Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
1. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 1 of 6
Mutaz Ahmed Ali Osman
Resident Add: Saudi Arabia – Riyadh
Mobile: +966501834091 Iqama: Transferable
Material Status: Single Email Address: mutaz.ahmed.ali@live.com
An accomplished professional, seeking mid managerial assignments in Project Management &
Implementation with an organization of repute in Telecom sector, preferably in Saudi Arabia
PROFILE
Health Insurance management professional with expertise in development of
corporate and business projects and programs across large multi-divisional business units.
Recognized for business strategy development and program analysis and implementation to
reduce risk and increase operational productivity and efficiencies. Demonstrated leadership in
business process improvement, complex problem resolution, organizational change and project
management, gaining business consensus, and implementing technology solution decisions.
Job Objective
To secure a position with an expanding company as Telecommunications Project Manager where my
education and experience can be utilized to the fullest.
Employment Experience: Total years of experience 11+ yrs
Senior Project Manager, Huda Constructing St. Saudi – Riyadh February 2015 – Till now
Contractor with Huawei & Mobily
Project: Zain & Mobily (IBS project)
Expert in IBS Phases and technicalities(DAS,CW,EM)
Direct and manage IBS project covering the whole IBS cycle (SAQ, Design, Implementation and Acceptance
Ensure that plans are entered into the standardized format and updated on daily basis
Delegate team tasks
Facilitate team tasks appropriately, problem solver, decision maker and able to motivate team member
Facilitate ongoing evaluation of his team
Verify progress and quality of work against agreed specifications and plans and report any deviations as per
project process
Verify the accuracy and quality for all documents and site reports submitted
Manage project budget, Monitor and Control Cost, time and Quality.
Ensure timely invoicing of the project, and follow up the accounts
2. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 2 of 6
Project Manager ,Takhatob Telecommunication .Saudi- Riyadh
Company ASP with NSN & Huawei
Project : Zain Saudi(swap , IBS & FTK) and STC(USF9 & FTK)
Reports daily and weekly project Status to the GM head
Works closely with the Project Coordinator to ensure that project-related assets, such
as communications, documentation and artifacts are updated and maintained
Submit monthly timesheets
Monitoring project risks and scope creep to identify potential problems and proactively
identifying solutions to address them in advance.
Escalating promptly any issues that may impact operations.
Producing stage plans, highlight reports, risk logs, requests for change etc.
Providing strategic direction during the implementation stages.
Managing client expectations by ensuring the delivery of the highest quality service
Acting on client feedback.
Monitoring staff & team performance
Attend and participate in customer/ vendor meetings.
Resolves conflicts when and where needed
Apr2014 – November2016
Project Coordinator , FCGI in Saudi- Jadda Company ASP with Ericsson
Project: STC (FTK& Add LTE) And Mobily (FTK, LTE1800,LTE2300,W900)
Attend and collaborate in planning meetings.
Preparing the handover document (binder, site master data)
Support the teams in the technical issue
Determine and prepare the scope of work for services and Engineering,
Procurement.
Prepare project execution plans, contracting strategy and prepare project cost
estimation.
Preparing the handover document (binder, site master data)
Preparing the sites Reports
Submit monthly timesheets
Supervise equipments installation, testing and commissioning according to the
vendor standards.
Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
Attend and participate in customer/ vendor meetings.
May 2013 – March 2014
Project Coordinator, PLUS Inter Co. Ltd.
Zain Sudan 2G/3G Project
Attend and collaborate in planning meetings.
Determine and prepare the scope of work for services and Engineering,
Procurement.
Prepare project execution plans, contracting strategy and prepare project cost
estimation.
Apr 2010 – May 2012
3. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 3 of 6
Supervise equipments installation, testing and commissioning according to the
vendor standards.
Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
Attend and participate in customer/ vendor meetings.
Project Coordinator, Ericsson A/B for Zain-Sudan
Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
Collect/Gather, analyze, and prepare the day to day operation’s report which
includes (RFI, RFA, and RFS) and share it with the project manager.
Negotiate site costing with the ASPs and ensure the installation cost within the
UPL.
Day to day monitoring and controlling for all ASPs tasks and ensure all tasks are
aligning to the plan.
Arrange site acceptance with Customer and handover the site to the operation
department and update the site handler.
Distribute tasks between the ASPs based on the geographic distribution of the
team as well as the team capability.
Facilitate materials for the sites according to the site configuration (Radio,
Transmission and Power) provided by Operator.
Responsible for delivering the site needs equipment in accordance to the
project’s planned cost
Attend and participate in customer as well as ASPs meetings.
Sepr2008 –December 2008
Project coordinator, ICTSolutions Co.Ltd.
Zain Sudan 3G project
Acquire project patch according to the available resources and budget.
Determine needed resource according to scale of qualifications.
Preparing the handover document (binder, site master data)
Prepare project execution plans, contracting strategy and prepare project cost
estimation.
Supervise equipments installation, testing and commissioning according to the
vendor standards.
Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
Attend and participate in customer meetings.
Jul 2007 – Aug 2009
Installation & Testing Engineer, ICTSolutions Co.Ltd. Zain Sd project Jul 2006 – Mar2007
Installation and Testing Engineer (BTS test) responsible for installing, testing, integrating GSM base
transceiver station (BTS) equipments and microwave installation & alignment (indoor & outdoor).
Implementation, testing and commissioning of Ericsson microwave equipments(MINI LINK-E, MINI LINK-TN
and MINI LINK- HC) include dish alignment (0.3, 0.6, 0.9, 1.2, 1.8, 2.4, 3.0 meter)
4. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 4 of 6
Determine needed resource according to scale of qualifications.
Responsible of installation, commissioning, testing and integration of Ericsson BTS (RBS2000 family),
Microwave (Mini-Link TN 2p,6p and 20p) and SDH Long Haul (MDRS and OMS).
Have a knowledge in microwave protection 1+1 space diversity , 1+1 frequency diversity, XPIC double
polarization
Implementation and commissioning of Ericsson MINI LINK Traffic Node (20P, 6P, 2P and CN) including
software upgrade and adding node to management system. Installation, testing, commissioning and
troubleshooting of Ericsson 3G node B (macro 2308, 6301). Installation, testing, commissioning and
troubleshooting 2G RBS (2206, 2206V2, 2106, 2106V2, 2102V3,2216,2216V2 2308,2309). Beside MDRS155EC
Marconi Digital Radio System
Installation and commissioning of Ericsson Power System(BBS2000,BBS2000I,PBC6500)
Excellent knowledge for Ericsson software(OMT for RBS , LMT for Node B and LTE accessing to the TN ,
MINI LINK craft LCT , MINI LINK management for MINI LINK- E and Marconi System
Installation of GSM & Node B Antennas System with ASC, RET, TMA, diplexer and feeder. And testing all the
equipment by Site master(DTF, VSWR)
Huawei BTS 3606 installation, testing, Pasolinc network management tools ‘PCMT’ software for
transmission and alignment microwave dish 0.6 with protection 1+1
Huawei DF , Emerson , GPS and rectifier installation
Report performance to project coordinators.
Telecom Engineer, SUDATEL (Sudanese Telecommunication Co. Ltd) Apr 2005 – Apr 2006
Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).
Sort out all customer complaints with regard to the International calls.
Ensure the connectivity of the SWITCH (Power, sub-station).
Report the operation performance on Daily basis.
Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).
Sort out all customer complaints with regard to the International calls.
Ensure the connectivity of the SWITCH (Power, sub-station).
Report the operation performance on Daily basis.
Education & Qualifications
M.Sc. in Electronics Engineering ( Telecommunication Engineering)
Sudan University of Science and Technology (SUST), Oct 2009
B.Sc. (Honors) in Electrical & Electronics Engineering
University for Technological Science (UTS) Jan 2006
CCNA preparation course
Data Net, Sept 2006.
Project Management Professional PMP Training course (35PDU’s)
From Cambridge International Training Center ,2009.
Project Management Professional PMP Preparation PMP Training course (35PDU’s)
5. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 5 of 6
From HEXA Engineering Training Canter, Oct- 2011.
Ericsson (RBS 6000 WCDMA Installation & Commissioning).
From Ericsson ASP Mentor
MINI-LINK TN R3 Installation (LZU 108 6895)
From Ericsson ASP Mentor
WCDMA RBS 3106/3206 installation(LZU 108 6479)
From Ericsson ASP Mentor
MINI-LINK HC Basic Setup (LZU 108 6281)
From Ericsson ASP Mentor
RBS 2106/2206 Installation Verification (LZU 108 5740)
From Ericsson ASP Mentor
RBS 2116/2216 Inst.&Inst. Verification(LZU 108 6830)
From Ericsson ASP Mentor
WCDMA Radio Network Functionality(LZU108 5686 R6A)
From Ericsson Education Canter LEBANON
Personal Skills:
Computer Skills
Installation and commissioning RBS, ML-TN and MDRS Systems.
Troubleshoot or replace the MDRS and ML.TN units and making alignment for TRM hops.
Tracing SW or HW Problem for RBS, ML-TN and MDRS.
Know how to fabricate the cables associated for Ericsson BTS System.
MS Windows® (Professional).
MS Office® (Word®, Excel® and Power point®) (Professional).
Primavera p6 (Excellent).
Operation Management
Project Scope, Management, and Rollout
Productivity and Performance
Revenue Escalation and Cost Reduction
Customer Service Relations
Problem Resolution and Decision Making
Training, Leadership, and Team Building
Negotiation and Presentation
Budget and Time Management
Strategic and Tactical Planning
6. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 6 of 6
PROFESSIONAL MEMBERSHIPS
Member of Sudan Engineering Society since 2005
Registered at Saudi Council of Engineers as Electrical Engineer since 2013
Languages
Arabic (Mother tongue),
English (Very good reading, writing and speaking)
REFERENCE
References are available on request.