Municipal Budgets, Capital Improvements Planning & Public Funding

Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Cargando en…3
×

Eche un vistazo a continuación

1 de 65 Anuncio

Más Contenido Relacionado

Presentaciones para usted (20)

A los espectadores también les gustó (12)

Anuncio

Similares a Municipal Budgets, Capital Improvements Planning & Public Funding (20)

Más reciente (20)

Anuncio

Municipal Budgets, Capital Improvements Planning & Public Funding

  1. 1. Wisconsin Rural Water Association “Municipal Budget Cycle Capital Improvements Planning and Public Funding” Kurt R. Muchow Community Development Consultant
  2. 2. Session Agenda • Municipal Budget / Project Cycle vs. Public Funding • Capital Improvements Planning • Conventional Funding Methods • Public Funding Opportunities
  3. 3. Typical Municipal Budget/Project Cycle 2015 2016 J J A S O N D J F M A M J J A S O N D Budget Planning Budget Review & Adoption Project Implementation • Financing • Design / Bidding Project Implementation • Construction
  4. 4. Municipal Project Cycle vs. Public Funding 2015 2016 2017 M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D CDBGPFGrantAward(Construction2017) CDBGPFAward(Construction2018) CDBGPFApplication CDBGPFApplication CDBGPFGrantAward(Construction2016) CDBGPFApplication WDNRStewardshipApplicationDeadline WDNRStewardshipAward(Construction2017) WDNRStewardshipApplicationDeadline WDNRStewardshipAward(Construction2018) WDNRStewardshipApplicationDeadline WDNRStewardshipAward(Construction2016) WDOTTAPAward(Construction2018-2019) WDOTTAPApplication(Bi-Annual) WDOTTAPAward(Construction2020-2021) WDOTTAPApplication(Bi-Annual) WDOTSTPAward(Construction2017-2019) WDOTSTPApplication(Bi-Annual) WDOTSTPAward(Construction2019-2020) WDOTSTPApplication(Bi-Annual) WDNRCWF&SDWLAward(Construction2018) WDNRCWF&SDWL(ITA&PERF) WDNRCWF&SDWLITA&PERF WDNRCWF&SDWLFinalApplication WDNRCWF&SDWLAward(Construction2017) WDNRCWF&SDWLITA&PERF WDNRCWF&SDWLFinalApplication
  5. 5. Municipal Capital Improvements Planning • Goal – Provide communities with information on the capital improvements needed during the upcoming planning period (typically 5 years) and the proposed method of financing these expenditures.
  6. 6. Municipal Capital Improvements Planning • Definition: Capital Improvements – “Capital items should have a useful life of at least 3 years and a cost of $5,000 or more.”
  7. 7. Municipal Capital Improvements Planning • Components: – Administrative & Policy Guidelines – Financial Analysis – List of Needed Projects & Priority – Estimated Costs – Timetable for Implementation – Sources of Project Funding
  8. 8. Municipal Capital Improvements Planning • General Suggestions - Include all Departments (Public works, water, wastewater, police, fire, parks, etc) - Create a CIP Committee (Dept. heads, Clerk, Treasurer, Board/Council members) - Understand Outside Influences * WDOT Six Year Plan * New Regulations (WDNR, EPA, etc.) * Private Development - Include Your Professional Advisors (Financial advisor, engineer, planner, etc.) - Update the CIP Annually
  9. 9. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary Table 1: General Financial Comparison (2011) Category High Low Average Viroqua 1. General Gov’t. Spending Per Capita* $ 144.88 $ 3.80 $ 91.09 $ 93.96 2. Street Maintenance Per Capita $ 181.94 $ 64.40 $ 134.74 $ 171.17 3. Fire-Ambulance Per Capita $ 242.75 $ 22.05 $ 83.44 $ 32.49 4. Police Expenses Per Capita $ 656.71 $ 88.12 $ 201.73 $ 226.81 5. General Obligation Debt ($1,000s) $ 15,455 $ 0.00 $ 6,788 $ 5,068 6. Debt Per Capita $ 3,461 $ 0.00 $ 1,414 $ 1,162 7. Munc. Property Tax Levy ($1,000s) $ 4,373 $ 1,067 $ 2,148 $ 1,720 8. Munc. Property Tax Levy Per Capita $ 998 $ 221 $ 427 $ 394 9. Munc. Property Tax Rate(Per $1,000) $ 13.03 $ 3.56 $ 6.95 $ 7.70 10. Equalized Values ($1,000,000s) $ 629.1 $ 190.9 $ 322.4 $ 237.9 11. Shared Revenues ($1,000s) $ 1,785 $ 163.7 $ 757.3 $ 1,090.8 12. Shared Revenue Per Capita $ 396 $ 32 $ 150 $ 250 13. Average Income/Tax Return** $142,080 $ 30,880 $ 43,930 $ 35,200 *Gen. Govt. Spending Per Capita – Spending for legislative, legal, general & financial administration and general buildings. **Average Adjusted Gross Income per tax return.
  10. 10. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  11. 11. Case Study-Viroqua (2015 – 2019 CIP) Table 3: Municipal Water Rate Comparison (As of 02/18/13) Annual Water Cost Per Household Community Population (Based on 75,000 gallons per year) Darlington 2,450 $ 334 Dodgeville 4,692 $ 352 Lancaster 3,855 $ 321 Mauston 4,447 $ 335 Prairie du Chien 5,895 $ 186 Richland Center 5,186 $ 236 Average of Above Communities NA $ 294 Wis. Avg. (Class 3 Utilities) NA $ 316 Viroqua (rate based on 02/26/13 rate increase) 4,362 $ 462 • Financial Summary
  12. 12. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary Table 4: Historic Revenue Trends
  13. 13. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  14. 14. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  15. 15. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  16. 16. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  17. 17. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  18. 18. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  19. 19. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  20. 20. Case Study-Viroqua (2015 – 2019 CIP) • Financial Summary
  21. 21. Case Study- Viroqua CIP TID Boundary Map vs. Proposed Projects
  22. 22. Case Study-Viroqua (2015 – 2019 CIP) • Financial Goals & Strategies (Adopted by Common Council) • Minimize new G.O. Debt to keep debt service at current levels. • Do not increase water user rates. • Limit Increases of sewer user rates to +/- 7% to 8%, keep lower than comparable communities. • Maximize use of surplus TIF Revenue. • Maximize use of grants. • Allocate Street Reconstruction Costs to Sewer & Water Utilities.
  23. 23. Case Study-Viroqua (2015 – 2019 CIP) Funds Available for CIP • General Obligation Debt (No D/S Increase) • $1,440,000 (Based on 20 yr term) • Water Utility (No Rate Increase) • $1,155,000 Rural Dev. Loan • $ 385,000 Rural Dev. Grant • $1,540,000 Total • Sanitary Sewer Utility (7.5% Rate Increase) • $ 800,000 Reserves • $3,700,000 New Debt (CWF Rates) • $ 500,000 CWF Principal Forgiveness • $5,000,000 Total
  24. 24. Case Study-Viroqua (2015 – 2019 CIP) Funds Available For CIP • Tax Incremental Financing • $1,560,000 New TIF Debt • Finance w/G.O. Loans • DOT LRIP Grant • $221,000 For Northeast Ave. • CDBG Public Facility Grants • $1,000,000 (Assumes Two $500,000 Grants) • Misc. Grants & Contributions • $300,000
  25. 25. City of Viroqua Capital Project Information Sheet Project Title: Rock Avenue – Decker to W. South Street City Department: Public Works Description: Reconstruction of street, curb & gutter, sidewalk, sanitary sewer, water main, storm sewer & street lights. Project includes reconstruction of: • Rock Avenue from Decker to W. South Street • Terhune Street from Main to Rock • West Court Street from Main to Rock • West Court Street from Rock to Dunlap • Jefferson Street from Main to Rock • West South Street from Main to Rock Justification & Priority: Condition of sanitary sewer, water main and street is very poor. Scheduled for construction in 2015. Project is being implemented in conjunction with construction of the new Library and expansion of the Western Wisconsin technical College. Priority: 1 2 3 4 5 (Circle One: 1=Highest, 5=Lowest) Budget: Funding Sources: • Capital Purchase =$ • General Fund = $ 0 • Land Acquisition =$ • Sewer Utility (RD Loan) = $ 891,028 • A/E Fees =$ 179,900 • Water Utility (RD Loan) = $ 728,030 • Construction =$ 1,441,379 • Borrowing = $ 0 • Contingency =$ 144,138 • Grants (RD Water 25%) = $ 242,677 • Other – Admin & Legal =$ 16,063 • TIF (TIDs 2 & 3) = $ 134,116* • Other - Interest =$ 80,255 • Other = $ 0 Total =$ 1,995,851 Total = $ 1,995,851 Implementation Schedule: Project will be bid early 2015 and constructed in 2015. Special Project Requirements or Considerations: Rural Development Grant & Loan for Water Main will include both Rock Avenue & Northeast Avenue. Rural Development Sewer Loan will include Rock Avenue & Northeast Avenue. • Rural Development eligible water system projects include water main & services and 50% of street reconstruction. Total estimate Rural Development eligible costs = $970,707. Rural Development grant = 25%. RD Loan = 75%. • Rural Development eligible sanitary sewer system projects include sewer main, manholes, laterals and 50% of street reconstruction. Total estimated Rural Development eligible costs = $891,028. To be with $891,028 of Rural Development Sanitary Sewer Loan. *TID No. 2 & 3 revenue will be used to pay debt service on Rural development sewer loan in an amount equivalent to a $118,800 TIF loan. • Storm sewer & non-eligible total costs = $134,116 100% to be paid with TIF. Submitted By: Steve Clark, DPW
  26. 26. City of Viroqua Police, Fire, Public Works and Parks & Recreation Departments Five Year Capital Improvement Project List Project Description 2015 2016 2017 2018 2019 Total Future Projects A. Police Department 1. Squad Cars 2. Radio System Subtotal Police B. Fire Department 1. SCBA Equip. 2. Storage Building 3. Building Addition Subtotal Fire C. Public Works 1. Tractor & Brush Hog 2. Pickup Truck 3. Dump Truck Subtotal Pub. Works D. Parks & Recreation 1. Seal Coating Trails 2. Park Bowl Bleachers 3. Tractor W/ Mower 4. ¾ Ton Plow Truck 5. Playground Equip. 6. Baseball Lights 7. Swimming Pool Subtotal Park & Rec E. Equip Reserve Fund $65,000 $0 $65,000 $0 $0 $0 $0 $91,000 $0 $0 $91,000 $7,500 $0 $0 $0 $0 $0 $0 $7,500 $10,000 $32,500 $30,000 $62,500 $0 $0 $0 $0 $0 $25,000 $0 $25,000 $7,500 $100,000 $0 $0 $0 $0 $0 $107,500 $10,000 $32,500 $0 $32,500 $0 $0 $0 $0 $0 $0 $160,000 $160,000 $0 $0 $0 $0 $0 $0 $0 $0 $10,000 $65,000 $0 $65,000 $200,000 $0 $0 $200,000 $0 $0 $0 $0 $0 $0 $35,000 $0 $0 $0 $0 $35,000 $10,000 $32,500 $0 $32,500 $0 $0 $0 $0 $0 $0 $0 $30 $0 $0 $0 $25,000 $200,000 $0 $0 $225,000 $10,000 $227,500 $30,000 $257,500 $200,000 $0 $0 $200,000 $91,000 $25,000 $160,000 $276,000 $15,000 $100,000 $35,000 $25,000 $200,000 $0 0 $375,000 $50,000 $0 $0 $0 $0 $100,000 $125,000 $225,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $2,600,000 $2,700,000 Total Project Costs $163,500 $195,000 $192,500 $300,000 $257,500 $1,108,500 $2,925,000 Funding Sources 1. General Funds 2. Gen. Reserve Funds 3. G.O. Bonds/Notes 4. Water Utility Funds 5. Water Ulility Loan 6. Sewer Utility Funds 7. Sewer Utility Loan 8. Grants 9. Other Contributions 10. Tax Increment Fin. $72,500 $0 $91,000 $0 $0 $0 $0 $0 $0 $0 $0 $70,000 $0 $75,000 $0 $0 $0 $0 $0 $50,000 $0 $0 $32,500 $0 $160,000 $0 $0 $0 $0 $0 $0 $0 $0 $65,000 $0 $102,000 $0 $0 $0 $0 $100,000 $33,000 $0 $0 $32,500 $0 $125,000 $0 $0 $0 $0 $0 $100,000 $0 $0 $272,500 $0 $553,000 $0 $0 $0 $0 $100,000 $183,000 $0 $0 Total Funding $163,500 $195,000 $192,500 $300,000 $257,500 $1,108,500 Equipment Reserve Fund Balance $10,000 $20,000 $30,000 $40,000 $50,000 $50,000 Note: The City should consult with their financial advisor (Ehlers & Associates) regarding financing future capital projects.
  27. 27. Constr Total 12/14/15* 9/14/17* 4/27/21* 4/25/21* Total Water Water Sewer Sewer CWF CWF SDWL SDWL DOT G.O. San. Sewer Project Name Year Cost TID No. 2 TID No. 3 TID No. 4 TID No. 5 TID Loan Grant Loan Grant Loan Prin. For. Loan Prin. For. LRIP Loan Reserve 1 Nelson Parkway 2014 $430,000 $0 $0 $0 $398,000 $398,000 $0 $0 $0 $0 $0 $0 $0 $0 $32,000 $0 $0 $0 2 Rock Ave - North 2015 $1,995,851 $134,116 $0 $0 $0 $134,116 $728,030 $242,677 $891,028 $0 $0 $0 $0 $0 $0 $0 $0 $0 4 Northeast Ave 2016 $1,230,709 $0 $192,084 $0 $0 $192,084 $425,948 $141,982 $249,695 $0 $0 $0 $0 $0 $221,000 $0 $0 $0 5 WWTP 2016 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,776,000 $500,000 $0 $0 $0 $500,000 $0 $224,000 6 Hwy 14 Lift Station 2016 $580,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $580,000 7 Jefferson St - West 2018 $225,000 $0 $0 $225,000 $0 $225,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 8 J Street Lift Station 2019 $348,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $348,700 $0 $0 $0 $0 $0 $0 $0 9 Center St. 2019 $1,412,715 $0 $0 $240,000 $200,000 $440,000 $0 $0 $0 $0 $606,810 $0 $0 $0 $350,000 $15,905 $0 10 Rock Ave - South 2019 $705,800 $0 $0 $0 $17,000 $17,000 $0 $0 $0 $0 $352,000 $0 $0 $0 $0 $150,000 $186,800 $0 11 E.D. & Downtown $20,000 $0 $0 $20,000 $20,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 12 Planning $30,000 $0 $0 $15,000 $0 $15,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $15,000 $0 $0 Total $9,978,775 $134,116 $192,084 $500,000 $615,000 $1,441,200 $1,153,978 $384,659 $1,140,723 $0 $3,083,510 $500,000 $0 $0 $253,000 $1,015,000 $202,705 $804,000 ***TIF-RD $118,800 $10,884 $107,916 $0 $0 TID Total $145,000 $300,000 $500,000 $615,000 $1,560,000 * End of Expenditure Period ** Colored cell means project is located within one-half mile radius of TID. TIF dollar amounts shown in white cells means these funds need to be transferred to TID No. 4. ***Revenue from TID No. 2 & 3 will be used to pay debt service on Rural Dev Sewer Loan for Rock Ave & Northeast Ave at a rate that is equivalent to a $118,800 TIF loan. City of Viroqua 2015-2019 Capital Improvements Plan Project Funding Spreadsheet (08-12-14) CDBG Tax Incremental Financing Rural Development DNR Env. Improvement Fund
  28. 28. • G.O. Borrowing • $553,000 for Equipment & Vehicles • $552,750 for Infrastructure • Less than maximum goal • Water Utility • $1,153,978 Rural Dev, Loan (Rock & NE Ave) • $384,659 Rural Dev. Grant (Rock & NE Ave) • No Rate Increase • Sewer Utility • $1,140,000 Rural Dev. Loan (Rock & NE Ave) • $3,100,000 DNR CWF Loan (WWTP) • $ 500,000 DNR CWF Prin. Forgiveness (WWTP) • $ 804,000 Reserves (WWTP & Hwy 14 LS) • +/- 8% Rate Increase without Refinancing Case Study-Viroqua (2015 – 2019 CIP) CIP Summary
  29. 29. • 2020-2024 • General Fund • Two Bonds will be paid off (2020 & 2022) • Can borrow +/- $1,450,000 based on 20 year term • Sanitary Sewer Utility • Two Bonds will be paid off (2020 & 2022) • Can refinance 2007 & 2010 bonds in 2019 • Can borrow +/- $2,500,000 with future surplus revenue • Water Utility • Two Bonds will be paid off (2020 & 2023) • Can borrow +/- $1,160,000 with future surplus revenue Case Study-Viroqua (2015 – 2019 CIP) After Five Years – Then What?
  30. 30. Conventional Funding Methods • Budgeted Funds - General Fund (Local Taxes) - Water Utility (User Rates) - Wastewater Utility (User Rates) - Stormwater Utility (User Rates)
  31. 31. Conventional Funding Methods • General Obligation Debt - Debt Service Paid With R. E. Tax Revenue (Can also be paid by TIF Revenue or Utility Revenue) - Secured by Taxing Authority - Most Secure Debt – Lowest Interest Rates - Max. G.O. Debt = 5% of Equalized Value - Project Types: Equipment, Buildings, Streets, Sidewalks, storm sewer, etc.
  32. 32. Conventional Funding Methods • Mortgage Revenue Bonds - Debt Service Paid With Sewer or Water Rates - Secured by Utility - Higher Interest rates vs. G. O. - Project Types: Sanitary Sewer, Water or Storm Sewer Utility Projects
  33. 33. Conventional Funding Methods • Special Assessments - Costs Assessed to Benefitting Properties - Statutory Process Including Public Hearing - Assessment Methods: Per Lot, Per Front Foot, Per Acre, etc. - Typical Project Types: Sidewalk, Curb & Gutter, Sewer, Water, etc.
  34. 34. Conventional Funding Methods • Impact Fees - Created by Local Ordinance - Charged to Developers or Lots Within New Developments - Typical Projects: Park Fees, Stormwater Fees, Sewer & Water Fees, Library Fees, etc.
  35. 35. Public Funding Opportunities • What is Public Purpose? – Economic Development – Health & Safety – Blight Elimination & Urban Renewal – Low-Income & Poverty – Affordable Housing – Environmental Protection – Recreation & “The Pursuit of Happiness”
  36. 36. Public Funding Opportunities Parks, Trails & Water Recreation • WDNR Stewardship • WDNR Rec. Boating • County Park Grants • County Conservation Grants • DOT Alternatives (MAP21) • Tax Incremental Financing
  37. 37. Public Funding Opportunities Water Resources & Flood Mitigation • WDNR Urban Non-Point • WDNR Lake Planning & Protection • WDNR River Planning & Protection • WDNR Municipal Flood Control • FEMA Hazard Mitigation • CDBG PF & PF-ED • Tax Incremental Financing
  38. 38. Public Funding Opportunities Municipal Infrastructure • WDNR Safe Drinking Water • WDNR Clean Water Fund • Rural Dev. Rural Utilities • Rural Dev. Comm. Fac. • WDOT Local Programs • CDBG PF & PF-ED • WDOT Tran. Econ Assist. • Tax Incremental Financing
  39. 39. Public Funding Opportunities Economic Development • Tax Incremental Financing • CDBG Planning • CDBG PF & PF-ED • WEDC Programs • Brownfield Programs • Econ. Dev. Admin • Rural Development
  40. 40. Public Funding Opportunities Federal Surface Transportation Bill (MAP-21) • Signed into law July 6, 2012 • New “Transportation Alternatives Program” • Replaces: • Transportation Enhancement • Safe Routes to Schools • Scenic Byways • Recreational Trails • Bi-Annual Application Cycles in Odd Years.
  41. 41. Tax Incremental Financing - Basics • TIF = Tax Increment Financing • TID = Tax Increment District • First Authorized in1975, Wis. 66.1105 • Currently over 1000 active TIDs in Wisconsin in over 400 communities
  42. 42. Tax Incremental Financing - Basics TIF is a tool available to communities that assists in promoting the orderly growth and development of the community. TIF is used as a means to: •promote industrial development •promote mixed-use development •eliminate blighted areas •rehabilitate deteriorating areas
  43. 43. Tax Incremental Financing - Basics
  44. 44. Tax Incremental Financing - Basics
  45. 45. Tax Incremental Financing - Basics
  46. 46. Tax Incremental Financing – General Requirements • The development described in the Project Plan would not occur without the creation of TID • Improvements in the TID are intended to encourage and attract business growth and improve the local tax base • The District is contiguous and contains only whole parcels • Planned improvements will enhance the value of property in the TID • Improvements to the District are likely to encourage and promote conformity with the City's existing plans and policies • The equalized value of the taxable property of the TID, plus the aggregate value increment of all existing TIDs does not exceed 12% of the total value of equalized taxable property in the City
  47. 47. TID Creation Process • Determine need for TIF • Identify TID Type • Identify Area to be included in the TID Boundary • Identify TID Eligible Projects • Perform Economic Analysis • Create a Project Plan • Establish Joint Review Board • Public Hearing & Plan Commission Resolution • Common Council Resolution • Joint Review Board Adoption
  48. 48. Eligible TIF Projects • Eligible TIF projects can be located within the TID, or within one-half mile radius. • Eligible projects must benefit TID • Eligible projects include: - Infrastructure - Land acquisition / demolition - Site development - Development Incentives - Marketing & promotion - Adminitration
  49. 49. Type of Tax Increment Districts • Industrial Development TID - 50% of area needs to be suitable for and zoned for industrial development - Maximum Life = 20 years - Expenditure Period = 15 Years
  50. 50. Type of Tax Increment Districts • Blight Elimination TID - Typically Older Neighborhoods - 50% of Area Must be Declared Blighted - Requires Formal Designation of Blight - Letter’s Must be sent to Landowners - Maximum 27 year = 27 Years - Expenditure Period = 22 Years
  51. 51. Type of Tax Increment Districts • Rehabilitation/Conservation TID - Commonly Referred to as Revitalization TID - At least 50% of the property must be suitable for rehabilitation or conservation - No more than 25% can be vacant property - Letter’s Must be sent to Landowners - Maximum 27 year = 27 Years - Expenditure Period = 22 Years
  52. 52. Type of Tax Increment Districts • Mixed-Use TID - Must Have at Least Two Land Uses (Commercial/Residential/Industrial) - No More Than 35% can be Residential - Maximum Life = 20 years - Expenditure Period = 15 Years
  53. 53. PDCH 2008 Street & Utility Reconstruction • City Infrastructure Reconstruction – 10,000 LF of Street & Utility Reconstruction – Downtown Enhancement – Total Project Cost = $4.3 Million • $1.5 M WDNR CWF Loan • $1.7 M WDNR SDWL Loan • $660,000 WDOT Enhancement Grant • $300,000 CDBG Grant • $105,000 Tax Incremental Financing • $50,000 Fundraiser • $0 General Fund
  54. 54. Railroad Crossing Safety Improvements USH 18 Bypass Blackhawk Ave. Enhancements Downtown Revitalization Marquette Road Reconstruction Existing TIDs with Eligible Projects City of Prairie du Chien 2014-2015 TIF Projects Project Cost •Lessard St. Extension = $578,000 •22nd St. Extension = $1,615,000 •Woodridge Acres = $1,050,000 •Prairie Mason Redevelopment = $450,000 •Godden Pit = $395,000 •Northgate Business Park = $1,132,000 •Marq. Road Sewer & Water = $1,300,000 Total = $6,600,000 Funding Source •$502,000 DNR SDWL •$265,000 Sewer Bond •$5,833,000 Surplus TIF Funds
  55. 55. Viroqua Street & Utility Reconstruction • 14 City Blocks of Street & Utility Reconstruction • Majority Located In Downtown • Total Project Cost = $3,225,000 • Project Funding • $1,153,978 Rural Development Water Loan • $384,659 Rural Development Water Grant • $1,140,723 Rural Development Sewer Loan • $326,200 TIF • $221,000 DOT LRIP Grant • All Loans Paid by TIF and Sewer & Water Utilities. $0 General Fund.
  56. 56. DeForest TID Development • Municipal Funded Private Development – Project Summary • Private Business Park, 100 acres • $5,000,000 Development Cost – Village Obligations • Execute Development Agreement • Create TID & Special Assessment • Issue Bonds to Fund Infrastructure • Design & Construct Infrastructure – Developer Obligations • Execute Development Agreement • Implement Private Development • Repay Village Bond through TIF Revenue & Special Assessment Payments
  57. 57. Lyndon Station Water System • Project Summary – New Water Tower – Water Distribution System Improvements – Well Rehab & Emergency Generator • Total Project Cost = $1,820,000 – $600,000 CDBG-PF Grant – $1.22M WDNR SDWL Loan
  58. 58. Marathon City Business Park • Project Summary – 80-acre Business Park – Creation of $9.0M new tax base – Creation of 150 jobs • Total Project Cost = $3.5M – $250,000 CDBG-PFED Grant – $530,000 DOT-TEA Grants (2) – $2,720,000 TIF
  59. 59. Park Place Apartments, Reedsburg • Project Summary – 48-unit Senior Housing Apts. – Downtown Redevelopment – Blight Elimination • Total Cost = $6.0M – $640,000 CDBG-EAP – $300,000 TIF – WHEDA Section 42 Tax Credits
  60. 60. DeForest Business Park • Project Summary – 115-acre Business Park – Creation of $63.8M new tax base – Creation of over 300 jobs • Project Scope – Streets & Utilities – Storm Water management – Rail Spurs • Funding – RDA-Lease Revenue Bonds – $798,000 CDBG-PFED Grants (2) – $300,000 WDOT-TEA Grants (2) – $174,000 WDNR Non-Point Source Grant – Tax Incremental Financing
  61. 61. Village of Oregon Oregon to Badger State Trail • Project Summary • 1.8 Mile Trail • Total Project Cost = $842,000 • Funding Sources • Village TIF = $120,000 • 2011 Dane County PARC Grant = $250,000 • 2014 Dane County PARC Grant = $150,000 • Town of Oregon & Contributions = $ 35,000 • Village Funds = $287,000
  62. 62. DeForest-Upper Yahara River Trail Description Phase 2 Phase 3 Total Trail Length 1,750 lf 7,500 lf • Boardwalk 1,300 lf 1,700 lf • Paved Trail 450 lf 5,800 lf Project Cost $850,932 $680,000 Source of Funds • WDNR Stewardship $243,997 $180,000 • WDNR Urban Rivers $ 0 $245,000 • Dane County PARC $225,000 $150,000 • Federal Rec. Trail $ 45,000 $ 45,000 • Madison Community Foundation $ 0 $ 50,000 • Village Funds $336,935 $ 0
  63. 63. Monona-Lottes Park • Project Scope • Parking Lot • Boat Ramp • Piers • Navigational Dredging • Restroom & Fish Cleaning • Total Project Cost • $1.6 Million • Funding • Dane County PARC Grant = $150,000 • WDNR Rec. Boating Grant = $500,000 • Developer Park Fees = $150,000 • City TIF = $700,000 • City General Fund = $100,000
  64. 64. Questions?

×