HYDRAULIC SYSTEM
Hydraulic system:
A industrial hydraulic system is fluid circuit based on hydrostatic principle that uses
pressurized hydraulic fluid to power hydraulic machinery.
There are 2 types of hydraulic circuits used in fluid power applications.
Open Loop Circuits:
These are circuits where the inlet of hydraulic pump and the actuator(or valve)
return are connected to a hydraulic reservoir.
Closed Loop Circuits:
These are circuits where the motor return is connected directly to the hydraulic
pump inlet .
• Hydraulic system installed in gasification unit is Open Loop Circuits supplied by
M/s Rexroth.
• Hydraulic system in unit-3 is divided into 3 verticals
1.Power pack
2.Working field circuit
3.Recirculation unit
Hydraulic oil reservoir Main header pump
Discharge filter
& NRV
Field
working
circuit
Main header
accumulator
Line
accumulator
filter
Bearing
flushing line
Return
line PSV
Power pack
Drain
line
Hydraulic reservoir
 Tank capacity-6000 lit
 Material- Stainless steel with tank inside Epoxy coated.
 Design for atmospheric pressure & temp 20-70o c
 Reservoir divide with main pump suction chamber & Return line
chamber.
 Oil chambers are provided by 4o slope from centre to out word for
easy removal of dirt particle.
 Reservoir Fitted with two breather for filtration & dehumidification of
intake air.
 Reservoir maximum & minimum oil level
>68%– warning HH
>65%– warning H
> 33%– warning L
>24%– warning LL
 Reservoir maximum & minimum oil Temperature
>62oc– warning HH
>60oc – warning H
HYDRAULIC OIL
 HFDR-46 synthetic oil is used in our hydraulic system.
Properties of HFDR-46
 Fire resistant hydraulic fluid based on selected phosphate esters
Good lubrication performance and anti-wear properties.
Excellent oxidation stability.
Prevention of foaming and very quick air release
Main Hydraulic pump
• 4 no's of Multiaxial piston pump installed considering 3 no's pump
in continuous operation & 1 pump for standby condition.
 Type-A4VSO180 Variable displacement type pump.
 Capacity-223 l/m
 discharge pressure-110kg/cm2,
 Efficiency-93.5%
 Best operating viscosity range 16 to 43 centistoke.
Require Minimum Cleanliness level ISO 20/18/15
NAS & ISO 4406 interconversion
Maximum Contamination Limits (per 100 mL)
Size range in microns
Approximate
ISO 4406
Equivalent
NAS 1638
code
5-15 µm 15-25 µm 25-50 µm 50-100 µm Over 100 µm
— 00 125 22 4 1 0
— 0 250 44 8 2 0
12/10/7 1 500 89 16 3 1
13/11/8 2 1000 178 32 6 1
14/12/9 3 2000 356 63 11 2
15/13/10 4 4000 712 126 22 4
16/14/11 5 8000 1425 253 45 8
17/15/12 6 16,000 2850 506 90 16
18/16/13 7 32,000 5700 1012 190 32
19/17/14 8 64,000 11,400 2025 360 64
20/18/15 9 128,000 22,800 4050 720 128
21/19/16 10 256,000 45,600 8100 1440 256
22/20/17 11 512,000 91,200 16,200 2880 512
23/21/18 12 1,024,000 182,400 32,400 5760 1020
DICHARGE & RETURN LINE FILTER
• General: Filter clogging indicators to be evaluated only when fluid
temperature is higher than 30o C.
• Each discharge line of main pump Fitted with 10 micron filter.
> 5 kg/cm2 – warning H
> 7 kg/cm2 - warning HH
• Return line fitted with 10 micron filter.
> 2 kg/cm2 - warning H
> 4 kg/cm2 - warning HH
ACCUMULATOR SECTION
Main accumulator
• 2 no's accumulator having each capacity 180 L.
• Accumulator fitted with 8 no's (8*75=600 l) of nitrogen cylinder.
Line Accumulator
• Total 4 no's of line accumulator present at 5 meter & 21 meter
• Each capacity 30 litre .
WORKING FIELD CIRCUIT
Pressure
reducing
valve
solenoid DC
Valve
Flow control
Circuit
selection
Actuator
Mimic panel
accumulator Pressure
reducing
valve
Optional Valve
PRESSURE REDUCING VALVE
• 2 pressure reducing valve in parallel connection (Size-NG20)
• General pressure setting 65kg/cm2 & 67kg/cm2
• Extra pressure reducing valve for dv6,dv2,dv4 & ash lock bottom cone.
• General pressure setting for reducing valve is 30kg/cm2.
SOLENOID OPERATED DC VALVE
• we are using 4/2 or 4/3 DC solenoid valve with hydraulic pilot line operated.
• Always we have extra solenoid DC valve for avoiding any malpractice situation.
FLOW CONTROL
• Meter in type flow control are installed in our hydraulic circuit.
• Main purpose of this meter in type circuit is velocity control in our actuator.
CIRCUIT SELECTION
• Each circuit has 2 no's of solenoid operated DC valve.
• Out of which we can choose running & isolation of any DC valve by manual ball
valve.
ACTUATER
• In our circuit only linear type actuators are used with different size.
• Every actuator Fitted with cushioning for avoiding damage of piston seal &
equipment.
• Maximum speed of actuator is .2m/sec.
• Gasifier area operating actuator hydraulic pressure.
Sl no Equipment actuator name Operating pressure
1 Coal feeding chute 65kg/cm2
2 Coal lock top cone 30kg/cm2
3 Coal lock bottom cone 65kg/cm2
4 Ash lock top cone 65kg/cm2
5 Ash lock bottom cone 30kg/cm2
6 DV1 valve 65kg/cm2
7 DV2 valve 30kg/cm2
8 DV5 valve 65kg/cm2
9 DV6 valve 30kg/cm2
10 PV1 valve 65kg/cm2
RECIRCULATION PART
Hydraulic oil
Reservoir
Recirculation
pump
Filtering Unit Cooling unit
Main pump
bearing
flushing line
Temp sense
bypass line
Filling
pump
NRV
RECIRCULATION PUMP
• 2no’s of Screw pump(1 running & 1 standby) are used for cooling purpose having
capacity 110 l/min.
• Working pressure 10kg/cm2 & efficiency 93.5%.
• Self priming type screw pump with triple screw.
FILLING PUMP
• 1 no of Screw pump is used for filling purpose having capacity 13l/ min.
• Working pressure 5kg/cm2 & efficiency 93.5%.
FILTERING UNIT
• We are using 6 micron duplex filter for recirculation unit .
• > 2 kg/cm2 - warning H
• > 4 kg/cm2 - warning HH
COOLING UNIT
• We are using shell & tube type Heat exchanger for cooling purpose
with 1 stand by condition.
• Cooling water flow 100 lit/min at maximum 35ocentigrade.
• Cooling water inlet to the heat exchanger control by thermostatically
reservoir temperature.
Daily pm check list
FREQUENT PRBLEMS
• Leakage from hydraulic hose.
• Looseness of QRC
• Malfunction of solenoid DC valve.
• Increase of hydraulic oil temperature.
MAJOR FAILURE
• Recirculation pump seal failure.
• Main header pump flow problem.
THANKS

Más contenido relacionado

Similar a Hydraulic ppt.pptx

Coconut water extraction mass production machine
Coconut water extraction mass production machineCoconut water extraction mass production machine
Coconut water extraction mass production machineLuis Cabrera
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticVibropac
 
Designer and operator manual dorot
Designer and operator manual dorotDesigner and operator manual dorot
Designer and operator manual dorotCarlos Rovello
 
Designer and operator manual dorot
Designer and operator manual dorotDesigner and operator manual dorot
Designer and operator manual dorotCarlos Rovello
 
Bl novaplex integral_process_diaphragm_pumps_117_gb
Bl novaplex integral_process_diaphragm_pumps_117_gbBl novaplex integral_process_diaphragm_pumps_117_gb
Bl novaplex integral_process_diaphragm_pumps_117_gbmohd kamal mastuki
 
Electrical_Submersible_Pump (final).ppt
Electrical_Submersible_Pump (final).pptElectrical_Submersible_Pump (final).ppt
Electrical_Submersible_Pump (final).pptAnkit732751
 
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITY
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITYTECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITY
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITYiQHub
 
Fuel gas system of gas production
Fuel gas system of gas productionFuel gas system of gas production
Fuel gas system of gas productionPhyoe Maung Maung
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Dmitry Kuraev
 
anaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptxanaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptxRaj Kumar
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingPRAN-RFL Group
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesMahajan Saurabh
 
Wcfx r134a - hermatic screw chiller
Wcfx r134a - hermatic screw chillerWcfx r134a - hermatic screw chiller
Wcfx r134a - hermatic screw chillerAruna Amarasekara
 
Pump api 675 presentation
Pump api 675 presentationPump api 675 presentation
Pump api 675 presentationVothanh Trung
 
Inplant training report
Inplant training reportInplant training report
Inplant training reportapplesam8
 
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGY
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGYAutomação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGY
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGYJúlio Gengo
 

Similar a Hydraulic ppt.pptx (20)

Coconut water extraction mass production machine
Coconut water extraction mass production machineCoconut water extraction mass production machine
Coconut water extraction mass production machine
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
 
Designer and operator manual dorot
Designer and operator manual dorotDesigner and operator manual dorot
Designer and operator manual dorot
 
Designer and operator manual dorot
Designer and operator manual dorotDesigner and operator manual dorot
Designer and operator manual dorot
 
Bl novaplex integral_process_diaphragm_pumps_117_gb
Bl novaplex integral_process_diaphragm_pumps_117_gbBl novaplex integral_process_diaphragm_pumps_117_gb
Bl novaplex integral_process_diaphragm_pumps_117_gb
 
Electrical_Submersible_Pump (final).ppt
Electrical_Submersible_Pump (final).pptElectrical_Submersible_Pump (final).ppt
Electrical_Submersible_Pump (final).ppt
 
Artificial Lift Methods
Artificial Lift MethodsArtificial Lift Methods
Artificial Lift Methods
 
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITY
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITYTECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITY
TECHNOLOGY FOR HIGH YIELD IMPROVEMENT IN PRODUCED WATER QUALITY
 
Fuel gas system of gas production
Fuel gas system of gas productionFuel gas system of gas production
Fuel gas system of gas production
 
Akhilesh ongc report
Akhilesh ongc reportAkhilesh ongc report
Akhilesh ongc report
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...
 
anaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptxanaesthesia machine-140810030802-pptx.pptx
anaesthesia machine-140810030802-pptx.pptx
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
 
Oil production 2
Oil production 2Oil production 2
Oil production 2
 
Wcfx r134a - hermatic screw chiller
Wcfx r134a - hermatic screw chillerWcfx r134a - hermatic screw chiller
Wcfx r134a - hermatic screw chiller
 
Pump api 675 presentation
Pump api 675 presentationPump api 675 presentation
Pump api 675 presentation
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGY
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGYAutomação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGY
Automação Pneumática para Máquinas CKD CORP - AERODYNAMIC TECHNOLOGY
 
vdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.pptvdocument.in_660-mw-turbine.ppt
vdocument.in_660-mw-turbine.ppt
 

Último

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackinghadarpinhas1
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 

Último (20)

priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and tracking
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 

Hydraulic ppt.pptx

  • 1. HYDRAULIC SYSTEM Hydraulic system: A industrial hydraulic system is fluid circuit based on hydrostatic principle that uses pressurized hydraulic fluid to power hydraulic machinery. There are 2 types of hydraulic circuits used in fluid power applications. Open Loop Circuits: These are circuits where the inlet of hydraulic pump and the actuator(or valve) return are connected to a hydraulic reservoir. Closed Loop Circuits: These are circuits where the motor return is connected directly to the hydraulic pump inlet .
  • 2. • Hydraulic system installed in gasification unit is Open Loop Circuits supplied by M/s Rexroth. • Hydraulic system in unit-3 is divided into 3 verticals 1.Power pack 2.Working field circuit 3.Recirculation unit
  • 3. Hydraulic oil reservoir Main header pump Discharge filter & NRV Field working circuit Main header accumulator Line accumulator filter Bearing flushing line Return line PSV Power pack Drain line
  • 4. Hydraulic reservoir  Tank capacity-6000 lit  Material- Stainless steel with tank inside Epoxy coated.  Design for atmospheric pressure & temp 20-70o c  Reservoir divide with main pump suction chamber & Return line chamber.  Oil chambers are provided by 4o slope from centre to out word for easy removal of dirt particle.  Reservoir Fitted with two breather for filtration & dehumidification of intake air.
  • 5.  Reservoir maximum & minimum oil level >68%– warning HH >65%– warning H > 33%– warning L >24%– warning LL  Reservoir maximum & minimum oil Temperature >62oc– warning HH >60oc – warning H
  • 6. HYDRAULIC OIL  HFDR-46 synthetic oil is used in our hydraulic system. Properties of HFDR-46  Fire resistant hydraulic fluid based on selected phosphate esters Good lubrication performance and anti-wear properties. Excellent oxidation stability. Prevention of foaming and very quick air release
  • 7. Main Hydraulic pump • 4 no's of Multiaxial piston pump installed considering 3 no's pump in continuous operation & 1 pump for standby condition.  Type-A4VSO180 Variable displacement type pump.  Capacity-223 l/m  discharge pressure-110kg/cm2,  Efficiency-93.5%  Best operating viscosity range 16 to 43 centistoke. Require Minimum Cleanliness level ISO 20/18/15
  • 8. NAS & ISO 4406 interconversion Maximum Contamination Limits (per 100 mL) Size range in microns Approximate ISO 4406 Equivalent NAS 1638 code 5-15 µm 15-25 µm 25-50 µm 50-100 µm Over 100 µm — 00 125 22 4 1 0 — 0 250 44 8 2 0 12/10/7 1 500 89 16 3 1 13/11/8 2 1000 178 32 6 1 14/12/9 3 2000 356 63 11 2 15/13/10 4 4000 712 126 22 4 16/14/11 5 8000 1425 253 45 8 17/15/12 6 16,000 2850 506 90 16 18/16/13 7 32,000 5700 1012 190 32 19/17/14 8 64,000 11,400 2025 360 64 20/18/15 9 128,000 22,800 4050 720 128 21/19/16 10 256,000 45,600 8100 1440 256 22/20/17 11 512,000 91,200 16,200 2880 512 23/21/18 12 1,024,000 182,400 32,400 5760 1020
  • 9. DICHARGE & RETURN LINE FILTER • General: Filter clogging indicators to be evaluated only when fluid temperature is higher than 30o C. • Each discharge line of main pump Fitted with 10 micron filter. > 5 kg/cm2 – warning H > 7 kg/cm2 - warning HH • Return line fitted with 10 micron filter. > 2 kg/cm2 - warning H > 4 kg/cm2 - warning HH
  • 10. ACCUMULATOR SECTION Main accumulator • 2 no's accumulator having each capacity 180 L. • Accumulator fitted with 8 no's (8*75=600 l) of nitrogen cylinder. Line Accumulator • Total 4 no's of line accumulator present at 5 meter & 21 meter • Each capacity 30 litre .
  • 11. WORKING FIELD CIRCUIT Pressure reducing valve solenoid DC Valve Flow control Circuit selection Actuator Mimic panel accumulator Pressure reducing valve Optional Valve
  • 12. PRESSURE REDUCING VALVE • 2 pressure reducing valve in parallel connection (Size-NG20) • General pressure setting 65kg/cm2 & 67kg/cm2 • Extra pressure reducing valve for dv6,dv2,dv4 & ash lock bottom cone. • General pressure setting for reducing valve is 30kg/cm2. SOLENOID OPERATED DC VALVE • we are using 4/2 or 4/3 DC solenoid valve with hydraulic pilot line operated. • Always we have extra solenoid DC valve for avoiding any malpractice situation. FLOW CONTROL • Meter in type flow control are installed in our hydraulic circuit. • Main purpose of this meter in type circuit is velocity control in our actuator.
  • 13. CIRCUIT SELECTION • Each circuit has 2 no's of solenoid operated DC valve. • Out of which we can choose running & isolation of any DC valve by manual ball valve. ACTUATER • In our circuit only linear type actuators are used with different size. • Every actuator Fitted with cushioning for avoiding damage of piston seal & equipment. • Maximum speed of actuator is .2m/sec. • Gasifier area operating actuator hydraulic pressure.
  • 14. Sl no Equipment actuator name Operating pressure 1 Coal feeding chute 65kg/cm2 2 Coal lock top cone 30kg/cm2 3 Coal lock bottom cone 65kg/cm2 4 Ash lock top cone 65kg/cm2 5 Ash lock bottom cone 30kg/cm2 6 DV1 valve 65kg/cm2 7 DV2 valve 30kg/cm2 8 DV5 valve 65kg/cm2 9 DV6 valve 30kg/cm2 10 PV1 valve 65kg/cm2
  • 15. RECIRCULATION PART Hydraulic oil Reservoir Recirculation pump Filtering Unit Cooling unit Main pump bearing flushing line Temp sense bypass line Filling pump NRV
  • 16. RECIRCULATION PUMP • 2no’s of Screw pump(1 running & 1 standby) are used for cooling purpose having capacity 110 l/min. • Working pressure 10kg/cm2 & efficiency 93.5%. • Self priming type screw pump with triple screw. FILLING PUMP • 1 no of Screw pump is used for filling purpose having capacity 13l/ min. • Working pressure 5kg/cm2 & efficiency 93.5%. FILTERING UNIT • We are using 6 micron duplex filter for recirculation unit . • > 2 kg/cm2 - warning H • > 4 kg/cm2 - warning HH
  • 17. COOLING UNIT • We are using shell & tube type Heat exchanger for cooling purpose with 1 stand by condition. • Cooling water flow 100 lit/min at maximum 35ocentigrade. • Cooling water inlet to the heat exchanger control by thermostatically reservoir temperature. Daily pm check list
  • 18. FREQUENT PRBLEMS • Leakage from hydraulic hose. • Looseness of QRC • Malfunction of solenoid DC valve. • Increase of hydraulic oil temperature. MAJOR FAILURE • Recirculation pump seal failure. • Main header pump flow problem.
  • 19.