Earthquakes, Codes, &
    Sustainability
                     by
            Ronald H. Dunn, SE
         Paul W. McMullin, SE, PhD
 Salt Lake Sustainable Building Conference
               April 29, 2008
Sustainable Design?




                                 State of California (2005)


© Dunn Associates Inc, 2008
                                 Earthquakes, Codes, & Sustainability
Outline


           Life Safety to a Structural
           Engineer

           Effect of Architectural Design
           Decisions on Structural
           Material Consumption

           Seismic Design Options
             Performance Based Design
             Base Isolation




© Dunn Associates Inc, 2008
                                            Earthquakes, Codes, & Sustainability
Hazard Examples


           Fire                     Earthquake




             krudesign (2007)
© Dunn Associates Inc, 2008
                                    Earthquakes, Codes, & Sustainability
College Academic Building:
                                            3 Story, 26,000 SF
                 3-story- 26,000 sf.
                                                                                % of
                 DIVISION                             Cost/SF          Cost    Total
           O1    General Requirements                    19.01       494,260    5.52%
           O3    Concrete                                13.55      352,300    3.94%
           O4    Masonry                                 14.81      385,060    4.30%
           O5    Metals                                  20.28      527,280    5.89%
           O6    Wood & Plastics                         13.54       352,040    3.93%
           O7    Moisture Protection                     35.91       933,660   10.43%
           O8    Openings                                48.63     1,264,380   14.12%
           O9    Finishes                                43.04     1,119,040   12.50%
           1O    Specialties                              4.52       117,520    1.31%
           11    Equipment                                0.50        13,000    0.15%
           12    Furnishings                              7.31       190,060    2.12%
           14    Conveying Systems                        5.09       132,340    1.48%
           15    Mechanical                              74.00     1,924,000   21.49%
           16    Electrical                              36.18       940,680   10.51%
           21    Fire Suppression /Protect                7.95       206,700    2.31%
                                             Totals    $344.32   $8,952,320 100.00%

                 Structural totals                   48.64       $1,264,640    14.13%
                 Increase structural system cost by 23%            $202,303
                 Increase total cost by only 2.2%                $1,466,943    16.39%
© Dunn Associates Inc, 2008
                                                         Earthquakes, Codes, & Sustainability
Life Safety Through the Eyes of an SE



           GET PEOPLE
            OUT THE
           DOOR ALIVE




© Dunn Associates Inc, 2008
                                             Earthquakes, Codes, & Sustainability
Life Safety Through the Eyes of an SE


           Structural Code generally
           does not consider:

           Building economics

           Business interruption losses

           Sustainability




© Dunn Associates Inc, 2008
                                             Earthquakes, Codes, & Sustainability
Building State After a Major Earthquake


      Northridge Earthquake
        Magnitude 6.7
        Estimated Economic
          Loss $49.3 billion




                                        PEER (2000)
© Dunn Associates Inc, 2008
                                                  Earthquakes, Codes, & Sustainability
© Dunn Associates Inc, 2008
                              Earthquakes, Codes, & Sustainability
Building State After a Major Earthquake:
                                             Northridge




          SDEDC (1994)
© Dunn Associates Inc, 2008
                                              Earthquakes, Codes, & Sustainability
Building State After a Major Earthquake:
                                             Northridge




                                                       FEMA (2000)
© Dunn Associates Inc, 2008
                                              Earthquakes, Codes, & Sustainability
Life Safety Through the Eyes of an SE



              The purpose of this code is to establish
                  the minimum requirements to
               safeguard the public health, safety and
                         general welfare…
                                     (IBC 2006, 101.3)




© Dunn Associates Inc, 2008
                                              Earthquakes, Codes, & Sustainability
Life Safety Through the Eyes of an SE


           Misconception:
           A structure built to Code is
           earthquake proof.




            American (2004)




© Dunn Associates Inc, 2008
                                             Earthquakes, Codes, & Sustainability
Life Safety Through the Eyes of an SE




                                                                          KSL (2007)
© Dunn Associates Inc, 2008
                                             Earthquakes, Codes, & Sustainability
The Question Matters




                   Never ask a Structural Engineer if
                   something is possible. He will get a
                     twinkle in his eye and say YES!

                              ASK HOW MUCH IT WILL COST
                                  (Christensen 2004)

© Dunn Associates Inc, 2008
                                            Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                Plan & Vertical Irregularities




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                Plan & Vertical Irregularities




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                      Plan Irregularity




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                     Vertical Irregularity




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                Plan & Vertical Irregularities


           Code requires increased
           force for irregular framing

                Force increases 25-300%
                 with a material
                 increase of 12-300%




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                    Redundancy Deficient


           Code penalty for non-
           redundant structures

           Non redundant structures
           have:
              Less load sharing ability
              Higher forces
              Lower toughness




                                                                                  FEMA (2000)
                                   ρ
           Increase of 1.3 factor (ρ)
            on seismic forces


© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Architectural Effect on Structure:
                                       Redundancy Deficient




                    Net result of non-redundant structure:
                                  non-redundant

                              1/3 increase in seismic force =
                              net material increase (16-33%)
                                                    (16-33%)




© Dunn Associates Inc, 2008
                                              Earthquakes, Codes, & Sustainability
Improved Seismic
                                   Design Options


           Performance Based Design      Base Isolation
             Allows owner to pair          Protects both structure
             ground shaking with post-     and contents
             earthquake condition




© Dunn Associates Inc, 2008
                                         Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                           Basics


           Next generation seismic
           design methodology

           Originally developed by
           FEMA for existing buildings

           Applicable for new design

           Considers each element’s
           energy dissipation capacity




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                                     Pairing
                                                                                           Target Building
                                                                                         Performance Levels




                                                               Operational Performance



                                                                                           Performance Level (1-B)




                                                                                                                                               Performance Level (5-E)
                                                                                                                     Life Safety Performance
                                                                                           Immediate Occupancy




                                                                                                                                               Collapse Prevention
                                                                                                                     Level (3-C)
                                                               Level (1-A)
                                       Once every 100 years            a                           b                         c                              d

                                       Once every 250 years            e                            f                        g                              h
                        Hazard Level
                        Earthquake




                                       Once every 500 years              i                          j                        k                               l

                                       Once every 2500 years         m                             n                         o                              p


© Dunn Associates Inc, 2008
                                                                             Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                     Levels & Acceleration


           Performance levels              Acceleration Options
             Operational                     Typical
             Immediate Occupancy                  50%/50 (1/100 year)
             Life Safety (IBC)                    20%/50 (1/250 year)
             Collapse Prevention                  10%/50 (1/500 year)
                                                  2/3 of 2%/50 (IBC)
                                                  2%/50 (1/2500 year)

                                              Any probability between
                                           those listed above




© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                        Cost Example

                                                                           Total1
                   Option         Force       Lateral      % Lat Cost      % Cost
                                Increase       Cost         Increase      Increase
                Typical Office       1.00     $1,378,000     0.00%
      PBD IBC




                Hospital             1.50     $1,643,325     19.25%          1.08%
                10%/50- IO           2.15     $1,916,725     32.78%          2.18%
                5%/50- IO            3.40     $2,216,700     43.76%          3.40%
                1. Based on $125/SF
                2. Gravity Frame $2,239,395


                                                                           $38.25




© Dunn Associates Inc, 2008
                                                   Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                        Cost Example




                                                             Murphy (2005)
© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
Performance Based Seismic Design:
                                        Cost Example




                               0.45% of 1 year’s
                                           year’s
                                Gross Revenue
                                   (1.6 days)

© Dunn Associates Inc, 2008
                                           Earthquakes, Codes, & Sustainability
© Dunn Associates Inc, 2008
                              Earthquakes, Codes, & Sustainability
Base Isolation


           Innovative design




© Dunn Associates Inc, 2008
                                  Earthquakes, Codes, & Sustainability
Base Isolation




© Dunn Associates Inc, 2008
                                 Earthquakes, Codes, & Sustainability
Summary




                     Recycled steel and fly ash
                       should not be where our
                     thinking or creativity stops.



© Dunn Associates Inc, 2008
                                   Earthquakes, Codes, & Sustainability
Earthquakes, Codes, &
    Sustainability
                     by
            Ronald H. Dunn, SE
         Paul W. McMullin, SE, PhD
 Salt Lake Sustainable Building Conference
               April 29, 2008
References


           American (2004). Earthquake-Proofing project still shaky in Utah, American
              Library Association,
              http://www.accessmylibrary.com/coms2/summary_0286-21752826_ITM,
              last accessed April 28, 2008.
           Center (2002). Strategic Insight, Center for Contemporary Conflict, Naval
              Postgraduate School, Monterey, CA,
              http://www.ccc.nps.navy.mil/contact.asp, last accessed April 28, 2008.
           Christensen (2004). Gary Christensen, personal communication.
           CNNMoney (2001). NY attack may cost $105B,
              http://money.cnn.com/2001/10/04/news/wtc_cost/, last accessed April 28,
              2008.
           FEMA (2000). Recommended Seismic Design Criteria for New Steel Moment
              Frame Buildings, FEMA-350, Federal Emergency Management Agency,
              Washington D.C.
           krudesign (2007). http://flickr.com/photos/krudesign/1006339582/, last
              accessed April 29, 2008.


© Dunn Associates Inc, 2008
                                                   Earthquakes, Codes, & Sustainability
References


           KSL (2007). Capitol Building Renovations are Earthquake Proof,
              http://www.ksl.com/?nid=148&sid=1192949, last accessed April 28, 2008.
           Murphy (2005). http://www.flickr.com/photos/jamiemurphey/56000489/, last
              accessed April 29, 2008.
           PEER (2000). Strong Motion Database, Pacific Earthquake Engienering
              Research Center, http://peer.berkeley.edu/smcat/, last accessed April 28,
              2008.
           SCEDC (1994). Southern California Earthquake Data Center,
              http://www.data.scec.org/chrono_index/northshow.html, lasted accessed
              April 28, 2008.
           State of California (2005). Guidelines for Earthquake Bracing of Residential
              Water Heaters, State of California,
              http://www.documents.dgs.ca.gov/dsa/pubs/waterheaterbracing_11_30_05
              .pdf, lasted accessed April 28, 2008.
           WTC (2008). World Trace Center Photos,
              http://jeffreymunro.com/worldtradecenterphotos/slides/0126.html, last
              accessed April 28, 2008.

© Dunn Associates Inc, 2008
                                                   Earthquakes, Codes, & Sustainability

Más contenido relacionado

Destacado

Revit training projects available at www.RevitTrainingLive.com
Revit training projects available at www.RevitTrainingLive.comRevit training projects available at www.RevitTrainingLive.com
Revit training projects available at www.RevitTrainingLive.comSubair Shamsudheen
 
Making Teams Work!
Making Teams Work!Making Teams Work!
Making Teams Work!David Hain
 
Latinsmspaco
LatinsmspacoLatinsmspaco
Latinsmspacoconfuncio
 
Op Sy 03 Ch 31
Op Sy 03 Ch 31Op Sy 03 Ch 31
Op Sy 03 Ch 31 Google
 
Teksan generator 2011
Teksan generator 2011Teksan generator 2011
Teksan generator 2011ataelif
 
Brazen Careerist
Brazen CareeristBrazen Careerist
Brazen Careeristbkeenhold
 
Wikipedia -- the missing link in science outreach?
Wikipedia -- the missing link in science outreach?Wikipedia -- the missing link in science outreach?
Wikipedia -- the missing link in science outreach?mblso
 
Vip Grand Lisboa
Vip Grand LisboaVip Grand Lisboa
Vip Grand LisboaVIPHotels
 
解构主义原典细读
解构主义原典细读解构主义原典细读
解构主义原典细读shayayass
 
Psychoanaliza.blogi naukowe
Psychoanaliza.blogi naukowePsychoanaliza.blogi naukowe
Psychoanaliza.blogi naukoweWeronika
 
Latinisms Alfonso
Latinisms AlfonsoLatinisms Alfonso
Latinisms Alfonsoconfuncio
 
Good coding-practices-for-scientists-jan-2014
Good coding-practices-for-scientists-jan-2014Good coding-practices-for-scientists-jan-2014
Good coding-practices-for-scientists-jan-2014mblso
 
Paul Holmes la PR Forum 2014 - AndraZaharia.ro
Paul Holmes la PR Forum 2014 - AndraZaharia.roPaul Holmes la PR Forum 2014 - AndraZaharia.ro
Paul Holmes la PR Forum 2014 - AndraZaharia.roAndra Zaharia
 

Destacado (20)

Revit training projects available at www.RevitTrainingLive.com
Revit training projects available at www.RevitTrainingLive.comRevit training projects available at www.RevitTrainingLive.com
Revit training projects available at www.RevitTrainingLive.com
 
Making Teams Work!
Making Teams Work!Making Teams Work!
Making Teams Work!
 
Wine web 2.0
Wine web 2.0Wine web 2.0
Wine web 2.0
 
Latinsmspaco
LatinsmspacoLatinsmspaco
Latinsmspaco
 
Op Sy 03 Ch 31
Op Sy 03 Ch 31Op Sy 03 Ch 31
Op Sy 03 Ch 31
 
Julekort Fra Vesterbro 2009
Julekort Fra Vesterbro   2009Julekort Fra Vesterbro   2009
Julekort Fra Vesterbro 2009
 
Teksan generator 2011
Teksan generator 2011Teksan generator 2011
Teksan generator 2011
 
Tech1002
Tech1002Tech1002
Tech1002
 
Brazen Careerist
Brazen CareeristBrazen Careerist
Brazen Careerist
 
Eims Adzzoopres3
Eims Adzzoopres3Eims Adzzoopres3
Eims Adzzoopres3
 
Be the first
Be the firstBe the first
Be the first
 
Wikipedia -- the missing link in science outreach?
Wikipedia -- the missing link in science outreach?Wikipedia -- the missing link in science outreach?
Wikipedia -- the missing link in science outreach?
 
Vip Grand Lisboa
Vip Grand LisboaVip Grand Lisboa
Vip Grand Lisboa
 
解构主义原典细读
解构主义原典细读解构主义原典细读
解构主义原典细读
 
Psychoanaliza.blogi naukowe
Psychoanaliza.blogi naukowePsychoanaliza.blogi naukowe
Psychoanaliza.blogi naukowe
 
Dramatic
DramaticDramatic
Dramatic
 
Latinisms Alfonso
Latinisms AlfonsoLatinisms Alfonso
Latinisms Alfonso
 
Iss
IssIss
Iss
 
Good coding-practices-for-scientists-jan-2014
Good coding-practices-for-scientists-jan-2014Good coding-practices-for-scientists-jan-2014
Good coding-practices-for-scientists-jan-2014
 
Paul Holmes la PR Forum 2014 - AndraZaharia.ro
Paul Holmes la PR Forum 2014 - AndraZaharia.roPaul Holmes la PR Forum 2014 - AndraZaharia.ro
Paul Holmes la PR Forum 2014 - AndraZaharia.ro
 

Último

Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 

Earthquakes Sustainability, & Codes

  • 1. Earthquakes, Codes, & Sustainability by Ronald H. Dunn, SE Paul W. McMullin, SE, PhD Salt Lake Sustainable Building Conference April 29, 2008
  • 2. Sustainable Design? State of California (2005) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 3. Outline Life Safety to a Structural Engineer Effect of Architectural Design Decisions on Structural Material Consumption Seismic Design Options Performance Based Design Base Isolation © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 4. Hazard Examples Fire Earthquake krudesign (2007) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 5. College Academic Building: 3 Story, 26,000 SF 3-story- 26,000 sf. % of DIVISION Cost/SF Cost Total O1 General Requirements 19.01 494,260 5.52% O3 Concrete 13.55 352,300 3.94% O4 Masonry 14.81 385,060 4.30% O5 Metals 20.28 527,280 5.89% O6 Wood & Plastics 13.54 352,040 3.93% O7 Moisture Protection 35.91 933,660 10.43% O8 Openings 48.63 1,264,380 14.12% O9 Finishes 43.04 1,119,040 12.50% 1O Specialties 4.52 117,520 1.31% 11 Equipment 0.50 13,000 0.15% 12 Furnishings 7.31 190,060 2.12% 14 Conveying Systems 5.09 132,340 1.48% 15 Mechanical 74.00 1,924,000 21.49% 16 Electrical 36.18 940,680 10.51% 21 Fire Suppression /Protect 7.95 206,700 2.31% Totals $344.32 $8,952,320 100.00% Structural totals 48.64 $1,264,640 14.13% Increase structural system cost by 23% $202,303 Increase total cost by only 2.2% $1,466,943 16.39% © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 6. Life Safety Through the Eyes of an SE GET PEOPLE OUT THE DOOR ALIVE © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 7. Life Safety Through the Eyes of an SE Structural Code generally does not consider: Building economics Business interruption losses Sustainability © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 8. Building State After a Major Earthquake Northridge Earthquake Magnitude 6.7 Estimated Economic Loss $49.3 billion PEER (2000) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 9. © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 10. Building State After a Major Earthquake: Northridge SDEDC (1994) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 11. Building State After a Major Earthquake: Northridge FEMA (2000) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 12. Life Safety Through the Eyes of an SE The purpose of this code is to establish the minimum requirements to safeguard the public health, safety and general welfare… (IBC 2006, 101.3) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 13. Life Safety Through the Eyes of an SE Misconception: A structure built to Code is earthquake proof. American (2004) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 14. Life Safety Through the Eyes of an SE KSL (2007) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 15. The Question Matters Never ask a Structural Engineer if something is possible. He will get a twinkle in his eye and say YES! ASK HOW MUCH IT WILL COST (Christensen 2004) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 16. Architectural Effect on Structure: Plan & Vertical Irregularities © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 17. Architectural Effect on Structure: Plan & Vertical Irregularities © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 18. Architectural Effect on Structure: Plan Irregularity © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 19. Architectural Effect on Structure: Vertical Irregularity © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 20. Architectural Effect on Structure: Plan & Vertical Irregularities Code requires increased force for irregular framing Force increases 25-300% with a material increase of 12-300% © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 21. Architectural Effect on Structure: Redundancy Deficient Code penalty for non- redundant structures Non redundant structures have: Less load sharing ability Higher forces Lower toughness FEMA (2000) ρ Increase of 1.3 factor (ρ) on seismic forces © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 22. Architectural Effect on Structure: Redundancy Deficient Net result of non-redundant structure: non-redundant 1/3 increase in seismic force = net material increase (16-33%) (16-33%) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 23. Improved Seismic Design Options Performance Based Design Base Isolation Allows owner to pair Protects both structure ground shaking with post- and contents earthquake condition © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 24. Performance Based Seismic Design: Basics Next generation seismic design methodology Originally developed by FEMA for existing buildings Applicable for new design Considers each element’s energy dissipation capacity © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 25. Performance Based Seismic Design: Pairing Target Building Performance Levels Operational Performance Performance Level (1-B) Performance Level (5-E) Life Safety Performance Immediate Occupancy Collapse Prevention Level (3-C) Level (1-A) Once every 100 years a b c d Once every 250 years e f g h Hazard Level Earthquake Once every 500 years i j k l Once every 2500 years m n o p © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 26. Performance Based Seismic Design: Levels & Acceleration Performance levels Acceleration Options Operational Typical Immediate Occupancy 50%/50 (1/100 year) Life Safety (IBC) 20%/50 (1/250 year) Collapse Prevention 10%/50 (1/500 year) 2/3 of 2%/50 (IBC) 2%/50 (1/2500 year) Any probability between those listed above © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 27. Performance Based Seismic Design: Cost Example Total1 Option Force Lateral % Lat Cost % Cost Increase Cost Increase Increase Typical Office 1.00 $1,378,000 0.00% PBD IBC Hospital 1.50 $1,643,325 19.25% 1.08% 10%/50- IO 2.15 $1,916,725 32.78% 2.18% 5%/50- IO 3.40 $2,216,700 43.76% 3.40% 1. Based on $125/SF 2. Gravity Frame $2,239,395 $38.25 © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 28. Performance Based Seismic Design: Cost Example Murphy (2005) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 29. Performance Based Seismic Design: Cost Example 0.45% of 1 year’s year’s Gross Revenue (1.6 days) © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 30. © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 31. Base Isolation Innovative design © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 32. Base Isolation © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 33. Summary Recycled steel and fly ash should not be where our thinking or creativity stops. © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 34. Earthquakes, Codes, & Sustainability by Ronald H. Dunn, SE Paul W. McMullin, SE, PhD Salt Lake Sustainable Building Conference April 29, 2008
  • 35. References American (2004). Earthquake-Proofing project still shaky in Utah, American Library Association, http://www.accessmylibrary.com/coms2/summary_0286-21752826_ITM, last accessed April 28, 2008. Center (2002). Strategic Insight, Center for Contemporary Conflict, Naval Postgraduate School, Monterey, CA, http://www.ccc.nps.navy.mil/contact.asp, last accessed April 28, 2008. Christensen (2004). Gary Christensen, personal communication. CNNMoney (2001). NY attack may cost $105B, http://money.cnn.com/2001/10/04/news/wtc_cost/, last accessed April 28, 2008. FEMA (2000). Recommended Seismic Design Criteria for New Steel Moment Frame Buildings, FEMA-350, Federal Emergency Management Agency, Washington D.C. krudesign (2007). http://flickr.com/photos/krudesign/1006339582/, last accessed April 29, 2008. © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability
  • 36. References KSL (2007). Capitol Building Renovations are Earthquake Proof, http://www.ksl.com/?nid=148&sid=1192949, last accessed April 28, 2008. Murphy (2005). http://www.flickr.com/photos/jamiemurphey/56000489/, last accessed April 29, 2008. PEER (2000). Strong Motion Database, Pacific Earthquake Engienering Research Center, http://peer.berkeley.edu/smcat/, last accessed April 28, 2008. SCEDC (1994). Southern California Earthquake Data Center, http://www.data.scec.org/chrono_index/northshow.html, lasted accessed April 28, 2008. State of California (2005). Guidelines for Earthquake Bracing of Residential Water Heaters, State of California, http://www.documents.dgs.ca.gov/dsa/pubs/waterheaterbracing_11_30_05 .pdf, lasted accessed April 28, 2008. WTC (2008). World Trace Center Photos, http://jeffreymunro.com/worldtradecenterphotos/slides/0126.html, last accessed April 28, 2008. © Dunn Associates Inc, 2008 Earthquakes, Codes, & Sustainability