- Presentaciones
- Documentos
- Infografías
Completion equipment packer part #1
Elsayed Amer
•
Hace 4 años
Commissioning & Interface With Engineering
asim569
•
Hace 12 años
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Allan Leyte
•
Hace 7 años
ISO 14001:2015 Significant Aspects sheet
Tim Matthews
•
Hace 8 años
Megyesy pressure vessel hand book [11th ed.]
Gowtham M
•
Hace 9 años
Ship Construction by Jayan Pillai
Mohammud Hanif Dewan M.Phil.
•
Hace 9 años
Fire Fighting and SOLAS Requirements
Mohammud Hanif Dewan M.Phil.
•
Hace 10 años