Se ha denunciado esta presentación.
Se está descargando tu SlideShare. ×

Sagnik_Construction_Management.pdf

Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Anuncio
Próximo SlideShare
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
Cargando en…3
×

Eche un vistazo a continuación

1 de 5 Anuncio

Más Contenido Relacionado

Similares a Sagnik_Construction_Management.pdf (20)

Más reciente (20)

Anuncio

Sagnik_Construction_Management.pdf

  1. 1. NAME:- SAGNIK BHATTACHARJEE STREAM:- CIVIL ENGINEERING YEAR:- B-TECH 3RD YEAR 6TH SEM ROLL NO.:- 27901321011 SUBJECT:- Construction Management SUBJECT CODE:- CE(PC)601 KALYANI SHILPANCHAL, PO+P.S. – KALYANI, DIST – NADIA, WEST BENGAL – 741235, INDIA
  2. 2. Introduction EPC contract the contractor designs the installation, procures the necessary materials and builds the project, either directly or by subcontracting part of the work. In some cases, the contractor carries the project risk for schedule as well as budget in return for a fixed price, called lump sum or LSTK depending on the agreed scope of work.[1] When the scope is restricted to engineering and procurement, this is referred to as an EP, E and P or E+P contract. This is often done in situations where the construction risk is too great for the contractor or when the owner does the construction
  3. 3. IMPORTANCE OF EPC An owner decides for an EPC contract for reasons that include • Reduced stress for owner • easy work and growth of the company. • Single point of contact for owner simplifies communications. • Ready availability of post-commissioning services • Ensures quality and reduces practical issues faced in other ways[clarification needed] • Owner protected against changing prices for materials, labor, etc. • Cost is known at the start of the project • Scope and the specifications of the plant • Quality • Project duration • Cost • The cost (the price to be paid to the EPCC) is negotiated and finalised and paid in mutually agreed installments.
  4. 4. Cost Certainity & Owner Responsiblity
  5. 5. Thank You

×