This presentation details out the Asia's largest CSP power plant (at its time of commissioning) - The Godawari Green energy solar thermal power plant. This is an redocs original presentation. All pictures have been sourced. For more quality resources log on to http://solarreference.com
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Godawari green energy - Solar thermal power plant
1. Godawari Green Energy
Asia’s biggest solar-thermal plant
Information compiled and brought to you by
www.redocs.co
Image source: Bloomberg
2. All copyrights to trademark(s) and other
IPR belong to their respective owners. The
information contained in this presentation
is based on secondary research. No claim is
made towards accuracy of the data.
6/17/2013 2www.redocs.co
3. Asia’s biggest solar-thermal plant
• 50 MWe capacity solar thermal power plant
• Started supplying electricity to grid on World
Environment day 2013
• India’s first solar thermal power plant under
National Solar Mission
• Construction: Nov 2011 – Jun 2013
• Status: Operational
6/17/2013 3www.redocs.co
4. Location
27° 36' 0.36" N
72° 13' 24.6" E
Nokh Village,
Pokaran Tehsil,
Jaisalmer,
Rajasthan, India
Land area = 150h
Image Source: Google Maps
Satellite view of the plant under construction
6/17/2013 4www.redocs.co
5. Technology
Solar technology – Parabolic trough
• Solar Collector Assemblies (SCA): EuroTrough ET-150
• Mirrors / Reflective surface: Flabeg RP3
• Number of SCAs: 480
• Number of loops: 120
• Number of SCAs per loop: 4
• Number of modules per SCA: 12
• SCA aperture area: 817 m²
6/17/2013 5www.redocs.co
6. Technology (contd.)
• SCA length: 144 m
• Reflecting area: 394 000 m²
• Heat Collector Element (Tube): Schott PTR70
Heat transfer fluid
• Heat Transfer Fluid: Dowtherm A
• HTF Temp in: 293°C
• HTF Temp out: 390°C
6/17/2013 6www.redocs.co
9. Participants
• Developer - Godawari Green Energy Limited
• Owner - Godawari Green Energy Limited (100%)
• EPC Contractor - Lauren-Jyoti
• Generation Offtaker - NTPC Vidyut Vyapar Nigam
Limited
Detailed list of suppliers on next slide
6/17/2013 9www.redocs.co
14. Commercials
• PPA/Tariff Rate: 12.2 Rs per kWh
• PPA/Tariff Period: 25 years
• The project has also been registered in the
Clean Development Mechanism of the
UNFCCC to earn Certified Emission Reduction
(CER) credits
• The project has overshot its budget by about
20% reports Bloomberg
6/17/2013 www.redocs.co 14
15. Visit us on
www.redocs.co
your personal library on RE
I would be bringing out an updated and very detailed
version of this presentation, to reserve your copy don’t
forget to click on “Get in touch” below. Better still log on
to www.redocs.co and subscribe to updates (right pane)