SlideShare a Scribd company logo
1 of 2
Download to read offline
Six Sigma DMAIC Project




                                            Pfizer Account




                                      Project Leader/Green Belt: Hank Gross
                                  Project Leader Title: Senior Systems Engineer
                                       Project Start Date: February 5, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                  SQL Backup Completeness
                                                                    Process Capability – Before Z_ST = 1.49

Customer Profile – Leading Pharmaceutical Company
Business Problem & Impact                                                                  257
                                                                      254 Defects
Only 50% of databases were being backed up. The number of                50%
                                                                                         Success
databases had increased 118% over the last year. The                                      50%
possibility of data loss could have cost the customer US
$1,206,024. The target backup success rate was 100%.

Measure & Analyze
Data Collection: Database backup success was measured.
The existing process sigma was 1.49.                               Process Capability – After Z_ST = 6.0
Root Causes: No SQL Agent was installed and lack of
notification of new databases were identified as root causes.                  Defect
                                                                               0.0%
Improve & Control
One resource was identified and used to implement the pilot
and all agents were installed on servers identified as defects.
SQL backups and restores are now tested periodically as part
                                                                                  Success
of SOP.                                                                           100.0%
Results/Benefits
After the 1 month project, the customer saved US $100,502,
as a result of DB availability.


                          A Savings of US $1,206,024 in 2003!

More Related Content

Viewers also liked

Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Leonardo Group Americas Introduction
Leonardo Group Americas IntroductionLeonardo Group Americas Introduction
Leonardo Group Americas IntroductionRichard Rahn
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships Simon Misiewicz
 
Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking templateSimon Misiewicz
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project managementSimon Misiewicz
 

Viewers also liked (9)

Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Leonardo Group Americas Introduction
Leonardo Group Americas IntroductionLeonardo Group Americas Introduction
Leonardo Group Americas Introduction
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
DMAIC Vs. DMADV
DMAIC Vs. DMADVDMAIC Vs. DMADV
DMAIC Vs. DMADV
 
Effective Communication for successful working and personal relationships
Effective  Communication for successful working and personal relationships Effective  Communication for successful working and personal relationships
Effective Communication for successful working and personal relationships
 
Creative thinking template
Creative thinking templateCreative thinking template
Creative thinking template
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 

More from Steven Bonacorsi

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingSteven Bonacorsi
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsSteven Bonacorsi
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sSteven Bonacorsi
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study PromappSteven Bonacorsi
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study ToyotaSteven Bonacorsi
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilSteven Bonacorsi
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI GlobalSteven Bonacorsi
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonaldsSteven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis EnergySteven Bonacorsi
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study CialSteven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study PromappSteven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case StudySteven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans OlexSteven Bonacorsi
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study PromappSteven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma TemplatesSteven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studiesSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalSteven Bonacorsi
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your StrategySteven Bonacorsi
 

More from Steven Bonacorsi (19)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Technology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 FinalTechnology Company Balanced Scorecard Systems 06222010 Final
Technology Company Balanced Scorecard Systems 06222010 Final
 
Build Innovation Into Your Strategy
Build Innovation Into Your StrategyBuild Innovation Into Your Strategy
Build Innovation Into Your Strategy
 

Backup Completeness Six Sigma Case Study

  • 1. Six Sigma DMAIC Project Pfizer Account Project Leader/Green Belt: Hank Gross Project Leader Title: Senior Systems Engineer Project Start Date: February 5, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action SQL Backup Completeness Process Capability – Before Z_ST = 1.49 Customer Profile – Leading Pharmaceutical Company Business Problem & Impact 257 254 Defects Only 50% of databases were being backed up. The number of 50% Success databases had increased 118% over the last year. The 50% possibility of data loss could have cost the customer US $1,206,024. The target backup success rate was 100%. Measure & Analyze Data Collection: Database backup success was measured. The existing process sigma was 1.49. Process Capability – After Z_ST = 6.0 Root Causes: No SQL Agent was installed and lack of notification of new databases were identified as root causes. Defect 0.0% Improve & Control One resource was identified and used to implement the pilot and all agents were installed on servers identified as defects. SQL backups and restores are now tested periodically as part Success of SOP. 100.0% Results/Benefits After the 1 month project, the customer saved US $100,502, as a result of DB availability. A Savings of US $1,206,024 in 2003!