VGU-UDP 2010-2012




                    BIDV TOWER EVALUATION




                           Hoang Anh




                        Real Estate market


                        Prof. Karl Kluegel


                            30/08/2011
Hoang Anh, BIDV tower – Page 2



                                    TABLE OF CONTENTS




Abstract                                                                        page 3




I.    Introduction                                                              page 3

      1.Project overview                                                        page 3

      2.Current situation of Real estate in Ho Chi Minh city                    page 3




II.   Methodology                                                               page 4




III. Evaluation                                                                 page 5

      1. Building assessment                                                    page 5

      2. Feasibility assessment                                                 page 9




IV. Conclusion                                                                  page 10




References                                                                      page 12
Hoang Anh, BIDV tower – Page 3



Abstract

      The monetary tightening from the Government to control inflation affected on Viet Nam
economy generally and the real estate specifically, especial on the office for rent. The appearance
of high rise building more and more has contradicted with the falling down of the empty
percentage and the decrease of price in three office type A, B and C1. Analyzing the BIDV about
the location, architecture style, construction, capacity lease, parking capacity, and the connection
with the other buildings surround, environment, etc, will help us understanding about the
feasibility of BIDV project in the Ho Chi Minh real estate. This article has 4 parts: the first part is
BIDV introduction and the situation of Ho Chi Minh real estate, second part is the methodology to
get information; third part is the analysis, building feasibility assessment and final is the
conclusion.

I. INTRODUCTION


      1. Building overview

      In recent years, there have been many high rise buildings which be built in Ho Chi Minh
center city, such as Vincom Center, Sky City Tower or Sea Bank tower… BIDV is one of highest
office buildings with 40 storeys which will be built in 2010. The investor of this building is Bank
of Investment and development of Vietnam (BIDV), with the Partners are DP Architects Pte Ltd,
Beca PCM Pte Ltd, Bescon Consulting Engineers Pte, KPK Quality Surveyors Pte Ltd and
Vietnam CDC Consulting Corp.

   As designed, the project will be 152-metre high, comprised of 40 storeys and 4 basements.
The Tower will be built in a site area of 2.374,90 m2, in which gross floor area of building is
about 43.590,78 m2, basements' area is about 10.339,76 m2 and building density of 65,94%.
Locating in the important place of center city, the BIDV is not only great building in 2010 but
also contribute the change of real estate in office for rent.

      2. Current situation of Real estate in Ho Chi Minh city

    As overall real estate market report in the first quarter in 2011 was announced by two
specializing companies in market research in Vietnam real estate are Savill and CBRE, the market
is equivalent with the last months of 2010 and the demand for office-rent is increasing2. If in
quarter 4/2010, CBRE leased 6.000 m2 floors, the result in this quarter are doubled with 37.000
m2, most of which are class B, because it is good standard but the price could be accepted by the
lessee.


1
    CBRE report in quarter 2/2010
2
    Rudolf Hever, the deputy director of research and consultancy CBRE Vietnam
Hoang Anh, BIDV tower – Page 4



   Some companies in management and office leasing brokers generally identified that the
supply of office in the near future 2012 -2013 will continue to increase, at least several hundred
thousand square meters. Most of the office building projects will be put to use in the next few
years will be deployed during the peak of the market in 2007 -2008. In addition, the vacancy rate
stands at 20%, or about 200.000m2. Thus, office space for rent within 3 years could be up to the
half a million square meters, approximately 40% of the total office supply in the city so far. As
supply continues to increase will cause significant pressure on the price for rent. (Figure 1).




          Figure 1: Vacancy rate and Asking Rents in Ho Chi Minh city in quarter 2/2011
                       (Source: report of CBRE Vietnam in quarter 2/2011).

II. METHODOLOGY

   1. Collecting, searching the information about the BIDV.
      Searching the building information from the internet with the key word “BIDV”.
       Connecting with the Departments and the Companies which have the necessary documents
       about this building.

   2. Finding out and researching the real estate market in Ho Chi Minh city in recent couple of
       years.
       Depend on the exercise requirement, searching the information which related with real
       estate from the internet, especially from the real estate webs such as: Savill, CBRE, Viet
       Nam real estate, Viet Nam national real estate association, Vietnam economic forum etc.

   3. Defining the criteria following the requirement of the exercise
      After finding out the characteristic of Ho Chi Minh real estate, class conferences, and the
      real estate lecture, chooses the criteria which can be used, such as: the technical parameter,
      design, construction, location, etc.

   4. Analyzing, assessing the criteria above to make clear the technical and economic
      feasibility of building.
Hoang Anh, BIDV tower – Page 5



III. EVALUATION

     1. Building assessment:

     There are many factors when analyzing building. Depend on some Vietnam construction
standards, the reality and the purpose of research, choosing 4 criteria to make clear the value of
BIDV project.

     Table 1: Assessment criteria of building


 No.      Criteria        Notes on method                   Assessment Recapitulate

 1      Location        -Where                    - In main street in CBD with high value of land
                        -Traffic accessibility    - In corner of 2 streets, easy to access by 2
                        -The building surround    sides
                                                  - Most of them are office building, model
                                                  style, should be same height

 2      Design          - Architecture-planning   -Accepted by City People’s Committee
                        standards
                        -Architecture style       - Modern style with simple form, focus on
                                                  open space
                        -Construction             - New technique, save energy,
                                                  environmentally friendly

 3      Parking         -Design                   -1 basement for motorbike, 3 basements for car
        Capacity        -The car/motorbike        - Capacity about 1000 motorbikes, 500 cars
                        number

 4      Environment     -Social impact            -Open space, Public space for pedestrian
                        -Landscape                -Friendly, harmonious




       1.1. Location:

       BIDV Tower is located at No.117-119 Nguyen Hue Boulevard and No.16 Ton That Thiep
Street, District 1. The contiguity: North is Nguyen Hue street, South is SunWah Tower, East and
West is Ton That Hiep street and complex building Kim Do. This area belong a part of block
which be limited by 4 streets: Nguyen Hue, Le Loi, Ton That Thiep and Pasteur. In addition, the
architecture-planning standards of this block have been accepted by City People’s Committee.
Hoang Anh, BIDV tower – Page 6



Therefore, when designing the BIDV, the consultant and architect have to depend on those
standards to make project is suitable with the other building surround.

      On the other hand, locating in CBD with Nguyen Hue Street, the main landscape axis of city
to make this area become one of the places which has highest land price, about 160 million
Vietnam dong per m2 (about 8000USD/m2). Thus the value of BIDV could be compared with
these other building as Sunwah or Vincom Tower after project finishing.

      Moreover, with the convenient traffic condition, on the corner of two streets: Nguyen Hue
(64m) and Ton That Thiep (20m), the accessibility from outside into building is easier and more
safety by 2 sides (Figure 2).




                                 Figure 2: Location of the site
Hoang Anh, BIDV tower – Page 7



      1.2. Design:

      By the agreement of the People's Committee of Ho Chi Minh city, Department of Planning
and Architecture, based on space-oriented region and urban design in detail for blocks of land, the
land for BIDV building has identified the architecture-planning standards as follows 3:

      1. Land area: approximately 2.734,9 m2
      2. The function of land use: the Finance-Trade-Services
      3. Density: up to 65,94% on the boundary of land suitable project planning
      4. Project scale: 40 storeys (not including the basement, mezzanine floor and roof
      technology). Maximum height: 152m (to roof peak)
      5. Coefficient of land use: 16

     According these standards, BIDV organized a design competition to choose the best project.
Although it has been simple, the win project was high evaluated because the harmonization and
connection:
     - Firstly, the height has same level with KimDo and Tax building
     - Secondly, the podium was researched to create the connecting space with next buildings
       without barriers.
      - Thirdly, the building setback on Nguyen Hue and Ton That Hiep street has been similar with
        neighbor building and make the gap space for pedestrian – this is the main point which BIDV
       directorate focused on: the open space will be not only a connected place but also a place
       where outdoor activity happen as meeting, concert, party, etc, under canopy 4
      - Fourth is the architecture form. BIDV is not so impress because it has to ensure harmonious
        environment and not cover the direction of the main building: City People’s Committee
        office. The architects only use hexagonal glasses to deal with the sunlight and create the
        convexo-concave elevation to make the glisten for building.

      In addition, the entire auxiliary (elevator, escape lift, toilet, etc) will concentrate in East and
West. This is the save energy solution and shelter from the light. Beside that, by the semi-unitized
curtain wall aluminum frame, BIDV building will save 20-30% electric cost for the lights and air-
conditioner system. (Figure 3)




3
  Document No 2294/SQHKT-QHKTT, date 24/06/2008 from Ho Chi Minh Department of planning and architecture
to Bank of Investment and development of Vietnam (BIDV), providing planning-architecture criteria for BIDV
building
4
  Ho Viet Vinh – architect, juryman in BIDV building design competition
Hoang Anh, BIDV tower – Page 8




                                   Figure 3: Site Layout plan

     1.3. Parking capacity:

     If in London or the other developed urban, parking is not the main element in evaluation or
classification, it could be very important in Viet Nam. According design, BIDV has four
basements with 10.339,76 m2: first basement is motorbike parking (with 2.584,94 m2, capacity
about 1000 units), 3 other basements is designed for car (with 7.754,82 m2, capacity about 400
units). In general, BIDV is successful to deal with the demand for all staffs and customers when
coming to transact business (about 5000 staffs with 9m2/person and 7000 customers with
6m2/person in 43.590,78m2 total floor area). However it is hard to say that this parking can serve
for neighbor.
Hoang Anh, BIDV tower – Page 9



           1.4. Environment:

           As assessment above, although the architecture style of BIDV building is not sophisticated,
  the new materials application such as hexagonal glasses, aluminum, saving energy materials
  created synchronism with the building around and harmonization with the environment and
  landscape. Moreover, the open space for pedestrian created friendly for this building. It is the
  positive factor which affect on social relationship. If most of buildings have been self-contained
  before, nowadays it has changed as BIDV tower is not only used for costumers but also for the
  pedestrian, tourists by the appropriate setback in 4 sides, canopy and podium design.

           2. The feasibility assessment:

        In technical and economic feasibility, BIDV could be satisfied all the criteria to become one
  of the successful office building projects:

           2.1. At technical issue, we can summarize the building technical information in two tables
  as:

  General information
Location                       No.117-119 Nguyen Hue Boulevard and
                               No.16 Ton That Thiep Street, District 1.

Lot size                       2.734,9 m2

Floors                         40 storeys above ground

                               4 storeys below ground (parking)                10.339,76 m2 (5m2 per
                                                                               18,58 m2 office surface =
                                                                               11.730 m2 – by construction
                                                                               law)
Usages                         Finance-Trade-Services

Structure                      Reinforcement     Concrete    Frame    and
                               Stainless Steel

Building area                  1.803,47 m2                                     Percentage       buildable
                                                                               (density) 65,94%
Gross floor area               43.590,78 m2

Leasable floor area            32.313,60 m2                                    Percentage leasable 74,13%

Coefficient of land usage      43.590,78/2.734,9 = 16
Hoang Anh, BIDV tower – Page 10



Area Table
    Section                  Building (m2)                              Usage
  Basement 4F                   2.584,94              Car park lots
  Basement 3F                   2.584,94              Car park lots
  Basement 2F                   2.584,94              Car park lots
  Basement 1F                   2.584,94              Motorcycles parking lot
Sub total                       10.339,76
              1F                1.416,50              Office, cafeteria, Shop, Substation,
                                                      Bin center
 1Mezzanine F                   1.208,00              Office of BIDV bank
              2F                1.070,61              Office of BIDV bank
 2Mezzanine F                   1.204,52              Office of BIDV bank
              3F                1.243,21              Office of BIDV bank
              4F                1.792,42              Office, Auditorium
              5F                 994,59               Office, Auditorium
   Technique F                   950,40               Lounge Area, M&E
        6F-39F                  32.313,60             Office for rent
              40F                870,09               Restaurant
         Roof F                  526,84               Restaurant, M&E, Helipad
Total                           43.590,78



     According the technical numbers and the building characteristics which are analyzed above,
we can assess the technical feasibility as:

     First is the location: consider in both of sides: relativity (in CBD) and absolutely (in the
main streets), BIDV is one of the buildings which has the best location in center with highest
value of land and convenient traffic.

     Second, although the architecture style is simple, by the appropriate design, new
construction and saving energy materials, this building has been harmonious and friendly with
neighbor, especially the space for pedestrian. All these elements make this building become one
of the main views in region, and is classified as office type A.

     Third is the density and coefficient of land use, BIDV tower used most of land with the
coefficient is 16 but ensuring the setback and suitable density (65,94%). As the economists said,
building has high coefficient will make great economic efficiency because it used most of
investment scale.
Hoang Anh, BIDV tower – Page 11



    Fourth is the parking capacity, as analyzing above, parking of BIDV can satisfy the large
number of motorbike and car of the staffs and customers. Following the Vietnam construction
standard, an average area for one motorbike lot is 2m2, for one car is 15m2, thus the needed area
for building which has 43.590,78m2 office area is 1000m2 motorbike parking, and 7500m2 car
parking (with 5000 staffs and 7000 customers). Hence these numbers are equivalent with the
building design: 2.584,94 m2 motorbike parking and 7.754,82 m2 car parking.

      The final in technical assessment is the environment, with the favorable location, good
infrastructure and radius service, beautiful view and landscape, BIDV will develop maximum
capacity to become one of typical building by the bank and finance function.

      2.2. Beside the good technique, to analyze the economic feasibility of this building, we have
to put it in the current situation of Ho Chi Minh real estate:

      As a design, the leased office area is 32.313,60m2; if using an average price of type A in Ho
Chi Minh in current time is 34,21USD/m2 (CBRE report in quarter 2/2011), the economic
feasibility can be analyzed that:
      -Construction cost: 1.359 billion Vietnam dong = 67,95 billion USD
      -Purchase Price for Lot: 441 billion Vietnam dong 5 = 22,05 billion USD
     -Project cost: 1.800 billion Vietnam dong 6 = 90 billion USD
     -Gross rental revenue at 100% Occupancy:
     32.313,60 m2 * 34,21USD/m2 * 12 months =13.265.379 USD
     -5% Vacancy Rate: 5% * 13.265.379 = 663.268,95
     -35% Operating Cost: 35% * 13.265.379 = 4.642.882,65
     -Net operating income: 13.265.379 - 663.268,95 - 4.642.882,65 = 7.959.227,4
     -Break even ROR = 7.959.227,4/90.000.000.000=0,0088%


     In Conclusion:

       Project is economically feasibility if investors require ROR =<0.0088%
       Project is economically not feasibility at 0.009% since

       7.959.277,4/0.00009 = 88.436.415.555,55 income value < 90.000.000.000 project cost ,
       i.e. 1.563.584.444,45 Loss

       Substantial development profit at 0.00008:

       7.959.227,4/0.00008 - 90.000.000.000 = 9.490.342.500 profit


5
  Document No 1166/CV-HĐQT, date 25/11/2009, from Bank of Investment and development of Vietnam (BIDV to
People’s Committee of Ho Chi Minh City, Purchase Price for BIDV Lot
6
  Website of Bank of Investment and development of Vietnam (BIDV), http://bidv.com.vn/
Hoang Anh, BIDV tower – Page 12



IV. CONCLUSION

     In generally, BIDV building could be seen as one of greatest project of city in 2001; in
architecture issue, Colin Wafd – an English architect said that this is a design has a modern style,
unique planning which be suitable with region “after building, I believe BIDV tower will be an
important architecture point in center city”; in society-economy, this building could be seen as a
symbol of social development with 100% funding from domestic investment, an impeccable
infrastructure, high technique, represented a new level in servicing for citizens and tourists.

      However, as reported by two CBRE and Savills Viet Nam, the real estate market, office
leasing in the future is still under pressure, due to a reduction in rent even though rates in early
2011 a slight increase (Figure 4) and the vacancy rate in the high-rise office, Although in recent
months that rate has been reduced, it still remains at very high level (especially Grade A 38.1%).
All those have happened because the supplies become more and more, in HCM City, more than 1
million m2 of office space is expected to enter the market from 2012 onwards mainly in District 1.
It accounted for 48% of all future projects will be great pressure for investors to find customers,
and BIDV is not outside this circumstances.

                                    USD/m2/month




                                     Capacity leased        Average price for rent

             Figure 4: The rental rates have increased slightly, prices continue to decrease
                                       (Source: Savills Vietnam).

       In Investor’s view, one can say that BIDV is a product which is invested on a large scale
and high economic value. However in recent real estate, BIDV will continue to increase the
number of offices in Ho Chi Minh when it is put into operation (expected in 2012). It makes a
pressure on rents and finding tenants. Therefore besides ensuring ROR is always lower than
0.0008%, the investors have to create policies and strategies for marketing to attract the lessee.
Hoang Anh, BIDV tower – Page 13



Reference

1. Internet:
        - Vietnam real estate:
          http://www.vietrees.com; http://vnre.blogspot.com;
          http://rol.vn/; http://batdongsanninhbinh.com
        - Ho Chi Minh real estate associations HOREA :
          http://www.horea.org.vn
        - BIDV information:
         http://www.skyscrapercity.com; http://www.diaoconline.vn;
       - Others:
          http://wedo.com.vn/Quy-Hoach-XD; http://vietnamnet.vn/vn/kinh-te
          http://kinhtexaydung.gov.vn


2. Document:
       - CBRE Ho Chi Minh City Market View in quarter 2/2010, 1/2011, 2/2011
       - Document No 2294/SQHKT-QHKTT, 24/06/2008 from Ho Chi Minh Department of
         urban planning and architecture to Bank of Investment and development of Vietnam
         (BIDV)
       - Document No 3533/SQHKT-QHKTT, 01/12/2006 from Ho Chi Minh Department of
         urban planning and architecture to City People’s Committee

Más contenido relacionado

La actualidad más candente

White paper downtown baltimore office market
White paper   downtown baltimore office marketWhite paper   downtown baltimore office market
White paper downtown baltimore office marketRobert Manekin
 
What drives Bangkok's Residential Condominium Prices
What drives Bangkok's Residential Condominium PricesWhat drives Bangkok's Residential Condominium Prices
What drives Bangkok's Residential Condominium PricesJoseba U
 
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio Arc.Mohamed Ibrahim Abdel-Fatah Portfolio
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio Mohamed A.Fatah
 
2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase BookAutodesk AEC
 
2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards FinalistsAutodesk AEC
 
De &amp; be final workshop submission
De &amp; be final workshop submissionDe &amp; be final workshop submission
De &amp; be final workshop submissionArthur Wilson
 
Nehru's Search for Suitable Architecture
Nehru's Search for Suitable ArchitectureNehru's Search for Suitable Architecture
Nehru's Search for Suitable ArchitectureVarsha Mallya
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV fullAmr Moussa
 
Cv Enghish 2011 Web Site
Cv Enghish 2011 Web SiteCv Enghish 2011 Web Site
Cv Enghish 2011 Web Sitemsmarino
 
Chandigarh planning
 Chandigarh planning Chandigarh planning
Chandigarh planningHareem Sheikh
 

La actualidad más candente (11)

White paper downtown baltimore office market
White paper   downtown baltimore office marketWhite paper   downtown baltimore office market
White paper downtown baltimore office market
 
What drives Bangkok's Residential Condominium Prices
What drives Bangkok's Residential Condominium PricesWhat drives Bangkok's Residential Condominium Prices
What drives Bangkok's Residential Condominium Prices
 
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio Arc.Mohamed Ibrahim Abdel-Fatah Portfolio
Arc.Mohamed Ibrahim Abdel-Fatah Portfolio
 
Chandigarh Planning
Chandigarh PlanningChandigarh Planning
Chandigarh Planning
 
2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book
 
2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists2017 AEC Excellence Awards Finalists
2017 AEC Excellence Awards Finalists
 
De &amp; be final workshop submission
De &amp; be final workshop submissionDe &amp; be final workshop submission
De &amp; be final workshop submission
 
Nehru's Search for Suitable Architecture
Nehru's Search for Suitable ArchitectureNehru's Search for Suitable Architecture
Nehru's Search for Suitable Architecture
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
Cv Enghish 2011 Web Site
Cv Enghish 2011 Web SiteCv Enghish 2011 Web Site
Cv Enghish 2011 Web Site
 
Chandigarh planning
 Chandigarh planning Chandigarh planning
Chandigarh planning
 

Destacado

22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...Nguyễn Khoa
 
Graduate project nguyen dinh khoa
Graduate project   nguyen dinh khoaGraduate project   nguyen dinh khoa
Graduate project nguyen dinh khoaNguyễn Khoa
 
G2. chuong duong quay week 2
G2. chuong duong quay   week 2G2. chuong duong quay   week 2
G2. chuong duong quay week 2Nguyễn Khoa
 
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...Nguyễn Khoa
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introductionNguyễn Khoa
 
15. ha vietcombank-tower
15. ha vietcombank-tower15. ha vietcombank-tower
15. ha vietcombank-towerNguyễn Khoa
 
Ngoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNgoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNguyễn Khoa
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjectsNguyễn Khoa
 
Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Nguyễn Khoa
 
Nguyen dinh khoa's assignment adaptation - the city of cape town
Nguyen dinh khoa's assignment   adaptation - the city of cape townNguyen dinh khoa's assignment   adaptation - the city of cape town
Nguyen dinh khoa's assignment adaptation - the city of cape townNguyễn Khoa
 
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityIntroduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityNguyễn Khoa
 
Indicators measurment cit
Indicators measurment citIndicators measurment cit
Indicators measurment citNguyễn Khoa
 
Saigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenSaigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenNguyễn Khoa
 
Prof. karl's assignment
Prof. karl's assignmentProf. karl's assignment
Prof. karl's assignmentNguyễn Khoa
 
Project prposal vo my y
Project prposal   vo my yProject prposal   vo my y
Project prposal vo my yNguyễn Khoa
 
Vietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionVietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionNguyễn Khoa
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introductionNguyễn Khoa
 

Destacado (20)

Portlofio large
Portlofio largePortlofio large
Portlofio large
 
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
 
Graduate project nguyen dinh khoa
Graduate project   nguyen dinh khoaGraduate project   nguyen dinh khoa
Graduate project nguyen dinh khoa
 
G2. chuong duong quay week 2
G2. chuong duong quay   week 2G2. chuong duong quay   week 2
G2. chuong duong quay week 2
 
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introduction
 
15. ha vietcombank-tower
15. ha vietcombank-tower15. ha vietcombank-tower
15. ha vietcombank-tower
 
Ngoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNgoc anh hcmc_mitigation
Ngoc anh hcmc_mitigation
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjects
 
Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.
 
Nguyen dinh khoa's assignment adaptation - the city of cape town
Nguyen dinh khoa's assignment   adaptation - the city of cape townNguyen dinh khoa's assignment   adaptation - the city of cape town
Nguyen dinh khoa's assignment adaptation - the city of cape town
 
Mumbai city
Mumbai cityMumbai city
Mumbai city
 
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityIntroduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
 
Indicators measurment cit
Indicators measurment citIndicators measurment cit
Indicators measurment cit
 
Saigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenSaigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyen
 
Prof. karl's assignment
Prof. karl's assignmentProf. karl's assignment
Prof. karl's assignment
 
Project prposal vo my y
Project prposal   vo my yProject prposal   vo my y
Project prposal vo my y
 
N.anh lim tower
N.anh lim towerN.anh lim tower
N.anh lim tower
 
Vietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionVietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introduction
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introduction
 

Similar a Hoang anh -_real_estate_-_bidv_tower

An Overview Of Developments In Real Estate Projects In Mumbai.pdf
An Overview Of Developments In Real Estate Projects In Mumbai.pdfAn Overview Of Developments In Real Estate Projects In Mumbai.pdf
An Overview Of Developments In Real Estate Projects In Mumbai.pdfThe Mumbai Realty
 
Mazen ALoud-CV-7916
Mazen ALoud-CV-7916Mazen ALoud-CV-7916
Mazen ALoud-CV-7916Mazen Oud
 
Minh-RESUME 2015
Minh-RESUME 2015Minh-RESUME 2015
Minh-RESUME 2015Minh TV
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesMelvin Lim
 
ICI FINAL PROJECT GROUP MEMBER
ICI FINAL PROJECT GROUP MEMBERICI FINAL PROJECT GROUP MEMBER
ICI FINAL PROJECT GROUP MEMBERDanica Gan
 
VHM: IPO in 17/52018
VHM: IPO in 17/52018VHM: IPO in 17/52018
VHM: IPO in 17/52018Uyen La
 
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfBIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfLPU / IITB / KM
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptxBaharAnjum
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif
 
AEC Excellence Awards 2016 Finalists
AEC Excellence Awards 2016 FinalistsAEC Excellence Awards 2016 Finalists
AEC Excellence Awards 2016 FinalistsAutodesk AEC
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET Journal
 

Similar a Hoang anh -_real_estate_-_bidv_tower (20)

An Overview Of Developments In Real Estate Projects In Mumbai.pdf
An Overview Of Developments In Real Estate Projects In Mumbai.pdfAn Overview Of Developments In Real Estate Projects In Mumbai.pdf
An Overview Of Developments In Real Estate Projects In Mumbai.pdf
 
Mazen ALoud-CV-7916
Mazen ALoud-CV-7916Mazen ALoud-CV-7916
Mazen ALoud-CV-7916
 
Minh-RESUME 2015
Minh-RESUME 2015Minh-RESUME 2015
Minh-RESUME 2015
 
Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
 
Daoud Bou Ajram
Daoud  Bou AjramDaoud  Bou Ajram
Daoud Bou Ajram
 
DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation Slides
 
ICI FINAL PROJECT GROUP MEMBER
ICI FINAL PROJECT GROUP MEMBERICI FINAL PROJECT GROUP MEMBER
ICI FINAL PROJECT GROUP MEMBER
 
VHM: IPO in 17/52018
VHM: IPO in 17/52018VHM: IPO in 17/52018
VHM: IPO in 17/52018
 
Proposal one
Proposal oneProposal one
Proposal one
 
BIM Assignment.doc
BIM Assignment.docBIM Assignment.doc
BIM Assignment.doc
 
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdfBIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
BIM Adoption, Benefits and Challenges - an IIT Bombay Seminar.pdf
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
AEC Excellence Awards 2016 Finalists
AEC Excellence Awards 2016 FinalistsAEC Excellence Awards 2016 Finalists
AEC Excellence Awards 2016 Finalists
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
IRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station ConstructionIRJET- Application of BIM Technology in Subway Station Construction
IRJET- Application of BIM Technology in Subway Station Construction
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
March-2015
March-2015March-2015
March-2015
 
Ahmed Hussien1 2
Ahmed Hussien1 2Ahmed Hussien1 2
Ahmed Hussien1 2
 

Más de Nguyễn Khoa

Shanghai global city
Shanghai global cityShanghai global city
Shanghai global cityNguyễn Khoa
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Nguyễn Khoa
 
Vietnam Water resources.
Vietnam Water resources.Vietnam Water resources.
Vietnam Water resources.Nguyễn Khoa
 
Green economy in the City of Toronto
Green economy in the City of TorontoGreen economy in the City of Toronto
Green economy in the City of TorontoNguyễn Khoa
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjectsNguyễn Khoa
 

Más de Nguyễn Khoa (7)

Shanghai global city
Shanghai global cityShanghai global city
Shanghai global city
 
Presentation1
Presentation1Presentation1
Presentation1
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)
 
Vietnam Water resources.
Vietnam Water resources.Vietnam Water resources.
Vietnam Water resources.
 
Green economy in the City of Toronto
Green economy in the City of TorontoGreen economy in the City of Toronto
Green economy in the City of Toronto
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjects
 
Vietnam profile
Vietnam profileVietnam profile
Vietnam profile
 

Último

It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldParagliding Billing Bir
 
The Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasThe Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasAmit Kakkar
 
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaWhat Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaDelphi Watersports
 
What Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceWhat Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceTahoe Whitewater Tours
 
Discover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideDiscover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideTime for Sicily
 
Canada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxCanada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxY-Axis Overseas Careers
 
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfTransportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfGlobalbustours
 
László Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyLászló Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyEDGAR TARRÉS FALCÓ
 
Sizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSnowshoe Tahoe
 
Melanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessMelanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessEDGAR TARRÉS FALCÓ
 
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxBusy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxRezStream
 
5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhandaradhya3287
 
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdfNewChandigarhTravels
 
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspWhat Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspHanalei Surf School
 
Top Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfTop Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfonlinevisaindia
 
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureWhat Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureHanalei Charters
 
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageVisit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageDhruv Sharma
 
Explore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxExplore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxIRCTCBuddhisttrain
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiCab Bazar
 

Último (20)

It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The World
 
The Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasThe Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student Visas
 
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaWhat Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
 
What Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceWhat Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting Experience
 
Discover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideDiscover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel Guide
 
Canada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxCanada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptx
 
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfTransportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
 
László Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyLászló Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and Economy
 
Sizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the Sun
 
Melanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessMelanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and Happiness
 
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxBusy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
 
5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand
 
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
 
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspWhat Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
 
Top Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfTop Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdf
 
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureWhat Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
 
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageVisit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
 
Explore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxExplore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptx
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal Pardesh
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
 

Hoang anh -_real_estate_-_bidv_tower

  • 1. VGU-UDP 2010-2012 BIDV TOWER EVALUATION Hoang Anh Real Estate market Prof. Karl Kluegel 30/08/2011
  • 2. Hoang Anh, BIDV tower – Page 2 TABLE OF CONTENTS Abstract page 3 I. Introduction page 3 1.Project overview page 3 2.Current situation of Real estate in Ho Chi Minh city page 3 II. Methodology page 4 III. Evaluation page 5 1. Building assessment page 5 2. Feasibility assessment page 9 IV. Conclusion page 10 References page 12
  • 3. Hoang Anh, BIDV tower – Page 3 Abstract The monetary tightening from the Government to control inflation affected on Viet Nam economy generally and the real estate specifically, especial on the office for rent. The appearance of high rise building more and more has contradicted with the falling down of the empty percentage and the decrease of price in three office type A, B and C1. Analyzing the BIDV about the location, architecture style, construction, capacity lease, parking capacity, and the connection with the other buildings surround, environment, etc, will help us understanding about the feasibility of BIDV project in the Ho Chi Minh real estate. This article has 4 parts: the first part is BIDV introduction and the situation of Ho Chi Minh real estate, second part is the methodology to get information; third part is the analysis, building feasibility assessment and final is the conclusion. I. INTRODUCTION 1. Building overview In recent years, there have been many high rise buildings which be built in Ho Chi Minh center city, such as Vincom Center, Sky City Tower or Sea Bank tower… BIDV is one of highest office buildings with 40 storeys which will be built in 2010. The investor of this building is Bank of Investment and development of Vietnam (BIDV), with the Partners are DP Architects Pte Ltd, Beca PCM Pte Ltd, Bescon Consulting Engineers Pte, KPK Quality Surveyors Pte Ltd and Vietnam CDC Consulting Corp. As designed, the project will be 152-metre high, comprised of 40 storeys and 4 basements. The Tower will be built in a site area of 2.374,90 m2, in which gross floor area of building is about 43.590,78 m2, basements' area is about 10.339,76 m2 and building density of 65,94%. Locating in the important place of center city, the BIDV is not only great building in 2010 but also contribute the change of real estate in office for rent. 2. Current situation of Real estate in Ho Chi Minh city As overall real estate market report in the first quarter in 2011 was announced by two specializing companies in market research in Vietnam real estate are Savill and CBRE, the market is equivalent with the last months of 2010 and the demand for office-rent is increasing2. If in quarter 4/2010, CBRE leased 6.000 m2 floors, the result in this quarter are doubled with 37.000 m2, most of which are class B, because it is good standard but the price could be accepted by the lessee. 1 CBRE report in quarter 2/2010 2 Rudolf Hever, the deputy director of research and consultancy CBRE Vietnam
  • 4. Hoang Anh, BIDV tower – Page 4 Some companies in management and office leasing brokers generally identified that the supply of office in the near future 2012 -2013 will continue to increase, at least several hundred thousand square meters. Most of the office building projects will be put to use in the next few years will be deployed during the peak of the market in 2007 -2008. In addition, the vacancy rate stands at 20%, or about 200.000m2. Thus, office space for rent within 3 years could be up to the half a million square meters, approximately 40% of the total office supply in the city so far. As supply continues to increase will cause significant pressure on the price for rent. (Figure 1). Figure 1: Vacancy rate and Asking Rents in Ho Chi Minh city in quarter 2/2011 (Source: report of CBRE Vietnam in quarter 2/2011). II. METHODOLOGY 1. Collecting, searching the information about the BIDV. Searching the building information from the internet with the key word “BIDV”. Connecting with the Departments and the Companies which have the necessary documents about this building. 2. Finding out and researching the real estate market in Ho Chi Minh city in recent couple of years. Depend on the exercise requirement, searching the information which related with real estate from the internet, especially from the real estate webs such as: Savill, CBRE, Viet Nam real estate, Viet Nam national real estate association, Vietnam economic forum etc. 3. Defining the criteria following the requirement of the exercise After finding out the characteristic of Ho Chi Minh real estate, class conferences, and the real estate lecture, chooses the criteria which can be used, such as: the technical parameter, design, construction, location, etc. 4. Analyzing, assessing the criteria above to make clear the technical and economic feasibility of building.
  • 5. Hoang Anh, BIDV tower – Page 5 III. EVALUATION 1. Building assessment: There are many factors when analyzing building. Depend on some Vietnam construction standards, the reality and the purpose of research, choosing 4 criteria to make clear the value of BIDV project. Table 1: Assessment criteria of building No. Criteria Notes on method Assessment Recapitulate 1 Location -Where - In main street in CBD with high value of land -Traffic accessibility - In corner of 2 streets, easy to access by 2 -The building surround sides - Most of them are office building, model style, should be same height 2 Design - Architecture-planning -Accepted by City People’s Committee standards -Architecture style - Modern style with simple form, focus on open space -Construction - New technique, save energy, environmentally friendly 3 Parking -Design -1 basement for motorbike, 3 basements for car Capacity -The car/motorbike - Capacity about 1000 motorbikes, 500 cars number 4 Environment -Social impact -Open space, Public space for pedestrian -Landscape -Friendly, harmonious 1.1. Location: BIDV Tower is located at No.117-119 Nguyen Hue Boulevard and No.16 Ton That Thiep Street, District 1. The contiguity: North is Nguyen Hue street, South is SunWah Tower, East and West is Ton That Hiep street and complex building Kim Do. This area belong a part of block which be limited by 4 streets: Nguyen Hue, Le Loi, Ton That Thiep and Pasteur. In addition, the architecture-planning standards of this block have been accepted by City People’s Committee.
  • 6. Hoang Anh, BIDV tower – Page 6 Therefore, when designing the BIDV, the consultant and architect have to depend on those standards to make project is suitable with the other building surround. On the other hand, locating in CBD with Nguyen Hue Street, the main landscape axis of city to make this area become one of the places which has highest land price, about 160 million Vietnam dong per m2 (about 8000USD/m2). Thus the value of BIDV could be compared with these other building as Sunwah or Vincom Tower after project finishing. Moreover, with the convenient traffic condition, on the corner of two streets: Nguyen Hue (64m) and Ton That Thiep (20m), the accessibility from outside into building is easier and more safety by 2 sides (Figure 2). Figure 2: Location of the site
  • 7. Hoang Anh, BIDV tower – Page 7 1.2. Design: By the agreement of the People's Committee of Ho Chi Minh city, Department of Planning and Architecture, based on space-oriented region and urban design in detail for blocks of land, the land for BIDV building has identified the architecture-planning standards as follows 3: 1. Land area: approximately 2.734,9 m2 2. The function of land use: the Finance-Trade-Services 3. Density: up to 65,94% on the boundary of land suitable project planning 4. Project scale: 40 storeys (not including the basement, mezzanine floor and roof technology). Maximum height: 152m (to roof peak) 5. Coefficient of land use: 16 According these standards, BIDV organized a design competition to choose the best project. Although it has been simple, the win project was high evaluated because the harmonization and connection: - Firstly, the height has same level with KimDo and Tax building - Secondly, the podium was researched to create the connecting space with next buildings without barriers. - Thirdly, the building setback on Nguyen Hue and Ton That Hiep street has been similar with neighbor building and make the gap space for pedestrian – this is the main point which BIDV directorate focused on: the open space will be not only a connected place but also a place where outdoor activity happen as meeting, concert, party, etc, under canopy 4 - Fourth is the architecture form. BIDV is not so impress because it has to ensure harmonious environment and not cover the direction of the main building: City People’s Committee office. The architects only use hexagonal glasses to deal with the sunlight and create the convexo-concave elevation to make the glisten for building. In addition, the entire auxiliary (elevator, escape lift, toilet, etc) will concentrate in East and West. This is the save energy solution and shelter from the light. Beside that, by the semi-unitized curtain wall aluminum frame, BIDV building will save 20-30% electric cost for the lights and air- conditioner system. (Figure 3) 3 Document No 2294/SQHKT-QHKTT, date 24/06/2008 from Ho Chi Minh Department of planning and architecture to Bank of Investment and development of Vietnam (BIDV), providing planning-architecture criteria for BIDV building 4 Ho Viet Vinh – architect, juryman in BIDV building design competition
  • 8. Hoang Anh, BIDV tower – Page 8 Figure 3: Site Layout plan 1.3. Parking capacity: If in London or the other developed urban, parking is not the main element in evaluation or classification, it could be very important in Viet Nam. According design, BIDV has four basements with 10.339,76 m2: first basement is motorbike parking (with 2.584,94 m2, capacity about 1000 units), 3 other basements is designed for car (with 7.754,82 m2, capacity about 400 units). In general, BIDV is successful to deal with the demand for all staffs and customers when coming to transact business (about 5000 staffs with 9m2/person and 7000 customers with 6m2/person in 43.590,78m2 total floor area). However it is hard to say that this parking can serve for neighbor.
  • 9. Hoang Anh, BIDV tower – Page 9 1.4. Environment: As assessment above, although the architecture style of BIDV building is not sophisticated, the new materials application such as hexagonal glasses, aluminum, saving energy materials created synchronism with the building around and harmonization with the environment and landscape. Moreover, the open space for pedestrian created friendly for this building. It is the positive factor which affect on social relationship. If most of buildings have been self-contained before, nowadays it has changed as BIDV tower is not only used for costumers but also for the pedestrian, tourists by the appropriate setback in 4 sides, canopy and podium design. 2. The feasibility assessment: In technical and economic feasibility, BIDV could be satisfied all the criteria to become one of the successful office building projects: 2.1. At technical issue, we can summarize the building technical information in two tables as: General information Location No.117-119 Nguyen Hue Boulevard and No.16 Ton That Thiep Street, District 1. Lot size 2.734,9 m2 Floors 40 storeys above ground 4 storeys below ground (parking) 10.339,76 m2 (5m2 per 18,58 m2 office surface = 11.730 m2 – by construction law) Usages Finance-Trade-Services Structure Reinforcement Concrete Frame and Stainless Steel Building area 1.803,47 m2 Percentage buildable (density) 65,94% Gross floor area 43.590,78 m2 Leasable floor area 32.313,60 m2 Percentage leasable 74,13% Coefficient of land usage 43.590,78/2.734,9 = 16
  • 10. Hoang Anh, BIDV tower – Page 10 Area Table Section Building (m2) Usage Basement 4F 2.584,94 Car park lots Basement 3F 2.584,94 Car park lots Basement 2F 2.584,94 Car park lots Basement 1F 2.584,94 Motorcycles parking lot Sub total 10.339,76 1F 1.416,50 Office, cafeteria, Shop, Substation, Bin center 1Mezzanine F 1.208,00 Office of BIDV bank 2F 1.070,61 Office of BIDV bank 2Mezzanine F 1.204,52 Office of BIDV bank 3F 1.243,21 Office of BIDV bank 4F 1.792,42 Office, Auditorium 5F 994,59 Office, Auditorium Technique F 950,40 Lounge Area, M&E 6F-39F 32.313,60 Office for rent 40F 870,09 Restaurant Roof F 526,84 Restaurant, M&E, Helipad Total 43.590,78 According the technical numbers and the building characteristics which are analyzed above, we can assess the technical feasibility as: First is the location: consider in both of sides: relativity (in CBD) and absolutely (in the main streets), BIDV is one of the buildings which has the best location in center with highest value of land and convenient traffic. Second, although the architecture style is simple, by the appropriate design, new construction and saving energy materials, this building has been harmonious and friendly with neighbor, especially the space for pedestrian. All these elements make this building become one of the main views in region, and is classified as office type A. Third is the density and coefficient of land use, BIDV tower used most of land with the coefficient is 16 but ensuring the setback and suitable density (65,94%). As the economists said, building has high coefficient will make great economic efficiency because it used most of investment scale.
  • 11. Hoang Anh, BIDV tower – Page 11 Fourth is the parking capacity, as analyzing above, parking of BIDV can satisfy the large number of motorbike and car of the staffs and customers. Following the Vietnam construction standard, an average area for one motorbike lot is 2m2, for one car is 15m2, thus the needed area for building which has 43.590,78m2 office area is 1000m2 motorbike parking, and 7500m2 car parking (with 5000 staffs and 7000 customers). Hence these numbers are equivalent with the building design: 2.584,94 m2 motorbike parking and 7.754,82 m2 car parking. The final in technical assessment is the environment, with the favorable location, good infrastructure and radius service, beautiful view and landscape, BIDV will develop maximum capacity to become one of typical building by the bank and finance function. 2.2. Beside the good technique, to analyze the economic feasibility of this building, we have to put it in the current situation of Ho Chi Minh real estate: As a design, the leased office area is 32.313,60m2; if using an average price of type A in Ho Chi Minh in current time is 34,21USD/m2 (CBRE report in quarter 2/2011), the economic feasibility can be analyzed that: -Construction cost: 1.359 billion Vietnam dong = 67,95 billion USD -Purchase Price for Lot: 441 billion Vietnam dong 5 = 22,05 billion USD -Project cost: 1.800 billion Vietnam dong 6 = 90 billion USD -Gross rental revenue at 100% Occupancy: 32.313,60 m2 * 34,21USD/m2 * 12 months =13.265.379 USD -5% Vacancy Rate: 5% * 13.265.379 = 663.268,95 -35% Operating Cost: 35% * 13.265.379 = 4.642.882,65 -Net operating income: 13.265.379 - 663.268,95 - 4.642.882,65 = 7.959.227,4 -Break even ROR = 7.959.227,4/90.000.000.000=0,0088% In Conclusion: Project is economically feasibility if investors require ROR =<0.0088% Project is economically not feasibility at 0.009% since 7.959.277,4/0.00009 = 88.436.415.555,55 income value < 90.000.000.000 project cost , i.e. 1.563.584.444,45 Loss Substantial development profit at 0.00008: 7.959.227,4/0.00008 - 90.000.000.000 = 9.490.342.500 profit 5 Document No 1166/CV-HĐQT, date 25/11/2009, from Bank of Investment and development of Vietnam (BIDV to People’s Committee of Ho Chi Minh City, Purchase Price for BIDV Lot 6 Website of Bank of Investment and development of Vietnam (BIDV), http://bidv.com.vn/
  • 12. Hoang Anh, BIDV tower – Page 12 IV. CONCLUSION In generally, BIDV building could be seen as one of greatest project of city in 2001; in architecture issue, Colin Wafd – an English architect said that this is a design has a modern style, unique planning which be suitable with region “after building, I believe BIDV tower will be an important architecture point in center city”; in society-economy, this building could be seen as a symbol of social development with 100% funding from domestic investment, an impeccable infrastructure, high technique, represented a new level in servicing for citizens and tourists. However, as reported by two CBRE and Savills Viet Nam, the real estate market, office leasing in the future is still under pressure, due to a reduction in rent even though rates in early 2011 a slight increase (Figure 4) and the vacancy rate in the high-rise office, Although in recent months that rate has been reduced, it still remains at very high level (especially Grade A 38.1%). All those have happened because the supplies become more and more, in HCM City, more than 1 million m2 of office space is expected to enter the market from 2012 onwards mainly in District 1. It accounted for 48% of all future projects will be great pressure for investors to find customers, and BIDV is not outside this circumstances. USD/m2/month Capacity leased Average price for rent Figure 4: The rental rates have increased slightly, prices continue to decrease (Source: Savills Vietnam). In Investor’s view, one can say that BIDV is a product which is invested on a large scale and high economic value. However in recent real estate, BIDV will continue to increase the number of offices in Ho Chi Minh when it is put into operation (expected in 2012). It makes a pressure on rents and finding tenants. Therefore besides ensuring ROR is always lower than 0.0008%, the investors have to create policies and strategies for marketing to attract the lessee.
  • 13. Hoang Anh, BIDV tower – Page 13 Reference 1. Internet: - Vietnam real estate: http://www.vietrees.com; http://vnre.blogspot.com; http://rol.vn/; http://batdongsanninhbinh.com - Ho Chi Minh real estate associations HOREA : http://www.horea.org.vn - BIDV information: http://www.skyscrapercity.com; http://www.diaoconline.vn; - Others: http://wedo.com.vn/Quy-Hoach-XD; http://vietnamnet.vn/vn/kinh-te http://kinhtexaydung.gov.vn 2. Document: - CBRE Ho Chi Minh City Market View in quarter 2/2010, 1/2011, 2/2011 - Document No 2294/SQHKT-QHKTT, 24/06/2008 from Ho Chi Minh Department of urban planning and architecture to Bank of Investment and development of Vietnam (BIDV) - Document No 3533/SQHKT-QHKTT, 01/12/2006 from Ho Chi Minh Department of urban planning and architecture to City People’s Committee