•  Work Package (WP) 1 – Desk study and literature review
•  WP 2 – Analytical method development and optimisation
•  WP 3 – Passive sampling, pilot monitors and spot sampling
•  WP 4 – Biota sampling and testing for selected substances
•  WP 5 – Upland activity: Cypermethrin study
•  WP 6 – WWTP outfall receiving waters
•  WP 7 – Integration and assessment of datasets
•  WP 8 – Project management
Work	
  Package	
  1	
  
Target	
  Monitoring	
  Sites	
  
•  Dublin	
  sites	
  have	
  been	
  changed	
  and	
  an	
  extra	
  
site	
  has	
  been	
  included:	
  
– Lucan	
  Bridge,	
  Malahide,	
  Kilcullen	
  Bridge	
  and	
  
Poobeg	
  	
  
•  This	
  sampling	
  will	
  be	
  taking	
  place	
  from	
  May	
  
2014.	
  
•  Historical	
  data	
  from	
  MI	
  and	
  DCU	
  is	
  available	
  
for	
  these	
  sites.	
  
Target	
  Monitoring	
  Sites	
  
•  Upstream	
  site	
  added	
  to	
  cypermethrin	
  study.	
  
•  SPMD,	
  POCIS,	
  grab	
  samples	
  and	
  biota	
  to	
  be	
  
collected.	
  
•  Patricia	
  McCreesh	
  and	
  Ray	
  Thomas	
  supplied	
  
informaNon	
  on	
  historic	
  data	
  and	
  site	
  selecNon	
  
for	
  Donegal.	
  	
  
Protocol	
  for	
  Biota	
  Sampling	
  
•  50	
  My#lus	
  edulis	
  mussels	
  
•  4	
  –	
  6	
  cm,	
  4	
  –	
  5	
  cm	
  
•  Depurate	
  for	
  24	
  hours	
  
•  Dissect	
  (shell	
  weight,	
  Nssue	
  
weight)	
  
•  Homogenise	
  
•  Store	
  at	
  -­‐30C	
  
Literature	
  Review	
  
•  ‘Passive	
  Sampling	
  of	
  Emerging	
  Compounds’	
  
– Environmental	
  PolluNon	
  (IF	
  3.730)	
  
Deliverables	
  
Work	
  Package	
  1	
   Status	
  
Desk	
  study	
  and	
  literature	
  review	
   Complete	
  
SelecNon	
  of	
  target	
  monitoring	
  staNons	
  	
   Complete	
  
Develop	
  protocols	
  and	
  select	
  locaNons	
  for	
  biota	
  monitoring	
  	
   Complete	
  
Develop	
  detailed	
  	
  protocols	
  for	
  passive	
  sampler	
  deployments	
  	
   Complete	
  
Final	
  Report:	
  Desk	
  study	
  with	
  protocols	
  for	
  deployment,	
  biota	
  sampling	
  	
  
Work	
  Package	
  2	
  
Work	
  Package	
  2	
  :	
  
•  Method development ongoing for:
–  Organohalogen pesticides by GCMS
–  HBCD and BFRs by LCMS
–  PFOS by LCMS
–  Pharmaceuticals and endocrine disrupting compounds
•  Extraction by soxhlet/solid phase extraction (SPE)
•  Analysis by gas and liquid chromatography with
tandem mass spectrometric or UV detection
Deliverables	
  
Work	
  Package	
  2	
   Status	
  
Method	
  selecNon	
  and	
  opNmisaNon	
  
Methods	
  in	
  place	
  for	
  	
  24	
  
of	
  27	
  analytes	
  
Methods	
   for:	
   Organohalogen	
   pesNcides,	
   HBCD.	
  
Transfer	
  of	
  BFR	
  method	
  to	
  LC-­‐MS/MS	
  
Ongoing	
  
Methods	
  for:	
  EDCs	
  	
   Ongoing	
  
Methods	
  for:	
  PharmaceuNcals	
  	
   Ongoing	
  
Methods	
  for:	
  PFOS	
  	
   Ongoing	
  
Note: All methods to be operational by month 26.
Work	
  Package	
  3	
  
Work Package 3:
•  Catchment approach has been taken in
Cork
•  Deployment of POCIS and PDMS samplers
in July 2013
•  POCIS collected after 4 weeks
•  PDMS and water samples collected after 2
months
Sampling	
  
•  Second	
  sampling	
  regime	
  in	
  Cork	
  underway	
  for	
  
PDMS	
  and	
  POCIS.	
  
•  POCIS	
  trial	
  to	
  Ne-­‐in	
  with	
  WP	
  3	
  in	
  Cork	
  
– 2,	
  4,	
  6	
  week	
  collecNons	
  to	
  evaluate	
  uptake	
  
•  Samplers	
  deployed	
  in	
  Kilkieran	
  (March	
  2014),	
  
POCIS	
  and	
  grab	
  samples	
  collected.	
  	
  
Results: POCIS and Grab Samples
Shandon	
   Lough	
  Mahon	
   Cork	
  Outer	
  Harbour	
   Iniscarra	
   Inchigeelagh	
  
Analyte	
   Units	
  
17alpha	
  
ethynyloestradiol	
  
(EE2)	
  
ng	
   <0.2	
   <0.2	
   <0.2	
   1.39	
   <0.2	
  
17beta	
  oestradiol	
  
(E2)	
   ng	
   <0.5	
   2.36	
   1.98	
   <0.5	
   <0.5	
  
17alpha	
  
ethynyloestradiol	
  
(EE2)	
  
ng/L*	
   nd	
   nd	
   nd	
   nd	
   nd	
  
17beta	
  oestradiol	
  
(E2)	
  
ng/L*	
   nd	
   nd	
   nd	
   nd	
   nd	
  
Deliverables	
  
Work	
  Package	
  3	
   Status	
  
Prepare	
  equipment	
  (PDMS	
  &	
  POCIS)	
  for	
  deployment	
   Complete	
  
Deployment	
  of	
  samplers	
   Phase	
  two	
  
complete	
  
CollecNon	
  and	
  screening	
  analysis	
  	
   Ongoing	
  
Spot	
  sampling	
  as	
  compliance	
  measure	
   Phase	
  two	
  
complete	
  
Work	
  Package	
  4	
  
Biota	
  sampling	
  
•  Fish	
  samples	
  supplied	
  by	
  IFI	
  for	
  Cork	
  
catchment	
  (2013)	
  
– Trout	
  	
  (Upper	
  Lee	
  catchment)	
  
– Whole	
  fish	
  
•  Analysed	
  for	
  organic	
  pollutants	
  at	
  the	
  MI	
  
– Ongoing	
  
•  IFI	
  to	
  supply	
  more	
  samples	
  in	
  2014	
  
•  Mussels	
  collected	
  from	
  marine	
  sites	
  
Deliverables	
  
Work	
  Package	
  4	
   Status	
  
Sampling	
  programme	
  for	
  biota	
  at	
  all	
  locaNons	
   Ongoing	
  
Sample	
  collecNon	
  &	
  preparaNon	
   Ongoing	
  
Analysis	
  of	
  shellfish	
  and	
  fish	
  samples	
   Ongoing	
  
RecommendaNons	
  	
   Cork	
  PDMS	
  
redeployed	
  
Work	
  Package	
  5	
  
StaQons	
  and	
  sampling	
  plan	
  
County	
   Site	
   RaNonale	
   POCIS	
   PDMS	
   Water	
   Mussels	
   Fish	
  
(IFI)	
  
Cork	
  
Inchigeelagh	
   Upstream	
  river	
  staNon	
   ✓

 ✓

 ✓

 ✓

Inniscarra	
   Downstream	
  river	
  staNon	
   ✓

 ✓

 ✓

 ✓

Shandon	
   Riverine/transiNonal	
   ✓

 ✓

 ✓

 ✓

Lough	
  Mahon	
   Riverine/transiNonal	
  staNon	
  	
   ✓

 ✓

 ✓

 ✓

Outer	
  bay	
  	
   Riverine/transiNonal	
  staNon	
   ✓

 ✓

 ✓

 ✓

Dublin	
  
Malahide	
   High	
  pressure	
  coastal	
   ✓

 ✓

 ✓

 ✓

	
  	
  
Poolbeg	
   Riverine/transiNonal	
   ✓

 ✓

 ✓

 ✓

Lucan	
  Bridge	
   Downstream	
  river	
  staNon	
   ✓

 ✓

 ✓

 ✓

Kilcullen	
  Bridge	
   Upstream	
  river	
  staNon	
   ✓

 ✓

 ✓

 ✓

Galway	
  
Kilkieran	
  Bay	
   Coastal	
  reference	
  staNon	
   ✓

 ✓

 ✓

 ✓

Mayo	
  
Burrishoole	
   Upstream	
  river	
  staNon	
   ✓

 ✓

 ✓

 ✓

Donegal	
  
Glen	
  Lackagh	
  1	
   Cypermethrin	
  study	
  	
   SPMD

 ✓

 ✓

EPA	
  Benthic	
  kick	
  
sampling

Glen	
  Lackagh	
  2	
   Cypermethrin	
  study	
  	
   SPMD

 ✓

 ✓
Work	
  Package	
  5	
  :	
  
•  Cypermethrin study beginning April 2014
•  Analysis by Ray Thomas, NIEA
•  Site (s):
–  Glen Lackagh sites 38G040900 and 38G040700
upstream of Glen Lough, Donegal
–  Pre- and post- application study
Cypermethrin	
  Data	
  
River	
  	
   Q-­‐Value	
   Date	
   X	
   Y	
   Remarks	
  from	
  fieldsheets	
  
GLEN	
  	
  
(LACKAGH)	
  
2-­‐3	
   28/09/2012	
   212685	
   431467	
   InvesNgaNve.	
  Toxic	
  signs	
  at	
  0900.	
  
Worse	
  here.	
  Sheep	
  suspected	
  –	
  
cypermethrin	
  
EffecNvely	
  a	
  dead	
  river	
  here.	
  Some	
  
forestry	
  u/s.	
  Also	
  one	
  field	
  that	
  
looks	
  ''burned''	
  possible	
  
herbicide?	
  Lots	
  of	
  heather	
  u/s.	
  
didn''t	
  see	
  sheep	
  on	
  open	
  land.	
  
Okay	
  at	
  0400	
  
GLEN	
  	
  
(LACKAGH)	
  
3/0	
   26/09/2012	
   211832	
   431043	
   Something	
  wrong	
  here.	
  Two	
  	
  
samples	
  taken.	
  Very	
  sparse.	
  Sheep	
  	
  
dip?	
  	
  
Cypermethrin	
  Assessment	
  
•  Large	
  dataset	
  of	
  usage	
  and	
  occurrence	
  reports	
  has	
  
been	
  compiled.	
  
–  Proposed	
  desk	
  study	
  on	
  this	
  data	
  
•  InformaNon	
  from	
  census	
  of	
  agriculture,	
  department	
  of	
  
veterinary	
  medicine,	
  Coilte,	
  Teagasc,	
  DEFRA,	
  
department	
  of	
  Agriculture,	
  etc.	
  	
  
•  Ray	
  Thomas,	
  Patricia	
  McCreesh	
  and	
  Danielle	
  Ashton	
  
have	
  assisted	
  the	
  project	
  team	
  in	
  the	
  collecNon	
  of	
  this	
  
data.	
  
Deliverables	
  
Work	
  Package	
  5	
   Status	
  
Site	
  selecNon	
  and	
  sampler	
  deployment	
  
Sites	
  selected,	
  
deployment	
  
ongoing	
  
Spot	
  sample	
  collecNon	
  	
  	
   Ongoing	
  
Analysis	
  of	
  samples	
  for	
  cypermethrin	
   May/June	
  2014	
  
Passive	
  sampler	
  extracNon	
  and	
  analysis	
  for	
  cypermethrin	
   June	
  2014	
  
Assessment	
  of	
  upland	
  acNvity	
   Ongoing	
  
Work	
  Package	
  6	
  
Work	
  Package	
  6	
  :	
  
•  WWTP outfall study-EDCs and pharmaceuticals
•  Methods
–  In place for E2 in water and biota
–  Optimising method for EE2 to detect below EQS
–  Diclofenac method under development
•  POCIS devices suitable
–  Issue with sampling rates
•  MI experience with integrated study-historical data
for E2 and EE2 in Dublin
Deliverables	
  
Work	
  Package	
  6	
   Status	
  
Site	
  selecNon	
  and	
  sampler	
  deployment	
   Ongoing	
  
Spot	
  sample	
  collecNon	
  	
   Ongoing	
  
Analysis	
  of	
  samples	
  for	
  EDCs	
  and	
  PharmaceuNcals	
   Ongoing	
  
Passive	
   sampler	
   extracNon	
   and	
   analysis	
   for	
   EDCs	
   and	
  
PharmaceuNcals	
   Ongoing	
  
CollecNon	
  of	
  background	
  data	
  on	
  WWTP	
  efficiency	
   Ongoing	
  
Work	
  Package	
  7	
  
PS	
  and	
  biota	
  
•  Biota	
  EQS	
  set	
  for	
  11	
  compounds	
  
•  EU	
  guidance	
  document	
  currently	
  being	
  developed	
  
–  SelecNon	
  of	
  target	
  organism	
  differs	
  between	
  MS	
  
–  Human	
  health	
  vs	
  secondary	
  poisoning	
  
–  Require consistency and comparability to assess compliance against
the EQSbiota and in interpretation of data
•  PS	
  and	
  biota	
  	
  
–  Similar	
  drivers	
  for	
  uptake	
  
–  Environmental	
  factors	
  can	
  be	
  modelled	
  
–  Metabolism	
  and	
  health	
  status	
  can	
  be	
  complicaNng	
  factors	
  
–  Suitable	
  where	
  no	
  biota	
  are	
  present	
  
White PhD thesis: Relationship between BAFs (dry weight) calculated from mussels and PS at the Kilkieran reference site vs. parameter LogKpw.
1	
  
2	
  
3	
  
4	
  
5	
  
6	
  
7	
  
3	
   3.5	
   4	
   4.5	
   5	
   5.5	
   6	
   6.5	
   7	
   7.5	
  
Log	
  BAF	
  (dry	
  weight)	
  
Log	
  Kpw	
  
PAH	
  BAFdw	
  
PCB	
  BAFdw	
  
OC	
  BAFdw	
  
PBDE	
  BAFdw	
  
Log BAFdw = 0.80 (Log Kpw) + 0.13 R2= 0.75
BAF	
  model	
  for	
  PDMS	
  and	
  biota	
  (mussels):	
  Kilkieran	
  	
  
Work	
  Package	
  8	
  
Project	
  Management	
  
•  Monthly and weekly meetings and conference
calls have continued for the project team.
•  Monthly analytical reports have been
introduced to facilitate the final STRIVE report
deliverable due at project completion.
Funding	
  OpportuniQes	
  
PublicaQons	
  in	
  PreparaQon	
  
•  JPI Water call
•  Passive sampling review (submitted)
•  Book (August 2014)
•  Review chapter (May/June 2014)
Deliverables	
  
Work	
  Package	
  3	
   Status	
  
Kick-­‐off	
  meeNng	
   Complete	
  
Workshops	
   1/3	
  
Project	
  meeNngs	
   Ongoing	
  
Financial	
  and	
  Technical	
  reports	
  (	
  EPA	
  Deadlines)	
   Ongoing	
  
Monthly	
  communicaNons	
   Ongoing	
  
Final	
  Report	
   2016	
  
Acknowledgements
This project is funded by the EPA as part of the Science,
Technology, Research and Innovation for the Environment
(STRIVE) Programme 2007–2013. This programme is financed by
the Irish Government under the National Development Plan 2007–
2013.
It is administered on behalf of the Department of the Environment,
Heritage and Local Government by the Environmental Protection
Agency, which has the statutory function of co-ordinating and
promoting environmental research.

Más contenido relacionado

La actualidad más candente

Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-... Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...hydrologywebsite1
 
Item 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesItem 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesSoils FAO-GSP
 
Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)ExternalEvents
 
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Soils FAO-GSP
 
R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015Kulbir Banwait
 
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodiesOECD Environment
 
lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)ExternalEvents
 
Future of PAH Monitoring Post Oil Spills
Future of PAH Monitoring Post Oil SpillsFuture of PAH Monitoring Post Oil Spills
Future of PAH Monitoring Post Oil SpillsChemistry Matters Inc.
 
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling Study
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling StudyPIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling Study
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling StudyMarcellus Drilling News
 
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect... Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...hydrologyproject2
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...LOWaterkeeper
 
Decontamination of mercury impacted process equipment
Decontamination of mercury impacted process equipmentDecontamination of mercury impacted process equipment
Decontamination of mercury impacted process equipmentISCT GROUP US LLC
 
A field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshareA field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshareValerie McCarthy
 
Brownfield Briefing Ra 2008 Presentation Mfc
Brownfield Briefing Ra 2008 Presentation MfcBrownfield Briefing Ra 2008 Presentation Mfc
Brownfield Briefing Ra 2008 Presentation Mfcmfchen2002
 

La actualidad más candente (18)

Item 6 Thai SLN
Item 6 Thai SLNItem 6 Thai SLN
Item 6 Thai SLN
 
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-... Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
Download-manuals-water quality-technicalpapers-inter-labfindingsaqc3rdround-...
 
Item 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesItem 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updates
 
PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014PAHs_are_families_Watertech2014
PAHs_are_families_Watertech2014
 
Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)
 
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
Item 7: Downscaling GLOSOLAN and SEALNET PTs - case study from China
 
R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015
 
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 -	Upgrading the water monitoring capacities for SW and GW bodiesItem 1.2 -	Upgrading the water monitoring capacities for SW and GW bodies
Item 1.2 - Upgrading the water monitoring capacities for SW and GW bodies
 
lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)
 
Future of PAH Monitoring Post Oil Spills
Future of PAH Monitoring Post Oil SpillsFuture of PAH Monitoring Post Oil Spills
Future of PAH Monitoring Post Oil Spills
 
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling Study
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling StudyPIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling Study
PIOGA/MSC Observations/Questions on PA DEP Radiation in Shale Drilling Study
 
Item 12d.Vietnam
Item 12d.VietnamItem 12d.Vietnam
Item 12d.Vietnam
 
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect... Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 
Frank resume 20150707
Frank resume 20150707Frank resume 20150707
Frank resume 20150707
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
 
Decontamination of mercury impacted process equipment
Decontamination of mercury impacted process equipmentDecontamination of mercury impacted process equipment
Decontamination of mercury impacted process equipment
 
A field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshareA field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshare
 
Brownfield Briefing Ra 2008 Presentation Mfc
Brownfield Briefing Ra 2008 Presentation MfcBrownfield Briefing Ra 2008 Presentation Mfc
Brownfield Briefing Ra 2008 Presentation Mfc
 

Similar a Steering meeting presentation april 15 2014

Seth Ervin Resume
Seth Ervin Resume Seth Ervin Resume
Seth Ervin Resume Seth Ervin
 
7 jb task force meeting 10 29-15 keith
7 jb task force meeting 10 29-15 keith7 jb task force meeting 10 29-15 keith
7 jb task force meeting 10 29-15 keithecowatchers
 
Update of the tasmanian pacific oyster health surveillance program kevin ...
Update of the tasmanian pacific oyster health surveillance program     kevin ...Update of the tasmanian pacific oyster health surveillance program     kevin ...
Update of the tasmanian pacific oyster health surveillance program kevin ...adamsaddler
 
Philippines, Department of Agriculture, Laboratory Services Division
Philippines, Department of Agriculture, Laboratory  Services DivisionPhilippines, Department of Agriculture, Laboratory  Services Division
Philippines, Department of Agriculture, Laboratory Services DivisionExternalEvents
 
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...LPE Learning Center
 
Item 6: The Thai Soil Laboratory Network
Item 6: The Thai Soil Laboratory Network Item 6: The Thai Soil Laboratory Network
Item 6: The Thai Soil Laboratory Network Soils FAO-GSP
 
1st NENALAB Meeting_Item 34: Decision making
1st NENALAB Meeting_Item 34: Decision making1st NENALAB Meeting_Item 34: Decision making
1st NENALAB Meeting_Item 34: Decision makingSoils FAO-GSP
 
Item 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANItem 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANSoils FAO-GSP
 

Similar a Steering meeting presentation april 15 2014 (20)

Seth Ervin Resume
Seth Ervin Resume Seth Ervin Resume
Seth Ervin Resume
 
7 jb task force meeting 10 29-15 keith
7 jb task force meeting 10 29-15 keith7 jb task force meeting 10 29-15 keith
7 jb task force meeting 10 29-15 keith
 
Session 4 - Peter Korytar
Session 4 - Peter KorytarSession 4 - Peter Korytar
Session 4 - Peter Korytar
 
giesy-gwf-omics.pptx
giesy-gwf-omics.pptxgiesy-gwf-omics.pptx
giesy-gwf-omics.pptx
 
SEPA update for SFCC annual meeting. Alistair Duguid
SEPA update for SFCC annual meeting. Alistair DuguidSEPA update for SFCC annual meeting. Alistair Duguid
SEPA update for SFCC annual meeting. Alistair Duguid
 
Update of the tasmanian pacific oyster health surveillance program kevin ...
Update of the tasmanian pacific oyster health surveillance program     kevin ...Update of the tasmanian pacific oyster health surveillance program     kevin ...
Update of the tasmanian pacific oyster health surveillance program kevin ...
 
Resume-OWS
Resume-OWSResume-OWS
Resume-OWS
 
Philippines, Department of Agriculture, Laboratory Services Division
Philippines, Department of Agriculture, Laboratory  Services DivisionPhilippines, Department of Agriculture, Laboratory  Services Division
Philippines, Department of Agriculture, Laboratory Services Division
 
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...
Preliminary Technical Evaluation of Three Reports by U.S. Environmental Prote...
 
King - What We Monitor for and What We Learn
King - What We Monitor for and What We LearnKing - What We Monitor for and What We Learn
King - What We Monitor for and What We Learn
 
Organic chemist
Organic chemistOrganic chemist
Organic chemist
 
Item 6: The Thai Soil Laboratory Network
Item 6: The Thai Soil Laboratory Network Item 6: The Thai Soil Laboratory Network
Item 6: The Thai Soil Laboratory Network
 
Fones G - UEI Day 1 - Kochi Jan18
Fones G - UEI Day 1 - Kochi Jan18Fones G - UEI Day 1 - Kochi Jan18
Fones G - UEI Day 1 - Kochi Jan18
 
1st NENALAB Meeting_Item 34: Decision making
1st NENALAB Meeting_Item 34: Decision making1st NENALAB Meeting_Item 34: Decision making
1st NENALAB Meeting_Item 34: Decision making
 
Thesis Defense
Thesis DefenseThesis Defense
Thesis Defense
 
Phosphorus index &amp; topo swat weld
Phosphorus index &amp; topo swat   weldPhosphorus index &amp; topo swat   weld
Phosphorus index &amp; topo swat weld
 
Water quality targeting success stories perez
Water quality targeting success stories   perezWater quality targeting success stories   perez
Water quality targeting success stories perez
 
Item 23
Item 23Item 23
Item 23
 
Item 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANItem 23: Report on GLOSOLAN
Item 23: Report on GLOSOLAN
 
JOURNAL CLUB PRESENTATION (20L81S0711-PA)
JOURNAL CLUB PRESENTATION (20L81S0711-PA)JOURNAL CLUB PRESENTATION (20L81S0711-PA)
JOURNAL CLUB PRESENTATION (20L81S0711-PA)
 

Más de reganf

Occurrences of priority substances in selected catchments
Occurrences of priority substances in selected catchmentsOccurrences of priority substances in selected catchments
Occurrences of priority substances in selected catchmentsreganf
 
Priority pollutants
Priority pollutantsPriority pollutants
Priority pollutantsreganf
 
Sensorcomm3 t sullivan
Sensorcomm3 t sullivanSensorcomm3 t sullivan
Sensorcomm3 t sullivanreganf
 
Smart sensors for BTEX
Smart sensors for BTEXSmart sensors for BTEX
Smart sensors for BTEXreganf
 
Novel materials for development of optical sensors
Novel materials for development of optical sensorsNovel materials for development of optical sensors
Novel materials for development of optical sensorsreganf
 
Swig water sensors sept 26th 2013 fiona regan
Swig water sensors sept 26th 2013 fiona reganSwig water sensors sept 26th 2013 fiona regan
Swig water sensors sept 26th 2013 fiona reganreganf
 
Mestech spring bulletin
Mestech spring bulletinMestech spring bulletin
Mestech spring bulletinreganf
 
Mestech autumn bulletin
Mestech autumn bulletinMestech autumn bulletin
Mestech autumn bulletinreganf
 
Ipsw presentation mestech
Ipsw presentation   mestechIpsw presentation   mestech
Ipsw presentation mestechreganf
 
Fiona regan oceanology march 11 2014
Fiona regan oceanology march 11 2014Fiona regan oceanology march 11 2014
Fiona regan oceanology march 11 2014reganf
 

Más de reganf (10)

Occurrences of priority substances in selected catchments
Occurrences of priority substances in selected catchmentsOccurrences of priority substances in selected catchments
Occurrences of priority substances in selected catchments
 
Priority pollutants
Priority pollutantsPriority pollutants
Priority pollutants
 
Sensorcomm3 t sullivan
Sensorcomm3 t sullivanSensorcomm3 t sullivan
Sensorcomm3 t sullivan
 
Smart sensors for BTEX
Smart sensors for BTEXSmart sensors for BTEX
Smart sensors for BTEX
 
Novel materials for development of optical sensors
Novel materials for development of optical sensorsNovel materials for development of optical sensors
Novel materials for development of optical sensors
 
Swig water sensors sept 26th 2013 fiona regan
Swig water sensors sept 26th 2013 fiona reganSwig water sensors sept 26th 2013 fiona regan
Swig water sensors sept 26th 2013 fiona regan
 
Mestech spring bulletin
Mestech spring bulletinMestech spring bulletin
Mestech spring bulletin
 
Mestech autumn bulletin
Mestech autumn bulletinMestech autumn bulletin
Mestech autumn bulletin
 
Ipsw presentation mestech
Ipsw presentation   mestechIpsw presentation   mestech
Ipsw presentation mestech
 
Fiona regan oceanology march 11 2014
Fiona regan oceanology march 11 2014Fiona regan oceanology march 11 2014
Fiona regan oceanology march 11 2014
 

Último

CCXG global forum, April 2024, Surabi Menon
CCXG global forum, April 2024, Surabi MenonCCXG global forum, April 2024, Surabi Menon
CCXG global forum, April 2024, Surabi MenonOECD Environment
 
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.pensoftservices
 
Get inspired by SYMBA Project: promoting Industrial Symbiosis
Get inspired by SYMBA Project: promoting Industrial SymbiosisGet inspired by SYMBA Project: promoting Industrial Symbiosis
Get inspired by SYMBA Project: promoting Industrial Symbiosissymbaprojecteu
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.pensoftservices
 
CCXG global forum, April 2024, XU Huaqing
CCXG global forum, April 2024,  XU HuaqingCCXG global forum, April 2024,  XU Huaqing
CCXG global forum, April 2024, XU HuaqingOECD Environment
 
Broiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecBroiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecLaceyannWilliams
 
human computer interaction of movie booking system project
human computer interaction of movie booking system projecthuman computer interaction of movie booking system project
human computer interaction of movie booking system project201roopikha
 
CCXG global forum, April 2024, Marcia Rocha
CCXG global forum, April 2024,  Marcia RochaCCXG global forum, April 2024,  Marcia Rocha
CCXG global forum, April 2024, Marcia RochaOECD Environment
 
CCXG global forum, April 2024, Brian Motherway and Paolo Frankl
CCXG global forum, April 2024,  Brian Motherway and Paolo FranklCCXG global forum, April 2024,  Brian Motherway and Paolo Frankl
CCXG global forum, April 2024, Brian Motherway and Paolo FranklOECD Environment
 
_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptxsnehalshah72
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet DhakalOECD Environment
 
CCXG global forum, April 2024, Niklas Höhne
CCXG global forum, April 2024,  Niklas HöhneCCXG global forum, April 2024,  Niklas Höhne
CCXG global forum, April 2024, Niklas HöhneOECD Environment
 
The Road to Cali. Dr. Aleksandar Rankovic
The Road to Cali. Dr. Aleksandar RankovicThe Road to Cali. Dr. Aleksandar Rankovic
The Road to Cali. Dr. Aleksandar Rankovicpensoftservices
 
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/dikjog
 
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationTaruna Deshwal
 
CCXG global forum, April 2024, Julio Cordano
CCXG global forum, April 2024,  Julio CordanoCCXG global forum, April 2024,  Julio Cordano
CCXG global forum, April 2024, Julio CordanoOECD Environment
 
CCXG global forum, April 2024, Sirini Jeudy-Hugo
CCXG global forum, April 2024,  Sirini Jeudy-HugoCCXG global forum, April 2024,  Sirini Jeudy-Hugo
CCXG global forum, April 2024, Sirini Jeudy-HugoOECD Environment
 
CCXG global forum, April 2024, David Mutisya
CCXG global forum, April 2024,  David MutisyaCCXG global forum, April 2024,  David Mutisya
CCXG global forum, April 2024, David MutisyaOECD Environment
 
CCXG global forum, April 2024, Watcharin Boonyarit
CCXG global forum, April 2024,  Watcharin BoonyaritCCXG global forum, April 2024,  Watcharin Boonyarit
CCXG global forum, April 2024, Watcharin BoonyaritOECD Environment
 
Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...pensoftservices
 

Último (20)

CCXG global forum, April 2024, Surabi Menon
CCXG global forum, April 2024, Surabi MenonCCXG global forum, April 2024, Surabi Menon
CCXG global forum, April 2024, Surabi Menon
 
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.
SBSTTA 26 Biosafety AI’s. A policy perspective. Jens Warrie.
 
Get inspired by SYMBA Project: promoting Industrial Symbiosis
Get inspired by SYMBA Project: promoting Industrial SymbiosisGet inspired by SYMBA Project: promoting Industrial Symbiosis
Get inspired by SYMBA Project: promoting Industrial Symbiosis
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.
 
CCXG global forum, April 2024, XU Huaqing
CCXG global forum, April 2024,  XU HuaqingCCXG global forum, April 2024,  XU Huaqing
CCXG global forum, April 2024, XU Huaqing
 
Broiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecBroiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csec
 
human computer interaction of movie booking system project
human computer interaction of movie booking system projecthuman computer interaction of movie booking system project
human computer interaction of movie booking system project
 
CCXG global forum, April 2024, Marcia Rocha
CCXG global forum, April 2024,  Marcia RochaCCXG global forum, April 2024,  Marcia Rocha
CCXG global forum, April 2024, Marcia Rocha
 
CCXG global forum, April 2024, Brian Motherway and Paolo Frankl
CCXG global forum, April 2024,  Brian Motherway and Paolo FranklCCXG global forum, April 2024,  Brian Motherway and Paolo Frankl
CCXG global forum, April 2024, Brian Motherway and Paolo Frankl
 
_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet Dhakal
 
CCXG global forum, April 2024, Niklas Höhne
CCXG global forum, April 2024,  Niklas HöhneCCXG global forum, April 2024,  Niklas Höhne
CCXG global forum, April 2024, Niklas Höhne
 
The Road to Cali. Dr. Aleksandar Rankovic
The Road to Cali. Dr. Aleksandar RankovicThe Road to Cali. Dr. Aleksandar Rankovic
The Road to Cali. Dr. Aleksandar Rankovic
 
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
 
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
 
CCXG global forum, April 2024, Julio Cordano
CCXG global forum, April 2024,  Julio CordanoCCXG global forum, April 2024,  Julio Cordano
CCXG global forum, April 2024, Julio Cordano
 
CCXG global forum, April 2024, Sirini Jeudy-Hugo
CCXG global forum, April 2024,  Sirini Jeudy-HugoCCXG global forum, April 2024,  Sirini Jeudy-Hugo
CCXG global forum, April 2024, Sirini Jeudy-Hugo
 
CCXG global forum, April 2024, David Mutisya
CCXG global forum, April 2024,  David MutisyaCCXG global forum, April 2024,  David Mutisya
CCXG global forum, April 2024, David Mutisya
 
CCXG global forum, April 2024, Watcharin Boonyarit
CCXG global forum, April 2024,  Watcharin BoonyaritCCXG global forum, April 2024,  Watcharin Boonyarit
CCXG global forum, April 2024, Watcharin Boonyarit
 
Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...
 

Steering meeting presentation april 15 2014

  • 1. The Role of Passive Sampling in the Screening and Monitoring of New and Emerging Chemicals April 15th, 2014
  • 2. Outline   •  Work Package (WP) 1 – Desk study and literature review •  WP 2 – Analytical method development and optimisation •  WP 3 – Passive sampling, pilot monitors and spot sampling •  WP 4 – Biota sampling and testing for selected substances •  WP 5 – Upland activity: Cypermethrin study •  WP 6 – WWTP outfall receiving waters •  WP 7 – Integration and assessment of datasets •  WP 8 – Project management
  • 4. Target  Monitoring  Sites   •  Dublin  sites  have  been  changed  and  an  extra   site  has  been  included:   – Lucan  Bridge,  Malahide,  Kilcullen  Bridge  and   Poobeg     •  This  sampling  will  be  taking  place  from  May   2014.   •  Historical  data  from  MI  and  DCU  is  available   for  these  sites.  
  • 5. Target  Monitoring  Sites   •  Upstream  site  added  to  cypermethrin  study.   •  SPMD,  POCIS,  grab  samples  and  biota  to  be   collected.   •  Patricia  McCreesh  and  Ray  Thomas  supplied   informaNon  on  historic  data  and  site  selecNon   for  Donegal.    
  • 6. Protocol  for  Biota  Sampling   •  50  My#lus  edulis  mussels   •  4  –  6  cm,  4  –  5  cm   •  Depurate  for  24  hours   •  Dissect  (shell  weight,  Nssue   weight)   •  Homogenise   •  Store  at  -­‐30C  
  • 7. Literature  Review   •  ‘Passive  Sampling  of  Emerging  Compounds’   – Environmental  PolluNon  (IF  3.730)  
  • 8. Deliverables   Work  Package  1   Status   Desk  study  and  literature  review   Complete   SelecNon  of  target  monitoring  staNons     Complete   Develop  protocols  and  select  locaNons  for  biota  monitoring     Complete   Develop  detailed    protocols  for  passive  sampler  deployments     Complete   Final  Report:  Desk  study  with  protocols  for  deployment,  biota  sampling    
  • 10. Work  Package  2  :   •  Method development ongoing for: –  Organohalogen pesticides by GCMS –  HBCD and BFRs by LCMS –  PFOS by LCMS –  Pharmaceuticals and endocrine disrupting compounds •  Extraction by soxhlet/solid phase extraction (SPE) •  Analysis by gas and liquid chromatography with tandem mass spectrometric or UV detection
  • 11. Deliverables   Work  Package  2   Status   Method  selecNon  and  opNmisaNon   Methods  in  place  for    24   of  27  analytes   Methods   for:   Organohalogen   pesNcides,   HBCD.   Transfer  of  BFR  method  to  LC-­‐MS/MS   Ongoing   Methods  for:  EDCs     Ongoing   Methods  for:  PharmaceuNcals     Ongoing   Methods  for:  PFOS     Ongoing   Note: All methods to be operational by month 26.
  • 13. Work Package 3: •  Catchment approach has been taken in Cork •  Deployment of POCIS and PDMS samplers in July 2013 •  POCIS collected after 4 weeks •  PDMS and water samples collected after 2 months
  • 14. Sampling   •  Second  sampling  regime  in  Cork  underway  for   PDMS  and  POCIS.   •  POCIS  trial  to  Ne-­‐in  with  WP  3  in  Cork   – 2,  4,  6  week  collecNons  to  evaluate  uptake   •  Samplers  deployed  in  Kilkieran  (March  2014),   POCIS  and  grab  samples  collected.    
  • 15. Results: POCIS and Grab Samples Shandon   Lough  Mahon   Cork  Outer  Harbour   Iniscarra   Inchigeelagh   Analyte   Units   17alpha   ethynyloestradiol   (EE2)   ng   <0.2   <0.2   <0.2   1.39   <0.2   17beta  oestradiol   (E2)   ng   <0.5   2.36   1.98   <0.5   <0.5   17alpha   ethynyloestradiol   (EE2)   ng/L*   nd   nd   nd   nd   nd   17beta  oestradiol   (E2)   ng/L*   nd   nd   nd   nd   nd  
  • 16. Deliverables   Work  Package  3   Status   Prepare  equipment  (PDMS  &  POCIS)  for  deployment   Complete   Deployment  of  samplers   Phase  two   complete   CollecNon  and  screening  analysis     Ongoing   Spot  sampling  as  compliance  measure   Phase  two   complete  
  • 18. Biota  sampling   •  Fish  samples  supplied  by  IFI  for  Cork   catchment  (2013)   – Trout    (Upper  Lee  catchment)   – Whole  fish   •  Analysed  for  organic  pollutants  at  the  MI   – Ongoing   •  IFI  to  supply  more  samples  in  2014   •  Mussels  collected  from  marine  sites  
  • 19. Deliverables   Work  Package  4   Status   Sampling  programme  for  biota  at  all  locaNons   Ongoing   Sample  collecNon  &  preparaNon   Ongoing   Analysis  of  shellfish  and  fish  samples   Ongoing   RecommendaNons     Cork  PDMS   redeployed  
  • 22. County   Site   RaNonale   POCIS   PDMS   Water   Mussels   Fish   (IFI)   Cork   Inchigeelagh   Upstream  river  staNon   ✓ ✓ ✓ ✓ Inniscarra   Downstream  river  staNon   ✓ ✓ ✓ ✓ Shandon   Riverine/transiNonal   ✓ ✓ ✓ ✓ Lough  Mahon   Riverine/transiNonal  staNon     ✓ ✓ ✓ ✓ Outer  bay     Riverine/transiNonal  staNon   ✓ ✓ ✓ ✓ Dublin   Malahide   High  pressure  coastal   ✓ ✓ ✓ ✓     Poolbeg   Riverine/transiNonal   ✓ ✓ ✓ ✓ Lucan  Bridge   Downstream  river  staNon   ✓ ✓ ✓ ✓ Kilcullen  Bridge   Upstream  river  staNon   ✓ ✓ ✓ ✓ Galway   Kilkieran  Bay   Coastal  reference  staNon   ✓ ✓ ✓ ✓ Mayo   Burrishoole   Upstream  river  staNon   ✓ ✓ ✓ ✓ Donegal   Glen  Lackagh  1   Cypermethrin  study     SPMD ✓ ✓ EPA  Benthic  kick   sampling Glen  Lackagh  2   Cypermethrin  study     SPMD ✓ ✓
  • 23. Work  Package  5  :   •  Cypermethrin study beginning April 2014 •  Analysis by Ray Thomas, NIEA •  Site (s): –  Glen Lackagh sites 38G040900 and 38G040700 upstream of Glen Lough, Donegal –  Pre- and post- application study
  • 24. Cypermethrin  Data   River     Q-­‐Value   Date   X   Y   Remarks  from  fieldsheets   GLEN     (LACKAGH)   2-­‐3   28/09/2012   212685   431467   InvesNgaNve.  Toxic  signs  at  0900.   Worse  here.  Sheep  suspected  –   cypermethrin   EffecNvely  a  dead  river  here.  Some   forestry  u/s.  Also  one  field  that   looks  ''burned''  possible   herbicide?  Lots  of  heather  u/s.   didn''t  see  sheep  on  open  land.   Okay  at  0400   GLEN     (LACKAGH)   3/0   26/09/2012   211832   431043   Something  wrong  here.  Two     samples  taken.  Very  sparse.  Sheep     dip?    
  • 25. Cypermethrin  Assessment   •  Large  dataset  of  usage  and  occurrence  reports  has   been  compiled.   –  Proposed  desk  study  on  this  data   •  InformaNon  from  census  of  agriculture,  department  of   veterinary  medicine,  Coilte,  Teagasc,  DEFRA,   department  of  Agriculture,  etc.     •  Ray  Thomas,  Patricia  McCreesh  and  Danielle  Ashton   have  assisted  the  project  team  in  the  collecNon  of  this   data.  
  • 26. Deliverables   Work  Package  5   Status   Site  selecNon  and  sampler  deployment   Sites  selected,   deployment   ongoing   Spot  sample  collecNon       Ongoing   Analysis  of  samples  for  cypermethrin   May/June  2014   Passive  sampler  extracNon  and  analysis  for  cypermethrin   June  2014   Assessment  of  upland  acNvity   Ongoing  
  • 28. Work  Package  6  :   •  WWTP outfall study-EDCs and pharmaceuticals •  Methods –  In place for E2 in water and biota –  Optimising method for EE2 to detect below EQS –  Diclofenac method under development •  POCIS devices suitable –  Issue with sampling rates •  MI experience with integrated study-historical data for E2 and EE2 in Dublin
  • 29. Deliverables   Work  Package  6   Status   Site  selecNon  and  sampler  deployment   Ongoing   Spot  sample  collecNon     Ongoing   Analysis  of  samples  for  EDCs  and  PharmaceuNcals   Ongoing   Passive   sampler   extracNon   and   analysis   for   EDCs   and   PharmaceuNcals   Ongoing   CollecNon  of  background  data  on  WWTP  efficiency   Ongoing  
  • 31. PS  and  biota   •  Biota  EQS  set  for  11  compounds   •  EU  guidance  document  currently  being  developed   –  SelecNon  of  target  organism  differs  between  MS   –  Human  health  vs  secondary  poisoning   –  Require consistency and comparability to assess compliance against the EQSbiota and in interpretation of data •  PS  and  biota     –  Similar  drivers  for  uptake   –  Environmental  factors  can  be  modelled   –  Metabolism  and  health  status  can  be  complicaNng  factors   –  Suitable  where  no  biota  are  present  
  • 32. White PhD thesis: Relationship between BAFs (dry weight) calculated from mussels and PS at the Kilkieran reference site vs. parameter LogKpw. 1   2   3   4   5   6   7   3   3.5   4   4.5   5   5.5   6   6.5   7   7.5   Log  BAF  (dry  weight)   Log  Kpw   PAH  BAFdw   PCB  BAFdw   OC  BAFdw   PBDE  BAFdw   Log BAFdw = 0.80 (Log Kpw) + 0.13 R2= 0.75 BAF  model  for  PDMS  and  biota  (mussels):  Kilkieran    
  • 34. Project  Management   •  Monthly and weekly meetings and conference calls have continued for the project team. •  Monthly analytical reports have been introduced to facilitate the final STRIVE report deliverable due at project completion.
  • 35. Funding  OpportuniQes   PublicaQons  in  PreparaQon   •  JPI Water call •  Passive sampling review (submitted) •  Book (August 2014) •  Review chapter (May/June 2014)
  • 36. Deliverables   Work  Package  3   Status   Kick-­‐off  meeNng   Complete   Workshops   1/3   Project  meeNngs   Ongoing   Financial  and  Technical  reports  (  EPA  Deadlines)   Ongoing   Monthly  communicaNons   Ongoing   Final  Report   2016  
  • 37. Acknowledgements This project is funded by the EPA as part of the Science, Technology, Research and Innovation for the Environment (STRIVE) Programme 2007–2013. This programme is financed by the Irish Government under the National Development Plan 2007– 2013. It is administered on behalf of the Department of the Environment, Heritage and Local Government by the Environmental Protection Agency, which has the statutory function of co-ordinating and promoting environmental research.