RESTRUCTURING OF GRID
SARAVANAN SIVAMANI 1
INTRODUCTION
• Power sector across the world is undergoing a lot of
restructuring; India is no exception to this.
• In some States of India there are multiple private
utilities, which are technically and financially in a
position to enter the phase of a competitive
electricity market.
SARAVANAN SIVAMANI 2
What is a “Grid” ?
WHAT IS AN “INTER-CONNECTION” ?
WHY DO WE NEED THIS INTER-CONNECTION ?
1)Reliability
2)Economy
3)Proper Load Sharing
Two or more generating stations are interconnected by tie lines.
Interconnection provides the best use of power resources and
ensures greater security of supply.
An Interconnected power system covering a major portion of a
country’s territory (or state) is called a Grid. The different state grids
may be a interconnected through transmission lines to form a Grid.
SARAVANAN SIVAMANI 3
All Power-Grid equipments used
Lightning Arrestor Power Transformer
Current Transformer/Potential Transformer
SARAVANAN SIVAMANI 4
Circuit Breakers Insulators Isolators
Wave Trap
SARAVANAN SIVAMANI 5
NEED FOR RESTRUCTURING
• The need for restructuring the power sector was felt
due to the scarcity of financial resources available
with Central and State Governments.
• Necessity of improving the technical and commercial
efficiency.
SARAVANAN SIVAMANI 6
PROPOSED MODEL FOR
RESTRUCTURING IN INDIA
• In many parts of the world wherever unbundling, i.e.
separation of generation, transmission and
distribution has taken place, the two models are more
prevalent for system operation.
• Independent System Operator (ISO) model
• Transmission System Operator (TSO) model.
SARAVANAN SIVAMANI 7
ISO AND TSO MODELS
• . In ISO model, transmission companies are also
permitted to own, manage and control generation and
distribution companies, an independent system operator is
created to facilitate open access and competitive markets.
• In TSO model, operation of the grid and ownership of the
grid are integrated in a single entity, which is responsible
for development of transmission system and to provide
non-discriminatory open access to all eligible market
participants.
SARAVANAN SIVAMANI 8
TO BE CONTINUED….
• TSO model seems to be most suitable for future
restructured electricity market in India.
• This is because the government owned transmission
company is merely responsible to provide non-
discriminatory open access.
SARAVANAN SIVAMANI 9
ELECTRICITY ACT 2003
• This act consolidates all the existing laws and
introduces provisions with respect to new
developments in the sector. It focuses on
creating competition, protecting consumer interests,
rationalizing tariff, etc.
• All the necessary powers including issue of licenses
are given to the regulators which
are made independent entities from the government.
SARAVANAN SIVAMANI 100
SARAVANAN SIVAMANI 111
SALIENT FEATURES
• Open access in transmission with provision of surcharge
for cross subsidy and this surcharge
will be gradually phased out.
• Distribution licensees are free to undertake generation
and generating companies are free to take up distribution
licensees.
• For rural and remote areas stand alone systems for
generation and distribution would be permitted.
• State Governments can convert State Electricity Boards
(SEBs) into companies or continue them as distribution
licensees.
SARAVANAN SIVAMANI 122
CENTRALAUTHORITY SYSTEM
SARAVANAN SIVAMANI 13
COORDINATE WITH
OTHER
SYSNCHRONOUS GRIDS
(EX NR, ER,NER)
REGIONAL (SYNCHRONOUS GRID)
LOAD DESPATCH CENTRE
STATE LOAD
DESPATCH
CENTRES
CENTRALLY
OWNED LINES
CENTRALLY
OWNED PLANTS
INTER-STATE TIE
LINES
STATE OWNED
HVDC LINES
DISTRIBUTION
SUBSTATION
POWERPLANT
OPERATORS
GENERATION OF ELECTRICITY
• The generating company should establish, operate and
maintain generating stations, tie-lines, substations and
dedicated transmission lines.
• According to the 16th Electric Power survey conducted
by CEA, the country has energy shortage of 7.8 % and
peaking shortage of 13 % (100GW).
• As per the reports published by Oxford Institute for
Energy Studies (OIES) [6] the Indian Government should
do more to encourage and facilitate local private
investment in small-scale distributed electricity
generation capacity.
SARAVANAN SIVAMANI 144
Central Authority System (contd.)
•The Central Electricity Authority of India (CEA) is a
statutory organisation constituted under section 3(1) of
Electricity Supply Act 1948
•To develop a sound adequate and uniform national power
policy, formulate short-term and perspective plans for power
development and co-ordinate the activities of planning
agencies in relation to the control and utilisation of national
power resources.
•To collect and record the data concerning generation,
distribution and utilisation of power and carry out studies
relating to cost, efficiency, losses, benefits and such like
matters.
SARAVANAN SIVAMANI 155
What is a National load Dispatch Centre ?
The main functions assigned to NLDC are:
• Supervision Over the Regional Load Dispatch Centers.
• Scheduling and dispatch of electricity over the inter-regional
links in accordance with grid standards specified by the
authority and grid code specified by Central Commission in
coordination with Regional Load Dispatch Centers.
• Coordination with Regional Load Dispatch Centers for
achieving maximum economy and efficiency in the operation
of National Grid.
• Monitoring of operations and grid security of the National
Grid.
• Coordination for restoration of synchronous operation of
national grid with Regional Load Despatch Centres.
SARAVANAN SIVAMANI 166
Sharing Of Transmission Charges
WHEELING CHARGES:
•Wheeling is the transportation of electric power (megawatts
or megavolt-amperes) over transmission lines.
•An entity that generates power does not have to own
power transmission lines
•The entity then pays the owner of the transmission line
based on how much power is being moved and how
congested the line is.
•Charges for inter-regional lines may be shared by two
contiguous regions on 50 : 50 basis.
•Charges for the regional assets may be shared by the regional
beneficiaries
•If an inter regional asset is used for wheeling by a third party
the balance transmission charges may be shared by the
beneficiaries of the contiguous region on 50 : 50 basis.
SARAVANAN SIVAMANI 177
Ownership and Coordination
• Inter-State and other transmission links may be owned
by other independent entity (Ex: PGCIL).
• State Electricity Boards can Import or Export a pre
decided amount of power from neighboring states or
generators owned by other entities like National
Thermal Power Corporation.
• State Electricity Boards are divided into
1) Generation companies (GENCOs)
2) Distribution Companies (DISCOs)
3) Transmission Companies(TRANSCOs)
• Overall coordination is done by a Load Dispatch
Centre.
SARAVANAN SIVAMANI 188
TRANSCOs:
DISCOS:
GENCOS:
The companies which are responsible for power generation are
called as Generation Companies(GENCOs) ex: NTPC
The companies which are responsible for transmission of large
amounts of power are called as Transmission
companies(TRANSCOs) Ex: PowerGrid
The companies which are responsible for Distribution of the
large amounts of power to the general public are called as
Distribution Companies(DISCOs) Ex: UP-RVVNL
SARAVANAN SIVAMANI 199
Transmission of Electricity
• The RLDC will work as per the Indian Electricity Grid Code
(IEGC) to ensure integrated operation of the power system in
the concerned regions.
• It has to monitor grid operations, keep accounts of
the quantity of electricity transmitted through the regional
grids, exercise supervision and control over the Intra-State
transmission.
• It will be responsible for carrying out real time operations for
grid control and dispatch of electricity within the state through
secure and economic operation of the state grid in accordance
with grid standards and the state grid code.
SARAVANAN SIVAMANI 20
Distribution of Electricity
• State Commission permits a consumer or class of
consumers to receive supply of electricity from a person
other than the distribution licensee of his area of
supply, such consumer shall be liable to pay an
additional surcharge on the charges of wheeling, as may
be specified by the State Commission, to meet the fixed
cost of such distribution licensee arising out of his
obligation to supply.
• Distribution companies have been given mandate for
achieving complete metering within two years from the
enactment of the law.
SARAVANAN SIVAMANI 21
Different grids of India
SARAVANAN SIVAMANI 22
Some Landmark Events Of Power Grid
• 1948 - Growth of supply systems
• 1962- First 220KV Voltage level
• 1967- Interconnection Of state Grids to form
Regional Grids
• 1975- First 400Kv Voltage level
• 1989- HVDC Back to Back
• 1998- Installation of 765 Kv line(Charged at 400Kv)
• 2006- Synchronisation of NR with ER-NER-WR
• 2007- Transmission at 765 Kv
• 2010/11- Installation of 800Kv HVDC Bi-pole Line
SARAVANAN SIVAMANI 23
Thank You…
SARAVANAN SIVAMANI 24

More Related Content

What's hot

Power System Operation and Control
Power System Operation and ControlPower System Operation and Control
Power System Operation and Control
Biswajit Pratihari
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
Tejaswi Shukla
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
Sifan Welisa
 

What's hot (20)

FACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY pptFACTS DEVICES AND POWER SYSTEM STABILITY ppt
FACTS DEVICES AND POWER SYSTEM STABILITY ppt
 
Grid code
Grid codeGrid code
Grid code
 
Reactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomReactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcom
 
Power System Operation and Control
Power System Operation and ControlPower System Operation and Control
Power System Operation and Control
 
Integration of Renewable Energy In Grid
Integration of Renewable Energy In GridIntegration of Renewable Energy In Grid
Integration of Renewable Energy In Grid
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
Unit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit CommitmentUnit 5 Economic Load Dispatch and Unit Commitment
Unit 5 Economic Load Dispatch and Unit Commitment
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
Distributed generation b 3
Distributed generation b 3Distributed generation b 3
Distributed generation b 3
 
Islanding
IslandingIslanding
Islanding
 
Load Forecasting Techniques.pdf
Load Forecasting Techniques.pdfLoad Forecasting Techniques.pdf
Load Forecasting Techniques.pdf
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Power System Oscillations Behavior, Types, Causes,Role of the System Operator...
Power System Oscillations Behavior, Types, Causes,Role of the System Operator...Power System Oscillations Behavior, Types, Causes,Role of the System Operator...
Power System Oscillations Behavior, Types, Causes,Role of the System Operator...
 
Smart Grid & WAMS
Smart Grid & WAMSSmart Grid & WAMS
Smart Grid & WAMS
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission Lines
 
Microgrid
MicrogridMicrogrid
Microgrid
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in India
 
Introduction to Microgrid
Introduction to Microgrid Introduction to Microgrid
Introduction to Microgrid
 

Similar to Restructuring of power grid

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
Rupesh Bobbili
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015
Adriann McCoy
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
ANUECI
 
Open access in india
Open access in indiaOpen access in india
Open access in india
omtaneja
 

Similar to Restructuring of power grid (20)

Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
Power grid operation in India
Power grid operation in IndiaPower grid operation in India
Power grid operation in India
 
IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 
Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Captive power Policy
Captive power PolicyCaptive power Policy
Captive power Policy
 
WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015WIRES - Transmission 101 - April 21 2015
WIRES - Transmission 101 - April 21 2015
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 
IEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.pptIEGC_PPT_SLDC.ppt
IEGC_PPT_SLDC.ppt
 
Captive gen
Captive genCaptive gen
Captive gen
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
 
Smart Grid - Future Electric Grid
Smart Grid - Future Electric GridSmart Grid - Future Electric Grid
Smart Grid - Future Electric Grid
 
Open access in india
Open access in indiaOpen access in india
Open access in india
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
UNIT-1-PPT.pptx
UNIT-1-PPT.pptxUNIT-1-PPT.pptx
UNIT-1-PPT.pptx
 
Presentation on IEA 2003.pptx
Presentation on IEA 2003.pptxPresentation on IEA 2003.pptx
Presentation on IEA 2003.pptx
 
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
400kV GCC Inter-connector : Overview and Comparison with Clean Energy Corrido...
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 

Recently uploaded

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Recently uploaded (20)

Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Restructuring of power grid

  • 2. INTRODUCTION • Power sector across the world is undergoing a lot of restructuring; India is no exception to this. • In some States of India there are multiple private utilities, which are technically and financially in a position to enter the phase of a competitive electricity market. SARAVANAN SIVAMANI 2
  • 3. What is a “Grid” ? WHAT IS AN “INTER-CONNECTION” ? WHY DO WE NEED THIS INTER-CONNECTION ? 1)Reliability 2)Economy 3)Proper Load Sharing Two or more generating stations are interconnected by tie lines. Interconnection provides the best use of power resources and ensures greater security of supply. An Interconnected power system covering a major portion of a country’s territory (or state) is called a Grid. The different state grids may be a interconnected through transmission lines to form a Grid. SARAVANAN SIVAMANI 3
  • 4. All Power-Grid equipments used Lightning Arrestor Power Transformer Current Transformer/Potential Transformer SARAVANAN SIVAMANI 4
  • 5. Circuit Breakers Insulators Isolators Wave Trap SARAVANAN SIVAMANI 5
  • 6. NEED FOR RESTRUCTURING • The need for restructuring the power sector was felt due to the scarcity of financial resources available with Central and State Governments. • Necessity of improving the technical and commercial efficiency. SARAVANAN SIVAMANI 6
  • 7. PROPOSED MODEL FOR RESTRUCTURING IN INDIA • In many parts of the world wherever unbundling, i.e. separation of generation, transmission and distribution has taken place, the two models are more prevalent for system operation. • Independent System Operator (ISO) model • Transmission System Operator (TSO) model. SARAVANAN SIVAMANI 7
  • 8. ISO AND TSO MODELS • . In ISO model, transmission companies are also permitted to own, manage and control generation and distribution companies, an independent system operator is created to facilitate open access and competitive markets. • In TSO model, operation of the grid and ownership of the grid are integrated in a single entity, which is responsible for development of transmission system and to provide non-discriminatory open access to all eligible market participants. SARAVANAN SIVAMANI 8
  • 9. TO BE CONTINUED…. • TSO model seems to be most suitable for future restructured electricity market in India. • This is because the government owned transmission company is merely responsible to provide non- discriminatory open access. SARAVANAN SIVAMANI 9
  • 10. ELECTRICITY ACT 2003 • This act consolidates all the existing laws and introduces provisions with respect to new developments in the sector. It focuses on creating competition, protecting consumer interests, rationalizing tariff, etc. • All the necessary powers including issue of licenses are given to the regulators which are made independent entities from the government. SARAVANAN SIVAMANI 100
  • 12. SALIENT FEATURES • Open access in transmission with provision of surcharge for cross subsidy and this surcharge will be gradually phased out. • Distribution licensees are free to undertake generation and generating companies are free to take up distribution licensees. • For rural and remote areas stand alone systems for generation and distribution would be permitted. • State Governments can convert State Electricity Boards (SEBs) into companies or continue them as distribution licensees. SARAVANAN SIVAMANI 122
  • 13. CENTRALAUTHORITY SYSTEM SARAVANAN SIVAMANI 13 COORDINATE WITH OTHER SYSNCHRONOUS GRIDS (EX NR, ER,NER) REGIONAL (SYNCHRONOUS GRID) LOAD DESPATCH CENTRE STATE LOAD DESPATCH CENTRES CENTRALLY OWNED LINES CENTRALLY OWNED PLANTS INTER-STATE TIE LINES STATE OWNED HVDC LINES DISTRIBUTION SUBSTATION POWERPLANT OPERATORS
  • 14. GENERATION OF ELECTRICITY • The generating company should establish, operate and maintain generating stations, tie-lines, substations and dedicated transmission lines. • According to the 16th Electric Power survey conducted by CEA, the country has energy shortage of 7.8 % and peaking shortage of 13 % (100GW). • As per the reports published by Oxford Institute for Energy Studies (OIES) [6] the Indian Government should do more to encourage and facilitate local private investment in small-scale distributed electricity generation capacity. SARAVANAN SIVAMANI 144
  • 15. Central Authority System (contd.) •The Central Electricity Authority of India (CEA) is a statutory organisation constituted under section 3(1) of Electricity Supply Act 1948 •To develop a sound adequate and uniform national power policy, formulate short-term and perspective plans for power development and co-ordinate the activities of planning agencies in relation to the control and utilisation of national power resources. •To collect and record the data concerning generation, distribution and utilisation of power and carry out studies relating to cost, efficiency, losses, benefits and such like matters. SARAVANAN SIVAMANI 155
  • 16. What is a National load Dispatch Centre ? The main functions assigned to NLDC are: • Supervision Over the Regional Load Dispatch Centers. • Scheduling and dispatch of electricity over the inter-regional links in accordance with grid standards specified by the authority and grid code specified by Central Commission in coordination with Regional Load Dispatch Centers. • Coordination with Regional Load Dispatch Centers for achieving maximum economy and efficiency in the operation of National Grid. • Monitoring of operations and grid security of the National Grid. • Coordination for restoration of synchronous operation of national grid with Regional Load Despatch Centres. SARAVANAN SIVAMANI 166
  • 17. Sharing Of Transmission Charges WHEELING CHARGES: •Wheeling is the transportation of electric power (megawatts or megavolt-amperes) over transmission lines. •An entity that generates power does not have to own power transmission lines •The entity then pays the owner of the transmission line based on how much power is being moved and how congested the line is. •Charges for inter-regional lines may be shared by two contiguous regions on 50 : 50 basis. •Charges for the regional assets may be shared by the regional beneficiaries •If an inter regional asset is used for wheeling by a third party the balance transmission charges may be shared by the beneficiaries of the contiguous region on 50 : 50 basis. SARAVANAN SIVAMANI 177
  • 18. Ownership and Coordination • Inter-State and other transmission links may be owned by other independent entity (Ex: PGCIL). • State Electricity Boards can Import or Export a pre decided amount of power from neighboring states or generators owned by other entities like National Thermal Power Corporation. • State Electricity Boards are divided into 1) Generation companies (GENCOs) 2) Distribution Companies (DISCOs) 3) Transmission Companies(TRANSCOs) • Overall coordination is done by a Load Dispatch Centre. SARAVANAN SIVAMANI 188
  • 19. TRANSCOs: DISCOS: GENCOS: The companies which are responsible for power generation are called as Generation Companies(GENCOs) ex: NTPC The companies which are responsible for transmission of large amounts of power are called as Transmission companies(TRANSCOs) Ex: PowerGrid The companies which are responsible for Distribution of the large amounts of power to the general public are called as Distribution Companies(DISCOs) Ex: UP-RVVNL SARAVANAN SIVAMANI 199
  • 20. Transmission of Electricity • The RLDC will work as per the Indian Electricity Grid Code (IEGC) to ensure integrated operation of the power system in the concerned regions. • It has to monitor grid operations, keep accounts of the quantity of electricity transmitted through the regional grids, exercise supervision and control over the Intra-State transmission. • It will be responsible for carrying out real time operations for grid control and dispatch of electricity within the state through secure and economic operation of the state grid in accordance with grid standards and the state grid code. SARAVANAN SIVAMANI 20
  • 21. Distribution of Electricity • State Commission permits a consumer or class of consumers to receive supply of electricity from a person other than the distribution licensee of his area of supply, such consumer shall be liable to pay an additional surcharge on the charges of wheeling, as may be specified by the State Commission, to meet the fixed cost of such distribution licensee arising out of his obligation to supply. • Distribution companies have been given mandate for achieving complete metering within two years from the enactment of the law. SARAVANAN SIVAMANI 21
  • 22. Different grids of India SARAVANAN SIVAMANI 22
  • 23. Some Landmark Events Of Power Grid • 1948 - Growth of supply systems • 1962- First 220KV Voltage level • 1967- Interconnection Of state Grids to form Regional Grids • 1975- First 400Kv Voltage level • 1989- HVDC Back to Back • 1998- Installation of 765 Kv line(Charged at 400Kv) • 2006- Synchronisation of NR with ER-NER-WR • 2007- Transmission at 765 Kv • 2010/11- Installation of 800Kv HVDC Bi-pole Line SARAVANAN SIVAMANI 23