SlideShare a Scribd company logo
Cargo sous Terrain

Cargo concept for integrated pallet
based underground transportation




                                      1
Cargo sous Terrain
     highlights at oneglance
1.   Project drivenbyfuturecustomersneeds
     and desires (consequentlymarketdriven)

1.   Realisation through private financing

1.   Trafficsegregation

1.   In general, proven and tested technology
     only


                                                2
System Design
       Cargosous Terrain
                        • Focus on logistics –   needs,
                          full integrations !

                        • “Committed traffic” ensures
Requirements              profitability
               System
 CargoTube              • Design of cargo moving systems
               Design
                          based on the know how of the
                          technology partners
 Technology
                        • Setting up project organization
                          with local partners


                                                            3
Multidisziplinary
                                                                      Project setup
                                                                      Cargo sous Terrain
                                                                                                                                       • Short PoC phase (12 month)
                     Construction


                                      Mechatronic


                                                    Logistics




                                                                                                                Business-
                                                                      Operatins


                                                                                                 Oecology



                                                                                                                 model
Users (logistics)




                                                                                                                                       • Short planing phase (12 month)
                                                                                                                            Proof of
                                                                                                                            Concept
                                    CargoTube Inc                                                                                      • Short building phase
                                                                                                                               &
                                                                                                                                         (40 km / year)
  Operators




                                                                                                                            Planing
                                                                                  associations
                                                       universities
                                     authorities




                                                                                                            Investors
                    politics




                                                                                                                                                                          4
Private financing
        • Low costs
          – Construction
          – Financing
          – Operations
        • Revenues
          –   Operations
          –   CO2-certificates
          –   Increase of land price
          –   Compensation from state
          –   Multiple use of tunnel


                                        5
Life Quality
         • Improve
           • Life quality
           • Supply reliability
         • Reduced
           •   CO2
           •   Pollution
           •   Noise
           •   Energy
           •   Land usage
           •   …..


                                  6
Technical
considerations
        • Diameter : 4.5 – 6 mfor
           – 3 palette tracks
           – One tunnel – both ways
           – Multiple use of tunnel
             (generating additional revenue)

        • Speed: 20 – 30 km/h




                                          7
• Proof of conceptCargo sous Terrain Switzerland
  (80 km)
                                                                                                     Vision
                                                                                                     • Surface for humans
             Extension north                   Zurich                 Winterthur
                                                                                   Extension east    • Supplies underground
                                                                                                     • Water, gas, electricity is
                                                                                                       underground, its time for
                                                           Cityeast                                    cargo underground
                                                                                                     • Quality of live increases
                               Suhr         Cityouest

                   Härkingen                                                                         Cargo sous Terrain
                                                                                                     • Low cost – high
                                                                                                       performance
                                 CargoTube phase 1                                                   • Sustainable
                                 Warehouses,, Crossdocking, Shoppingcenters,                         • profitable
                                 Further phases
                                 Interfaces to train und trucks
Extension ouest



                                                                                                    Container link from harbor to
• Harbor link Hamburg (37 km)                                                                       logistic center

                                                                                                    Project proposal: City quality
• World Bank (transport carbon division):                                                           check up




                                                                                                                                     8
Cargosous Terrain
              • Technology partners are
                ligned up
                 –   Logistics
                 –   Mechatronics
                 –   Geoengineering
                 –   Financial engineering
              • First results indicate
                profitable investment !
BAV




                                             9
For your attention and




future partnership to success




                            10

More Related Content

Similar to Cargo Sous terrain

Product Roadmap Overview
Product Roadmap OverviewProduct Roadmap Overview
Product Roadmap Overview
tracksoftware
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
Paul Allen
 
Illinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USAIllinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USA
Global CCS Institute
 
Southern Company CCS Project Portfolio
Southern Company CCS Project PortfolioSouthern Company CCS Project Portfolio
Southern Company CCS Project Portfolio
Global CCS Institute
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
canaleenergia
 

Similar to Cargo Sous terrain (20)

Product Roadmap Overview
Product Roadmap OverviewProduct Roadmap Overview
Product Roadmap Overview
 
Alignment brochure web
Alignment brochure webAlignment brochure web
Alignment brochure web
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
IRENEC-PPT
IRENEC-PPTIRENEC-PPT
IRENEC-PPT
 
Design On The Delaware 2008
Design On The Delaware  2008Design On The Delaware  2008
Design On The Delaware 2008
 
NAVFAC Conference Briefing
NAVFAC Conference BriefingNAVFAC Conference Briefing
NAVFAC Conference Briefing
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Quantm enterprise english
Quantm enterprise   englishQuantm enterprise   english
Quantm enterprise english
 
Quantm professional english
Quantm professional   englishQuantm professional   english
Quantm professional english
 
ECR Europe Forum '08. Road map to sustainable transport
ECR Europe Forum '08. Road map to sustainable transportECR Europe Forum '08. Road map to sustainable transport
ECR Europe Forum '08. Road map to sustainable transport
 
DHL - Logistics & eBusiness Standards
DHL - Logistics & eBusiness StandardsDHL - Logistics & eBusiness Standards
DHL - Logistics & eBusiness Standards
 
Dinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp SunumDinamikler 2017 - Alan Sharp Sunum
Dinamikler 2017 - Alan Sharp Sunum
 
Illinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USAIllinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USA
 
Southern Company CCS Project Portfolio
Southern Company CCS Project PortfolioSouthern Company CCS Project Portfolio
Southern Company CCS Project Portfolio
 
Glasgow elevator pitches
Glasgow elevator pitchesGlasgow elevator pitches
Glasgow elevator pitches
 
Why modularization should not be based on cost and size alone
Why modularization should not be based on cost and size aloneWhy modularization should not be based on cost and size alone
Why modularization should not be based on cost and size alone
 
Partnership with Synergy
Partnership with SynergyPartnership with Synergy
Partnership with Synergy
 
TRC Oppday Q255
TRC Oppday Q255TRC Oppday Q255
TRC Oppday Q255
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
 

More from Global Infrastructure Basel Foundation

More from Global Infrastructure Basel Foundation (20)

GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD PanelGIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
 
GIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_RoosGIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_Roos
 
GIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_RuijieGIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_Ruijie
 
GIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-KornmannGIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-Kornmann
 
GIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_GeorgouliasGIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_Georgoulias
 
GIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_BaillonGIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_Baillon
 
GIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_HughesGIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_Hughes
 
GIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_GrantGIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_Grant
 
GIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_GonzalezGIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_Gonzalez
 
GIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_BustinduyGIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_Bustinduy
 
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_BarbenGIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
 
GIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_ZhangGIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_Zhang
 
GIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von GuntenGIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von Gunten
 
GIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_FischerGIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_Fischer
 
GIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_AlexanderGIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_Alexander
 
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
 
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_JianzhongGIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_PretelGIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_BreschGIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
 

Recently uploaded

Recently uploaded (20)

Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?
 
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step InstructionsThe Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdf
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 

Cargo Sous terrain

  • 1. Cargo sous Terrain Cargo concept for integrated pallet based underground transportation 1
  • 2. Cargo sous Terrain highlights at oneglance 1. Project drivenbyfuturecustomersneeds and desires (consequentlymarketdriven) 1. Realisation through private financing 1. Trafficsegregation 1. In general, proven and tested technology only 2
  • 3. System Design Cargosous Terrain • Focus on logistics – needs, full integrations ! • “Committed traffic” ensures Requirements profitability System CargoTube • Design of cargo moving systems Design based on the know how of the technology partners Technology • Setting up project organization with local partners 3
  • 4. Multidisziplinary Project setup Cargo sous Terrain • Short PoC phase (12 month) Construction Mechatronic Logistics Business- Operatins Oecology model Users (logistics) • Short planing phase (12 month) Proof of Concept CargoTube Inc • Short building phase & (40 km / year) Operators Planing associations universities authorities Investors politics 4
  • 5. Private financing • Low costs – Construction – Financing – Operations • Revenues – Operations – CO2-certificates – Increase of land price – Compensation from state – Multiple use of tunnel 5
  • 6. Life Quality • Improve • Life quality • Supply reliability • Reduced • CO2 • Pollution • Noise • Energy • Land usage • ….. 6
  • 7. Technical considerations • Diameter : 4.5 – 6 mfor – 3 palette tracks – One tunnel – both ways – Multiple use of tunnel (generating additional revenue) • Speed: 20 – 30 km/h 7
  • 8. • Proof of conceptCargo sous Terrain Switzerland (80 km) Vision • Surface for humans Extension north Zurich Winterthur Extension east • Supplies underground • Water, gas, electricity is underground, its time for Cityeast cargo underground • Quality of live increases Suhr Cityouest Härkingen Cargo sous Terrain • Low cost – high performance CargoTube phase 1 • Sustainable Warehouses,, Crossdocking, Shoppingcenters, • profitable Further phases Interfaces to train und trucks Extension ouest Container link from harbor to • Harbor link Hamburg (37 km) logistic center Project proposal: City quality • World Bank (transport carbon division): check up 8
  • 9. Cargosous Terrain • Technology partners are ligned up – Logistics – Mechatronics – Geoengineering – Financial engineering • First results indicate profitable investment ! BAV 9
  • 10. For your attention and future partnership to success 10