SlideShare a Scribd company logo
1 of 23
1. Why outsource? What are key indicators that selection of a vendor IT solution to

  implement business process reengineering may be the best decision? What are the

  potential pros and cons? Provide examples where possible.


  Business process reengineering is the process which involves the rethinking and

  remodeling of the processes within the business for the purpose of attaining an

  enhancement in the strategic and key sectors of a particular business, such areas

  include the quality of products, the cost of the products as well as the qualities of the

  services offered and the speed of delivery of those services (Hammer & Champy, 1993:

  46). There exists several factors that can be used as potential indicators to show that

  the selection of a vendor IT solution could be the best option in the implementation of

  the business process reengineering. To begin with, dis-functionality of the current

  system components is a major indicator for the implementation of an IT solution.

  Shortfalls constantly recorded in particular portfolios are noted as being the worst

  performing will need reengineering. Secondly, the importance of the particular process

  and its influence on customer satisfaction. It is noted that the process that least provides

  proper customer satisfaction is substituted with an IT solution that increases the speed

  and the quality of services offered. Finally the feasibility of the reengineering process

  also plays a fundamental role in the reengineering process. The organization considers

  which portfolios can be successfully reengineered and hence helps in the decision to

  acquire a proper vendor IT solution for the particular reengineering process. According

  to Meyer Richard(1998), a business process refers to a specific predetermined set of

  steps that are intended to produce a product or service, comprising all of the services

  required to satisfy a particular customer’s request.
2. State and discuss the key strengths of service-oriented architectures, especially as

 related to modern businesses. Support your answer(s).


 Service oriented architectures are a complete and specific set of methodologies and

 processes that are implemented in the development of business software’s. Service

 Oriented Architecture is an architecture that serves to eliminate redundancies as well as

 enhancing the delivery of services in the business organization. It mainly achieves this

 by consolidating and reusing the services involved within the particular organization

 .Such kind of architecture has proven to have several advantages over the other normal

 set of architectures available for software development. To begin with SOA enables the

 business functions to be able to be self reliant and dependable. This in turn will enable

 the entire business process to be self reliant. In addition, SOA offers the required

 functionalities in the form of an interface that is relevant to the offered services. This

 offers the consumer an easy method of interacting with the system as well as acquiring

 the products and services offered by the business organization. It also sets itself aside

 as the architecture that a consumer involved with other application functionalities may

 find useful to employ with another preferred application or service. SOA is able to

 separate the implementation of the service from its actual interface. The service

 provided is viewed as the endpoint which is support of a given contract or format. SOA

 are also self bound dynamically as well as being discoverable. This is because it

 supports service discovery concept. In this mode of service execution the consumer is

 not required to know the request message format, until the particular service is actually

 needed. It is also has modular and self-contained services in its structure. Its modular
decomposability allows the application to be split and divided into smaller more

  manageable components.


3. Describe how environmental analysis, SWOT analysis, value chain analysis, and choice

  of business strategy influence business process reengineering. Provide examples.


  SWOT is an acronym that stands for Strengths, Weaknesses, Opportunities, and
  Threats. It is an analysis tool that is used for understanding different situations that may

  arise within the business organization; hence it can also be used in decision making for

  a wide range of situations within the organization. SWOT analysis is used in the

  development of the business, evaluation of the competitors within the market,

  marketing, as well as the development of product reports and research reports. Prior to

  conducting a SWOT analysis the organization carries out the PEST (Political,

  Economic, Social and Technological) analysis. This helps the organization’s potential

  within the market as well its potential basing on the external factors affecting the

  organization. SWOT analysis can be effectively used in business process reengineering

  where it can be used to determine a particular business position in the market, such as

  its commercial viability, it could also be used as a method of distributing sales as well as

  used to offer invaluable information on strategic options that may involve entering new

  markets or even the timely launch of a company’s product. On the other hand

  environmental analysis involves the careful considerations of all the external factors that

  affect an organization in its activities of production. Bearing in mind that the typical BPR

  projects include a cross-functional cooperation, it becomes highly necessary for the

  organization to consider the impacts of the environment and changes that occur within

  its environment. This in turn will serve as an impetus for the ongoing reengineering
process as it will enable proper establishment of guidelines during the reengineering

  process.


4. Describe and rate the overall organization and information systems function in terms of

  scorecards and methodologies provided by standards such as Capability Maturity Model

  (CMM), Six Sigma, ISO 9000, and Balanced Scorecard.


  The balanced score card is a business management methodology that offers an

  approach to strategic management of an organization. It offers an insight into what

  companies should put into consideration in order to measure and balance their financial

  obligations as well as “perspectives”. The ISO-9000 is an international standards

  organization rating of an organizations performance and quality of management in

  industrial organizations. Six sigma is a process that offers help on focusing in the

  production and delivery of high quality services and products. It is based on deviations

  from the required standards where the management considers the shortcomings and

  defects in their organizations products and services and tries to eliminate them

  systematically in order to come up with a near-perfect product. These standards of

  rating an organizations performance ensure high standards and quality of goods and

  services offered while ensuring that the best managerial skills and principles are

  employed in the business organizations processes. They serve to boost the consumer’s

  confidence in a particular company’s products and or services that have been rated by

  these standards. Such promotes the returns of the company as well as increasing its

  profitability. It also extends to maximal utilization of the organizations resources ranging

  from the labor to cost reduction while not compromising on the high degree and levels

  of performance expected.
5. Rate the organization’s ability to achieve its overall goals, including high customer

   satisfaction and superior return on investment, based on product and process

   innovation, customer focus, knowledge management, strategic systems, and motivated

   people.


   Every organization has set goals and targets that are to be achieved within certain

   boundaries of time and resources available. Regardless of these boundaries, the

   organization is always expected to provide high quality output that considers the

   customer satisfaction and exceed their expectations in terms of quality. High customer

   satisfaction involves meeting the needs and requirements of the customer up to the

   expected levels and standards that have been set. It involves producing products and

   services that are of high quality and within the reach of the customer in terms of price

   friendliness. In addition to that, an organization will be highly rated if it has a high level

   of innovativeness and can be able to reinvent its product so as to always appeal to the

   customer as well as be able to match the ever changing needs of the customer base.

   Ina addition, it should always be able to meet the new requirements without

   compromising the quality of the product. Knowledge management of the organization

   also plays a fundamental role in ensuring that an organization is up to speed on the

   developments within the markets and hence enabling it to appropriately adapt and be

   able to compete with its competitors within the same field of production. Having

   strategic systems within the organization involves having the appropriate managerial

   and production systems that enable the organization to meet its demands and

   obligations to the client satisfactorily.
6. Compare the organization and its systems and processes to the rest of its vertical

     industry, based on industry best practices and benchmarks, including revenue and

     profitability.

     A vertically integrated organization is one which encompasses more than one single-

     output process production in which there is an option of all the output from an

     upstream process is utilized as a part of or of the whole quantity of one input

     intermediates in a downstream process. In addition it is the “is the ownership and

     control over neighboring stages of production or distribution”(Perry, 1989). Industry

     level specialization is a major practice which is enhanced by advances in technology

     as well as standards. This leads to the emergence of a group of producers as well

     as the division of industrial processes into modular components, where the

     equipment is split and reorganized to enhance the division of labor. Consider DIS

     markets which the most successful as well as largest firms were initially vertically

     integrated (Schlueter-Langdon 1999).




7. Based on the above indicators, predict the organization’s ability to conduct a

 successful information systems project that meets or exceeds its stated goals, including

 return on investment, appropriate functionality, successful implementation, and minimal

 reversion to old systems/processes


 By implementing the vertical industrial processes, an organization will be able to

 conduct with great chances of success, an information systems project that will be able

 to meet the organizations fundamental goals and also act as a means of implementing

 its fundamental targets. The organization will be able identify strategies by which their
emerging industries can operate. The various settings with different levels of industry

  concentrations could be created with the purpose of reflecting the prevailing and the

  emerging conditions of the competitive market that the organization is in. this will give

  the organization a competitive edge over its rivals.


8. Analyze the changes in external (and internal) environment, such as changes

  introduced by the competition, regulatory changes in various markets, changing

  customer needs and demographics, and systems and products nearing the end of their

  life cycle(s).

  In the constant endeavors by business to enhance their business processes and

  improve the customer experience, many organizations have had to face a variety of

  challenges, both from the internal and external environments of the organization. To

  begin with there are changes that are competitor oriented which necessitate an

  organization to reorganize its processes, for instance when a company’s costs become

  higher than those of the competitors, they will be force to reorganize their business

  processes. In addition to that, there could be an increase in the number of competitors

  in the market, to cope with such changes the organization will be forced to reengineer

  its processes. Apart from these changes in the economic environment also proves to be

  a bottleneck to the organizations processes. Changing customer or consumer needs will

  also pose a challenge to the organization for it to reorganize and remodel it processes.

  Internal challenges such as over ambitious managers , found in company’s which are in

  their peal conditions, will face the challenge of ever struggling to be way ahead of their

  competitors, in order to maintain their market dominance over their competitors while

  satisfying their consumer’s needs.
9. Identify and analyze changes in business strategy that have to accompany the changes

   in the business environment.

   For a business organization to remain competitive, it must identify and suitably adapt to

   the changes that are constantly occurring within its environs. For instance trade offs are

   a major change that businesses have to consider when faced with a situation that

   challenges the company’s existence. Pursuing of sustainable development strategies is

   also a change in the business strategy that business organizations must always

   consider in order stay afloat with the stringent rules of development while cost cutting on

   their operational costs. Internal changes in the business strategy include; increasing the

   accountability of the business firms to nontraditional stakeholders as well as

   encouraging the habit of continuous internal reporting. This increases the accountability

   of the management as well as enhancing governance within the organization.

10. Identify and analyze changes in business process architecture that have to accompany

   the changes in business strategy.

   Changes in a company’s business strategy ultimately lead to changes in the business

   process architecture of the business. Some of the changes that will be experienced in

   the business architecture include changes in the baseline business context. This will

   cause a reverting from one source of input into the system to other more reliable

   sources of input. There will also be a change in the Target Business Architecture where

   the organization will be required to describe its products and services in a new and

   fresh manner.
11. Evaluate key existing business processes and systems in order to distinguish the

   ones that are hard to duplicate and contribute directly to competitive advantage,

   versus the ones that are not necessarily unique but are essential to conducting

   business.

    There exist several business processes which are essential for the fundamental

    being of a business. These processes ensure the smooth running of the business.

    To begin with there is the management process. This process oversees all the

    system operations; such management systems include strategic management as

    well as corporate governance. There also exists the operational process of the

    business. These are at the epicenter of the business as they comprise the core

    business activities. These contribute directly to the business competitive advantage

    against the business rivals. Such operational processes include advertising,

    purchasing, supplying as well as marketing of a company’s product and services.

    This process is fundamental and quite difficult to duplicate from one instance to

    another. Finally there are business support processes which are subsidiary

    processes that facilitate and enhance the occurrence and success of the other core

    processes. Despite the fact that such processes are easy to duplicate and replicate

    their effect , they play a fundamental role in ensuring the smooth flow of the other

    business processes.
12. Propose ways to ensure that these key processes and systems are not

      compromised in the information systems project.


   In the creation and development of a viable system, the system developers should

   always bear in mind that the business process and systems should not be compromised

   to ensure a smooth transition and flow during the implementation of the new system.

   Consequently, by observing certain factors and procedures, this can be ensured. To

   begin with , the system developers must set down clearly their missions and goals

   expected to be attained by the new system to be created, in view of this, the system can

   be broken down into modules which can be developed separately without majorly

   interfering with the management and day to day running of the organization. The

   different modules enhance the system development as each has its own attributes as

   related to the whole process of creating a new system. In addition to that the system

   developers should always consider a variety of techniques for modeling the system.

   Such techniques as the business process modeling notation could be employed

   whereby the developers represent the business process using tools known as workflow

   diagrams.




13. In conjunction with business process owners and a process change committee, develop

   workflow diagrams with swim lanes for each department/entity, documenting the current

   state (IS) of the processes
14. In conjunction with business process owners and a process change committee,

   develop workflow diagrams outlining the proposed (SHOULD or TO-BE) state of the

   processes, including possible variations (COULD).
15. Develop use-case scenarios in Unified Modeling Language (UML), identifying the

   design of steps in the proposed processes that involve automation and interfacing

   with existing or new systems.




16. Make a determination regarding whether the system will be developed in-house or

   by using external resources.
17. Is the organization in the business of developing information systems?




18. Can the organization truly do a better job than software vendors who are dedicated

   to developing and implementing best-of-breed applications that already incorporate

   industry best practices?




19. Can the solutions provided by software vendors be made to work for the

   organization? At what cost? Will key internal processes have to be changed or

   compromised dramatically? How difficult will it be to maintain modified code?


Solutions provided by software vendors can be incorporated into the organization and

made to facilitate the enhancement of the functionality within the organization. Such

solutions provide the organization with reduced redundancy and there is no duplication

of roles within the organization. The software vendors will be required to develop

program solutions that are able to tackle problems encountered by the organizations

members and also promote the organizations delivery of services and products to the

end user. Depending on the level of functionality required by the organization, the cost

of implementation of the software vendor solutions will vary from one organization to the

other. Organizations that heavily rely on manual systems and processes and require a
complete overhaul of the system will require more intense and cost intensive software

vendor solutions. With regard to such changes, the internal processes of the

organization will be changed to a varied degree, in the sense that deeper and more

intense vendor solutions implemented will result in more and intense and considerable

changes in the internal processes of the organization. The maintenance of the code will

highly depend on the participation of the end user and their interaction with the new

software installed or recommended by the software vendor.




20. In case there is no off-the-shelf application available that fits the bill, and the

   organization chooses to outsource the development to a software vendor, what

   methodologies will have to be adopted to ensure that outsourced development yields

   the desired results? What does the organization stand to gain or lose by outsourcing

   the development?
21. Compare the costs and benefits, tangible and intangible, of each approach.




22. Research software vendors who are industry leaders in the major enterprise

   applications in categories such as ERP (Enterprise Resource Planning), CRM

   (Customer Relationship Management), and LOB (Line of Business). Examine their

   offerings for companies of various sizes and industries.
23. Document functional requirements focusing on the support of key business

   processes (utilizing process diagrams of the proposed processes). Break down the

   requirements into categories such as “mandatory” and “optional.”




24. Document technology considerations, including interfaces to pre-existing systems,

   technology standards, and constraints of the IT infrastructure.
25. Identify reports, input forms, and other screen-shots needed by users at all levels of

   the organization, and by users outside the organization.




26. Identify and make public the evaluation criteria and the precise formula that will be

   used to compare proposals from competing vendors.




27. Develop detailed implementation timelines that the vendor will have to work with,

   based on internal business cycles, customer service needs, and regulatory

   standards (if applicable).
28. Research articles and Web links regarding best practices and trends in outsourced

   software development.




29. Research available case studies on companies that have successfully managed or

   completely failed at outsourced systems development, whether domestic or off-

   shore.
30. Focus on the challenges and critical success factors relative to managing and

   participating in geographically dispersed software development projects.




31. Rate the outsourcing organization’s capability maturity using CMM and its ability to

   handle clients and projects of a size and industry similar to the case study at hand.


      a. Conduct capacity planning for the new system.


      b. Develop and implement a plan for conducting unit testing on each system

          component, and load testing and integration testing on the overall system.


      c. Develop and execute a plan for data migration and parallel operation of old

          and new systems.


      d. In the case of having to test system(s), component(s), and/or code from

          external sources, the challenge is to create effective test plans that can

          uncover underlying, hidden “problems.” How will this be addressed?
e. Address changes to management systems, job descriptions, organizational

     structure, and performance measures.


f. Develop a plan to ensure that managers get evaluated using new metrics

     based upon the redesigned processes.


g. Develop ways of predicting and dealing with the challenge of possible

     reversion to earlier processes.


h. Examine and apply Critical Success Factors of change management.


i.   Discuss best practices and case studies relative to successes and failures in

     managing change in systems projects.


j.   Discuss the importance of marketing the change to management and end-

     users.


k. Address the involvement of upper management in ways that are appropriate

     to the success of the project.


l.   Discuss why people comprise the most important and complex aspect of

     change in system implementation projects.


m. Explain the role of politics in process analysis and system implementation

     projects.


n. Explain the need for, and appropriate role definition of, project champions.


o. Determine strike force creation and management. Discuss who is best suited

     to be part of the “strike force” and if there is a need for multiple committees
outside of the strike force to conduct “public relations” and “selling” activities

   with employees and stakeholders at all levels of the organization.


p. Discuss best practices and case studies relative to successes and failures in

   managing the people aspect of change in systems projects.


q. Discuss ways to build and sustain project momentum by using “quick wins”

   while continuing to engage unwieldy, complex problems that require longer-

   term change management efforts.


r. Discuss ways in which facilitation can be provided to help end-users and

   managers affected by system changes to come up with their own home-

   grown strategies to deal with the changes. Contrast this with the approach in

   which, not only is the change imposed from above, there is also no help

   provided to the employees in the area of developing coping mechanisms.


s. Discuss how e-business applications may be more complex than internal

   applications and involve multiple constituencies and stakeholders outside of

   the organization.


t. Discuss protocols and standards in business-to-business applications,

   including legacy approaches such as EDI (Electronic Data Interchange) and

   newer approaches such as XML-enabled Web services (utilizing other

   standards such as SOAP, UDDI, and WSDL).
u. Discuss the role of XML and its subsets that are optimized towards certain

   vertical industries for creating, transmitting, and receiving business

   transactions.


v. Discuss the role of emerging technologies such as WAP (Wireless Access

   Protocol) and WML (Wireless Markup Language) that can be used to create

   new applications for serving the customers in the e-business context.


w. Discuss the complexity of achieving real-time and batch interfaces with

   systems owned by other entities, including customers and suppliers.


x. Discuss how IT/IS organizations within companies can serve a role in

   strategic planning.


y. Discuss how IT can be an enabler toward positive change versus how it can

   be a drain on corporate and societal resources.


z. Discuss why IT/IS personnel ought to think of themselves as facilitators and

   problem-solvers in service to the stakeholders, process owners, and end-

   users. Contrast this with a more adversarial situation where IT sees itself at

   odds with the rest of the enterprise, or even with certain parts of the

   enterprise.


aa. Discuss ROI models and total cost of ownership metrics in use in the industry.

   Explain why ROI metrics are essential to the success of any IT/IS project or

   application.
bb. Brainstorm ways in which IT personnel and managers can collaborate with

         functional managers and process owners to help create new business models

         and revenue sources, and realize improvements in competitive advantage,

         employee satisfaction, and customer satisfaction.




32.

More Related Content

What's hot

Business Process-Reengineering BPR Moghimi
Business Process-Reengineering BPR MoghimiBusiness Process-Reengineering BPR Moghimi
Business Process-Reengineering BPR MoghimiBahman Moghimi
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringvijay1238891
 
Bpr asignment
Bpr asignmentBpr asignment
Bpr asignmentarsalan10
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An IntroductionVipen Mahajan
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineeringsagvid
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIAAditi Walia
 
Business Process Re-engineering/ JIT/ERP
Business Process Re-engineering/ JIT/ERPBusiness Process Re-engineering/ JIT/ERP
Business Process Re-engineering/ JIT/ERPVikram Dey
 
Business Process Re-Engineering Essay
Business Process Re-Engineering EssayBusiness Process Re-Engineering Essay
Business Process Re-Engineering EssayPrince Bertrand
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 
Bpr 01 Introduction
Bpr 01 IntroductionBpr 01 Introduction
Bpr 01 Introductionmsq2004
 
Business process reengineering module 1
Business process reengineering module 1Business process reengineering module 1
Business process reengineering module 1POOJA UDAYAN
 
Bpr training v 2.0 4.1.2012
Bpr training   v 2.0 4.1.2012Bpr training   v 2.0 4.1.2012
Bpr training v 2.0 4.1.2012Mohammad Saleh
 
Business process re- engineering
Business process re- engineeringBusiness process re- engineering
Business process re- engineeringAshutosh Sharma
 
BPR highlevel presentation slides
BPR highlevel presentation slidesBPR highlevel presentation slides
BPR highlevel presentation slidesChidozie Ofoegbu
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringSANDESH GHOSAL
 
Bpr 03 Process Re Design
Bpr 03 Process Re DesignBpr 03 Process Re Design
Bpr 03 Process Re Designmsq2004
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringNitin Gulgulia
 
Final bpr new
Final bpr newFinal bpr new
Final bpr newJojin Pk
 

What's hot (20)

Business Process-Reengineering BPR Moghimi
Business Process-Reengineering BPR MoghimiBusiness Process-Reengineering BPR Moghimi
Business Process-Reengineering BPR Moghimi
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Bpr asignment
Bpr asignmentBpr asignment
Bpr asignment
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An Introduction
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineering
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIA
 
Mazda Bpr China1999
Mazda Bpr China1999Mazda Bpr China1999
Mazda Bpr China1999
 
Business Process Re-engineering/ JIT/ERP
Business Process Re-engineering/ JIT/ERPBusiness Process Re-engineering/ JIT/ERP
Business Process Re-engineering/ JIT/ERP
 
Business Process Re-Engineering Essay
Business Process Re-Engineering EssayBusiness Process Re-Engineering Essay
Business Process Re-Engineering Essay
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
Bpr 01 Introduction
Bpr 01 IntroductionBpr 01 Introduction
Bpr 01 Introduction
 
Business process reengineering module 1
Business process reengineering module 1Business process reengineering module 1
Business process reengineering module 1
 
Bpr training v 2.0 4.1.2012
Bpr training   v 2.0 4.1.2012Bpr training   v 2.0 4.1.2012
Bpr training v 2.0 4.1.2012
 
Business process re- engineering
Business process re- engineeringBusiness process re- engineering
Business process re- engineering
 
BPR highlevel presentation slides
BPR highlevel presentation slidesBPR highlevel presentation slides
BPR highlevel presentation slides
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Bpr 03 Process Re Design
Bpr 03 Process Re DesignBpr 03 Process Re Design
Bpr 03 Process Re Design
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business Process Re engineering
Business Process Re engineering Business Process Re engineering
Business Process Re engineering
 
Final bpr new
Final bpr newFinal bpr new
Final bpr new
 

Viewers also liked

Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringAnit Jain
 
Chapter07 determining system requirements
Chapter07 determining system requirementsChapter07 determining system requirements
Chapter07 determining system requirementsDhani Ahmad
 
Role of Information Technology in BPR
Role of Information Technology in BPRRole of Information Technology in BPR
Role of Information Technology in BPRkhushbupurswani
 
Bpr Case Studies
Bpr Case StudiesBpr Case Studies
Bpr Case Studiesmsq2004
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineeringrajatiipm
 
Case study on erp failures
Case study on erp failuresCase study on erp failures
Case study on erp failuresTarvinder Singh
 
Erp Failure In Hershey’s
Erp Failure In Hershey’sErp Failure In Hershey’s
Erp Failure In Hershey’sAnkit Malhotra
 
Business Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITBusiness Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITAbhinav Johnson
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering CompleteRoy Antony Arnold G
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringAniket Verma
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)Chitrangada Roy
 

Viewers also liked (18)

Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Chapter07 determining system requirements
Chapter07 determining system requirementsChapter07 determining system requirements
Chapter07 determining system requirements
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Role of Information Technology in BPR
Role of Information Technology in BPRRole of Information Technology in BPR
Role of Information Technology in BPR
 
Bpr Case Studies
Bpr Case StudiesBpr Case Studies
Bpr Case Studies
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineering
 
M&M Bpr Final
M&M Bpr FinalM&M Bpr Final
M&M Bpr Final
 
Case study on erp failures
Case study on erp failuresCase study on erp failures
Case study on erp failures
 
Erp Failure In Hershey’s
Erp Failure In Hershey’sErp Failure In Hershey’s
Erp Failure In Hershey’s
 
United Parcel Service
United Parcel ServiceUnited Parcel Service
United Parcel Service
 
Business Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of ITBusiness Process Re-engineering (BPR): Role of IT
Business Process Re-engineering (BPR): Role of IT
 
FINAL YEAR PROJECT
FINAL YEAR PROJECTFINAL YEAR PROJECT
FINAL YEAR PROJECT
 
Bpr ppt
Bpr pptBpr ppt
Bpr ppt
 
Business Process Reengineering Complete
Business Process Reengineering   CompleteBusiness Process Reengineering   Complete
Business Process Reengineering Complete
 
4 business process reengineering
4 business process reengineering4 business process reengineering
4 business process reengineering
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)
 
Bpr Case Study
Bpr Case StudyBpr Case Study
Bpr Case Study
 

Similar to Business process reengineering

Factors influencing Process Design and Process Analysis
Factors influencing Process Design and Process AnalysisFactors influencing Process Design and Process Analysis
Factors influencing Process Design and Process Analysisi4VC
 
CRM Systems Start With A Philosophy
CRM Systems Start With A PhilosophyCRM Systems Start With A Philosophy
CRM Systems Start With A PhilosophyRichard Bowden
 
Advanced Operations Management by CollegeEssay.org.pdf
Advanced Operations Management by CollegeEssay.org.pdfAdvanced Operations Management by CollegeEssay.org.pdf
Advanced Operations Management by CollegeEssay.org.pdfCollegeEssay.Org
 
operations research homework help,marketing homework help, project management...
operations research homework help,marketing homework help, project management...operations research homework help,marketing homework help, project management...
operations research homework help,marketing homework help, project management...guest3d3d11f
 
8000 tcm882 4812
8000 tcm882 48128000 tcm882 4812
8000 tcm882 4812vnprabhu86
 
Management Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetManagement Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetOnline
 
Management Assignment Help for students worldwide | by Onlineassignment.n
Management Assignment Help for students worldwide   | by Onlineassignment.nManagement Assignment Help for students worldwide   | by Onlineassignment.n
Management Assignment Help for students worldwide | by Onlineassignment.nOnline
 
Management Assignment Help
Management Assignment HelpManagement Assignment Help
Management Assignment HelpOnline
 
Module 2 ..Valur Chain Analysis.pptx
Module 2 ..Valur Chain Analysis.pptxModule 2 ..Valur Chain Analysis.pptx
Module 2 ..Valur Chain Analysis.pptxPalakJain224208
 
What is operations management software?
What is operations management software?What is operations management software?
What is operations management software?MRPeasy
 
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015Claire Louis
 
B P G010 Mooney 091907
B P G010  Mooney 091907B P G010  Mooney 091907
B P G010 Mooney 091907Dreamforce07
 
B P G010 Mooney 091907
B P G010  Mooney 091907B P G010  Mooney 091907
B P G010 Mooney 091907Dreamforce07
 
building-an-agile-organization-a-process-guide-for-effective-collaboration
building-an-agile-organization-a-process-guide-for-effective-collaborationbuilding-an-agile-organization-a-process-guide-for-effective-collaboration
building-an-agile-organization-a-process-guide-for-effective-collaborationDavid Messineo
 
National quality award 2014
National quality award 2014National quality award 2014
National quality award 2014Haya Haroon
 
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docx
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docxRunning head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docx
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docxsusanschei
 

Similar to Business process reengineering (20)

Factors influencing Process Design and Process Analysis
Factors influencing Process Design and Process AnalysisFactors influencing Process Design and Process Analysis
Factors influencing Process Design and Process Analysis
 
CRM Systems Start With A Philosophy
CRM Systems Start With A PhilosophyCRM Systems Start With A Philosophy
CRM Systems Start With A Philosophy
 
Advanced Operations Management by CollegeEssay.org.pdf
Advanced Operations Management by CollegeEssay.org.pdfAdvanced Operations Management by CollegeEssay.org.pdf
Advanced Operations Management by CollegeEssay.org.pdf
 
operations research homework help,marketing homework help, project management...
operations research homework help,marketing homework help, project management...operations research homework help,marketing homework help, project management...
operations research homework help,marketing homework help, project management...
 
SCM 303
SCM 303SCM 303
SCM 303
 
Agilitive
Agilitive Agilitive
Agilitive
 
8000 tcm882 4812
8000 tcm882 48128000 tcm882 4812
8000 tcm882 4812
 
Management Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.NetManagement Assignment Help | by Onlineassignment.Net
Management Assignment Help | by Onlineassignment.Net
 
Management Assignment Help for students worldwide | by Onlineassignment.n
Management Assignment Help for students worldwide   | by Onlineassignment.nManagement Assignment Help for students worldwide   | by Onlineassignment.n
Management Assignment Help for students worldwide | by Onlineassignment.n
 
Management Assignment Help
Management Assignment HelpManagement Assignment Help
Management Assignment Help
 
Module 2 ..Valur Chain Analysis.pptx
Module 2 ..Valur Chain Analysis.pptxModule 2 ..Valur Chain Analysis.pptx
Module 2 ..Valur Chain Analysis.pptx
 
Mit Great
Mit GreatMit Great
Mit Great
 
What is operations management software?
What is operations management software?What is operations management software?
What is operations management software?
 
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
Capgemini Consulting Claims Ops Model Alignment Program 3 13 2015
 
B P G010 Mooney 091907
B P G010  Mooney 091907B P G010  Mooney 091907
B P G010 Mooney 091907
 
B P G010 Mooney 091907
B P G010  Mooney 091907B P G010  Mooney 091907
B P G010 Mooney 091907
 
PVC Whitepaper Nov 2014
PVC Whitepaper Nov 2014PVC Whitepaper Nov 2014
PVC Whitepaper Nov 2014
 
building-an-agile-organization-a-process-guide-for-effective-collaboration
building-an-agile-organization-a-process-guide-for-effective-collaborationbuilding-an-agile-organization-a-process-guide-for-effective-collaboration
building-an-agile-organization-a-process-guide-for-effective-collaboration
 
National quality award 2014
National quality award 2014National quality award 2014
National quality award 2014
 
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docx
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docxRunning head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docx
Running head BUSIENSS POLICY DEVLEOPMENT AND IMPLEMENTATION 1B.docx
 

Recently uploaded

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 

Recently uploaded (20)

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 

Business process reengineering

  • 1. 1. Why outsource? What are key indicators that selection of a vendor IT solution to implement business process reengineering may be the best decision? What are the potential pros and cons? Provide examples where possible. Business process reengineering is the process which involves the rethinking and remodeling of the processes within the business for the purpose of attaining an enhancement in the strategic and key sectors of a particular business, such areas include the quality of products, the cost of the products as well as the qualities of the services offered and the speed of delivery of those services (Hammer & Champy, 1993: 46). There exists several factors that can be used as potential indicators to show that the selection of a vendor IT solution could be the best option in the implementation of the business process reengineering. To begin with, dis-functionality of the current system components is a major indicator for the implementation of an IT solution. Shortfalls constantly recorded in particular portfolios are noted as being the worst performing will need reengineering. Secondly, the importance of the particular process and its influence on customer satisfaction. It is noted that the process that least provides proper customer satisfaction is substituted with an IT solution that increases the speed and the quality of services offered. Finally the feasibility of the reengineering process also plays a fundamental role in the reengineering process. The organization considers which portfolios can be successfully reengineered and hence helps in the decision to acquire a proper vendor IT solution for the particular reengineering process. According to Meyer Richard(1998), a business process refers to a specific predetermined set of steps that are intended to produce a product or service, comprising all of the services required to satisfy a particular customer’s request.
  • 2. 2. State and discuss the key strengths of service-oriented architectures, especially as related to modern businesses. Support your answer(s). Service oriented architectures are a complete and specific set of methodologies and processes that are implemented in the development of business software’s. Service Oriented Architecture is an architecture that serves to eliminate redundancies as well as enhancing the delivery of services in the business organization. It mainly achieves this by consolidating and reusing the services involved within the particular organization .Such kind of architecture has proven to have several advantages over the other normal set of architectures available for software development. To begin with SOA enables the business functions to be able to be self reliant and dependable. This in turn will enable the entire business process to be self reliant. In addition, SOA offers the required functionalities in the form of an interface that is relevant to the offered services. This offers the consumer an easy method of interacting with the system as well as acquiring the products and services offered by the business organization. It also sets itself aside as the architecture that a consumer involved with other application functionalities may find useful to employ with another preferred application or service. SOA is able to separate the implementation of the service from its actual interface. The service provided is viewed as the endpoint which is support of a given contract or format. SOA are also self bound dynamically as well as being discoverable. This is because it supports service discovery concept. In this mode of service execution the consumer is not required to know the request message format, until the particular service is actually needed. It is also has modular and self-contained services in its structure. Its modular
  • 3. decomposability allows the application to be split and divided into smaller more manageable components. 3. Describe how environmental analysis, SWOT analysis, value chain analysis, and choice of business strategy influence business process reengineering. Provide examples. SWOT is an acronym that stands for Strengths, Weaknesses, Opportunities, and Threats. It is an analysis tool that is used for understanding different situations that may arise within the business organization; hence it can also be used in decision making for a wide range of situations within the organization. SWOT analysis is used in the development of the business, evaluation of the competitors within the market, marketing, as well as the development of product reports and research reports. Prior to conducting a SWOT analysis the organization carries out the PEST (Political, Economic, Social and Technological) analysis. This helps the organization’s potential within the market as well its potential basing on the external factors affecting the organization. SWOT analysis can be effectively used in business process reengineering where it can be used to determine a particular business position in the market, such as its commercial viability, it could also be used as a method of distributing sales as well as used to offer invaluable information on strategic options that may involve entering new markets or even the timely launch of a company’s product. On the other hand environmental analysis involves the careful considerations of all the external factors that affect an organization in its activities of production. Bearing in mind that the typical BPR projects include a cross-functional cooperation, it becomes highly necessary for the organization to consider the impacts of the environment and changes that occur within its environment. This in turn will serve as an impetus for the ongoing reengineering
  • 4. process as it will enable proper establishment of guidelines during the reengineering process. 4. Describe and rate the overall organization and information systems function in terms of scorecards and methodologies provided by standards such as Capability Maturity Model (CMM), Six Sigma, ISO 9000, and Balanced Scorecard. The balanced score card is a business management methodology that offers an approach to strategic management of an organization. It offers an insight into what companies should put into consideration in order to measure and balance their financial obligations as well as “perspectives”. The ISO-9000 is an international standards organization rating of an organizations performance and quality of management in industrial organizations. Six sigma is a process that offers help on focusing in the production and delivery of high quality services and products. It is based on deviations from the required standards where the management considers the shortcomings and defects in their organizations products and services and tries to eliminate them systematically in order to come up with a near-perfect product. These standards of rating an organizations performance ensure high standards and quality of goods and services offered while ensuring that the best managerial skills and principles are employed in the business organizations processes. They serve to boost the consumer’s confidence in a particular company’s products and or services that have been rated by these standards. Such promotes the returns of the company as well as increasing its profitability. It also extends to maximal utilization of the organizations resources ranging from the labor to cost reduction while not compromising on the high degree and levels of performance expected.
  • 5. 5. Rate the organization’s ability to achieve its overall goals, including high customer satisfaction and superior return on investment, based on product and process innovation, customer focus, knowledge management, strategic systems, and motivated people. Every organization has set goals and targets that are to be achieved within certain boundaries of time and resources available. Regardless of these boundaries, the organization is always expected to provide high quality output that considers the customer satisfaction and exceed their expectations in terms of quality. High customer satisfaction involves meeting the needs and requirements of the customer up to the expected levels and standards that have been set. It involves producing products and services that are of high quality and within the reach of the customer in terms of price friendliness. In addition to that, an organization will be highly rated if it has a high level of innovativeness and can be able to reinvent its product so as to always appeal to the customer as well as be able to match the ever changing needs of the customer base. Ina addition, it should always be able to meet the new requirements without compromising the quality of the product. Knowledge management of the organization also plays a fundamental role in ensuring that an organization is up to speed on the developments within the markets and hence enabling it to appropriately adapt and be able to compete with its competitors within the same field of production. Having strategic systems within the organization involves having the appropriate managerial and production systems that enable the organization to meet its demands and obligations to the client satisfactorily.
  • 6. 6. Compare the organization and its systems and processes to the rest of its vertical industry, based on industry best practices and benchmarks, including revenue and profitability. A vertically integrated organization is one which encompasses more than one single- output process production in which there is an option of all the output from an upstream process is utilized as a part of or of the whole quantity of one input intermediates in a downstream process. In addition it is the “is the ownership and control over neighboring stages of production or distribution”(Perry, 1989). Industry level specialization is a major practice which is enhanced by advances in technology as well as standards. This leads to the emergence of a group of producers as well as the division of industrial processes into modular components, where the equipment is split and reorganized to enhance the division of labor. Consider DIS markets which the most successful as well as largest firms were initially vertically integrated (Schlueter-Langdon 1999). 7. Based on the above indicators, predict the organization’s ability to conduct a successful information systems project that meets or exceeds its stated goals, including return on investment, appropriate functionality, successful implementation, and minimal reversion to old systems/processes By implementing the vertical industrial processes, an organization will be able to conduct with great chances of success, an information systems project that will be able to meet the organizations fundamental goals and also act as a means of implementing its fundamental targets. The organization will be able identify strategies by which their
  • 7. emerging industries can operate. The various settings with different levels of industry concentrations could be created with the purpose of reflecting the prevailing and the emerging conditions of the competitive market that the organization is in. this will give the organization a competitive edge over its rivals. 8. Analyze the changes in external (and internal) environment, such as changes introduced by the competition, regulatory changes in various markets, changing customer needs and demographics, and systems and products nearing the end of their life cycle(s). In the constant endeavors by business to enhance their business processes and improve the customer experience, many organizations have had to face a variety of challenges, both from the internal and external environments of the organization. To begin with there are changes that are competitor oriented which necessitate an organization to reorganize its processes, for instance when a company’s costs become higher than those of the competitors, they will be force to reorganize their business processes. In addition to that, there could be an increase in the number of competitors in the market, to cope with such changes the organization will be forced to reengineer its processes. Apart from these changes in the economic environment also proves to be a bottleneck to the organizations processes. Changing customer or consumer needs will also pose a challenge to the organization for it to reorganize and remodel it processes. Internal challenges such as over ambitious managers , found in company’s which are in their peal conditions, will face the challenge of ever struggling to be way ahead of their competitors, in order to maintain their market dominance over their competitors while satisfying their consumer’s needs.
  • 8. 9. Identify and analyze changes in business strategy that have to accompany the changes in the business environment. For a business organization to remain competitive, it must identify and suitably adapt to the changes that are constantly occurring within its environs. For instance trade offs are a major change that businesses have to consider when faced with a situation that challenges the company’s existence. Pursuing of sustainable development strategies is also a change in the business strategy that business organizations must always consider in order stay afloat with the stringent rules of development while cost cutting on their operational costs. Internal changes in the business strategy include; increasing the accountability of the business firms to nontraditional stakeholders as well as encouraging the habit of continuous internal reporting. This increases the accountability of the management as well as enhancing governance within the organization. 10. Identify and analyze changes in business process architecture that have to accompany the changes in business strategy. Changes in a company’s business strategy ultimately lead to changes in the business process architecture of the business. Some of the changes that will be experienced in the business architecture include changes in the baseline business context. This will cause a reverting from one source of input into the system to other more reliable sources of input. There will also be a change in the Target Business Architecture where the organization will be required to describe its products and services in a new and fresh manner.
  • 9. 11. Evaluate key existing business processes and systems in order to distinguish the ones that are hard to duplicate and contribute directly to competitive advantage, versus the ones that are not necessarily unique but are essential to conducting business. There exist several business processes which are essential for the fundamental being of a business. These processes ensure the smooth running of the business. To begin with there is the management process. This process oversees all the system operations; such management systems include strategic management as well as corporate governance. There also exists the operational process of the business. These are at the epicenter of the business as they comprise the core business activities. These contribute directly to the business competitive advantage against the business rivals. Such operational processes include advertising, purchasing, supplying as well as marketing of a company’s product and services. This process is fundamental and quite difficult to duplicate from one instance to another. Finally there are business support processes which are subsidiary processes that facilitate and enhance the occurrence and success of the other core processes. Despite the fact that such processes are easy to duplicate and replicate their effect , they play a fundamental role in ensuring the smooth flow of the other business processes.
  • 10. 12. Propose ways to ensure that these key processes and systems are not compromised in the information systems project. In the creation and development of a viable system, the system developers should always bear in mind that the business process and systems should not be compromised to ensure a smooth transition and flow during the implementation of the new system. Consequently, by observing certain factors and procedures, this can be ensured. To begin with , the system developers must set down clearly their missions and goals expected to be attained by the new system to be created, in view of this, the system can be broken down into modules which can be developed separately without majorly interfering with the management and day to day running of the organization. The different modules enhance the system development as each has its own attributes as related to the whole process of creating a new system. In addition to that the system developers should always consider a variety of techniques for modeling the system. Such techniques as the business process modeling notation could be employed whereby the developers represent the business process using tools known as workflow diagrams. 13. In conjunction with business process owners and a process change committee, develop workflow diagrams with swim lanes for each department/entity, documenting the current state (IS) of the processes
  • 11. 14. In conjunction with business process owners and a process change committee, develop workflow diagrams outlining the proposed (SHOULD or TO-BE) state of the processes, including possible variations (COULD).
  • 12. 15. Develop use-case scenarios in Unified Modeling Language (UML), identifying the design of steps in the proposed processes that involve automation and interfacing with existing or new systems. 16. Make a determination regarding whether the system will be developed in-house or by using external resources.
  • 13. 17. Is the organization in the business of developing information systems? 18. Can the organization truly do a better job than software vendors who are dedicated to developing and implementing best-of-breed applications that already incorporate industry best practices? 19. Can the solutions provided by software vendors be made to work for the organization? At what cost? Will key internal processes have to be changed or compromised dramatically? How difficult will it be to maintain modified code? Solutions provided by software vendors can be incorporated into the organization and made to facilitate the enhancement of the functionality within the organization. Such solutions provide the organization with reduced redundancy and there is no duplication of roles within the organization. The software vendors will be required to develop program solutions that are able to tackle problems encountered by the organizations members and also promote the organizations delivery of services and products to the end user. Depending on the level of functionality required by the organization, the cost of implementation of the software vendor solutions will vary from one organization to the other. Organizations that heavily rely on manual systems and processes and require a
  • 14. complete overhaul of the system will require more intense and cost intensive software vendor solutions. With regard to such changes, the internal processes of the organization will be changed to a varied degree, in the sense that deeper and more intense vendor solutions implemented will result in more and intense and considerable changes in the internal processes of the organization. The maintenance of the code will highly depend on the participation of the end user and their interaction with the new software installed or recommended by the software vendor. 20. In case there is no off-the-shelf application available that fits the bill, and the organization chooses to outsource the development to a software vendor, what methodologies will have to be adopted to ensure that outsourced development yields the desired results? What does the organization stand to gain or lose by outsourcing the development?
  • 15. 21. Compare the costs and benefits, tangible and intangible, of each approach. 22. Research software vendors who are industry leaders in the major enterprise applications in categories such as ERP (Enterprise Resource Planning), CRM (Customer Relationship Management), and LOB (Line of Business). Examine their offerings for companies of various sizes and industries.
  • 16. 23. Document functional requirements focusing on the support of key business processes (utilizing process diagrams of the proposed processes). Break down the requirements into categories such as “mandatory” and “optional.” 24. Document technology considerations, including interfaces to pre-existing systems, technology standards, and constraints of the IT infrastructure.
  • 17. 25. Identify reports, input forms, and other screen-shots needed by users at all levels of the organization, and by users outside the organization. 26. Identify and make public the evaluation criteria and the precise formula that will be used to compare proposals from competing vendors. 27. Develop detailed implementation timelines that the vendor will have to work with, based on internal business cycles, customer service needs, and regulatory standards (if applicable).
  • 18. 28. Research articles and Web links regarding best practices and trends in outsourced software development. 29. Research available case studies on companies that have successfully managed or completely failed at outsourced systems development, whether domestic or off- shore.
  • 19. 30. Focus on the challenges and critical success factors relative to managing and participating in geographically dispersed software development projects. 31. Rate the outsourcing organization’s capability maturity using CMM and its ability to handle clients and projects of a size and industry similar to the case study at hand. a. Conduct capacity planning for the new system. b. Develop and implement a plan for conducting unit testing on each system component, and load testing and integration testing on the overall system. c. Develop and execute a plan for data migration and parallel operation of old and new systems. d. In the case of having to test system(s), component(s), and/or code from external sources, the challenge is to create effective test plans that can uncover underlying, hidden “problems.” How will this be addressed?
  • 20. e. Address changes to management systems, job descriptions, organizational structure, and performance measures. f. Develop a plan to ensure that managers get evaluated using new metrics based upon the redesigned processes. g. Develop ways of predicting and dealing with the challenge of possible reversion to earlier processes. h. Examine and apply Critical Success Factors of change management. i. Discuss best practices and case studies relative to successes and failures in managing change in systems projects. j. Discuss the importance of marketing the change to management and end- users. k. Address the involvement of upper management in ways that are appropriate to the success of the project. l. Discuss why people comprise the most important and complex aspect of change in system implementation projects. m. Explain the role of politics in process analysis and system implementation projects. n. Explain the need for, and appropriate role definition of, project champions. o. Determine strike force creation and management. Discuss who is best suited to be part of the “strike force” and if there is a need for multiple committees
  • 21. outside of the strike force to conduct “public relations” and “selling” activities with employees and stakeholders at all levels of the organization. p. Discuss best practices and case studies relative to successes and failures in managing the people aspect of change in systems projects. q. Discuss ways to build and sustain project momentum by using “quick wins” while continuing to engage unwieldy, complex problems that require longer- term change management efforts. r. Discuss ways in which facilitation can be provided to help end-users and managers affected by system changes to come up with their own home- grown strategies to deal with the changes. Contrast this with the approach in which, not only is the change imposed from above, there is also no help provided to the employees in the area of developing coping mechanisms. s. Discuss how e-business applications may be more complex than internal applications and involve multiple constituencies and stakeholders outside of the organization. t. Discuss protocols and standards in business-to-business applications, including legacy approaches such as EDI (Electronic Data Interchange) and newer approaches such as XML-enabled Web services (utilizing other standards such as SOAP, UDDI, and WSDL).
  • 22. u. Discuss the role of XML and its subsets that are optimized towards certain vertical industries for creating, transmitting, and receiving business transactions. v. Discuss the role of emerging technologies such as WAP (Wireless Access Protocol) and WML (Wireless Markup Language) that can be used to create new applications for serving the customers in the e-business context. w. Discuss the complexity of achieving real-time and batch interfaces with systems owned by other entities, including customers and suppliers. x. Discuss how IT/IS organizations within companies can serve a role in strategic planning. y. Discuss how IT can be an enabler toward positive change versus how it can be a drain on corporate and societal resources. z. Discuss why IT/IS personnel ought to think of themselves as facilitators and problem-solvers in service to the stakeholders, process owners, and end- users. Contrast this with a more adversarial situation where IT sees itself at odds with the rest of the enterprise, or even with certain parts of the enterprise. aa. Discuss ROI models and total cost of ownership metrics in use in the industry. Explain why ROI metrics are essential to the success of any IT/IS project or application.
  • 23. bb. Brainstorm ways in which IT personnel and managers can collaborate with functional managers and process owners to help create new business models and revenue sources, and realize improvements in competitive advantage, employee satisfaction, and customer satisfaction. 32.