Lean Six Sigma DMAIC Poster

The Lean Six Sigma DMAIC Poster describes the five key phases of process improvement based on the Lean Six Sigma DMAIC methodology. The poster comes in two themes: color and monochrome. Formatted in PDF, the poster can be easily printed on an A3-sized paper.

The LSS DMAIC Poster complements your Lean Six Sigma Green/Black Belt training presentation materials. It is an effective tool that can be printed and distributed to attendees of your workshop session. It serves as a takeaway and summary of your process improvement presentation.

The LSS DMAIC Poster describes the five main phases of process improvement activities and deliverables:

1. DEFINE
Define the problem or opportunity.

Define Phase Deliverables:
1.1 Define business case
1.2 Define problem statement
1.3 Establish baseline project metrics
1.4 Define objective statement and scope
1.5 Form project team
1.6 Identify financial impact
1.7 Complete project charter
1.8 Approved project charter

2. MEASURE
Measure the current performance and capability.

Measure Phase Deliverables:
2.1 Map the process
2.2 Collect process data
2.3 Verify data integrity
2.4 Document process behavior
2.5 Baseline process capability (Sigma level or DPMO)
2.6 Quick wins
2.7 List of potential X's

3. ANALYZE
Analyze to identify root causes.

Analyze Phase Deliverables:
3.1 Cause and effect analysis
3.2 FMEA
3.3 Graphical analysis
3.4 Statistical analysis

4. IMPROVE
Improve by implementing potential solutions.

Improve Phase Deliverables:
4.1 Generate solutions
4.2 Evaluate solutions
4.3 Pilot and implement solutions
4.4 Statement of Y = f(X)

5. CONTROL
Control by standardizing solution and monitoring performance.

Control Phase Deliverables:
5.1 Control methods
5.2 Control plan
5.3 Clear indication of improved primary metric
5.4 Project transition action plan
5.5 Project approval
5.6 Financial validation
5.7 Lessons learned

  • Inicia sesión para ver los comentarios

  • Sé el primero en recomendar esto

Lean Six Sigma DMAIC Poster

  1. 1. © Operational Excellence Consulting. All rights reserved. 1. DEFINE Define the problem or opportunity. Define Phase Deliverables: 1.1 Define business case 1.2 Define problem statement 1.3 Establish baseline project metrics 1.4 Define objective statement and scope 1.5 Form project team 1.6 Identify financial impact 1.7 Complete project charter 1.8 Approved project charter 2. MEASURE Measure the current performance and capability. Measure Phase Deliverables: 2.1 Map the process 2.2 Collect process data 2.3 Verify data integrity 2.4 Document process behavior 2.5 Baseline process capability (Sigma level or DPMO) 2.6 Quick wins 2.7 List of potential X’s 5. CONTROL Control by standardizing solution and monitoring performance. Control Phase Deliverables: 5.1 Control methods 5.2 Control plan 5.3 Clear indication of improved primary metric 5.4 Project transition action plan 5.5 Project approval 5.6 Financial validation 5.7 Lessons learned 4. IMPROVE Improve by implementing potential solutions. Improve Phase Deliverables: 4.1 Generate solutions 4.2 Evaluate solutions 4.3 Pilot and implement solutions 4.4 Statement of Y = f(X) 3. ANALYZE Analyze to identify root causes. Analyze Phase Deliverables: 3.1 Cause and effect analysis 3.2 FMEA 3.3 Graphical analysis 3.4 Statistical analysis Lean Six Sigma DMAIC Lean Six Sigma DMAIC Process Each step in the LSS DMAIC process is required and results in deliverables that ensures the team is focused on key process performance measures.
  2. 2. © Operational Excellence Consulting. All rights reserved. 1. DEFINE Define the problem or opportunity. Define Phase Deliverables: 1.1 Define business case 1.2 Define problem statement 1.3 Establish baseline project metrics 1.4 Define objective statement and scope 1.5 Form project team 1.6 Identify financial impact 1.7 Complete project charter 1.8 Approved project charter 2. MEASURE Measure the current performance and capability. Measure Phase Deliverables: 2.1 Map the process 2.2 Collect process data 2.3 Verify data integrity 2.4 Document process behavior 2.5 Baseline process capability (Sigma level or DPMO) 2.6 Quick wins 2.7 List of potential X’s 5. CONTROL Control by standardizing solution and monitoring performance. Control Phase Deliverables: 5.1 Control methods 5.2 Control plan 5.3 Clear indication of improved primary metric 5.4 Project transition action plan 5.5 Project approval 5.6 Financial validation 5.7 Lessons learned 4. IMPROVE Improve by implementing potential solutions. Improve Phase Deliverables: 4.1 Generate solutions 4.2 Evaluate solutions 4.3 Pilot and implement solutions 4.4 Statement of Y = f(X) Each step in the LSS DMAIC process is required and results in deliverables that ensures the team is focused on key process performance measures. 3. ANALYZE Analyze to identify root causes. Analyze Phase Deliverables: 3.1 Cause and effect analysis 3.2 FMEA 3.3 Graphical analysis 3.4 Statistical analysis Lean Six Sigma DMAIC Process Lean Six Sigma DMAIC
  3. 3. © Operational Excellence Consulting. All rights reserved. 3 Operational Excellence Consulting is a management training and consulting firm that assists organizations in improving business performance and effectiveness. Based in Singapore, the firm’s mission is to create business value for organizations through innovative design and operational excellence management training and consulting solutions. For more information, please visit www.oeconsulting.com.sg

×