Inverter coordination with
existing distribution equipment
Chase Sun
PG&E
May 6, 2014
1
Areas require coordination
• Protection
• Voltage regulation
2
Protection
• Run fault studies with inverter modelled and with the inverter
contribution.
• Set each inverter to trip for end of line fault if possible. Conventional
overcurrent settings may not be adequate for variable resources such as
PV inverters since the settings may be too high when the PV output is low
in the morning and in the late afternoon. Often, the inverters are set up
for sequential tripping, using anti-islanding, after the feeder tripped first.
• Check to make sure that the inverter will not trip for adjacent feeder faults
that should be cleared by the adjacent feeder breaker.
• Check the existing feeder protective device settings for relays, reclosers,
interrupters, fuses, to make sure the existing relay settings are still
adequate with the inverter contribution. In other words, make sure the
devices will not be de-sensitized by a significant amount as to not trip for
an in-section fault. This is not usually an issue due to the low inverter
fault duty.
3
Protection
• Check that the additional inverter fault duty will not
overstress existing equipment. This is usually not an
issue due to the low inverter fault duty.
• In general, each protective device, including inverters,
should trip for faults within its protected section and
not trip for faults outside of its protection zone. This is
problematic since the existing inverters are set up for
low penetration mode and may overtrip.
• At high penetrations, the inverter should not trip for a
system-wide event and aggravate the severity of the
event. This is being addressed in the Phase 1 revised
trip settings.
4
Voltage interaction/coordination
Background
• Main issues:
• Traditionally, generators were connected to the transmission system, designed for
multi-directional flow where the conductors are much bigger and sized for both
local load and loop flow. Also, the transmission system is not regulated as tightly
as the distribution system.
• Distribution system was designed in a radial tree configuration, to distribute power
at the lowest cost. So, the distribution feeder mainline is composed of big
conductors, similar to a tree trunk, and the branch conductors are sized for local
load but not capable of carrying current for any significant distance without severe
voltage drop.
• For example, on the PG&E system, less than 15% of the overall distribution
conductor population are large mainline conductors sized at 397 MCM or larger.
PVs connected to large mainline conductors have minimal voltage impact to other
customers. But more than 85% of the locations have smaller conductors with
various degrees of voltage impact. The worst cases are larger units at the end of
small feeder conductors. In the interconnection studies, once the feeder is
reconductored, the voltage issues usually go away.
• PG&E has approximately 140,000 circuit miles of distribution conductors. it costs
about $500,000/mile to replace the conductor to 397 MCM or larger.
5
Voltage interaction/coordination
Background
As a frame of reference, we can look at the current load review process:
• The distribution loads are reviewed during load interconnection to insure
that the load switching will not cause excessive voltage fluctuation to
other customers.
• CA Rule 2 limits the largest single phase 240V motor that can be started
across the line to 7.5 HP and the largest 480V, 3 phase motor that can be
switched across the line to 100 HP.
• Rule 2, Sec D3d states that for its operating convenience and necessity,
PG&E may elect to supply an applicant whose demand load is in excess of
2,000 kVA from a substation on the customer premises supplied from a
transmission source.
• Load has diversity that is well understood and utilized by the operating
utilities.
6
Voltage interaction/coordination
Background
• The distribution system is also regulated to +/-5% of nominal
voltage by radial tap changing voltage regulators to provide the
proper utilization voltage to the distribution customers.
• The tap changing voltage regulators are not effective in regulating
voltage in the reverse direction when DG is present.
• The existing E/M regulators used time delays to coordinate
operation between multiple regulators. Since these are E/M
regulators, it takes time to change taps. Typically, there is about 20-
45 second time delay between regulators to insure the upstream
regulator is done with its correction before the next stage regulator
operates. Setting the time delays too close may cause hunting and
unstable operation between the regulators.
7
Voltage Regulation
• There are no specific operational provisions for voltage rise due to DG in
Rule 21. For example, if the feeder is operating at 126V at peak already, as
allowed by Rule 2, there is no room for DG voltage rise. The good thing is
that PV peaks at noon and the feeders typically peak at 4-6 PM when the
PV output is much lower. At noon, the feeder voltage is typically not at
126V and there is more room for DG voltage rise. Please note that the
higher trip set point of 132 V specified in Rule 21 is intended to cover
voltage rise within the customer facility and not intended to allow the DG
to cause voltage beyond the PCC to operate at 132V.
• When Conservation Voltage Regulation (CVR) program is present, the
required operating voltage is restricted to +0% and -5% range which
further reduce the available DG operating voltage margin.
• Typically, the distribution engineer make adjustments in the voltage
regulator settings, when possible, to accommodate the DG voltage rise.
Often this reduces the operating flexibility of the distribution feeder.
8
Voltage regulation
• DGs are generation sources and will cause voltage to rise in order to
push out the rated power.
• DGs are located on the load side of the voltage regulators and may
render the regulators ineffective.
• DGs are intermittent and not dependable from a capacity
perspective.
• PV also does not have that much diversity when it comes to cloud
cover effects. When a cloud cover comes over, the PV output may
drop from 100% down to 20% within seconds. For a storm cloud,
the drop may go lower.
• PV and wind output fluctuations may occur much faster than the
E/M voltage regulators can respond. Without mitigation, this may
reduce the power quality on the existing feeders and may have the
potential to damage customer equipment.
9
Conventional voltage mitigation
• Reset LTC and voltage regulators, where possible, to allow more margin for the
inverters to operate.
• Replace radial regulator control to bi-directional control and set in Cogen Mode.
Bi-directional mode is intended for radial feed from a back-up feeder and not
intended for DG.
• Remove Load Drop Compensator setting and use flat voltage regulation and install
additional voltage regulators as needed.
• Re-design the LTC control circuit to allow proper voltage on the other feeders.
• Install large PV on dedicated feeders to minimize impact on load customers that
require +/-5% voltage regulation. This is how PG&E designed its own large PV
installations.
• Connect larger PV to the mainline, large conductors, and close to the substation.
• Reconductor the small wires causing the voltage violations. This is the most
effective and simplest but sometimes the most expensive option
• Relocate voltage regulators and capacitors to account for the prevailing DG
outputs.
10
Potential smart inverter mitigations
• Note: The discussion below is relevant to larger inverters.
Volt/var control with small inverters may not be effective
since they may not be able to buck the system to any
significant extent. Also operating the feeder at off-unity PF
may increase the line current and increase line losses.
• High voltage due to PV reverse flow
– Set inverter at lagging PF to drag voltage down. This mode is
not considered active voltage regulation and is allowed under
the current Rule 21 and IEEE-1547. But this may require
installation of capacitors elsewhere to make up for the lost vars
to avoid voltage problems elsewhere.
– Reduce output at unit PF to maintain voltage below limits. This
may be viable for occasional overvoltage conditions.
11
Smart Inverter Voltage Enhancements
• Other voltage control opportunities also exist
and should be explored.
12
Active volt/var control issues
• Autonomous active volt/var control using local voltage feedback needs to
be coordinated carefully when there are multiple active control inverters
in the vicinity. If not coordinated properly, this may lead to the devices
fighting each other and potentially worse voltage on the feeder. This is
still an evolving area that needs more study.
• Communication based active volt/var control may be much simpler since
the central control computer can dictate which unit is in control at any
given time. But this may require a real time smart grid computer and an
extensive communication infrastructure, which do not exist at this time.
– Local master slave set-up is also possible with radio communication between the units.
13
Potential ways to avoid/minimize inintended interaction
between autonomous active control inverters:
• Defined ramp up of var absorption rate when voltage goes over a preset
level to help reduce the local voltage.
• Defined ramp up of var injection when voltage goes below a preset level
to help raise the local voltage.
• Include deadbands to de-sensitize the inverter response
• Define time delay between specific inverters to allow one inverter to
complete its control action before the next inverter act.
• The inverter can respond much quicker than the voltage regulators when
the voltage is outside of the deadband. So, it would be desirable to have
the inverter complete its active voltage control action before the voltage
regulators respond. This may also minimize the regulator response and
reduce the wear and tear on the regulators.
• Set a large inverter to active volt/var control and disable the active
volt/var on the smaller units to avoid complications
14
Outstanding high penetration issues
• Scenario 1: When there is a large amount of DG on the feeder that
displaced load normally, and there is a momentary fault on the
feeder. The feeder breaker will trip to clear the fault and all of the
DG are required to de-energize the line for safety reasons. On the
PG&E system, the feeder breaker is typically designed to reclose in
5 seconds to test the line. If the momentary fault cleared, the
feeder will be energized. But at that time, the DGs will be off and
the regulator will be seeing much higher load but it will not respond
until the time delay period expired. So, the effect is the same as a
large load switching in together. In that time frame, the customers
may experience low voltage due to the higher load. Without the DG
being there, there will not be any load masking and the regulator
will be set for the correct load level before and after the fault.
• A possible mitigation is to decrease the inverter re-energizing time
to minimize the time that the customers experience low voltage.
15
High Penetration Issues
• Scenario 2: When there is a close-in adjacent feeder
fault, the bus voltage may sag to close to zero. The
current UV setpoint is 0.16 second at <50% voltage.
But the feeder breaker may not trip for more than 0.25
sec and all of the DG tied to that bus will trip
unnecessarily due to the current Rule 21 and IEEE-1547
setting. The sudden loss of a large amount of DG
capacity may also lead to low voltage conditions for the
load customers on the unfaulted feeder, until the
voltage regulation equipment can respond.
• The mitigation is presented in the Phase 1 UV settings
where we extended the time delay to 1 second for UV
<50% voltage.
16

Más contenido relacionado

La actualidad más candente

DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547michaeljmack
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015johnwrightsmith
 
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...IDES Editor
 
AMSC D-VAR® Model for PSSE_releasable
AMSC D-VAR® Model for PSSE_releasableAMSC D-VAR® Model for PSSE_releasable
AMSC D-VAR® Model for PSSE_releasablejohnwrightsmith
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introductionjohnwrightsmith
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentationAneeque Qaiser
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
auto matic load shedding control for substation
auto matic load shedding control for substationauto matic load shedding control for substation
auto matic load shedding control for substationbishow kandel
 
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...AKASH BISWAS
 
Detecting power grid synchronisation failure
Detecting power grid synchronisation failureDetecting power grid synchronisation failure
Detecting power grid synchronisation failureVivek Bhakta
 
Monitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperMonitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperEltek
 

La actualidad más candente (20)

12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot
 
03 broderick qsts_sand2016-4697 c
03 broderick qsts_sand2016-4697 c03 broderick qsts_sand2016-4697 c
03 broderick qsts_sand2016-4697 c
 
13 tansy ssa grid int @ epri_sandia 2016
13 tansy ssa grid int @ epri_sandia 201613 tansy ssa grid int @ epri_sandia 2016
13 tansy ssa grid int @ epri_sandia 2016
 
18 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_16051018 b mather_pv_sys_symposium_san_jose_ca_160510
18 b mather_pv_sys_symposium_san_jose_ca_160510
 
DG interconnection protection ieee 1547
DG interconnection protection ieee 1547DG interconnection protection ieee 1547
DG interconnection protection ieee 1547
 
14 berdner hawaiian adv inverters
14 berdner   hawaiian adv inverters14 berdner   hawaiian adv inverters
14 berdner hawaiian adv inverters
 
Advanced WEC Controls Webinar June 2016
Advanced WEC Controls Webinar June 2016Advanced WEC Controls Webinar June 2016
Advanced WEC Controls Webinar June 2016
 
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
 
AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015AMSC D-VAR Solutions 2015
AMSC D-VAR Solutions 2015
 
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...
Voltage Sag Mitigation in Utility Connected System Using Current Source Conve...
 
AMSC D-VAR® Model for PSSE_releasable
AMSC D-VAR® Model for PSSE_releasableAMSC D-VAR® Model for PSSE_releasable
AMSC D-VAR® Model for PSSE_releasable
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introduction
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentation
 
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
 
Fault location techniques in smart distribution system
Fault location techniques in smart distribution systemFault location techniques in smart distribution system
Fault location techniques in smart distribution system
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
auto matic load shedding control for substation
auto matic load shedding control for substationauto matic load shedding control for substation
auto matic load shedding control for substation
 
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...
Test Operation Procedures for Electrical & Electronic Parameters of Solar Pho...
 
Detecting power grid synchronisation failure
Detecting power grid synchronisation failureDetecting power grid synchronisation failure
Detecting power grid synchronisation failure
 
Monitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperMonitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White Paper
 

Destacado

Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)open-e
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSMOHANASUNDARAM ANTHONY
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design conceptKumar VEL
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 

Destacado (20)

5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
 
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
 
11 reno sandia_dgi_reno_sand2016-4701 pe
11 reno sandia_dgi_reno_sand2016-4701 pe11 reno sandia_dgi_reno_sand2016-4701 pe
11 reno sandia_dgi_reno_sand2016-4701 pe
 
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
 
17 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v117 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v1
 
Dishant ppt
Dishant pptDishant ppt
Dishant ppt
 
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
 
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
 
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
 
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUS
 
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
 
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
 
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Servic...
2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Servic...2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Servic...
2014 PV Reliability, Operations & Maintenance Workshop: Arizona Public Servic...
 
2014 PV Performance Modeling Workshop: Modeling Photovoltaic Inverter Perform...
2014 PV Performance Modeling Workshop: Modeling Photovoltaic Inverter Perform...2014 PV Performance Modeling Workshop: Modeling Photovoltaic Inverter Perform...
2014 PV Performance Modeling Workshop: Modeling Photovoltaic Inverter Perform...
 
Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
FACTS
FACTS FACTS
FACTS
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 

Similar a 2014 PV Distribution System Modeling Workshop: Interaction and Coordination with EPS Equipment: Chase Sun, PG&E

Issues in Interconnections
Issues in InterconnectionsIssues in Interconnections
Issues in InterconnectionsRidwanul Hoque
 
improved reactive power capability of grid connected doubly fed induction gen...
improved reactive power capability of grid connected doubly fed induction gen...improved reactive power capability of grid connected doubly fed induction gen...
improved reactive power capability of grid connected doubly fed induction gen...vinay kumar mali
 
Advancements in inverter technology
Advancements  in inverter technologyAdvancements  in inverter technology
Advancements in inverter technologyBhanu Teja
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system managementAkshay Awadhani
 
Impacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power QualityImpacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power QualityParth Patel
 
DVARVVO_WPb_0117
DVARVVO_WPb_0117DVARVVO_WPb_0117
DVARVVO_WPb_0117Paul Chang
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESEMERSON EDUARDO RODRIGUES
 
Power factor
Power factorPower factor
Power factorwkugubre
 
Grid Voltage Regulation
Grid Voltage RegulationGrid Voltage Regulation
Grid Voltage RegulationAditya Nehwal
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 

Similar a 2014 PV Distribution System Modeling Workshop: Interaction and Coordination with EPS Equipment: Chase Sun, PG&E (20)

Issues in Interconnections
Issues in InterconnectionsIssues in Interconnections
Issues in Interconnections
 
improved reactive power capability of grid connected doubly fed induction gen...
improved reactive power capability of grid connected doubly fed induction gen...improved reactive power capability of grid connected doubly fed induction gen...
improved reactive power capability of grid connected doubly fed induction gen...
 
7PG2111 Solkor Relay
7PG2111 Solkor Relay7PG2111 Solkor Relay
7PG2111 Solkor Relay
 
Advancements in inverter technology
Advancements  in inverter technologyAdvancements  in inverter technology
Advancements in inverter technology
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system management
 
Inverter doc
Inverter docInverter doc
Inverter doc
 
Impacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power QualityImpacts of Distributed Generation on Power Quality
Impacts of Distributed Generation on Power Quality
 
DVARVVO_WPb_0117
DVARVVO_WPb_0117DVARVVO_WPb_0117
DVARVVO_WPb_0117
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
PQH 3rd chapter.pptx
PQH 3rd chapter.pptxPQH 3rd chapter.pptx
PQH 3rd chapter.pptx
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
 
Solar pv
Solar pvSolar pv
Solar pv
 
Power factor
Power factorPower factor
Power factor
 
Ripple Control Receiver
Ripple Control ReceiverRipple Control Receiver
Ripple Control Receiver
 
T&D_Unit V.pdf
T&D_Unit V.pdfT&D_Unit V.pdf
T&D_Unit V.pdf
 
Grid Voltage Regulation
Grid Voltage RegulationGrid Voltage Regulation
Grid Voltage Regulation
 
Ppt of inverter.1
Ppt of inverter.1Ppt of inverter.1
Ppt of inverter.1
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
Managing High PV Deployment on the EPS: Overview of Key Challenges and Mitiga...
 
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEMISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
 

Más de Sandia National Laboratories: Energy & Climate: Renewables

Más de Sandia National Laboratories: Energy & Climate: Renewables (20)

M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339rM4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
 
22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project
 
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project
 
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
 
13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...
 
12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data
 
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
 

Último

Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleSERUDS INDIA
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdfilocosnortegovph
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 

Último (20)

Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in moti bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor People
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 

2014 PV Distribution System Modeling Workshop: Interaction and Coordination with EPS Equipment: Chase Sun, PG&E

  • 1. Inverter coordination with existing distribution equipment Chase Sun PG&E May 6, 2014 1
  • 2. Areas require coordination • Protection • Voltage regulation 2
  • 3. Protection • Run fault studies with inverter modelled and with the inverter contribution. • Set each inverter to trip for end of line fault if possible. Conventional overcurrent settings may not be adequate for variable resources such as PV inverters since the settings may be too high when the PV output is low in the morning and in the late afternoon. Often, the inverters are set up for sequential tripping, using anti-islanding, after the feeder tripped first. • Check to make sure that the inverter will not trip for adjacent feeder faults that should be cleared by the adjacent feeder breaker. • Check the existing feeder protective device settings for relays, reclosers, interrupters, fuses, to make sure the existing relay settings are still adequate with the inverter contribution. In other words, make sure the devices will not be de-sensitized by a significant amount as to not trip for an in-section fault. This is not usually an issue due to the low inverter fault duty. 3
  • 4. Protection • Check that the additional inverter fault duty will not overstress existing equipment. This is usually not an issue due to the low inverter fault duty. • In general, each protective device, including inverters, should trip for faults within its protected section and not trip for faults outside of its protection zone. This is problematic since the existing inverters are set up for low penetration mode and may overtrip. • At high penetrations, the inverter should not trip for a system-wide event and aggravate the severity of the event. This is being addressed in the Phase 1 revised trip settings. 4
  • 5. Voltage interaction/coordination Background • Main issues: • Traditionally, generators were connected to the transmission system, designed for multi-directional flow where the conductors are much bigger and sized for both local load and loop flow. Also, the transmission system is not regulated as tightly as the distribution system. • Distribution system was designed in a radial tree configuration, to distribute power at the lowest cost. So, the distribution feeder mainline is composed of big conductors, similar to a tree trunk, and the branch conductors are sized for local load but not capable of carrying current for any significant distance without severe voltage drop. • For example, on the PG&E system, less than 15% of the overall distribution conductor population are large mainline conductors sized at 397 MCM or larger. PVs connected to large mainline conductors have minimal voltage impact to other customers. But more than 85% of the locations have smaller conductors with various degrees of voltage impact. The worst cases are larger units at the end of small feeder conductors. In the interconnection studies, once the feeder is reconductored, the voltage issues usually go away. • PG&E has approximately 140,000 circuit miles of distribution conductors. it costs about $500,000/mile to replace the conductor to 397 MCM or larger. 5
  • 6. Voltage interaction/coordination Background As a frame of reference, we can look at the current load review process: • The distribution loads are reviewed during load interconnection to insure that the load switching will not cause excessive voltage fluctuation to other customers. • CA Rule 2 limits the largest single phase 240V motor that can be started across the line to 7.5 HP and the largest 480V, 3 phase motor that can be switched across the line to 100 HP. • Rule 2, Sec D3d states that for its operating convenience and necessity, PG&E may elect to supply an applicant whose demand load is in excess of 2,000 kVA from a substation on the customer premises supplied from a transmission source. • Load has diversity that is well understood and utilized by the operating utilities. 6
  • 7. Voltage interaction/coordination Background • The distribution system is also regulated to +/-5% of nominal voltage by radial tap changing voltage regulators to provide the proper utilization voltage to the distribution customers. • The tap changing voltage regulators are not effective in regulating voltage in the reverse direction when DG is present. • The existing E/M regulators used time delays to coordinate operation between multiple regulators. Since these are E/M regulators, it takes time to change taps. Typically, there is about 20- 45 second time delay between regulators to insure the upstream regulator is done with its correction before the next stage regulator operates. Setting the time delays too close may cause hunting and unstable operation between the regulators. 7
  • 8. Voltage Regulation • There are no specific operational provisions for voltage rise due to DG in Rule 21. For example, if the feeder is operating at 126V at peak already, as allowed by Rule 2, there is no room for DG voltage rise. The good thing is that PV peaks at noon and the feeders typically peak at 4-6 PM when the PV output is much lower. At noon, the feeder voltage is typically not at 126V and there is more room for DG voltage rise. Please note that the higher trip set point of 132 V specified in Rule 21 is intended to cover voltage rise within the customer facility and not intended to allow the DG to cause voltage beyond the PCC to operate at 132V. • When Conservation Voltage Regulation (CVR) program is present, the required operating voltage is restricted to +0% and -5% range which further reduce the available DG operating voltage margin. • Typically, the distribution engineer make adjustments in the voltage regulator settings, when possible, to accommodate the DG voltage rise. Often this reduces the operating flexibility of the distribution feeder. 8
  • 9. Voltage regulation • DGs are generation sources and will cause voltage to rise in order to push out the rated power. • DGs are located on the load side of the voltage regulators and may render the regulators ineffective. • DGs are intermittent and not dependable from a capacity perspective. • PV also does not have that much diversity when it comes to cloud cover effects. When a cloud cover comes over, the PV output may drop from 100% down to 20% within seconds. For a storm cloud, the drop may go lower. • PV and wind output fluctuations may occur much faster than the E/M voltage regulators can respond. Without mitigation, this may reduce the power quality on the existing feeders and may have the potential to damage customer equipment. 9
  • 10. Conventional voltage mitigation • Reset LTC and voltage regulators, where possible, to allow more margin for the inverters to operate. • Replace radial regulator control to bi-directional control and set in Cogen Mode. Bi-directional mode is intended for radial feed from a back-up feeder and not intended for DG. • Remove Load Drop Compensator setting and use flat voltage regulation and install additional voltage regulators as needed. • Re-design the LTC control circuit to allow proper voltage on the other feeders. • Install large PV on dedicated feeders to minimize impact on load customers that require +/-5% voltage regulation. This is how PG&E designed its own large PV installations. • Connect larger PV to the mainline, large conductors, and close to the substation. • Reconductor the small wires causing the voltage violations. This is the most effective and simplest but sometimes the most expensive option • Relocate voltage regulators and capacitors to account for the prevailing DG outputs. 10
  • 11. Potential smart inverter mitigations • Note: The discussion below is relevant to larger inverters. Volt/var control with small inverters may not be effective since they may not be able to buck the system to any significant extent. Also operating the feeder at off-unity PF may increase the line current and increase line losses. • High voltage due to PV reverse flow – Set inverter at lagging PF to drag voltage down. This mode is not considered active voltage regulation and is allowed under the current Rule 21 and IEEE-1547. But this may require installation of capacitors elsewhere to make up for the lost vars to avoid voltage problems elsewhere. – Reduce output at unit PF to maintain voltage below limits. This may be viable for occasional overvoltage conditions. 11
  • 12. Smart Inverter Voltage Enhancements • Other voltage control opportunities also exist and should be explored. 12
  • 13. Active volt/var control issues • Autonomous active volt/var control using local voltage feedback needs to be coordinated carefully when there are multiple active control inverters in the vicinity. If not coordinated properly, this may lead to the devices fighting each other and potentially worse voltage on the feeder. This is still an evolving area that needs more study. • Communication based active volt/var control may be much simpler since the central control computer can dictate which unit is in control at any given time. But this may require a real time smart grid computer and an extensive communication infrastructure, which do not exist at this time. – Local master slave set-up is also possible with radio communication between the units. 13
  • 14. Potential ways to avoid/minimize inintended interaction between autonomous active control inverters: • Defined ramp up of var absorption rate when voltage goes over a preset level to help reduce the local voltage. • Defined ramp up of var injection when voltage goes below a preset level to help raise the local voltage. • Include deadbands to de-sensitize the inverter response • Define time delay between specific inverters to allow one inverter to complete its control action before the next inverter act. • The inverter can respond much quicker than the voltage regulators when the voltage is outside of the deadband. So, it would be desirable to have the inverter complete its active voltage control action before the voltage regulators respond. This may also minimize the regulator response and reduce the wear and tear on the regulators. • Set a large inverter to active volt/var control and disable the active volt/var on the smaller units to avoid complications 14
  • 15. Outstanding high penetration issues • Scenario 1: When there is a large amount of DG on the feeder that displaced load normally, and there is a momentary fault on the feeder. The feeder breaker will trip to clear the fault and all of the DG are required to de-energize the line for safety reasons. On the PG&E system, the feeder breaker is typically designed to reclose in 5 seconds to test the line. If the momentary fault cleared, the feeder will be energized. But at that time, the DGs will be off and the regulator will be seeing much higher load but it will not respond until the time delay period expired. So, the effect is the same as a large load switching in together. In that time frame, the customers may experience low voltage due to the higher load. Without the DG being there, there will not be any load masking and the regulator will be set for the correct load level before and after the fault. • A possible mitigation is to decrease the inverter re-energizing time to minimize the time that the customers experience low voltage. 15
  • 16. High Penetration Issues • Scenario 2: When there is a close-in adjacent feeder fault, the bus voltage may sag to close to zero. The current UV setpoint is 0.16 second at <50% voltage. But the feeder breaker may not trip for more than 0.25 sec and all of the DG tied to that bus will trip unnecessarily due to the current Rule 21 and IEEE-1547 setting. The sudden loss of a large amount of DG capacity may also lead to low voltage conditions for the load customers on the unfaulted feeder, until the voltage regulation equipment can respond. • The mitigation is presented in the Phase 1 UV settings where we extended the time delay to 1 second for UV <50% voltage. 16