Plant Maintenance in the R/3System
Plant Maintenance:An overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing
Business Process of Plant Maintenance
SAPTransactions
Course List
Plant Maintenance in the r/3 System
• Plant Maintenance (PM) is a high-performance application component
integrated in the logistics chain of the R/3 System that supports you when
carrying out all maintenance tasks
• The Plant Maintenance component supplements resource planning for
the maintenance of your production systems, vehicles, buildings and so on,
across all branches of industry.
PM application component has already been
successfully implemented
• Automotive industry
• Chemical industry
• Commerce/service industries
• Energy suppliers
• Electronics industry
• Food industry
• Mechanical engineering
• Metal-working industry
• Mining industry
• Paper industry
• Petrochemical industry
• Pharmaceutical industry
• Precision engineering
• Primary industries
• Public service industry
• Publishing industry
• Software and computing
• Steel industry
• Transportation industry
What is SAP Plant Maintenance
• Plant Maintenance is a function or an essential support system in an
industrial process.This system helps and keep all the machinery and
infrastructure into prime condition or ideal in terms of quality and
operational.
SAP Plant Maintenance comprises the following activities:
• Inspection
Determining the actual condition of a technical system
• Preventive Maintenance
Maintaining the ideal condition of a technical system
• Repair
Restoring the ideal condition of a technical system
Organizational Structure
• Maintenance Planning Plant: Plant in which maintenance tasks are planned
and prepared. Example: Maintenance planner group, maintenance work
centers
• Maintenance Plant: Plant in which the technical objects of a company are
installed. Example: Building, production area
Structured Clarification Functional Location
Functionallocations enable you to structure maintenance
objects according to the following criteria:
Process-oriented (for example, ”polymerization,” ”condensation”)
• Functional (for example, ”pumpstation,” ”power unit”)
•
• Spatial (for example, ”hall,” ”location”)
• A piece of equipment is an individual physical object maintained as an autonomous unit.
Pieces of equipment usually represent single objects such as pumps, motors, vehicles, for
which maintenance tasks should be performed and recorded.
• Equipment can be installed at functional locations.A piece of equipment can be linked with
a material, if there is inventory management, in the sense of Materials Management, for
the object.
Equipment Hierarchy
Structure of a Bill of Material
An individual bill of material can be defined for each maintenance object.
The bill of material contains the following information:
• Structure of the unit (using assemblies)
• Spare parts for its maintenance (for example, stock items, external material, documents, and texts)
Notification
Notification
Order
• Direct creation of a maintenance order
Order
• Creation of a maintenance notification with immediate order
Notification Order
• Creation of a maintenance order based on a notification
Notification Order
• Combination of maintenance notification to make a order
Notification
Planning MaintenanceTasks
What is different between Notification andWork Order
• Maintenance Notifications
are Reporting objects to
record:
Maintenance requirement
Cause, Object Impacted,Tasks
due & Activities Performed
• Types: Maintenance Request,
Malfunction (Breakdown)
Report, Activity Report,
Service Notifications
• Maintenance Notifications
generally do not record Costs
• Maintenance Orders are a complete
record of:
Operations performed
Components used (Stock/Non stock)
External Services
Time, plan costs and actual costs
posted
Settlements executed
• Types: Breakdown Orders,
Corrective Orders, Predictive Orders,
Refurbishment Orders, Preventive
Orders
Breakdown Maintenance Processing
Notification
Scheduling
Execution
Completion
Technical object
Description
Date
Malfunction
Order release
Printout
Capacityleveling
Availabilitycheck
Planned/unplannedmat. withdrawal
Time conf.
Tech. completion
Order settlement
Technicalconfirmation
Maintenance
planner
Technician/
Storeperson
Maintenance
supervisor
MalfunctionReports MalfunctionOrder
History
Material usage, orders, notifications, PMIS, usage list
Corrective Maintenance Processing
Notification
Planning
Scheduling
Execution
Completion
Work to be performed
Internal/external resources
Material
Tools
Technical object
Description
Date
Malfunction
Order release
Printout
Capacityleveling
Availabilitycheck
Planned/unplannedmat. withdrawal
Time conf.
Tech. completion
Order settlement
Technicalconfirmation
Maintenance
planner
Technician/
Storeperson
Maintenance
supervisor
Internal ExternalService Material
Stock Material Process Flow (Reservation)
Create
Notification
(IW21)
CreateOrder refer
from Notification
(IW22)
Order Planning,
Assignoperation,
CTRLKey PM01,
InputStock Material
(IW32)
Order Release
(IW32)
Goods Issue
Material
(MIGO)
Order
Confirmation for
ActualWork
(IW41)
OrderTechnical
Completion
(IW32)
Order
Settlement
(KO88)
OrderClosure
(CO99)
Procurement Non-Stock Material Process Flow
Create Notification
(IW21)
CreateOrder refer from
Notification
(IW22)
Order Planning, Assign
operation,CTRL Key PM01,
Non-StockMaterial
(IW32)
Order Release
(IW32)
Release Purchase
Requisition
(ME54N)
Create PO refer from
Purchase Requisition
(ME21N)
Release PO
(ME29N)
Goods Receipt from
PO
(MIGO)
Usage Decision/Quality
Inspection
(QA32)
Order Confirmation for
Actual Work
(IW41)
Order Technical
Completion
(IW32)
Sys. Status - TECO
Settlement a
maintenance order
(KO88)
Order Closure
(co99)