/t 334,820 @ 1.2 g/t 345,132 @ 0.98 g/t 1,276,964 @ 1.6 g/t From underground 245,656 @ 4.1 g/t 131,606 @ 4.4 g/t 208,097 @ 4.5 g/t 231,346 @ 4.67 g/t 816,705 @ 4.4 g/t Tonnes of ore milled 503,585 483,266 517,157 544,074 2,048,082 Avg. milled head grade 3.3 g/t Pd 3.1 g/t pd 2.5 g/t Pd 2.4 g/t Pd 2.8 g/t Pd Palladium mill recovery 80.1% 80.7% 80.7% 81.5% 80.7% Total cost per tonne milled C$57 C$53 C$42 C$55 C$52
  • 8. 7 Payable palladium produced 170,000 - 175,000 oz Cash cost per ounce1 ~US$550/oz (expected to decline to ~$450/oz in Q4) Tonnes of ore mined ~2.3 M From Surface Stockpile ~1 M @ 1.0 g/t From Underground ~1.3 M @ 4.2 g/t Average milled head grade 3.0 g/t Pd Palladium mill recovery ~82% Total cost per tonne milled C$51 ā€“ C$55 Mining Rate ~3,000 tpd in 1H/14 & gradually increase to ~5,000 tpd in 2H/14 Capital expenditure forecast ~$30 M Exploration budget ~$4 M LDI Operations 2014 TARGETS 1. Non-IFRS measure. Please refer to Non-IFRS Measures in the MD&A.
  • 9. 8 LDI Mine Expansion ā€¢ Phase I of mine expansion completed in Q4, 2013: ā€“ Currently transitioning from ramp haulage to shaft hoisting (increasing shaft production) ā€“ Targeting mining rate of ~3,000 tpd in H1/14, up to 5,000 tpd by YE ā€“ Current focus on material flow improvements ā€¢ Operations expected to benefit from increased mining rates & decreased operating costs through the utilization of the shaft ā€¢ Targeting to achieve steady-state production in 2014 ā€¢ 2014 scoping study to define future growth potential (targeted for H2/14) PLAN FOR GROWTH ROBY ZONE OPEN PIT OFFSET ZONE 825-M Level Surface 990-M Level Shaft The underground design schematic of the underground mine, showing the deposit and underground ramp infrastructure, looking east. Offset Zone remains open to the west, south & at depth.
  • 10. 9 Future Growth Potential UPSIDE Mill Complex Nameplate capacity: 15,000 tpd mill Shaft Infrastructure Nameplate capacity: 8,000 tpd mill Robust Ore Body Offset Zone remains open at depth, to the west and south Opportunity to optimize the ore body & utilize existing infrastructure Growth could potentially come from: ā€¢ Deeper Offset Zone (via shaft extension & new ore handling system) ā€¢ New bulk mining method (potential to significantly increase mining volumes) ā€¢ Lateral development (lateral targets near existing infrastructure) ā€¢ Surface exploration upside
  • 11. 10 New Mining Method ā€¢ Ore body suitable for lower cost bulk mining ā€“ Potential for increased resources at a lower cut- off grade ā€¢ Reviewing viability of changing mining method for certain LDI deposits: ā€“ from long-hole stoping to higher volume bulk mining ā€“ targeting increased mining volumes ā€¢ Engaged external engineering firm to assist with internal analysis OPPORTUNITY
  • 12. 11 LDI Property EXPLORATION UPSIDE ā€¢ LDI complex remains largely underexplored ā€¢ New lateral targets are under review (near existing infrastructure) ā€¢ Multiple new targets identified (surface & underground) ā€¢ Regional land package covers the most prospective mafic complexes in the area
  • 13. 12 Investment LEVERAGE TO RISING PALLADIUM PRICES CLEAR STRATEGY TO INCREASE PRODUCTION & LOWER CASH COSTS ATTRACTIVE PGM INVESTMENT JURSIDICTION UPSIDE IN EXPLORATION & DEVELOPMENT THESIS
  • 15. 14 Constrained Small Market: ā€¢ Only ~6.5 M oz in annual mine production (unlikely to increase meaningfully) Highly Concentrated: ā€¢ 80% of mine supply derived from risky jurisdictions: Russia & South Africa (mined as a by-product metal) Challenged Global Supply: ā€¢ Decreased production from Russiaā€™s Norilsk Nickel due to declining grades ā€¢ Anticipated closures of some South African mines, where output is affected by political issues, labour unrest & technical challenges ā€¢ Decreased sales from Russian stockpiles, a historical overhang (believed to be depleted) ā€¢ Recycling insufficient to offset demand The palladium market is forecasted to remain in a deficit position for the foreseeable future SUPPLY 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 2008 2009 2010 2011 2012e 2013p 2014p 2015p Other United States Canada South Africa Russia NORTH AMERICA RUSSIA SOUTH AFRICA 36% 14% 44% Sources: Johnson Matthey & CPM Group (excludes secondary supply)
  • 16. 15 Growing ā€¢ Strong demand from automotive sector ā€¢ Growth in demand driven by vehicle sales & environmental legislation in developing markets: o Light vehicle production forecasted to increase by 4% annually o Strong growth in light vehicle production driven by China (forecast ~31 M vehicles per year by 2018) o More stringent emission control standards mandate the use of catalytic converters DEMAND Automotive (catalytic converters) 67% Electronics 12% 5% Dental 1% Other 5% Jewellery 5% Chemical 4% Investment 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 110,000 2011 2012 2013 2014 2015 2016 2017 2018 Global Light Vehicle Production Forecast: (000ā€™s) Source: IHS Automotive, February 2012 1. Other includes: Japan, Korea, Middle East and Africa 2. BRIC Economies include: Greater China, South America and South Asia
  • 17. 16Source: CPM Group, as at May 13, 2013 Investment DEMAND ā€¢ Large increase in palladium investment demand ā€¢ Investment demand driven by supply/demand fundamentals for palladium -- constrained mine supply and growth in global vehicle production Exchange Traded Funds' Physical Palladium Holdings M oz. Pd. M oz. Pd. 0.0 0.5 1.0 1.5 2.0 2.5 0.0 0.5 1.0 1.5 2.0 2.5 20-Apr-07 20-Mar-08 20-Feb-09 20-Jan-10 20-Dec-10 20-Nov-11 20-Oct-12 SPPP-NYSE (Sprott) Mitsubishi SPAL-LSE Source SPDM-LSE iShares WITE-NYSE ETF Securities GLTR-NYSE ETF Securities Julius Baer PALL - NYSE ETF Securities MSL (Australia) Palladium ZKB PHPD LSE
  • 18. 17 Firm As of: 2014 2015 2016 2017 BMO Capital Markets 01-13-14 $750 $750 $800 $800 Scotia 01-09-14 $725 $725 $700 $650 CPM Group 01-08-14 $769 $830 $875 $908 Mitsui Precious Metals 01-08-14 $745 $780 CIBC World Markets 01-07-14 $800 $1,000 - - Cormark 01-07-14 $750 $750 $750 $750 Macquarie 01-07-14 $785 $838 - - Credit Suisse 01-06-14 $760 $840 $850 $850 Prestige Economics LLC 12-31-13 $745 $800 - - Intesa Sanpaolo SpA 12-18-13 $800 $850 $875 - TD Bank 12-02-13 $819 $831 - - Societe Generale SA 11-26-13 $790 $850 $900 $950 ABN AMRO Bank NV 11-21-13 $650 $725 - - Citigroup 11-18-13 $800 $925 $925 - LBBW 11-07-13 $775 - - - Standard Chartered Bank 11-04-13 $850 $800 $650 - UBS 10-15-13 $825 $850 $825 $825 Raymond James 10-08-13 $750 $850 - - Bank of America Merrill Lynch 09-27-13 $800 $850 $777 - Deutsche Bank 09-25-13 $750 $850 $950 - RBC Capital Markets 08-11-13 $850 $850 - - Capital Economics 08-16-13 $850 - - - CIMB Group Holdings 08-09-13 $850 $1,000 $708 $708 Barclays 07-12-13 $795 $900 - - China International Capital 04-15-13 $800 - - - Annual Average (US$/oz.) $786 $844 $824 $827 PalladiumPriceForecasts (US$perounce)
  • 19. 18 Shareholder INFORMATION North American Palladiumā€™s vision is to become a low cost, mid-tier precious metals company operating in mining friendly jurisdictions. NAP is an established precious metals producer that has been operating its Lac des Iles mine (LDI) located in Ontario, Canada since 1993. LDI is one of only two primary producers of palladium in the world, and is currently completing a major expansion to increase production and reduce cash costs per ounce. Royal Bank Plaza, South Tower 200 Bay St., Suite 2350 Toronto, ON M5J 2J2 NYSE MKTā€“ PAL TSX ā€“ PDL, PDL.DB www.nap.com Investor Relations & Corporate Communications IR@nap.com 416-360-7374 Corporate Office: Security Symbols: Website: Investor Relations:
  • 21. 20 Senior EXECUTIVES Phil du Toit ā€“ President & CEO Mr. du Toit is an accomplished mining executive with a proven track record for executing on his management mandates throughout his career. He brings significant project management expertise to the CEO role, developed during his 37 years of global experience in the mining industry which included senior roles for some of the world's leading mining companies, and the successful development of multiple large capital projects. Recently, Mr. du Toit served as Executive Vice President and Head of Mining Projects and Exploration for ArcelorMittal, the world's leading integrated steel and mining company, where he was responsible for mining strategy, exploration, project and business development. His experience also includes serving as interim CEO of Baffinland Iron Mines Corp., as well as having held various senior management positions for Vale, Diavik Diamond Mines (a subsidiary of Rio Tinto plc), Voest Alpine Inc., and Gencor Ltd. He holds a Bachelor of Science degree in Civil Engineering from the University of Pretoria in South Africa. Dave Langille ā€“ Chief Financial Officer Mr. Langille is a seasoned finance executive with over 26 years of international public company experience. He brings a wealth of international financial expertise to NAP, notably a solid track record of optimizing operations to improve operating margins, along with merger and acquisition experience, and raising capital through a broad range of capital market products. Most recently, Mr. Langille served as the CFO and Vice President, Finance of Breakwater Resources Ltd. Prior to this, he served in senior financial positions for various public companies, including Lindsey Morden Group Inc., Capital Environmental Resource Inc., Cott Corporation, and TVX Gold Inc. Mr. Langille received an Honours Bachelor of Business Administration from Wilfrid Laurier University in Waterloo, Ontario, Canada in 1985, and has been a member of the Institute of Chartered Accounts of Ontario and the Society of Management Accountants of Ontario since 1987. David Peck ā€“ Head of Exploration Dr. Peck is a Professional Geoscientist with nearly 30 years of exploration and research experience specializing in magmatic Ni-Cu-PGE ore deposits. Dr. Peck holds global recognition as an expert in PGE exploration after serving as a senior technical and strategic consultant to several public and private companies and having worked on exploration and mining projects in more than a dozen countries. He was directly involved in several significant magmatic Ni-Cu-PGE discoveries in Canada and overseas. Prior to joining NAP, Dr. Peck served as President and Senior Technical and Strategic Consultant at Revelation Geoscience Ltd., and prior to this, he served as Global Nickel Commodity Leader at Anglo American plc, a Senior Geologist for Falconbridge Ltd., a Senior Mineral Deposits Geologist with the Manitoba Geological Survey, held various academic roles in Canadian universities, and was the technical lead on a multi-year mineral potential study funded by the Ontario Geological Survey. He has authored numerous public publications addressing his area of specialization. Jim Gallagher ā€“ Chief Operating Officer Mr. Gallagher is a seasoned mining executive with over 30 years of experience in a series of roles spanning operations, projects, engineering, technology and consulting. For the last seven years, Mr. Gallagher served as Global Director of Mining at Hatch Ltd., with a mandate to build the firmā€™s global underground capability, where he led the firmā€™s global mining group involved in transitioning projects to normal operations. Prior to Hatch, the foundational part of his experience came from his 24-year career at Falconbridge in a variety of operations and project management roles, most of which were based in Northern Ontario. Mr. Gallagher also has a track record for identifying improvement opportunities and building out technical capabilities. Mr. Gallagher holds a Bachelor of Mining Engineering degree from Laurentian University in Canada.
  • 22. 21 Board of DIRECTORS C. David A. Comba ā€“ Retired Mining Executive (Director since 2006) Mr. Comba was first appointed to the Board of Directors of the Company in March 2006. He has over four decades of experience as an exploration advocate and senior mining executive. As Chief Exploration Geologist of Falconbridge Limited in Sudbury, Ontario, he led the team that discovered the high-grade footwall deposit that allowed the Thayer Lindsley mine to go into production. Prior to its takeover by Kinross Gold Corporation, Mr. Comba was Vice-President, Exploration of Falconbridge Gold Corporation. Following the takeover, he became President and Chief Executive Officer of Pentland Firth Venture Ltd., a Kinross-controlled junior gold exploration company listed on the TSX. Pentlandā€™s work added the first couple of million ounce resource to the Hammond Reef property Atikokan, ON. Mr. Comba was Director of Issues Management with the Prospectors and Developers Association of Canada from 1998 to 2005, during which time he led the successful lobby effort for the re-introduction of enhanced or ā€œsuperā€ flow-through shares. Mr. Comba has Bachelorā€™s and Masterā€™s degrees in geology from Queenā€™s University in Kingston, Ontario. Steven R. Berlin ā€“ Retired Financial Executive (Director since 2001) Mr. Berlin was appointed to the Board of Directors of the Company in February 2001, and is also a director of Orchids Paper Products, an AMEX listed company. At the end of 2005, Mr. Berlin retired from his position as Vice-President of Kaiser Francis Oil Company (KFOC) where he worked part-time for two years following four years full-time as Vice-President and Chief Financial Officer. Prior to joining KFOC, Mr. Berlin taught at the University of Tulsa for three years where he also served a year as acting associate Dean of the College of Business and acting Director of the School of Accounting. Before joining the University of Tulsa, Mr. Berlin spent 25 years with Citgo Petroleum Corporation, where he retired as Senior VP Finance and Administration and Chief Financial Officer. Mr. Berlin has a bachelorā€™s degree from Duquesne University, an MBA from the University of Wisconsin Madison and has completed the Executive Management program at Stanford University. Robert J. Quinn ā€“ Chairman (Director since 2006) Mr. Quinn was first appointed to the Board of Directors of the Company in June 2006. A founding partner of the Houston mining transactional law firm Quinn & Brooks LLP, Mr. Quinn has over 30 years of legal and management experience, including as Vice President and General Counsel for Battle Mountain Gold Company. He has extensive experience in M&A transactions, corporate governance, public disclosure, governmental affairs, environmental law and land management. Mr. Quinn has a Bachelor of Science in Business Administration from the University of Denver, a Juris Doctorate degree from the University of Denver College of Law and has completed two years of graduate work in mineral economics at the Colorado School of Mines.
  • 23. 22 Greg J. Van Staveren ā€“ Strategic Financial Consultant (Director since 2003) Mr. Van Staveren was appointed to the Board of Directors of the Company in February 2003. Since September 2001, Mr. Van Staveren has been the President of Strategic Financial Services, a private company providing business advisory services. During this period he has sat on the board of a number of publicly traded companies. Mr. Van Staveren is a Chartered Accountant and a Certified Public Accountant and holds a Bachelor of Math (Honours) degree from the University of Waterloo. From February 1998 until September 2001, Mr. Van Staveren was the Chief Financial Officer of MartinRea International Inc (MRE-TSX), and prior to that he was a partner in the mining group of KPMG, which he joined in 1980, and where he provided accounting, and advisory services to his clients. William J. Weymark ā€“ President, Weymark Engineering Ltd. (Director since 2007) Appointed to the Board of Directors of the Company in January 2007, Mr. Weymark is President of Weymark Engineering Ltd., a Company providing consulting services to businesses in the private equity, construction and resource sector. He is also a director of the VGH & UBC Hospital Foundation Board, and several private companies. Mr. Weymark is also a Member of the Industry Advisory Committee for the Norman B. Keevil Institute of Mining Engineering at the University of British Columbia. Until June 2007, Mr. Weymark was President and CEO of Vancouver Wharves/BCR Marine, a transportation firm located on the west coast of British Columbia. Prior to joining Vancouver Wharves in 1991, Mr. Weymark spent 14 years in the mining industry throughout western Canada working on the start-up and operation of several mines. Mr. Weymark is a Professional Engineer and holds a Bachelor of Applied Science in Mining and Mineral Process Engineering from the University of British Columbia and is a graduate of the Institute of Corporate Directorsā€™, Directors Education Program. Board of DIRECTORS (CONā€™T) Andre Douchane ā€“ President and Chief Executive Officer, Mahdia Gold Corp. (Director since 2003) Mr. Douchane is a seasoned mining executive with over 40 years of experience in the mining industry with a solid track record of successfully bringing development projects into production. He was appointed to the Companyā€™s Board of Directors in April 2003, and served as the President and CEO until January 2006. He has held senior positions with several precious and base metal international mining companies including CEO of THEMAC Resources, President and CEO of Starfield Resources Inc., President and COO of Chief Consolidated Mining Co., and Vice President, Operations of Franco and Euro-Nevada (Newmont Mining Corporation). He holds a Bachelorā€™s degree in Mining Engineering from the New Mexico Institute of Mining and Technology and is a graduate of the Executive Business Program at the Kellogg School of Business in Toronto.
  • 24. 23 Cautionary Note to U.S. Investors Concerning ā€¢ Mineral reserves and mineral resources have been calculated in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, Industry Guide 7, (under the Securities and Exchange Act of 1934), as interpreted by Staff of the Securities Exchange Commission (SEC), applies different standards in order to classify mineralization as a reserve. In addition, while the terms ā€œmeasuredā€, ā€œindicatedā€ and ā€œinferredā€ mineral resources are required pursuant to National Instrument 43-101, the U.S. Securities and Exchange Commission does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC, and mineral resource information contained herein is not comparable to similar information regarding mineral reserves disclosed in accordance with the requirements of the U.S. Securities and Exchange Commission. U.S. investors should understand that ā€œinferredā€ mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of NAP's mineral resources constitute or will be converted into reserves. For a more detailed description of the key assumptions, parameters and methods used in calculating NAPā€™s mineral reserves and mineral resources, see NAPā€™s most recent Annual Information Form/Form 40-F on file with Canadian provincial securities regulatory authorities and the SEC. ā€¢ Please refer to North American Palladiumā€™s most current Annual Information Form and applicable technical reports available on www.sedar.com, www.sec.gov and www.nap.com for further information. MINERAL RESERVES AND MINERAL RESOURCE
  • 25. 24 LDI Palladium Mine RESERVES & RESOURCES See accompanying Notes on the last page. The Company has completed an update to its LDI mineral reserves and resources. The effective date for the new reserve and resource estimates, shown in Table 1, is December 31, 2013. The new estimates exclude material mined up until the effective date. The resource estimates provided in Table 1 were prepared by NAP Qualified Persons in accordance with NI 43-101 guidelines. The reserve estimates provided in Table 1 were prepared by qualified persons from Tetra Tech, also in accordance with NI 43-101 guidelines. A detailed discussion of the resource and reserve estimates presented in Table 1 will be contained in a NI 43-101 technical report containing an updated pre-feasibility study for the Lac des Iles mine. This report is expected to be filed on SEDAR on or before March 31, 2014. The following discussion provides summary information for the new resource and reserve estimates for LDI with reference to Table 1. TABLE 1: Mineral reserve and mineral resource estimates for the Lac des Iles mine property effective December 31st, 2013. RESERVES & RESOURCES NEAR SURFACE RESERVES Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained Proven (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Low-Grade Stockpile (RGO) 0.95 4,876 0.97 0.12 0.08 0.06 0.03 152 Roby Zone Open Pit 1.09 716 1.31 0.16 0.13 0.07 0.06 30 Total Proven - 5,592 1.01 0.13 0.09 0.06 0.03 182 Probable Roby Zone Open Pit 1.09 293 1.39 0.18 0.15 0.08 0.07 13 Total Reserve - 5,885 1.03 0.13 0.09 0.06 0.04 195
  • 26. 25 LDI Palladium Mine RESERVES & RESOURCES See accompanying Notes on the last page. NEAR-SURFACE RESOURCES Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Low-Grade Stockpile (RGO) 0.95 7,679 0.97 0.12 0.08 0.06 0.03 239 Roby Zone Pit Expansion 1.00 10,476 1.60 0.21 0.12 0.07 0.05 539 Sheriff Zone 1.50 1,725 2.06 0.21 0.11 0.06 0.07 114 North VT Rim 1.00 437 2.03 0.12 0.03 0.03 0.01 28 Total Measured - 20,317 1.41 0.17 0.10 0.07 0.04 921 Indicated Roby Zone Pit Expansion 1.00 5,393 1.53 0.21 0.11 0.07 0.05 265 Sheriff Zone 1.50 35 1.74 0.20 0.14 0.07 0.09 2 North VT Rim 1.00 14 1.75 0.12 0.03 0.03 0.01 1 Total Indicated 5,442 1.53 0.21 0.11 0.07 0.05 268 Total Measured + Indicated - 25,759 1.44 0.18 0.10 0.07 0.04 1,189 UNDERGROUND RESERVES - HANGINGWALL ZONES Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained Proven (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Offset Hangingwall Zone 2.60 4,499 4.06 0.28 0.28 0.11 0.08 587 Roby Hangingwall Zone 2.40 847 3.51 0.23 0.20 0.05 0.04 96 Total Proven - 5,346 3.97 0.27 0.27 0.10 0.07 683 Probable Offset Hangingwall Zone 2.60 3,564 3.82 0.27 0.27 0.10 0.09 438 Roby Hangingwall Zone 2.40 251 3.17 0.22 0.18 0.05 0.04 26 Total Probable 3,815 3.78 0.27 0.26 0.10 0.09 463 Total Reserve - 9,161 3.89 0.27 0.27 0.10 0.08 1,146
  • 27. 26 LDI Palladium Mine RESERVES & RESOURCES See accompanying Notes on the last page. UNDERGROUND RESOURCES - HANGINGWALL ZONES Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Offset Hangingwall Zone 2.50 2,418 4.34 0.31 0.28 0.11 0.08 337 Indicated Offset Hangingwall Zone 2.50 3,234 4.19 0.30 0.29 0.12 0.10 436 Total Measured + Indicated 2.50 5,652 4.25 0.30 0.29 0.12 0.09 773 Inferred Offset Hangingwall Zone 2.50 5,942 3.75 0.23 0.23 0.10 0.09 UNDERGROUND RESOURCES - FOOTWALL ZONES Category/Source Pd Cut-Off Tonnes Pd Pt Au Ni Cu Pd Contained Measured (g/t) (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Offset Footwall Zone 1.50 11,011 2.24 0.23 0.16 0.08 0.06 793 Roby Footwall Zone 1.50 4,159 2.43 0.21 0.18 0.06 0.05 325 Total Measured 1.50 15,170 2.29 0.22 0.17 0.07 0.06 1,118 Indicated Offset Footwall Zone 1.50 8,810 2.12 0.22 0.16 0.08 0.07 600 Roby Footwall Zone 1.50 2,341 2.34 0.20 0.17 0.06 0.05 176 Total Indicated 1.50 11,151 2.17 0.22 0.16 0.08 0.07 777 Total Measured + Indicated 1.50 26,321 2.24 0.22 0.16 0.08 0.07 1,895 Inferred Offset Footwall Zone 1.50 9,530 2.16 0.15 0.12 0.06 0.05 Roby Footwall Zone 1.50 248 2.43 0.18 0.08 0.03 0.02 Total Inferred 1.50 9,778 2.17 0.15 0.12 0.06 0.05
  • 28. 27 LDI Palladium Mine RESERVES & RESOURCES See accompanying Notes on the last page. COMBINED RESERVES AND RESOURCES - ALL SOURCES Category/Source Tonnes Pd Pt Au Ni Cu Pd Contained Sub-Category (000's) (g/t) (g/t) (g/t) (%) (%) (000's oz) Total Proven + Probable 15,046 2.77 0.21 0.20 0.08 0.06 1,341 Total Measured + Indicated 57,732 2.08 0.21 0.15 0.08 0.06 3,857 Total Inferred 15,720 2.77 0.18 0.16 0.07 0.07
  • 29. 28 LDI Reserves & Resources Notes 1. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. 2. Palladium ounces are stated as contained ounces. Disclosure of contained ounces is permitted under Canadian regulations; however, the US Securities and Exchange Commission (SEC) generally permits resources to be reported only as in place tonnage and grade. 3. Resources listed in Table 1.1 are exclusive of reserves. Resources and reserves reflect depletion from mining activities to December 31, 2013. 4. Tonnages are rounded to nearest '000 tonnes. Palladium, platinum and gold grades are rounded to nearest 0.01 g/t. Nickel and copper grades are rounded to nearest 0.01%. Rounded numbers used to calculate contained palladium (oz) and average resource and reserve tonnage and grades. 5. All reserve and resource estimates were prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (NI 43-101) and the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) classification system. US investors should refer to the Annual Information Form for an overview on how Canadian Standards differ significantly from US requirements. 6. The mineral resource for the Offset hangingwall and footwall zones was estimated as of December 31, 2013 by Denis Decharte P.Eng, an employee of North American Palladium Ltd. (NAP) and a qualified person (QP) under NI 43-101. The mineral resource calculation uses a minimum 2.5 g/t palladium resource block cut-off for the hangingwall zone and a minimum 1.5 g/t palladium resource block cut- off for the footwall zone. The mineral resource estimate is based on the combination of geological modeling, geostatistics, and conventional block modelling (5 m by 5 m by 5 m blocks). 1 m composite intervals were used with a grade capping at 30 g/t for palladium and 3 g/t for gold. Grade capping was determined not to be necessary for others metals. The Offset Zone resource models used the ordinary kriging (OK) grade interpolation method within a 3DI block model with mineralized zones defined by wireframe solids. The mineral resource is exclusive of mineral reserve and mined-out material as of December 31, 2013. 7. The mineral resource for the Roby footwall zone was estimated as of December 31, 2013 by Denis Decharte P.Eng, an employee of NAP and a QP under NI 43-101. The mineral resource calculation uses a minimum 1.5 g/t palladium resource block cut-off. The mineral resource estimate is based on the combination of geological modeling, geostatistics, and conventional block modelling (5 m by 5 m by 5 m blocks). Grade capping was determined not to be necessary, however influence of composite intervals with palladium grade higher than 50 g/t were limited in space. The Roby Zone resource models used the OK grade interpolation method within a 3DI block model with mineralized zones defined by wireframe solids. The mineral resource is exclusive of mineral reserve and mined-out material as of December 31, 2013. NOTES
  • 30. 29 LDI Reserves & Resources 8. Mineral resource estimates for the near-surface portion of the western part of the North VT Rim Zone (west and east deep zones) at the Lac des Iles Mine Property was prepared by Chris Roney, P.Geo., a QP and a private consultant to the Company. This resource estimate was based on a 1.0 g/t palladium cut-off grade. The North VT Rim Zone mineral resources were estimated from drilling completed to April 15, 2013. The mineral resource uses a minimum 1.0 g/t palladium resource block cut-off. The mineral resource estimate is based on the combination of geological modeling, geostatistics, and conventional block modeling (5 m by 5 m by 5 m blocks). The North VT Rim resource models used the inverse distance squared (ID2) grade interpolation method. North American Palladium Ltd. 1-4 1496780200- REP-R0002-01 Technical Report for Lac des Iles Mine, Ontario Incorporating Prefeasibility Study for Life of Mine Plan. 9. Mineral resource estimates for the low-grade stockpile (RGO) was prepared by David N. Penna, P.Geo., an employee of Lac des Iles Mines Ltd. and a QP within the meaning of NI 43-101. 10. As with mineral resources, the estimate of mineral reserves may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. The mineral reserves were estimated from geological block models provided by Denis Decharte P.Eng. and from RGO stockpile resource information provided by Dave Penna, P. Geo., employees of NAP and QPs under NI 43-101. The geological block models reflect updates that are based upon diamond drilling completed after March 31, 2012 and before December 31, 2013. 11. Mineral resources for the Sheriff Zone are based on estimates originally provided in the Companyā€™s September 5, 2013 press release. 12. The mineral reserves were estimated by William Richard McBride, P.Eng. of Tetra Tech and Wenchang Ni, P.Eng. of Tetra Tech; with input by Dave Penna, P. Geo., an employee of NAP and QPs under NI 43-101 on allocation of indirect mining costs and John Cooney, P. Eng., an employee of NAP and QP under NI 43-101 on the use of the Lac Des Isle Mine 2014 budget for unit cost determinations; and with additional input by Cam McKinnon, P.Eng. of Tetra Tech on recoveries; and Philip Bridson, P.Eng. of Tetra Tech on metal prices and exchange rate, independent QPs within the meaning of NI 43-101. 13. Reserves were estimated to the 1065 Mine Level (4,435 m elevation), a maximum depth of 1,072.5 m. 14. The following metal price assumptions were used for reserves estimation: US$700/oz palladium, US$1,453/oz platinum, US$1,320/oz gold, US$6.47/lb nickel, and US$3.26/lb copper. A Cdn$/US$ exchange rate of Cdn$1.00 = US$0.95 was also applied. NOTES
  • 31. 30 LDI Reserves & Resources 15. An average production rate of 5,272 t/d was used to determine the reserves. The following recoveries were used in the assumptions to determine the reserves: 86.3% palladium, 80.3% platinum, 80.4% gold, 38.8% nickel, and 88.7% copper. The effective date of NAPā€™s Lac des Iles Mine resource models for the Offset Zone and for the Roby Zone, as prepared by NAPā€™s Denis Decharte P.Eng., is December 31, 2013 and as a result of ā€œmining depletionā€ the user of this reserve information should ensure that this is based upon the most recent resource estimate for the Property. 16. It should also be noted that the mineral reserve estimate for the Offset Zone as provided in 2013 as part of the technical report labeled ā€œTechnical Report Lac des Iles Mine, Ontario, Incorporating Prefeasibility Study Offset Zone Phase I, effective January 31, 2013ā€ reflected a different mining method with a different set of economic circumstances that thereby lead to that January 2013 reserve estimate in that prior report to be non-applicable to the unconsolidated fill mining method demonstrated as being viable by this prefeasibility study work. It should be further noted that ā€œmining depletionā€ during 2013 is not accounted for in the reserves, as in place underground mining developments were removed from the resource model prepared by NAPā€™s Denis Decharte P.Eng., and thereby from the reserve numbers; and a 0% mining recovery was applied to known mined-out stopes. The projected top down, long-hole with unconsolidated fill mining method, its potential production profile and the plans referred to in this prefeasibility study are preliminary in nature and additional technical studies will need to be completed in order to prove out their viability. There is no certainty that this mining method will be realized or that the production capabilities as represented will be realized. A mine production decision that is made without a feasibility study carries additional potential risks which include but are not limited to the lack of details pertaining to geotechnical and ventilation field study inputs for mine design, ore handling upgrades and their impact on mining schedules, metallurgical flow sheets and process plant designs that in themselves may require additional economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production. Numbers may not add due to rounding. NOTES