SlideShare a Scribd company logo
1 of 4
Download to read offline
Page1
CURRICULUM-VITAE of
Eng.Shaik Mazhar Ahmed
: 0500-630866(Off), : 0509-383865(Residence),
: citymech@gmail.com
SUMMARY
Core Competencies: Strong knowledge and interest in mechanical, electrical and plumbing
equipment’s, installation, construction, procurement, communications and cost controlling materials.
Strengths include innovative and entrepreneurial thinking, learning new concepts quickly, working
well under pressure, and effectively communicating ideas.
Recognized as resourceful, creative and innovative, with proven success in developing cost-effective
strategies.
CARRIER OBJECTIVE
To secure a challenging position in the field of Project management or any suitable position that
utilizes my diverse background, skills and experience. Possess the aptitudes of good analytical and
negotiations skills.
Equipped with the skills of Self-motivated, Diligent, and Result-oriented and strive for perfection.
POSITION DESIRED : Interface Manager
SKILLS & QUALITIES :
Skilled in using wide range of design, using the principles of Heat Ventilating and Air conditioning (HVAC). Also
have knowledge in calculating the heat load of a given area. SelfMotivated,Versatile,Independent handling
Electro-Mechanical works, Skillfull Operation of PC and with Effective communication skills.
PROFESSIONAL QUALIFICATION:
MECHANICAL ENGINEERING G.L (D.M.E) Year 1990
University : Banglore University, India
EMPLOYMENT HISTORY IN K .S .A
Company :H.G.I.S. CO.
Professional Experience
Senoir Technical Projects Engineer Jan 2011 till Present
 To manage consistently the multiple project execution interfaces from detailed engineering to
procurement, construction and site activities
 Monitor and ensure that Contractor performs all interface activities in accordance with its
obligations under the contract.
 Assist to identify, document, and resolve interface activities of the project team between
disciplines as well as Contractor and its subcontractors.
 Support the Project Manager in resolving all interfaces between Company, Contractor and its
subcontractors.
Page2
 Develop and maintain an overall interface Plan for projects covering all identified and potential
interfaces. Ensure the development of an interface plan relative to activities as per the contract.
 Ensure that all interface related requirements are met during detailed engineering and according
to the Project milestone schedule and completion priorities.
 Full coordination between Company and Contractor in all execution areas
 Technical queries, deviations, changes and actions are closed out in a timely manner
 Coordination between engineering and equipment suppliers for timely deliveries
 Logistical measures are in place for procurement and construction
 Activities coordination from design to construction and from construction to commissioning
 All above activities are done in accordance with project schedule.
 Ensure interfaces are executed and completed in a timely manner consistent with the overall
project schedule and objectives.
 Assist with the identification of the technical, execution, and organizational interfaces for the
project.
 Assist with the coordination and monitoring of the interfaces that will help all affected parties
understand their obligations and roles in the supply of information and other actions necessary
for the resolution of interface issues.
 To control and to assure the required level of quality and safety
Technical Projects Engineer Jan 2001 - 2010
 The Senoir Projects Technical Support Engineer is responsible for the day to day management
and over see the implementation and execution efforts for projects.
 Project planning and construction and material handling through out the kingdom warehouses.
 Supervising the installation of all works for ongoing projects.
 Supervising the ducting & Refrigerant piping work & giving proper guidance to the contractors,
in order to complete the work within lead time.
 Inspect and approved completed works for mechanical discipline.
 Resolve and discussed any snag arising during construction as well as in contract manuscript.
 Visiting & surveying new projects & advising them the type of A/C & the location of units to be
installed considering all technical points.
 Attending meetings with the consultants, contractors, clients & giving them technical
information.
 Supporting the Project Manager with all tasks related to the Project Management.
 Managing the Sub Contractor and Suppliers.
 Follow up the internal and external tasks.
 Reviewing tenders and bids.
 Preparation of periodic reports for site activities.
 Responsible for the complete design of the HVAC systems for the assigned project. Coordination
of Mechanical drawings with Architectural, electrical and Structural design drawings.
 Review of HVAC drawings to ensure that specifications are met.
 Review and approved shop drawing and material for the Project.
 Fully familiar with design criteria within ASHRAE Standards.
 Giving technical support & product knowledge to the client, contractors& consultant.
Company : LUCENT TECHNOLOGIES INTERNATIONAL INC( AT & T)
(Dec 96 Till December 2000)
Department : ENGINEERING (Bldgs) Electro/Mechanical Engineer.
Project : TELECOMMUNICATION EXPANSION PROJECT
(TEP-6)-SAUDI TELECOM PROJECT
Construction of DIGITAL MICROWAVE BUILDINGS in consortium with
SAUDI TELECOM.
Page3
DUTIES & RESPONSIBILITIES :
 Overall incharge for Monitoring Installation of Electro/Mechanical works for the sites DIGITAL
MICROWAVE, JUNCTION DIGITAL MICROWAVE, FIBRE OPTIC REPEATER STATION & SMALL
EXCHANGE BUILDING REDUCED TELEPHONE EXPANSION PROJECT Kingdom wide.
 Responsible for all Sub-contractors ensure their labour ,testing equipments & plant are in keeping with
high standards required as per project specification.
 Responsible for maintaining Daily Log Sheets, Inspection Request for Electro/ Mechanical works & Site
Logs for depict actual site construction completed daily.
 Responsible for conducting weekly site progres meetings with SAUDI TELECOM/NORCONSULT
& Sub-contractor to discuss items such as design,scheduling & revisions.
 Responsible for Field Inspection Sheets confirming percentage of Installation works for HVAC, ELECTRICAL,
GENRETOR, EARTHING SYSTEM & FIRE DETECTION ALARM SYSTEM accomplished by the Sub-con
during the indicated period .
 Responsible for conducting joint Inspection of Electro/Mechanical works with SAUDI
TELECOM / NORCONSULT confirming complaince with project specifications.
 Responsible for arranging & conducting required Installations tests of HVAC,ELECTRICAL
DISTRIBUTION,DIESAL GENERATOR,FIRE PROTECTION & EARTHING SYSTEMS with
SAUDI TELECOM/NORCONSULT to demostrate that the buildings has met functional & specific
requirements stated in the contract specifications.
 Responsible for arranging & conducting PRILIMANARY ACCEPTANCE TEST PLAN with SAUDI
TELECOM/NORCONSULT to demonstrate functional compliance with Electrical works, Generator
works, Fire Protection, Air-conditioning works , Plumbing & a series of visual inspections, & quality
control checks.
 Responsible for arranging & conducting Prilimanary Acceptance Test Plan with
SaudiTelecom/Norconsult to demonstrate functional compliance with Electrical works, Generator
works, FireProtection, Airconditioning works, Plumbing & a series of visual inspections, &
quality control checks.
REPORTING
Directly to the Electro / Mechanical Senior Manager (Bldgs).
EMPLOYMENT HISTORY IN INDIA : AROUND 5 ½ YEARS EXPERIENCE IN INDIA.
Company : M/S. ACE CLIMATIZERS & ENGINEERS PVT. LTD. Jan 1991 To May 1996
MECHANICAL ENGINEER. (HVAC)
JOB REPONSIBILITIES WERE :
 To handle workorder contracts of HVAC systems (MECHANICAL&ELECTRICAL CONTROL).
WIRING Subsequently as a site supervisor to handle independently Installation of HVAC
EQUIPMENT as per drawings, ordering for materials required,testing,balancing & commissioning of
CENTRALISED HVAC SYSTEM Exhaust fans & various ducting & piping accessories complete with
various Electrical control panels & Master repeater panel for Centralized control of all HVAC
Equipments.
 Maintain records of site execution activities, compliance to specifications, adherence to work plans,
and other project activities essential to verify vendor contract compliance.
 Ensure that all contractual issues are well documented and resolved on time.
 Ensures timely completion of the projects adhering to critical deadlines.
Page4
CAPABILITIES & ACHIEVEMENTS:
After acquiring a vast working experience in HVAC OPERATIONS, I can confidently handle the
following among other Jobs.
Sound Technical knowledge & understanding of HVAC INSTALLATION OPERATIONS.
Always contributed to the situations & activities which are beyond my immediate area of
responsibility.
REPORTING : Directly to the Project Manager.
Main Interfaces:
• Internal : Project Manager, Project Construction Site team, Procurement Engineers, Design Engineers.
• External : Contractors, Third parties, authorities, suppliers, vendors and consultants as required.
Knowledge and skills:
• Project Management and Major Project Execution experience, demonstrated skill in leading the
contractors.
• Quality & Safety: audit & certification activities, operational security , contractors specs,
qualifications & auditing
• Contracting, Procurement, Supply Chain & Site Logistics experience
• Specialists Knowledge : engineering knowledge in specialist disciplines and activities
• Compliances : local/national & international standards & codes
• Construction & Installations : site construction, inspection
Personal capabilities:
• Decision Making
• Cultural Awareness; ability to work effectively with Nationals
• Excellence Orientation
• Flexibility
• Deadline Management
TRAINING & SEMINARS ATTENDED:
 Making Your Meeting A Success Rather Than A Mess.
 Carrier Airconditioning Installation Training.
 Attended Technical Seminars for Unitary Line up and Multi V II.
 LatsLoad Program for Building Design.
 Model Selection Program for Specifying Models, according to the Projects requirement.
PERSONAL PROFILE
Ambitious and energetic composed under pressure and get along very well with people at all levels.
Possess excellent correspondence & communication skills. I come across as a confident person, friendly
natured, self-motivated; possess leadership qualities, extremely patient, good organizing skills.
RELIGION : ISLAM
NATIONALITY : INDIAN
MARITAL STATUS : MARRIED
IQAMA STATUS : TRANSFERABLE
DRIVING LICENSE : VALID SAUDI DRIVING LICENSE

More Related Content

What's hot

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1Farhan Morai
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas revShibu Thomas
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16Tony Lowery
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi Shankar
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updatedMohammed Hashim
 
Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim
 

What's hot (20)

Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
F. CV
F. CVF. CV
F. CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
C V
C VC V
C V
 
nestor
nestornestor
nestor
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Civil Engineer 2
Civil Engineer 2Civil Engineer 2
Civil Engineer 2
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
CLP - resume
CLP - resumeCLP - resume
CLP - resume
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas rev
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV final
 
Sayooj cv
Sayooj cvSayooj cv
Sayooj cv
 

Similar to Mazhar SheikhMECH ENGR-CV- 2016-Construction

Similar to Mazhar SheikhMECH ENGR-CV- 2016-Construction (20)

Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
 
Ahmad Haddad
Ahmad HaddadAhmad Haddad
Ahmad Haddad
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
 
Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
krishnajith_original
krishnajith_originalkrishnajith_original
krishnajith_original
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 

Mazhar SheikhMECH ENGR-CV- 2016-Construction

  • 1. Page1 CURRICULUM-VITAE of Eng.Shaik Mazhar Ahmed : 0500-630866(Off), : 0509-383865(Residence), : citymech@gmail.com SUMMARY Core Competencies: Strong knowledge and interest in mechanical, electrical and plumbing equipment’s, installation, construction, procurement, communications and cost controlling materials. Strengths include innovative and entrepreneurial thinking, learning new concepts quickly, working well under pressure, and effectively communicating ideas. Recognized as resourceful, creative and innovative, with proven success in developing cost-effective strategies. CARRIER OBJECTIVE To secure a challenging position in the field of Project management or any suitable position that utilizes my diverse background, skills and experience. Possess the aptitudes of good analytical and negotiations skills. Equipped with the skills of Self-motivated, Diligent, and Result-oriented and strive for perfection. POSITION DESIRED : Interface Manager SKILLS & QUALITIES : Skilled in using wide range of design, using the principles of Heat Ventilating and Air conditioning (HVAC). Also have knowledge in calculating the heat load of a given area. SelfMotivated,Versatile,Independent handling Electro-Mechanical works, Skillfull Operation of PC and with Effective communication skills. PROFESSIONAL QUALIFICATION: MECHANICAL ENGINEERING G.L (D.M.E) Year 1990 University : Banglore University, India EMPLOYMENT HISTORY IN K .S .A Company :H.G.I.S. CO. Professional Experience Senoir Technical Projects Engineer Jan 2011 till Present  To manage consistently the multiple project execution interfaces from detailed engineering to procurement, construction and site activities  Monitor and ensure that Contractor performs all interface activities in accordance with its obligations under the contract.  Assist to identify, document, and resolve interface activities of the project team between disciplines as well as Contractor and its subcontractors.  Support the Project Manager in resolving all interfaces between Company, Contractor and its subcontractors.
  • 2. Page2  Develop and maintain an overall interface Plan for projects covering all identified and potential interfaces. Ensure the development of an interface plan relative to activities as per the contract.  Ensure that all interface related requirements are met during detailed engineering and according to the Project milestone schedule and completion priorities.  Full coordination between Company and Contractor in all execution areas  Technical queries, deviations, changes and actions are closed out in a timely manner  Coordination between engineering and equipment suppliers for timely deliveries  Logistical measures are in place for procurement and construction  Activities coordination from design to construction and from construction to commissioning  All above activities are done in accordance with project schedule.  Ensure interfaces are executed and completed in a timely manner consistent with the overall project schedule and objectives.  Assist with the identification of the technical, execution, and organizational interfaces for the project.  Assist with the coordination and monitoring of the interfaces that will help all affected parties understand their obligations and roles in the supply of information and other actions necessary for the resolution of interface issues.  To control and to assure the required level of quality and safety Technical Projects Engineer Jan 2001 - 2010  The Senoir Projects Technical Support Engineer is responsible for the day to day management and over see the implementation and execution efforts for projects.  Project planning and construction and material handling through out the kingdom warehouses.  Supervising the installation of all works for ongoing projects.  Supervising the ducting & Refrigerant piping work & giving proper guidance to the contractors, in order to complete the work within lead time.  Inspect and approved completed works for mechanical discipline.  Resolve and discussed any snag arising during construction as well as in contract manuscript.  Visiting & surveying new projects & advising them the type of A/C & the location of units to be installed considering all technical points.  Attending meetings with the consultants, contractors, clients & giving them technical information.  Supporting the Project Manager with all tasks related to the Project Management.  Managing the Sub Contractor and Suppliers.  Follow up the internal and external tasks.  Reviewing tenders and bids.  Preparation of periodic reports for site activities.  Responsible for the complete design of the HVAC systems for the assigned project. Coordination of Mechanical drawings with Architectural, electrical and Structural design drawings.  Review of HVAC drawings to ensure that specifications are met.  Review and approved shop drawing and material for the Project.  Fully familiar with design criteria within ASHRAE Standards.  Giving technical support & product knowledge to the client, contractors& consultant. Company : LUCENT TECHNOLOGIES INTERNATIONAL INC( AT & T) (Dec 96 Till December 2000) Department : ENGINEERING (Bldgs) Electro/Mechanical Engineer. Project : TELECOMMUNICATION EXPANSION PROJECT (TEP-6)-SAUDI TELECOM PROJECT Construction of DIGITAL MICROWAVE BUILDINGS in consortium with SAUDI TELECOM.
  • 3. Page3 DUTIES & RESPONSIBILITIES :  Overall incharge for Monitoring Installation of Electro/Mechanical works for the sites DIGITAL MICROWAVE, JUNCTION DIGITAL MICROWAVE, FIBRE OPTIC REPEATER STATION & SMALL EXCHANGE BUILDING REDUCED TELEPHONE EXPANSION PROJECT Kingdom wide.  Responsible for all Sub-contractors ensure their labour ,testing equipments & plant are in keeping with high standards required as per project specification.  Responsible for maintaining Daily Log Sheets, Inspection Request for Electro/ Mechanical works & Site Logs for depict actual site construction completed daily.  Responsible for conducting weekly site progres meetings with SAUDI TELECOM/NORCONSULT & Sub-contractor to discuss items such as design,scheduling & revisions.  Responsible for Field Inspection Sheets confirming percentage of Installation works for HVAC, ELECTRICAL, GENRETOR, EARTHING SYSTEM & FIRE DETECTION ALARM SYSTEM accomplished by the Sub-con during the indicated period .  Responsible for conducting joint Inspection of Electro/Mechanical works with SAUDI TELECOM / NORCONSULT confirming complaince with project specifications.  Responsible for arranging & conducting required Installations tests of HVAC,ELECTRICAL DISTRIBUTION,DIESAL GENERATOR,FIRE PROTECTION & EARTHING SYSTEMS with SAUDI TELECOM/NORCONSULT to demostrate that the buildings has met functional & specific requirements stated in the contract specifications.  Responsible for arranging & conducting PRILIMANARY ACCEPTANCE TEST PLAN with SAUDI TELECOM/NORCONSULT to demonstrate functional compliance with Electrical works, Generator works, Fire Protection, Air-conditioning works , Plumbing & a series of visual inspections, & quality control checks.  Responsible for arranging & conducting Prilimanary Acceptance Test Plan with SaudiTelecom/Norconsult to demonstrate functional compliance with Electrical works, Generator works, FireProtection, Airconditioning works, Plumbing & a series of visual inspections, & quality control checks. REPORTING Directly to the Electro / Mechanical Senior Manager (Bldgs). EMPLOYMENT HISTORY IN INDIA : AROUND 5 ½ YEARS EXPERIENCE IN INDIA. Company : M/S. ACE CLIMATIZERS & ENGINEERS PVT. LTD. Jan 1991 To May 1996 MECHANICAL ENGINEER. (HVAC) JOB REPONSIBILITIES WERE :  To handle workorder contracts of HVAC systems (MECHANICAL&ELECTRICAL CONTROL). WIRING Subsequently as a site supervisor to handle independently Installation of HVAC EQUIPMENT as per drawings, ordering for materials required,testing,balancing & commissioning of CENTRALISED HVAC SYSTEM Exhaust fans & various ducting & piping accessories complete with various Electrical control panels & Master repeater panel for Centralized control of all HVAC Equipments.  Maintain records of site execution activities, compliance to specifications, adherence to work plans, and other project activities essential to verify vendor contract compliance.  Ensure that all contractual issues are well documented and resolved on time.  Ensures timely completion of the projects adhering to critical deadlines.
  • 4. Page4 CAPABILITIES & ACHIEVEMENTS: After acquiring a vast working experience in HVAC OPERATIONS, I can confidently handle the following among other Jobs. Sound Technical knowledge & understanding of HVAC INSTALLATION OPERATIONS. Always contributed to the situations & activities which are beyond my immediate area of responsibility. REPORTING : Directly to the Project Manager. Main Interfaces: • Internal : Project Manager, Project Construction Site team, Procurement Engineers, Design Engineers. • External : Contractors, Third parties, authorities, suppliers, vendors and consultants as required. Knowledge and skills: • Project Management and Major Project Execution experience, demonstrated skill in leading the contractors. • Quality & Safety: audit & certification activities, operational security , contractors specs, qualifications & auditing • Contracting, Procurement, Supply Chain & Site Logistics experience • Specialists Knowledge : engineering knowledge in specialist disciplines and activities • Compliances : local/national & international standards & codes • Construction & Installations : site construction, inspection Personal capabilities: • Decision Making • Cultural Awareness; ability to work effectively with Nationals • Excellence Orientation • Flexibility • Deadline Management TRAINING & SEMINARS ATTENDED:  Making Your Meeting A Success Rather Than A Mess.  Carrier Airconditioning Installation Training.  Attended Technical Seminars for Unitary Line up and Multi V II.  LatsLoad Program for Building Design.  Model Selection Program for Specifying Models, according to the Projects requirement. PERSONAL PROFILE Ambitious and energetic composed under pressure and get along very well with people at all levels. Possess excellent correspondence & communication skills. I come across as a confident person, friendly natured, self-motivated; possess leadership qualities, extremely patient, good organizing skills. RELIGION : ISLAM NATIONALITY : INDIAN MARITAL STATUS : MARRIED IQAMA STATUS : TRANSFERABLE DRIVING LICENSE : VALID SAUDI DRIVING LICENSE