Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.
VATIKA TURNING POINTVATIKA TURNING POINTVATIKA TURNING POINTVATIKA TURNING POINT
Turning Point
Turning Point
Overview & Location
Turning Point is a premium group housing complex which
enjoys a prime location in Sector 88B, Gurgaon ...
Overview & Location
It also has the distinct advantage of a commercial/retailIt also has the distinct advantage of a comme...
Vatika Express City
Location Map:Location Map:
Project Features
Part of 300 acre Vatika Express City, Gurgaon – An Integratedp y, g g
township
Located on intersection of...
Project Features
While maximum apartments enjoy the park view severalWhile maximum apartments enjoy the park view, several...
Turning Point – The Club
TWO Elaborate Clubs :TWO Elaborate Clubs :
Sports Club & Health Club with following facilities:
S...
BSP
( ) ( )Type Area (Sq. Ft.) BSP (Rs.)
2BHK 1150 5900000
3BHK 1450 7439130
3BHK+ 1650 8465217
4BHK 1850 9491304
4BHK+ 21...
Payment Plan TLP/CLP (G+9)
At the time of Booking Rs.400000 (3BHK & 3BHK+) & Rs.500000 (4BHK+)
Within 45 days from the dat...
Payment Plan TLP/CLP (G+35)
At the time of Booking  Rs.300000 (2BHK), Rs.400000 (3BHK) & Rs.500000 (4BHK & 4BHK+)
Within 4...
Easy Salary Plan (G+35)
Milestones 2BHK 3BHK 4BHK 4BHK+
At the time of booking 300000 400000 500000 500000At the time of b...
THANK YOU 
Próxima SlideShare
Cargando en…5
×

Propjuntion vatika turning point 2 3 4 apts-pay 10% no emi till possession~~call-8826419900

Turning Point is a premium group housing complex which enjoys a prime location in Sector 88B, Gurgaon and

within Vatika Express City. It is closely located to the Dwarka Expressway (NH 8A) and is accessed from the expressway by

a 24 m wide Sector road. The site is a part of Vatika Express City (XPC) which is an integrated township with all the

amenities such as education, healthcare, retail etc. It is surrounded by Low rise development all around creating

opportunity for good views on all sides.


2 BHK- 1150 sqft-59 Lacs
3 BHK- 1450 sqft-74.39 Lacs
3 BHK+ 1650 sqft-84.65 Lacs
4 BHK- 1850 sqft-94.91 Lacs
4 BHK+ 2150 sqft-1.10 Cr
Possession : Dec 2019


Keywords :-Vatika turning Point,Vatika turning Point Gurgaon,Vatika Turning Point Sec 88B,Vatika Turning Point Dwarka

Expressway Gurgaon, vatika the turning point, vatika turning point sector 88b,vatika turning point dwarka expressway,

vatika turning point gurgaon,vatika turning point price list,vatika turning point location map,vatika turning point floor

plan,Vatika The Turning Point,Residential Flats in Gurgaon,3 BHK Flats for Sale in Gurgaon,2 BHK Flats for Sale in

Gurgaon,4 BHK Flats for Sale in Gurgaon,2 BHK Flats for in Gurgaon at Affordable Price, Residential Flats for Sale in

Gurgaon Dwarka Expressway,Vatika The Turning Point, The Turning Point on dwarka expressway, The Turning Point in sector

88 gurgaon.

  • Sé el primero en comentar

  • Sé el primero en recomendar esto

Propjuntion vatika turning point 2 3 4 apts-pay 10% no emi till possession~~call-8826419900

  1. 1. VATIKA TURNING POINTVATIKA TURNING POINTVATIKA TURNING POINTVATIKA TURNING POINT
  2. 2. Turning Point
  3. 3. Turning Point
  4. 4. Overview & Location Turning Point is a premium group housing complex which enjoys a prime location in Sector 88B, Gurgaon and within Vatika Express City. It is closely located to the Dwarka Expressway (NH 8A) and is accessed from the expressway by a 24 m wide Sector road. The site is a part of Vatika Express City (XPC) which is an integrated township with all the amenities such as education, healthcare retail etchealthcare, retail etc. It is surrounded by Low rise development all around creating opportunity for good views on all sides.g pp y g
  5. 5. Overview & Location It also has the distinct advantage of a commercial/retailIt also has the distinct advantage of a commercial/retail development right next to it It also enjoys the benefit of being flanked by roads on 3 sidesIt also enjoys the benefit of being flanked by roads on 3 sides which lends an unparalleled advantage of vehicular connectivity from various directions. Distances from important landmarks Delhi/Dwarka – 12 kms. IGI Airport (Terminal 3) – 14 kms. Proposed ISBT & Metro station – 6.5 kms. Sultanpur Bird Sanctuary 15 kmsSultanpur Bird Sanctuary – 15 kms. Vatika India NXT – 3 kms.
  6. 6. Vatika Express City Location Map:Location Map:
  7. 7. Project Features Part of 300 acre Vatika Express City, Gurgaon – An Integratedp y, g g township Located on intersection of two major roads ‐ the Dwarka Expressway (Now NH‐ 8A) & Pataudi Road Group Housing complex consisting of Mid and High‐rise Towers located in Sector 88B, Gurgaon More that 80% open space with long continuous unhindered central greens A long continuous landscaped central green park forms the spine of the Housing with all blocks organized around it.
  8. 8. Project Features While maximum apartments enjoy the park view severalWhile maximum apartments enjoy the park view, several apartments are arranged around the landscaped courtyards to enjoy panoramic views of the park. Clear segregation of vehicular and pedestrian zones for safety Sufficient car parking available in the basement withp g connectivity to each core. Contemporary Architecture with well designed indoor and outdoor spaces that assign an identity to the address Retail to address the daily needs of residents
  9. 9. Turning Point – The Club TWO Elaborate Clubs :TWO Elaborate Clubs : Sports Club & Health Club with following facilities: S i i l ( t f d lt d kid )a. Swimming pool (separate for adults and kids) b. Tennis ,Badminton courts & Gymnasium c. Indoor games like snooker, table tennis etc d. Well designed landscaped greens with nooks for outdoor activities like Kids play area & tot‐lots Social club with following facilities: a. Lounges, restaurant, cards play, area &  Multipurpose hall for family get togethers
  10. 10. BSP ( ) ( )Type Area (Sq. Ft.) BSP (Rs.) 2BHK 1150 5900000 3BHK 1450 7439130 3BHK+ 1650 8465217 4BHK 1850 9491304 4BHK+ 2150 11030435
  11. 11. Payment Plan TLP/CLP (G+9) At the time of Booking Rs.400000 (3BHK & 3BHK+) & Rs.500000 (4BHK+) Within 45 days from the date of booking 5% of BSP less booking amount Within 90 days from the date of booking 10% of BSP Within 180 days from the date of booking 5% of BSP At the Start of Excavation of Tower 5% of BSP + 25% of EDC/IDC Casting of 5th Floor Roof Slab 10% of BSP Completion of Super Structure 10% of BSP + 25% of EDC/IDC On Start of flooring work inside the unit 10% of BSP On Installation of Lift 15% of BSP + 25% of EDC/IDC On offer of Possession 30% of BSP + 25% of EDC/IDC + 100% of (PLC + Car Park + IFMS + Club Membership +Electricity Meter Charges + Piped Gas Supply Charges + STP Charges) + Stamp Dutyy g p pp y g g ) p y & Registration Charges + Escalation in Construction Cost (if any) Other Charges  EDC/IDC: As applicable 1PLC‐Rs.100/‐, 2PLCs‐Rs.150/‐, 3PLCs‐Rs.200/‐ & 4PLCs‐Rs.300/ , / , / One Car Park ‐ Rs.300000/‐ IFMSD: As applicable Club Membership Charges: Rs 75000 * Electric Meter Charges : Rs. 25000 * Gas Pipeline Charges : Rs. 15000 * STP : Rs. 5 psf * Charges are indicative and are subject to change at the time of possession
  12. 12. Payment Plan TLP/CLP (G+35) At the time of Booking  Rs.300000 (2BHK), Rs.400000 (3BHK) & Rs.500000 (4BHK & 4BHK+) Within 45 days from the date of booking  5% of BSP less booking amount Within 90 days from the date of booking   10% of BSP Within 180 days from the date of booking   5% of BSP At the Start of Excavation of Tower 5% of BSP + 25% of EDC/IDC Casting of 9th Floor Roof Slab 10% of BSP Casting of 18th Floor Roof Slab 10% of BSP + 25% of EDC/IDC Casting of 27th Floor Roof Slab 10% of BSP On Completion of Super Structure 10% of BSP  On Start of flooring work inside the unit 10% of BSP On Installation of Lift 5% of BSP + 25% of EDC/IDC On offer of Possession 20% of BSP + 25% of EDC/IDC + 100% of (PLC + Car Park + IFMS + Club Membership  + Electricity Meter Charges + Piped Gas Supply Charges + STP Charges) + Stamp  Duty & Registration Charges + Escalation in Construction Cost (if any) Other Charges EDC/IDC: As applicable 1PLC‐Rs.100/‐, 2PLCs‐Rs.150/‐, 3PLCs‐Rs.200/‐ & 4PLCs‐Rs.300 One Car Park Rs 300000/One Car Park ‐ Rs.300000/‐ Club Membership ‐ Rs.75000/‐ IFMSD: As applicable * Electric Meter Charges : Rs. 25000 * Gas Pipeline Charges : Rs. 15000 * STP : Rs. 5 psf * Charges are indicative and are subject to change at the time of possession
  13. 13. Easy Salary Plan (G+35) Milestones 2BHK 3BHK 4BHK 4BHK+ At the time of booking 300000 400000 500000 500000At the time of booking 300000 400000 500000 500000 Within 45 days from the date of booking  5% of BSP less booking  amount 5% of BSP less booking  amount 5% of BSP less booking  amount 5% of BSP less booking  amount Within 90 days from the date of booking   10% of BSP 10% of BSP 10% of BSP 10% of BSP Within 180 days from the date of booking   5% of BSP   5% of BSP   5% of BSP   5% of BSP   9 h M h 19 h M h (ECS P M h) 45000 PM9th Months ‐ 19th Months (ECS Per Moth) 45000 PM  55000 PM 75000 PM 85000 PM 20 Months or 10th Floor Roof Slab is Cast* 450000 550000 750000 850000 21th Months ‐ 31th Months (ECS Per Moth) 45000 PM  55000 PM 75000 PM 85000 PM 32 Months or 15th Floor Roof Slab is Cast* 450000 550000 750000 850000 33rd Months ‐ 43rd Months (ECS Per Moth) 45000 PM  55000 PM 75000 PM 85000 PM 44 Months Or Super Structure of Tower* 450000 550000 750000 850000 45th Months ‐ 48th Months (ECS Per Moth) 45000 PM  55000 PM 75000 PM 85000 PM Rs 2266304 + 100% of (PLC + Rs.2568043 + 100% of  (PLC + EDC/IDC + Car  Rs.3129348 + 100% of  (PLC + EDC/IDC + Car  On Offer of Possession  Rs.1705000 + 100% of (PLC +  EDC/IDC + Car Park + IFMS +  Club Membership + Electricity  Meter Charges + Piped Gas  Supply Charges + STP Charges)  + Stamp Duty & Registration  Rs.2266304 + 100% of (PLC +  EDC/IDC + Car Park + IFMS +  Club Membership + Electricity  Meter Charges + Piped Gas  Supply Charges + STP  Charges) + Stamp Duty &  Registration Charges + Park + IFMS + Club  Membership +  Electricity Meter  Charges + Piped Gas  Supply Charges + STP  Charges) + Stamp Duty  Park + IFMS + Club  Membership +  Electricity Meter  Charges + Piped Gas  Supply Charges + STP  Charges) + Stamp Duty  Charges + Escalation in  Construction Cost (if any) Registration Charges +  Escalation in Construction  Cost (if any) & Registration Charges  + Escalation in  Construction Cost (if  any) & Registration Charges  + Escalation in  Construction Cost (if  any)
  14. 14. THANK YOU 

×