Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.

A DSS module for project manager selection according to past performance

386 visualizaciones

Publicado el

presented article by sarvenaz arianfar
Article title: A Decision-making Support System Module for Project Manager Selection According to Past Performance

Publicado en: Liderazgo y gestión
  • Inicia sesión para ver los comentarios

A DSS module for project manager selection according to past performance

  1. 1. accepted 4 October 2012
  2. 2. Introduction • • •
  3. 3. past performance • • •
  4. 4. multiple-criteria problem • • • •
  5. 5. The sampled set of past projects • • •
  6. 6. The candidates and their accomplished projects
  7. 7. Exceptional Project Failure
  8. 8. Candidate ranking
  9. 9. Step 1 Determine the projects of each candidate.
  10. 10. Step21 Choose the ranking method
  11. 11. Ranking methods •
  12. 12. DEA: Data Envelopment Analysis • • • • •
  13. 13. Cross-Efficiency (CE) • • ) • •
  14. 14. Step22 determine the performance criteria divided into inputs and outputs.
  15. 15. Criteria that can be defined as inputs andoutputs • •
  16. 16. stabilization coefficients • • •
  17. 17. Input 1 and 2 انحراف معیار هزینه انحراف معیار زمان هزینه مورد انتظار زمان مورد انتظار
  18. 18. Input 3 • • • زمان مورد انتظار هزینه مورد انتظار
  19. 19. Output 1 and 2 • • زمان مورد انتظار هزینه مورد انتظار هزینه واقعی – هزینه های اجرا زمان واقعی – زمان اجرا
  20. 20. Output 3 and 4 هزینه واقعی – هزینه های اجرا زمان واقعی – زمان اجرا زمان اجرا هزینه اجرا
  21. 21. Step3 Calculate or determine the input and output values
  22. 22. Step4 Calculate the scores of each project. Rank the projects according to their scores.
  23. 23. Step5 Calculatethegradeofeachcandidateaccordingtotheaveragerankoftheirprojects. Rankthecandidatesaccordingtotheirgrades.
  24. 24. Step6 UsetheMWWUtest(aone-tailedtest) totestthedifferencebetweenthegradesofanytwocandidatesandcomputethelowerhalfofthetriangularpairwisecomparisonmatrix.Thismatrixissortedwiththegradesinascendingorder.
  25. 25. Step 7 Subgroup of the preferred managers 7.1Setthesignificancelevelα,Notethatasmallervalueofαmayincreasethesubgroupofthepreferredcandidates.
  26. 26. Step 7 7.2Foreachrowofthetriangularpairwisematrix,checkifone(ormore)oftherowvaluesislessthanα.Ifnot(alltherowvaluesareequaltoαorlarger),thecandidateunderconsiderationwillbeincludedinthesubgroupofthepreferredcandidates.
  27. 27. • •
  28. 28. انتقادات عدم بررسی معیارهای کیفی )نظیر کیفیت پروژه( عدم بررسی ویژگی های فردی مدیر پروژه به عنوان یک مساله چند معیاره
  29. 29. با تشکر از توجه شما

×