Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Paul Morgan, Ausley and Associates
1. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Small Unmanned Systems
Business Exposition 2015
Paul Morgan
Ausley and Assoc
240-577-4861
2. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Small UAS Operations
Contract
Flight Operations
Post Mission
Data Processing
Dissemination
Data Management
3. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Contract Practicalities
• Does the Customer Understand Their
Requirements?
• Do YOU Understand the Customer
Requirements
• Data Rights
• Data Formats
• Delivery of Data Sets
• Data Storage
• Prime/Sub Relationship
• In Field or Data Manager?
• Payment Methods
Contract
4. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Flight Operations: Harder Than It Looks
Flight Operations
• Training/Maintenance/Repair
• Flight Planning
• SOP
• Location
• Equipment
• Spares
• Logs and Records
• Time of Day
• Crew Qualifications
• Avionics Integration/Software: The Right Tool
• Weather
• Point of Contact
• Level of Automation
• Repeatable Processes for Each Vertical
When Have the Contract Requirements Been Met?
5. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Accident Data
0
50
100
150
200
250
300
350
400
1,000 10,000 100,000 1,000,000 10,000,000
Cumulative Hours
CumulativeMishapRate
AH-64
UH-60
CH-47
1. Engines
Fuel Systems
3. Human Factor
Checklist
Training
Aviation Discipline, Culture
Heavy Fuel Engine
Airworthy Fuel System
One Standard
Automated T/O and Landing
Condition Based Maintenance
Air Worthiness Release
File
&
Fly
Shadow
Condition Based Maintenance
AWR Level II
AWR Level III
Improved Fuel System
Warrior
1101 Engine
Hunter
FAR 33
Software Upgrades
Aviation Accident Investigation
Checklist
Maintenance Discipline
DES
Culture Change
2.
(C Model/HFE)
AWR Level I
Army Safety Progress May
Outpace FAA Developed
NAS Standards
GOAL
(FY10)
Accident Data
Army Aviation Manned & Unmanned
Accident Data Class A-C
6. www.ausley.us • 46611 Corporate Drive, Suite 101 • Lexington Park, MD 20653 • 301-863-2800
Summary
• Must Understand the Process Flow for Each UAS Segment
• Understand Customer Needs and Requirements for DATA and
Infield Requirements
• Contract is the Binding Document
• Cost Variables the Critical Factor
• Talent in the Field Key
• Develop SOP and Only Work with Firms That Have and Follow One