• About OG&E
• Our History with SAP
• Smart Grid Program Objectives and Goals
• Meter Deployment and Billing
• Demand Response
• Remote Reconnect/Disconnect
Questions
Our Journey
3
Enogex and Centerpoint Midstream Partnership
• 8.3k miles of pipeline
• 6 processing plants
• 23B cubic feet of natural gas storage
3
OGE Energy Corporation
Electric Utility
• 9 power plants: 6.8 GW
• 778 MW - wind
• 765k customers in OK & AK
• 30k square mile service area
• 23k miles of overhead distribution lines
• 500 substations
• 1100 distribution circuits
Slide 4
• Went live with R/3 January 1, 1997
o SD, PM, MM, FICO, HR, PS (2008)
• Spring 1996 delivered business requirements to SAP to develop utility specific CIS
• Spring 1997 delivery of IS-U Beta v0
o One of 6 Beta companies world wide
• Live with IS-U-CCS June 14, 1999
o IS-U v1.1B, R/3 3.0F
o 3 Month Roll Out
• Currently running ECC 6.0 EHP6
o We do not use CRM, EDM, SAP’s AMI
@
Slide 5
CEO Goal
Defer building more fossil fuel
generation until 2020 or beyond
Slide 6
Slide 7
(CC) SublimeDharma on Flickr (CC) Valard LP
Additional wind generation Build transmission to deliver wind energy Increased focus on energy efficiency Deploy SmartGrid technology
• Meter Operational Savings
o Meter Reading $15M/Yr
o 300,000 reconnect/disconnect orders/yr – reduced truck rolls
o 200,000 move-in/out orders/yr – reduced truck rolls
• Net Headcount Reduction: 135
• Customer Participation Goals
o 20% penetration
o 1.3kW per customer
• Avoided Generation Cost: $287M (15 Yr NPV)
• Energy Reduction (VVO): 75 MW
• Reliability: 30% SAIDI reduction
o DA Societal Benefits $300 M/Yr
OGE Smart Grid Program Goals
Slide 8
Slide 9
• Advanced Metering Infrastructure (AMI)
Digital meters for all customers 15 min interval reads
Remote reconnect and disconnect
2-way communications
• Demand Response (DR) Programs
Dynamic pricing
In-home technology
Customer engagement
• Distribution Automation (DA) Technologies
• Automated switching
• Volt–VAr Optimization
• Centralized control - DMS
• All enabled through integrated wide area communications
network, IT systems and supporting business processes
OG&E Smart Grid Includes
DA
DR
AMI
• February 15, 2010 –
First meter set in Norman, OK
• 200 per day at first
• Ramped up to around 2000+ per
day over a 3 year period
• Meter Deployment officially
ended in December of 2012
Meter Deployment
By the Numbers
Slide 10
2010 184,000 meters
2011 314,000 meters
Meter Deployment+
2012 299,000 meters
• Weekly Meter Deployment population file
o Population file used by meter installation vendor to plan and schedule meter deployment
• Black Out Window (Dunning disconnects and billing)
• SAP Serialization program to consume meter vendor data
• Automated meter installation program written to install meter in SAP
• Sync program to MDMS system
• Based upon what meters were installed per day, SAP generated Location
Information File which would sync with AMI system
SAP Development to Support Deployment
Slide 12
• Once smart meter installed, no meter reader used
• Custom programs created to satisfy meter reading document for billing
• Normal register reads
• Demand response using daily register reads
• Calling MDMS using interval data for demand response
• Interval meter data used for complex tariffs
• Goal - no estimation to generate electric bill
• Meter Deployment plan allowed us to read and bill customers with no
interruption to billing schedule
Billing with Smart Meters
Slide 13
Demand Response Background
Slide 14
Quail
Creek
• 25 Customers
• Acceptance
• Energy Awareness
2010 Study
• 3,000 Customers
• Reduced Peak
• Segment Results
• Acceptance
• Technology
• Dynamic Pricing
2011 Study
• 6,000 Customers
• Commercial
Results
• Critical Price
Results
2012
Roll-Out
• ~40 K Customers
• 70 MW
• ROI Marketing
• Penetration
Testing
2012 and
beyond
• 20% Penetration
• 210 MW
• New Pricing
Products
• Value Added
Products
New Dynamic Pricing Options Offered
Slide 15
• Hours: 2 – 7pm, Monday - Friday
• Summer Season (June – September)
• Customers receive day-ahead price via
in-home display, web, text, email, voice
message
• Tariff is optional
• Customer decides how to respond &
manage consumption
Residential Variable Peak Price Tariff
Price
Time of Day
$0.46
$0.113
$0.045
12:00 a.m. 3:00 a.m. 6:00 a.m. 9:00 a.m. 2:00 p.m. 7:00 p.m. 12:00 a.m.
Customer
Demand
Line
$0.23
• Enrollment
o 3rd party portal makes web service call to SAP to verify last 4 of SSN
o Rate changed in SAP
o PCT Installation
• Daily Price Signals
o Pricing from fuels department
o SAP jobs run to store daily price
o Price signals for voice, SMS, email
 72,000 sent in 1.5 hours
o AMI vendor calls SAP web service to get price
o OGE.com calls SAP via web service to get price
DR Enrollment and Dynamic Pricing
Slide 16
Price Signals
Slide 17
Voice Message
Home Energy Report
Slide 18
MyOGEPower.com
Slide 19
Smart Grid Screens in SAP
Slide 20
Existing Custom Screens Modified
Slide 21
Slide 22
VPP and Technology Impact
• Leave existing disconnect processes in place
o Existing processes included Business Workflows and programs to generate PM
orders to reconnect/disconnect service
o Programs running to look at device category to determine if the order should be
sent to the field or queued in SAP to provision remotely
• Additional considerations for Dunning
• Additional considerations for Vacancy Reconnect/Disconnect
Remote Reconnect/Disconnect
Slide 23
• Ratchet volume up or down
depending on need
o Critical Operations Protector
Disconnect/Reconnect
Capabilities
Slide 24
• SAP will attempt to remotely provision service
• After 2 failed attempts to provision meter, order is sent to mobile
dispatch system
o 99.3% successfully provision from SAP
• Emergency reconnect process
Successful Provisioning
Slide 25
Trap Orders in
SAP Table
Slide 26
• Don’t disconnect rail road crossings
o Eyes on accounts before disconnects start
• OK to start disconnects
o Table entry made when it’s okay to start letting dunning disconnects fly
• Moratorium
o Company wide, by state, by service district
• Additional requirements before disconnecting Arkansas service
Considerations for Dunning
Slide 27
• Disconnect all Move-Outs that do not have a corresponding Move-In
• If existing disconnect document exists at the time of move-in
• Move-in/out reads satisfied by daily register read
Considerations for Move-In/Out
Slide 28
• Nearly 800,000 meters deployed in 3 years time
• All customers billed “on-time” during meter deployment
• Demand Response growing to 120,000 planned by end of 2014
• 350,000 Remote disconnects
• 343,000 Remote reconnects
• 1 Million Move-in/Out Reads
At a glance
Slide 29
A collaboration of:
Kevin Jackson
OGE Energy Corp
jacksokm@oge.com

Más contenido relacionado

La actualidad más candente

Implementing smart metering in the German energy market
Implementing smart metering in the German energy marketImplementing smart metering in the German energy market
Implementing smart metering in the German energy marketMichaline Todd
 
Advance Metering Infrastructure: Smart Meter
Advance Metering Infrastructure: Smart MeterAdvance Metering Infrastructure: Smart Meter
Advance Metering Infrastructure: Smart MeterMD NAWAZ
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolEklavya Sharma
 
Meazon energy submetering_portfolio
Meazon energy submetering_portfolioMeazon energy submetering_portfolio
Meazon energy submetering_portfolioGiannis Gionas
 
Automation of a state electric transmission and distribution department in india
Automation of a state electric transmission and distribution department in indiaAutomation of a state electric transmission and distribution department in india
Automation of a state electric transmission and distribution department in indiaHcl Brand
 
Meter Data Management Presentation
Meter Data Management PresentationMeter Data Management Presentation
Meter Data Management PresentationTalyam
 
I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015Barry Gander
 
Abb power and automation solid foundations for smart cities
Abb power and automation   solid foundations for smart citiesAbb power and automation   solid foundations for smart cities
Abb power and automation solid foundations for smart citiesSiegfried Quemado
 
Lessons learned from tower management outsourcing
Lessons learned from tower management outsourcingLessons learned from tower management outsourcing
Lessons learned from tower management outsourcingIbrahim Misto
 
Capgemini Super Techies Show Season 2: The CESC Challenge Presentation
Capgemini Super Techies Show Season 2: The CESC Challenge PresentationCapgemini Super Techies Show Season 2: The CESC Challenge Presentation
Capgemini Super Techies Show Season 2: The CESC Challenge PresentationCapgemini
 
Naya Corporate Primer
Naya Corporate PrimerNaya Corporate Primer
Naya Corporate PrimerKetan Patel
 
Affinitymeterflow Sinkorswimwithsmartmeterdatamanagement
Affinitymeterflow SinkorswimwithsmartmeterdatamanagementAffinitymeterflow Sinkorswimwithsmartmeterdatamanagement
Affinitymeterflow SinkorswimwithsmartmeterdatamanagementTalyam
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric India
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Naveena Navi
 
Elitia_IoT_capabilities
Elitia_IoT_capabilitiesElitia_IoT_capabilities
Elitia_IoT_capabilitiessisanche
 

La actualidad más candente (19)

Implementing smart metering in the German energy market
Implementing smart metering in the German energy marketImplementing smart metering in the German energy market
Implementing smart metering in the German energy market
 
Advance Metering Infrastructure: Smart Meter
Advance Metering Infrastructure: Smart MeterAdvance Metering Infrastructure: Smart Meter
Advance Metering Infrastructure: Smart Meter
 
Smart power technology @ tata power delhi distribution
Smart power technology @ tata power delhi distributionSmart power technology @ tata power delhi distribution
Smart power technology @ tata power delhi distribution
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocol
 
Meazon energy submetering_portfolio
Meazon energy submetering_portfolioMeazon energy submetering_portfolio
Meazon energy submetering_portfolio
 
Automation of a state electric transmission and distribution department in india
Automation of a state electric transmission and distribution department in indiaAutomation of a state electric transmission and distribution department in india
Automation of a state electric transmission and distribution department in india
 
Engineering the Smart Grid
Engineering the Smart GridEngineering the Smart Grid
Engineering the Smart Grid
 
Meter Data Management Presentation
Meter Data Management PresentationMeter Data Management Presentation
Meter Data Management Presentation
 
I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015
 
Abb power and automation solid foundations for smart cities
Abb power and automation   solid foundations for smart citiesAbb power and automation   solid foundations for smart cities
Abb power and automation solid foundations for smart cities
 
Lessons learned from tower management outsourcing
Lessons learned from tower management outsourcingLessons learned from tower management outsourcing
Lessons learned from tower management outsourcing
 
Capgemini Super Techies Show Season 2: The CESC Challenge Presentation
Capgemini Super Techies Show Season 2: The CESC Challenge PresentationCapgemini Super Techies Show Season 2: The CESC Challenge Presentation
Capgemini Super Techies Show Season 2: The CESC Challenge Presentation
 
Naya Corporate Primer
Naya Corporate PrimerNaya Corporate Primer
Naya Corporate Primer
 
Energy Performance
Energy Performance Energy Performance
Energy Performance
 
Affinitymeterflow Sinkorswimwithsmartmeterdatamanagement
Affinitymeterflow SinkorswimwithsmartmeterdatamanagementAffinitymeterflow Sinkorswimwithsmartmeterdatamanagement
Affinitymeterflow Sinkorswimwithsmartmeterdatamanagement
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domains
 
Managing Vendor Issues on AMI Design
Managing Vendor Issues on AMI DesignManaging Vendor Issues on AMI Design
Managing Vendor Issues on AMI Design
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)
 
Elitia_IoT_capabilities
Elitia_IoT_capabilitiesElitia_IoT_capabilities
Elitia_IoT_capabilities
 

Similar a The smart grid journey at oklahoma gas and electric

3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...
3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...
3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...DevOps.com
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 
Demand Response in Ireland
Demand Response in IrelandDemand Response in Ireland
Demand Response in IrelandKiwiPower1
 
New Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI TechnologyNew Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI TechnologyTESCO - The Eastern Specialty Company
 
The New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeThe New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeDenodo
 
Final IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsFinal IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsTerry Daly
 
EPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckEPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckJaswin Sood
 
Mysore, pilot project
Mysore, pilot projectMysore, pilot project
Mysore, pilot projectcanaleenergia
 
How smart grid metrics will define the modern utility
How smart grid metrics will define the modern utilityHow smart grid metrics will define the modern utility
How smart grid metrics will define the modern utilityrobgirvan
 
Western Power Distribution Presentation Distributed Community Energy Low Carb...
Western Power Distribution Presentation Distributed Community Energy Low Carb...Western Power Distribution Presentation Distributed Community Energy Low Carb...
Western Power Distribution Presentation Distributed Community Energy Low Carb...The Future Economy Network
 
Improving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsImproving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsDatabricks
 
Biman ghosh resume
Biman ghosh resumeBiman ghosh resume
Biman ghosh resumeBiman Ghosh
 
JAZERA ACCESS POWER DIVISION SERVICES
JAZERA ACCESS POWER DIVISION SERVICESJAZERA ACCESS POWER DIVISION SERVICES
JAZERA ACCESS POWER DIVISION SERVICESMojahid Abdu M.Salih
 

Similar a The smart grid journey at oklahoma gas and electric (20)

IoT and Smart Grids
IoT and Smart GridsIoT and Smart Grids
IoT and Smart Grids
 
Proposal for PSEB
Proposal for PSEBProposal for PSEB
Proposal for PSEB
 
3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...
3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...
3 Critical Keys to DevOps Success: Lessons from Forrester Research, Intel, an...
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 
Demand Response in Ireland
Demand Response in IrelandDemand Response in Ireland
Demand Response in Ireland
 
New Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI TechnologyNew Uses For Electric Meters as We Continue to Leverage AMI Technology
New Uses For Electric Meters as We Continue to Leverage AMI Technology
 
IPKeysPP - WEEC Presentation 9.29.15
IPKeysPP - WEEC Presentation 9.29.15IPKeysPP - WEEC Presentation 9.29.15
IPKeysPP - WEEC Presentation 9.29.15
 
The New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeThe New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities Landscape
 
Final IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer ApplicationsFinal IUWG symposium SGSC Customer Applications
Final IUWG symposium SGSC Customer Applications
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
Lect k week 12 summary on smart meters & sg 1
Lect k  week 12 summary on smart meters & sg  1Lect k  week 12 summary on smart meters & sg  1
Lect k week 12 summary on smart meters & sg 1
 
EPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_DeckEPC_Enterprise_Systems_Deck
EPC_Enterprise_Systems_Deck
 
Mysore, pilot project
Mysore, pilot projectMysore, pilot project
Mysore, pilot project
 
How smart grid metrics will define the modern utility
How smart grid metrics will define the modern utilityHow smart grid metrics will define the modern utility
How smart grid metrics will define the modern utility
 
CSWeek2010XcelEnergy
CSWeek2010XcelEnergyCSWeek2010XcelEnergy
CSWeek2010XcelEnergy
 
Western Power Distribution Presentation Distributed Community Energy Low Carb...
Western Power Distribution Presentation Distributed Community Energy Low Carb...Western Power Distribution Presentation Distributed Community Energy Low Carb...
Western Power Distribution Presentation Distributed Community Energy Low Carb...
 
Improving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT AnalyticsImproving Power Grid Reliability Using IoT Analytics
Improving Power Grid Reliability Using IoT Analytics
 
Addendum
AddendumAddendum
Addendum
 
Biman ghosh resume
Biman ghosh resumeBiman ghosh resume
Biman ghosh resume
 
JAZERA ACCESS POWER DIVISION SERVICES
JAZERA ACCESS POWER DIVISION SERVICESJAZERA ACCESS POWER DIVISION SERVICES
JAZERA ACCESS POWER DIVISION SERVICES
 

Más de robgirvan

Work clearance management operational switching
Work clearance management   operational switchingWork clearance management   operational switching
Work clearance management operational switchingrobgirvan
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process changerobgirvan
 
Using hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityUsing hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityrobgirvan
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crbrobgirvan
 
Too big for twitter the superstorm sandy experience
Too big for twitter   the superstorm sandy experienceToo big for twitter   the superstorm sandy experience
Too big for twitter the superstorm sandy experiencerobgirvan
 
T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylierobgirvan
 
T keynote 845_valoochi
T keynote 845_valoochiT keynote 845_valoochi
T keynote 845_valoochirobgirvan
 
T keynote 830_lisa_d
T keynote 830_lisa_dT keynote 830_lisa_d
T keynote 830_lisa_drobgirvan
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...robgirvan
 
Sap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanaSap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanarobgirvan
 
Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phirobgirvan
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...robgirvan
 
M keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesM keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesrobgirvan
 
M keynote 800_capitani_inlander
M keynote 800_capitani_inlanderM keynote 800_capitani_inlander
M keynote 800_capitani_inlanderrobgirvan
 
M keynote 400_bailey
M keynote 400_baileyM keynote 400_bailey
M keynote 400_baileyrobgirvan
 
Key findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemKey findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemrobgirvan
 
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...robgirvan
 
Huntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer careHuntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer carerobgirvan
 
How to analyze your sap data and optimize your workforce
How to analyze your sap data and optimize your workforceHow to analyze your sap data and optimize your workforce
How to analyze your sap data and optimize your workforcerobgirvan
 
How a real time platform supports the modern utility
How a real time platform supports the modern utilityHow a real time platform supports the modern utility
How a real time platform supports the modern utilityrobgirvan
 

Más de robgirvan (20)

Work clearance management operational switching
Work clearance management   operational switchingWork clearance management   operational switching
Work clearance management operational switching
 
Using sap implementation to drive process change
Using sap implementation to drive process changeUsing sap implementation to drive process change
Using sap implementation to drive process change
 
Using hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrityUsing hana to add value to electric & gas revenue integrity
Using hana to add value to electric & gas revenue integrity
 
Transforming the customer experience crb
Transforming the customer experience   crbTransforming the customer experience   crb
Transforming the customer experience crb
 
Too big for twitter the superstorm sandy experience
Too big for twitter   the superstorm sandy experienceToo big for twitter   the superstorm sandy experience
Too big for twitter the superstorm sandy experience
 
T keynote 1020_de_lost wylie
T keynote 1020_de_lost wylieT keynote 1020_de_lost wylie
T keynote 1020_de_lost wylie
 
T keynote 845_valoochi
T keynote 845_valoochiT keynote 845_valoochi
T keynote 845_valoochi
 
T keynote 830_lisa_d
T keynote 830_lisa_dT keynote 830_lisa_d
T keynote 830_lisa_d
 
Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...Simplifying the work order business processes at marin municipal water distri...
Simplifying the work order business processes at marin municipal water distri...
 
Sap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hanaSap hana experiences at southern california edison — bw hana and standalone hana
Sap hana experiences at southern california edison — bw hana and standalone hana
 
Replacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phiReplacement of legacy cis with sap cr&b at phi
Replacement of legacy cis with sap cr&b at phi
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...
 
M keynote 820_mc_cue_jones
M keynote 820_mc_cue_jonesM keynote 820_mc_cue_jones
M keynote 820_mc_cue_jones
 
M keynote 800_capitani_inlander
M keynote 800_capitani_inlanderM keynote 800_capitani_inlander
M keynote 800_capitani_inlander
 
M keynote 400_bailey
M keynote 400_baileyM keynote 400_bailey
M keynote 400_bailey
 
Key findings when upgrading your sap crm system
Key findings when upgrading your sap crm systemKey findings when upgrading your sap crm system
Key findings when upgrading your sap crm system
 
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
Iberdrola usa improves customer satisfaction, productivity and crew safety wi...
 
Huntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer careHuntsville utilties and source gas — delivering total customer care
Huntsville utilties and source gas — delivering total customer care
 
How to analyze your sap data and optimize your workforce
How to analyze your sap data and optimize your workforceHow to analyze your sap data and optimize your workforce
How to analyze your sap data and optimize your workforce
 
How a real time platform supports the modern utility
How a real time platform supports the modern utilityHow a real time platform supports the modern utility
How a real time platform supports the modern utility
 

Último

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Último (20)

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

The smart grid journey at oklahoma gas and electric

  • 1. A collaboration of: The Smart Grid Journey At OGE Energy Corp Kevin Jackson OGE Energy Corp
  • 2. • About OG&E • Our History with SAP • Smart Grid Program Objectives and Goals • Meter Deployment and Billing • Demand Response • Remote Reconnect/Disconnect Questions Our Journey
  • 3. 3 Enogex and Centerpoint Midstream Partnership • 8.3k miles of pipeline • 6 processing plants • 23B cubic feet of natural gas storage 3 OGE Energy Corporation Electric Utility • 9 power plants: 6.8 GW • 778 MW - wind • 765k customers in OK & AK • 30k square mile service area • 23k miles of overhead distribution lines • 500 substations • 1100 distribution circuits
  • 5. • Went live with R/3 January 1, 1997 o SD, PM, MM, FICO, HR, PS (2008) • Spring 1996 delivered business requirements to SAP to develop utility specific CIS • Spring 1997 delivery of IS-U Beta v0 o One of 6 Beta companies world wide • Live with IS-U-CCS June 14, 1999 o IS-U v1.1B, R/3 3.0F o 3 Month Roll Out • Currently running ECC 6.0 EHP6 o We do not use CRM, EDM, SAP’s AMI @ Slide 5
  • 6. CEO Goal Defer building more fossil fuel generation until 2020 or beyond Slide 6
  • 7. Slide 7 (CC) SublimeDharma on Flickr (CC) Valard LP Additional wind generation Build transmission to deliver wind energy Increased focus on energy efficiency Deploy SmartGrid technology
  • 8. • Meter Operational Savings o Meter Reading $15M/Yr o 300,000 reconnect/disconnect orders/yr – reduced truck rolls o 200,000 move-in/out orders/yr – reduced truck rolls • Net Headcount Reduction: 135 • Customer Participation Goals o 20% penetration o 1.3kW per customer • Avoided Generation Cost: $287M (15 Yr NPV) • Energy Reduction (VVO): 75 MW • Reliability: 30% SAIDI reduction o DA Societal Benefits $300 M/Yr OGE Smart Grid Program Goals Slide 8
  • 9. Slide 9 • Advanced Metering Infrastructure (AMI) Digital meters for all customers 15 min interval reads Remote reconnect and disconnect 2-way communications • Demand Response (DR) Programs Dynamic pricing In-home technology Customer engagement • Distribution Automation (DA) Technologies • Automated switching • Volt–VAr Optimization • Centralized control - DMS • All enabled through integrated wide area communications network, IT systems and supporting business processes OG&E Smart Grid Includes DA DR AMI
  • 10. • February 15, 2010 – First meter set in Norman, OK • 200 per day at first • Ramped up to around 2000+ per day over a 3 year period • Meter Deployment officially ended in December of 2012 Meter Deployment By the Numbers Slide 10
  • 11. 2010 184,000 meters 2011 314,000 meters Meter Deployment+ 2012 299,000 meters
  • 12. • Weekly Meter Deployment population file o Population file used by meter installation vendor to plan and schedule meter deployment • Black Out Window (Dunning disconnects and billing) • SAP Serialization program to consume meter vendor data • Automated meter installation program written to install meter in SAP • Sync program to MDMS system • Based upon what meters were installed per day, SAP generated Location Information File which would sync with AMI system SAP Development to Support Deployment Slide 12
  • 13. • Once smart meter installed, no meter reader used • Custom programs created to satisfy meter reading document for billing • Normal register reads • Demand response using daily register reads • Calling MDMS using interval data for demand response • Interval meter data used for complex tariffs • Goal - no estimation to generate electric bill • Meter Deployment plan allowed us to read and bill customers with no interruption to billing schedule Billing with Smart Meters Slide 13
  • 14. Demand Response Background Slide 14 Quail Creek • 25 Customers • Acceptance • Energy Awareness 2010 Study • 3,000 Customers • Reduced Peak • Segment Results • Acceptance • Technology • Dynamic Pricing 2011 Study • 6,000 Customers • Commercial Results • Critical Price Results 2012 Roll-Out • ~40 K Customers • 70 MW • ROI Marketing • Penetration Testing 2012 and beyond • 20% Penetration • 210 MW • New Pricing Products • Value Added Products
  • 15. New Dynamic Pricing Options Offered Slide 15 • Hours: 2 – 7pm, Monday - Friday • Summer Season (June – September) • Customers receive day-ahead price via in-home display, web, text, email, voice message • Tariff is optional • Customer decides how to respond & manage consumption Residential Variable Peak Price Tariff Price Time of Day $0.46 $0.113 $0.045 12:00 a.m. 3:00 a.m. 6:00 a.m. 9:00 a.m. 2:00 p.m. 7:00 p.m. 12:00 a.m. Customer Demand Line $0.23
  • 16. • Enrollment o 3rd party portal makes web service call to SAP to verify last 4 of SSN o Rate changed in SAP o PCT Installation • Daily Price Signals o Pricing from fuels department o SAP jobs run to store daily price o Price signals for voice, SMS, email  72,000 sent in 1.5 hours o AMI vendor calls SAP web service to get price o OGE.com calls SAP via web service to get price DR Enrollment and Dynamic Pricing Slide 16
  • 20. Smart Grid Screens in SAP Slide 20
  • 21. Existing Custom Screens Modified Slide 21
  • 22. Slide 22 VPP and Technology Impact
  • 23. • Leave existing disconnect processes in place o Existing processes included Business Workflows and programs to generate PM orders to reconnect/disconnect service o Programs running to look at device category to determine if the order should be sent to the field or queued in SAP to provision remotely • Additional considerations for Dunning • Additional considerations for Vacancy Reconnect/Disconnect Remote Reconnect/Disconnect Slide 23
  • 24. • Ratchet volume up or down depending on need o Critical Operations Protector Disconnect/Reconnect Capabilities Slide 24
  • 25. • SAP will attempt to remotely provision service • After 2 failed attempts to provision meter, order is sent to mobile dispatch system o 99.3% successfully provision from SAP • Emergency reconnect process Successful Provisioning Slide 25
  • 26. Trap Orders in SAP Table Slide 26
  • 27. • Don’t disconnect rail road crossings o Eyes on accounts before disconnects start • OK to start disconnects o Table entry made when it’s okay to start letting dunning disconnects fly • Moratorium o Company wide, by state, by service district • Additional requirements before disconnecting Arkansas service Considerations for Dunning Slide 27
  • 28. • Disconnect all Move-Outs that do not have a corresponding Move-In • If existing disconnect document exists at the time of move-in • Move-in/out reads satisfied by daily register read Considerations for Move-In/Out Slide 28
  • 29. • Nearly 800,000 meters deployed in 3 years time • All customers billed “on-time” during meter deployment • Demand Response growing to 120,000 planned by end of 2014 • 350,000 Remote disconnects • 343,000 Remote reconnects • 1 Million Move-in/Out Reads At a glance Slide 29