SlideShare una empresa de Scribd logo
1 de 1
What hazards
have been
identified?

What are the
potential injuries
or damage?

What measures have
been taken to prevent
injury or damage?

Number of
people at
risk

Severity (1, 2 or 3)

Smoking

Burning self on
cigarette (1)

Drinking cold Tea

Could make Dan
ill (2)

Cold
weather/rain

Tripping over
wires

Dan being hit by a
car

Could make us all
ill (1)

It could cause
injury to anyone
who is involved
(2)
It could cause
serious injury to
him (3)

Use a person that
already smokes so they
know what they are
doing
Don’t force him to
drink it
Wrap up in plenty of
layers and take layers
off when filming but
put them back on
straight after
Watch your step and
keep an eye on where
you’re placing feet and
check where the wires
are before walking
somewhere
Look both ways and
make sure there are no
vehicles travelling

What additional
measures or
actions are
required?

Who is responsible for
action?

R
A
G

1

Dan (main character)

G

1

Dan (main character)

A

5

Everyone is responsible
for their own safety
regarding the weather

G

5

Everyone as it is their
responsibility to
remember to look for
the wires

A

I am responsible for Dan
(main character) as I
have asked him to walk
across the road

R

2

Más contenido relacionado

Destacado

Magazine ad for the digipak
Magazine ad for the digipakMagazine ad for the digipak
Magazine ad for the digipakSam Benzie
 
Primavera 3
Primavera 3Primavera 3
Primavera 3rama24x7
 
Tower Crane Installation Work
Tower Crane Installation WorkTower Crane Installation Work
Tower Crane Installation Worknittipurohit
 
Intro sviluppo comunicazione_linguaggio
Intro sviluppo comunicazione_linguaggioIntro sviluppo comunicazione_linguaggio
Intro sviluppo comunicazione_linguaggioimartini
 
Tips For Outdoor Cooking
Tips For Outdoor CookingTips For Outdoor Cooking
Tips For Outdoor Cookingandrobased
 
Presentación1
Presentación1Presentación1
Presentación1Naiara93
 
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europe
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europeTE Summit 24-25.10.2013.-Gabi Barna-Uniting europe
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europeTELECENTRE EUROPE
 
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europe
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europeTE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europe
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europeTELECENTRE EUROPE
 
49614512 apostila-alianca-de-sangue-professor-ctbrbr
49614512 apostila-alianca-de-sangue-professor-ctbrbr49614512 apostila-alianca-de-sangue-professor-ctbrbr
49614512 apostila-alianca-de-sangue-professor-ctbrbrAntonio Ferreira
 
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...Integrated Device Technology
 
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support people
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support peopleTE Summit 24-25.10.2013.-Elzbieta Dydak-Support people
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support peopleTELECENTRE EUROPE
 

Destacado (20)

Construction Safety Gear Guide
Construction Safety Gear GuideConstruction Safety Gear Guide
Construction Safety Gear Guide
 
Magazine ad for the digipak
Magazine ad for the digipakMagazine ad for the digipak
Magazine ad for the digipak
 
Evaluating your safety culture
Evaluating your safety cultureEvaluating your safety culture
Evaluating your safety culture
 
Osha Manager Role
Osha Manager RoleOsha Manager Role
Osha Manager Role
 
Primavera 3
Primavera 3Primavera 3
Primavera 3
 
10 Tips For Staying Warm on the Construction Site
10 Tips For Staying Warm on the Construction Site10 Tips For Staying Warm on the Construction Site
10 Tips For Staying Warm on the Construction Site
 
Catu 3
Catu 3Catu 3
Catu 3
 
Tower Crane Installation Work
Tower Crane Installation WorkTower Crane Installation Work
Tower Crane Installation Work
 
Intro sviluppo comunicazione_linguaggio
Intro sviluppo comunicazione_linguaggioIntro sviluppo comunicazione_linguaggio
Intro sviluppo comunicazione_linguaggio
 
Tips For Outdoor Cooking
Tips For Outdoor CookingTips For Outdoor Cooking
Tips For Outdoor Cooking
 
89HT0832P 16-lane 8 Gbps PCIe 3.0 Retimer by IDT
89HT0832P 16-lane 8 Gbps PCIe 3.0 Retimer by IDT89HT0832P 16-lane 8 Gbps PCIe 3.0 Retimer by IDT
89HT0832P 16-lane 8 Gbps PCIe 3.0 Retimer by IDT
 
Presentación1
Presentación1Presentación1
Presentación1
 
Curso de moodle
Curso de moodleCurso de moodle
Curso de moodle
 
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europe
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europeTE Summit 24-25.10.2013.-Gabi Barna-Uniting europe
TE Summit 24-25.10.2013.-Gabi Barna-Uniting europe
 
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europe
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europeTE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europe
TE Summit 24-25.10.2013.-Ekaterina Fedotova-TechSoup europe
 
49399532 servindo-a-deus
49399532 servindo-a-deus49399532 servindo-a-deus
49399532 servindo-a-deus
 
49614512 apostila-alianca-de-sangue-professor-ctbrbr
49614512 apostila-alianca-de-sangue-professor-ctbrbr49614512 apostila-alianca-de-sangue-professor-ctbrbr
49614512 apostila-alianca-de-sangue-professor-ctbrbr
 
Ensayo sociedad de la información
Ensayo sociedad de la informaciónEnsayo sociedad de la información
Ensayo sociedad de la información
 
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...
PCI Express Clock Generators and Buffers by IDT: Ultra-low-power for PCIe Gen...
 
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support people
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support peopleTE Summit 24-25.10.2013.-Elzbieta Dydak-Support people
TE Summit 24-25.10.2013.-Elzbieta Dydak-Support people
 

Más de Sam Benzie

Evaluation question 3
Evaluation question 3Evaluation question 3
Evaluation question 3Sam Benzie
 
Evaluation question 4
Evaluation question 4Evaluation question 4
Evaluation question 4Sam Benzie
 
Risk assessment
Risk assessment Risk assessment
Risk assessment Sam Benzie
 
Risk assessment jf
Risk assessment jfRisk assessment jf
Risk assessment jfSam Benzie
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting scheduleSam Benzie
 
Shooting schedule a2
Shooting schedule a2Shooting schedule a2
Shooting schedule a2Sam Benzie
 
Shot list music video
Shot list music videoShot list music video
Shot list music videoSam Benzie
 
Evaluation Question 3
Evaluation Question 3Evaluation Question 3
Evaluation Question 3Sam Benzie
 
Evaluation question 6
Evaluation question 6Evaluation question 6
Evaluation question 6Sam Benzie
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting scheduleSam Benzie
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting scheduleSam Benzie
 
Student video analysis
Student video analysisStudent video analysis
Student video analysisSam Benzie
 
Title sequence analysis
Title sequence analysisTitle sequence analysis
Title sequence analysisSam Benzie
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting scheduleSam Benzie
 
Student film opening analysis
Student film opening analysis Student film opening analysis
Student film opening analysis Sam Benzie
 
Mise en scene
Mise en scene Mise en scene
Mise en scene Sam Benzie
 

Más de Sam Benzie (20)

Evaluation question 3
Evaluation question 3Evaluation question 3
Evaluation question 3
 
Evaluation question 4
Evaluation question 4Evaluation question 4
Evaluation question 4
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 
Risk assessment jf
Risk assessment jfRisk assessment jf
Risk assessment jf
 
Mise-en-scene
Mise-en-sceneMise-en-scene
Mise-en-scene
 
Casting
CastingCasting
Casting
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Shooting schedule a2
Shooting schedule a2Shooting schedule a2
Shooting schedule a2
 
Shot list music video
Shot list music videoShot list music video
Shot list music video
 
Evaluation Question 3
Evaluation Question 3Evaluation Question 3
Evaluation Question 3
 
Evaluation question 6
Evaluation question 6Evaluation question 6
Evaluation question 6
 
Question 3
Question 3Question 3
Question 3
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Student video analysis
Student video analysisStudent video analysis
Student video analysis
 
Title sequence analysis
Title sequence analysisTitle sequence analysis
Title sequence analysis
 
Shooting schedule
Shooting scheduleShooting schedule
Shooting schedule
 
Student film opening analysis
Student film opening analysis Student film opening analysis
Student film opening analysis
 
Mise en scene
Mise en scene Mise en scene
Mise en scene
 

Risk assessment Youth & Whisky

  • 1. What hazards have been identified? What are the potential injuries or damage? What measures have been taken to prevent injury or damage? Number of people at risk Severity (1, 2 or 3) Smoking Burning self on cigarette (1) Drinking cold Tea Could make Dan ill (2) Cold weather/rain Tripping over wires Dan being hit by a car Could make us all ill (1) It could cause injury to anyone who is involved (2) It could cause serious injury to him (3) Use a person that already smokes so they know what they are doing Don’t force him to drink it Wrap up in plenty of layers and take layers off when filming but put them back on straight after Watch your step and keep an eye on where you’re placing feet and check where the wires are before walking somewhere Look both ways and make sure there are no vehicles travelling What additional measures or actions are required? Who is responsible for action? R A G 1 Dan (main character) G 1 Dan (main character) A 5 Everyone is responsible for their own safety regarding the weather G 5 Everyone as it is their responsibility to remember to look for the wires A I am responsible for Dan (main character) as I have asked him to walk across the road R 2