SlideShare una empresa de Scribd logo
1 de 49
Done by-Prateek Sharma (9C)
Established in 1969, ISRO superseded the erstwhile Indian National Committee
for Space Research (INCOSPAR). Headquartered in Bangalore, ISRO is under
the administrative control of the Department of Space, Government of India.
Since its establishment, ISRO has achieved numerous milestones. It built
India's first satellite, Aryabhata, which was launched by the Soviet Union on 19
April in 1975. In 1980, Rohini became the first satellite to be placed in orbit by
an Indian-made launch vehicle, SLV-3. ISRO subsequently developed two
other rockets: the Polar Satellite Launch Vehicle (PSLV) for launching
satellites into polar orbits and the Geosynchronous Satellite Launch Vehicle
(GSLV) for placing satellites into geostationary orbits.
These rockets have launched numerous
communications satellites and earth
observation satellite. On 22 October in 2008,
Chandrayaan-1, India sent its first mission to
the Moon. Over the years, ISRO has
conducted a variety of operations for both
Indian and foreign clients. ISRO's satellite
launch capability is mostly provided by
indigenous launch vehicles and launch sites.
In 2008, ISRO successfully launched its first
lunar probe, Chandrayaan-1, while future
plans include indigenous development of
GSLV, manned space missions, further lunar
exploration, mars exploration and
interplanetary probes. ISRO has several field
installations as assets, and cooperates with
the international community as a part of
several bilateral and multilateral agreements.
5 November 2013, ISRO launched its Mars
Orbiter Mission, which is currently en route to
Mars.
The Mars Orbiter Mission (MOM), informally called Mangalyaan
(Sanskrit: मङ्गलयान, "Mars-Craft"), is a Mars orbiter launched into Earth
orbit on 5 November 2013 by the Indian Space Research Organisation
(ISRO). It is expected to enter orbit around Mars on 24 September 2014.
The mission is a
"technology
demonstrator" project
aiming to develop the
technologies required
for design, planning,
management, and
operations of an
interplanetary
mission.
Mars Orbiter Mission is India's first interplanetary
mission to planet Mars with an orbiter craft designed to
orbit Mars in an elliptical orbit.
The Mission is primarily technological mission
considering the critical mission operations and stringent
requirements on propulsion and other bus systems of
spacecraft.
The Mars Orbiter Mission probe
lifted-off from the First Launch
Pad at Satish Dhawan Space
Centre SHAR, Sriharikota,
Andhra Pradesh, using a Polar
Satellite Launch Vehicle (PSLV)
rocket C25 at 09:08 UTC (2:38
PM IST) on 5 November 2013.
The launch window was
approximately 20 days long and
started on 28 October 2013. The
MOM probe spent about a
month in Earth orbit, where it
made a series of seven altitude-
raising orbital manoeuvres
before trans-Mars injection on
30 November 2013 (UTC).
Travelling at a speed of 1.55 km per second, Mangalyan crossed half way
to Mars on 9 April 2014.
It is India's first interplanetary mission and, if successful, ISRO would
become the fourth space agency to reach Mars, after the Soviet space
program, NASA, and European Space Agency.
The spacecraft is being currently monitored from the Spacecraft Control
Centre at ISRO Telemetry, Tracking and Command Network (ISTRAC) in
Bangalore with support from Indian Deep Space Network (IDSN) antennae
at Byalalu.
One of the main objectives of the first Indian mission to Mars is to develop the
technologies required for design, planning, management and operations of an
interplanetary mission.
Following are the major objectives of the mission:
A. Technological Objectives:
1. Design and realisation of a Mars orbiter with a capability to survive and perform
Earth bound manoeuvres, cruise phase of 300 days, Mars orbit insertion / capture,
and on-orbit phase around Mars.
2. Deep space communication, navigation, mission planning and management.
3. Incorporate autonomous features to handle contingency situations.
B. Scientific Objectives:
1. Exploration of Mars surface features, morphology, mineralogy and Martian
atmosphere by indigenous scientific instruments.
The MOM mission concept began with a feasibility study in 2010,
after the launch of lunar satellite Chandrayaan-1 in 2008. The
government of India approved the project on 3 August 2012, after
the Indian Space Research Organisation completed ₹1.25 billion
(US $21 million) of required studies for the orbiter. The total
project cost may be up to ₹4.54 billion (US $77 million). The
satellite costs ₹1.53 billion (US$26 million) and the rest of the
budget has been attributed to ground stations and relay upgrades
that will be used for other ISRO projects.
The space agency had initially planned the launch on 28 October
2013 but was postponed to 5 November 2013 following the
inability of ISRO's spacecraft tracking ships to take up pre-
determined positions due to poor weather in the Pacific Ocean.
Launch opportunities for a fuel-saving Hohmann transfer orbit
occur about every 26 months, in this case, 2016 and 2018. The
Assembly of the PSLV-XL launch vehicle, designated C25,
started on 5 August 2013. The mounting of the five scientific
instruments was completed at ISRO Satellite Centre, Bangalore,
and the finished spacecraft was shipped to Sriharikota on 2
October 2013 for integration to the PSLV-XL launch vehicle.
The satellite's development was fast-tracked and completed in a
record 15 months. Despite the US federal government
shutdown, NASA reaffirmed on 5 October 2013 it would provide
communications and navigation support to the mission. ISRO
chairman stated in November 2013 that if the MOM and NASA's
orbiter MAVEN were successful, they would complement each
other in findings and help understand Mars better.
Some of the scientists working on the Mars Orbiter
Mission project are:
1. K. Radhakrishan – Chairman, ISRO
2. A. S. Kiran Kumar – Director, SAC
3. Mylswamy Annadurai – Programme Director, MOM
4. B. S. Chandrashekar – Director, ISTRAC
5. P. Robert – Operations Director, MOM
6. Subbiah Arunan – Project Director, MOM
7. V. Kesavaraju – Post-Launch Mission Director, MOM
8. P. Ekambaram – Operations Director, MOM
9. P. Kunhikrishnan – Launch Mission Director, PSLV-XL
10. S. K. Shivkumar – Orbiting payload Director, ISAC
11. B. Jayakumar – Launch Vehicle Director, PSLV
The lift-off mass was 1,350 kg (2,980 lb), including 852 kg
(1,878 lb) of propellant mass.
Cuboid in shape of approximately 1.5 m (4 feet 11 inches).
The spacecraft's bus is a modified I-1 K structure and propulsion
hardware configurations similar to Chandrayaan 1, India's lunar orbiter
that operated from 2008 to 2009, with specific improvements and
upgrades needed for a Mars mission.[31] The satellite structure is of
aluminium and composite fibre reinforced plastic (CFRP) sandwich
construction.
Electric power is generated by three solar array panels of 1.8 m × 1.4 m (5
ft. 11 in × 4 ft. 7 in) each (7.56 m2 (81.4 sq. ft.) total), for a maximum of 840
W generation in Martian orbit. Electricity is stored in a 36 Ah Li-ion battery.
Liquid fuel engine of 440 N thrust is used for orbit raising and insertion in
Martian orbit. The orbiter also has eight 22 N thrusters for attitude control or
orientation.
Two 230 W TWTAs and two coherent transponders. The antenna array
consists of a low-gain antenna, a medium-gain antenna and a high-gain
antenna. The High-gain antenna system is based on a single 2.2-metre
reflector illuminated by a feed at S-band. It is used to transmit and receive
the telemetry, tracking, commanding and data to and from the Indian Deep
Space Network.
LAP Lyman-Alpha Photometer 1.97 kg
MSM Methane Sensor For Mars 2.94 kg
MENCA Mars Exospheric Neutral Composition Analyser 3.56 kg
TIS Thermal Infrared Imaging Spectrometer 3.20 kg
MCC Mars Colour Camera 1.27 kg
The 15 kg (33 lb) scientific payload consists of five
instruments:
Lyman-Alpha Photometer (LAP) – a photometer that measures the relative
abundance of deuterium and hydrogen from Lyman-alpha emissions in the
upper atmosphere. Measuring the deuterium/hydrogen ratio will allow an
estimation of the amount of water loss to outer space.
Methane Sensor For Mars (MSM) – will measure methane in the atmosphere
of Mars, if any, and map its sources. Particle environment studies.
Mars Exospheric Neutral Composition Analyser (MENCA) – is a quadruple
mass analyser capable of analysing the neutral composition of particles in the
exosphere.
Surface imaging studies
Thermal Infrared Imaging Spectrometer (TIS) – will measure the temperature
and emissivity of the Martian surface, allowing for the mapping of surface
composition and mineralogy of Mars.
Mars Colour Camera (MCC) – will provide images in the visual spectrum,
providing context for the other instruments.
Nov 05, 2013
o PSLV-C25, in its twenty fifth flight successfully launches Mars Orbiter
Mission Spacecraft from SDSC SHAR.
o PSLV-C25 lifted off at 14:38 hrs.
o Automatic sequencing of launch initiated.
o Launch authorised by Mission Director for GO at 14:24 hrs.
o Mobile Service Tower (MST) withdrawal to final parking (150m)
completed. Countdown is normal.
o All vehicle systems are switched ON for the final eight and half hour
countdown starting at 6:08 hrs (IST).
o Second Stage (PS2) Propellant filling operations completed.
Nov 04, 2013
• Second Stage (PS2) Propellant filling commenced.
• Mobile Service Tower (MST) withdrawal up to 50m is completed.
• Mandatory Checks and Preparations for Propellant filling operations of
Second Stage (PS2) are in progress.
Nov 03, 2013
 Propellant filling of PS4 stage and RCT completed.
 Mixed Oxides of Nitrogen (MON) filling of PS4 completed at 17:00 hrs.
(IST).
 Mixed Oxides of Nitrogen (MON) filling of PS4 under progress.
 Mono Methyl Hydrazine (MMH) filling of Reaction Control Thrusters (RCT)
completed.
 Mono Methyl Hydrazine (MMH) filling completed.
 Propellant filling operations of Fourth Stage (PS4) are in progress.
 The 56 hr. 30 min countdown of Mission commenced at 06:08 hrs. (IST).
Nov 02, 2013
 All the pre-countdown activities have been completed
satisfactorily and the 56 and half hr. countdown of Mission will
commence tomorrow at 06:08 hrs. (IST).
 Pre-count down activities of Mission commenced at 08:45 hrs.
Nov 01, 2013
 Launch Authorisation Board has approved & cleared the PSLV-
C25/Mars Orbiter Mission launch on Nov 05, 2013 at 14:38
hrs. (IST)
 56 and half hr. countdown for launch will begin on Nov 03,
2013 at 06:08 hrs. (IST)
Oct 31, 2013
 Launch Rehearsal of PSLV-C25/Mars Orbiter Mission has
been completed successfully in the afternoon on Oct 31,
2013.
 Launch Rehearsal of PSLV-C25/Mars Orbiter Mission
commenced at 06:08 hrs. (IST) on Oct 31, 2013 at First
Launch Pad, SDSC SHAR.
 Vehicle systems powered and health is normal.
Oct 30, 2013
• Spacecraft & Launch Vehicle integrated level checks
completed.
• Preparations for Launch Rehearsal are under progress.
Oct 22, 2013
• Spacecraft Integration with the Launcher PSLV-C25
Completed.
The 18-metre diameter dish-antenna will be used for communication
with craft till April 2014, after which the larger 32-metre antenna will be
used.
NASA's Deep Space Network is providing position data through its three
stations located in Canberra, Madrid and Goldstone on the US West Coast
during the non-visible period of ISRO's network. The South African National
Space Agency's (SANSA) Hartebeesthoek (HBK) ground station is also
providing satellite tracking, telemetry and command services. Additional
monitoring is provided by technicians on board two leased ships from the
Shipping Corporation of India, SCI Nalanda and SCI Yamuna which are
currently in position in the South Pacific near Fiji.
PSLV-C25 carrying the Mars Orbiter Mission spacecraft was launched
from Sriharikota on 5 November 2013.
As originally conceived, ISRO would have launched MOM on its new
Geosynchronous Satellite Launch Vehicle (GSLV), but the GSLV has
failed twice in two space missions in 2010, ISRO is still sorting out
issues with its cryogenic engine, and it was not advisable to wait for
the new batch of rockets since that would have delayed the MOM
project for at least three years. ISRO had to make a choice between
delaying the Mars Orbiter Mission and switching to the less-powerful
PSLV.
They opted for the latter. There is no way
to launch on a direct-to-Mars trajectory
with the PSLV as it does not have the
power. Instead, ISRO launched it into
Earth orbit first and slowly boosted it
into an interplanetary trajectory with
the help of gravity assist manoeuvres.
The Launch Vehicle - PSLV-C25 will inject the Spacecraft into an Elliptical
Parking Orbit with a perigee of 250 km and an apogee of 23,500 km. With six
Liquid Engine firing, the spacecraft is gradually maneuvered into a hyperbolic
trajectory with which it escapes from the Earth’s Sphere of Influence (SOI) and
arrives at the Mars Sphere of Influence.
When spacecraft reaches nearest point
of Mars (Peri-apsis), it is maneuvered
in to an elliptical orbit around Mars by
firing the Liquid Engine. The spacecraft
then moves around the Mars in an orbit
with Peri-apsis of 366 km and Apo-apsis
of about 80000 km.
1. Geo Centric Phase
The spacecraft is injected into an Elliptic Parking Orbit by the launcher. With
six main engine burns, the spacecraft is gradually maneuvered into a
departure hyperbolic trajectory with which it escapes from the Earth’s
Sphere of Influence (SOI) with Earth’s orbital velocity + V boost. The SOI of
earth ends at 918347 km from the surface of the earth beyond which the
perturbing force on the orbiter is mainly due to the Sun. One primary
concern is how to get the spacecraft to Mars, on the least amount of fuel.
ISRO uses a method of travel called a Hohmann Transfer Orbit – or a
Minimum Energy Transfer Orbit – to send a spacecraft from Earth to Mars
with the least amount of fuel possible.
2. Helio Centric Phase
The spacecraft leaves Earth in a direction tangential to Earth’s orbit and
encounters Mars tangentially to its orbit. The flight path is roughly one half
of an ellipse around sun. Eventually it will intersect the orbit of Mars at the
exact moment when Mars is there too. This trajectory becomes possible
with certain allowances when the relative position of Earth, Mars and Sun
form an angle of approximately 44o. Such an arrangement recur
periodically at intervals of about 780 days. Minimum energy opportunities
for Earth-Mars occur in November 2013, January 2016, May2018 etc.
3. Martian Phase
The spacecraft arrives at the Mars Sphere of Influence (around
573473 km from the surface of Mars) in a hyperbolic trajectory. At the
time the spacecraft reaches the closest approach to Mars (Periapsis),
it is captured into planned orbit around mars by imparting ∆V retro
which is called the Mars Orbit Insertion (MOI) manoeuvre. The Earth-
Mars trajectory is shown in the above figure. ISRO plans to launch the
Mars Orbiter Mission during the November 2013 window utilizing
minimum energy transfer opportunity.
Mars Orbiter Mission spacecraft being prepared for a
prelaunch test at Satish Dhawan Space Centre SHAR,
Srihairkota.
Loading Spacecraft for Thermovacuum Test in Large Space
Simulation Chamber
First image of the Earth by Mars Color Camera (MCC) of Mars Orbiter Spacecraft taken o
Nov 19, 2013 at 13:50 hrs. (IST) from 67975 km altitude with a resolution of 3.53 km.
The Polar Satellite Launch Vehicle, usually
known by its abbreviation PSLV is the first
operational launch vehicle of ISRO. PSLV is
capable of launching 1600 kg satellites in 620
km sun-synchronous polar orbit and 1050 kg
satellite in geo-synchronous transfer orbit. In
the standard configuration, it measures 44.4
m tall, with a lift off weight of 295 tonnes.
PSLV has four stages using solid and liquid
propulsion systems alternately. The first stage
is one of the largest solid propellant boosters
in the world and carries 139 tonnes of
propellant. A cluster of six strap-ones attached
to the first stage motor, four of which are
ignited on the ground and two are air-lit.
The reliability rate of PSLV has been superb. There had been
25 continuously successful flights of PSLV, till April 2014 .
With its variant configurations, PSLV has proved its multi-
payload, multi-mission capability in a single launch and its
geosynchronous launch capability. In the Chandrayaan-
mission, another variant of PSLV with an extended version of
strap-on motors, PSOM-XL, the payload haul was enhanced
to 1750 kg in 620 km SSPO. PSLV has rightfully earned the
status of workhorse launch vehicle of ISRO.
1. Lift-off weight 295 tonne
2. Pay Load 1600 kg in to 620 km Polar Orbit,
1060 kg in to Geosynchronous Transfer
Orbit (GTO)
3. Height 44 metre
Typical Parameters of PSLV
MOM Mission
MOM Mission

Más contenido relacionado

La actualidad más candente

Mangalyaan: The Mars Orbitary Misssion
Mangalyaan: The Mars Orbitary MisssionMangalyaan: The Mars Orbitary Misssion
Mangalyaan: The Mars Orbitary MisssionMohammed Aslam
 
Mangalyaan - India's First Interplanetary Mission to Mars
Mangalyaan - India's First Interplanetary Mission to MarsMangalyaan - India's First Interplanetary Mission to Mars
Mangalyaan - India's First Interplanetary Mission to MarsAerospaceinindia.org
 
MARS ORBITER MISSION (MOM) (MANGALYAN)
MARS ORBITER MISSION (MOM) (MANGALYAN)MARS ORBITER MISSION (MOM) (MANGALYAN)
MARS ORBITER MISSION (MOM) (MANGALYAN)VinodKumar Reddy A
 
Mars Orbital Mission (MOM)
Mars Orbital Mission (MOM)Mars Orbital Mission (MOM)
Mars Orbital Mission (MOM)Himanshi Gupta
 
ISRO's Mars Orbiter Mission (Mangalyaan)
ISRO's Mars Orbiter Mission (Mangalyaan)ISRO's Mars Orbiter Mission (Mangalyaan)
ISRO's Mars Orbiter Mission (Mangalyaan)Tushaar Neb
 
Mangalyaan ppt for vi bha student's forum vidarbha unit
Mangalyaan ppt for vi bha student's forum vidarbha unitMangalyaan ppt for vi bha student's forum vidarbha unit
Mangalyaan ppt for vi bha student's forum vidarbha unitDr. BP Joshi
 
CASE STUDY ON MANGALYAAN Final
CASE STUDY ON MANGALYAAN FinalCASE STUDY ON MANGALYAAN Final
CASE STUDY ON MANGALYAAN FinalAakash Patel
 
Mangalayan (Mars Orbiter Mission - MOM)
Mangalayan (Mars Orbiter Mission - MOM)Mangalayan (Mars Orbiter Mission - MOM)
Mangalayan (Mars Orbiter Mission - MOM)Discussion Solution
 
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...Swetha A
 
Chandrayaan
ChandrayaanChandrayaan
ChandrayaanWipro
 
INDIA'S MARS ORBITER MISSION
INDIA'S MARS ORBITER MISSIONINDIA'S MARS ORBITER MISSION
INDIA'S MARS ORBITER MISSIONAnurag Jain
 
Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)prathik_gs
 

La actualidad más candente (20)

Mangalyaan: The Mars Orbitary Misssion
Mangalyaan: The Mars Orbitary MisssionMangalyaan: The Mars Orbitary Misssion
Mangalyaan: The Mars Orbitary Misssion
 
Mangalyaan - India's First Interplanetary Mission to Mars
Mangalyaan - India's First Interplanetary Mission to MarsMangalyaan - India's First Interplanetary Mission to Mars
Mangalyaan - India's First Interplanetary Mission to Mars
 
Mangalyaan
MangalyaanMangalyaan
Mangalyaan
 
Journey of Mangalyaan report
Journey of Mangalyaan reportJourney of Mangalyaan report
Journey of Mangalyaan report
 
mangalyaan
mangalyaanmangalyaan
mangalyaan
 
Mangalyaan
MangalyaanMangalyaan
Mangalyaan
 
MARS ORBITER MISSION (MOM) (MANGALYAN)
MARS ORBITER MISSION (MOM) (MANGALYAN)MARS ORBITER MISSION (MOM) (MANGALYAN)
MARS ORBITER MISSION (MOM) (MANGALYAN)
 
MANGALYAAN
MANGALYAANMANGALYAAN
MANGALYAAN
 
MANGALYAAN
MANGALYAANMANGALYAAN
MANGALYAAN
 
Mars Orbital Mission (MOM)
Mars Orbital Mission (MOM)Mars Orbital Mission (MOM)
Mars Orbital Mission (MOM)
 
ISRO's Mars Orbiter Mission (Mangalyaan)
ISRO's Mars Orbiter Mission (Mangalyaan)ISRO's Mars Orbiter Mission (Mangalyaan)
ISRO's Mars Orbiter Mission (Mangalyaan)
 
Mangalyaan ppt for vi bha student's forum vidarbha unit
Mangalyaan ppt for vi bha student's forum vidarbha unitMangalyaan ppt for vi bha student's forum vidarbha unit
Mangalyaan ppt for vi bha student's forum vidarbha unit
 
CASE STUDY ON MANGALYAAN Final
CASE STUDY ON MANGALYAAN FinalCASE STUDY ON MANGALYAAN Final
CASE STUDY ON MANGALYAAN Final
 
Mangalayan (Mars Orbiter Mission - MOM)
Mangalayan (Mars Orbiter Mission - MOM)Mangalayan (Mars Orbiter Mission - MOM)
Mangalayan (Mars Orbiter Mission - MOM)
 
Mangalyan Mission
Mangalyan MissionMangalyan Mission
Mangalyan Mission
 
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...
MISSION TO PLANETS (CHANDRAYAAN,MAVEN,CURIOSITY,MANGALYAAN,CASSINI SOLSTICE M...
 
Chandrayaan
ChandrayaanChandrayaan
Chandrayaan
 
INDIA'S MARS ORBITER MISSION
INDIA'S MARS ORBITER MISSIONINDIA'S MARS ORBITER MISSION
INDIA'S MARS ORBITER MISSION
 
Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)Mangalyaan (India's mission to mars)
Mangalyaan (India's mission to mars)
 
Journey of Mangalyaan
Journey of MangalyaanJourney of Mangalyaan
Journey of Mangalyaan
 

Similar a MOM Mission

Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best ppt
Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best pptMars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best ppt
Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best pptNoman Jarang
 
Mangalyan{India}
Mangalyan{India}Mangalyan{India}
Mangalyan{India}Mukhar Jain
 
Mars orbitar misson [mom]
Mars orbitar misson [mom]Mars orbitar misson [mom]
Mars orbitar misson [mom]Ajay Gadhwal
 
National Income of India is given in this video
National Income of India is given in this videoNational Income of India is given in this video
National Income of India is given in this videoSHYAMALBANERJEE11
 
Indian Mars Orbiter Mission
Indian Mars Orbiter MissionIndian Mars Orbiter Mission
Indian Mars Orbiter MissionAntesh Jain
 
Mars Orbiter Mission ( MOM ) or Mangalyaan
Mars Orbiter Mission ( MOM ) or Mangalyaan Mars Orbiter Mission ( MOM ) or Mangalyaan
Mars Orbiter Mission ( MOM ) or Mangalyaan aman2227
 
India's Mars Orbiter Mission
India's Mars Orbiter MissionIndia's Mars Orbiter Mission
India's Mars Orbiter MissionTushaar Neb
 
Indian Space Exploration Missions
Indian Space Exploration Missions  Indian Space Exploration Missions
Indian Space Exploration Missions Aerospaceinindia.org
 
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxchandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxArinGanjoo
 
Indian Space Research Organisation
Indian Space Research OrganisationIndian Space Research Organisation
Indian Space Research OrganisationGajendra Choudhary
 
Isro technological advancements
Isro technological advancementsIsro technological advancements
Isro technological advancementsGautham Reddy
 
mangalyaan-1-638 (15 files merged).pptx
mangalyaan-1-638 (15 files merged).pptxmangalyaan-1-638 (15 files merged).pptx
mangalyaan-1-638 (15 files merged).pptxSaivenkatBingi
 
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxLVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxSiddhPanchori
 
Indian aerospace research
Indian aerospace researchIndian aerospace research
Indian aerospace researchparsi3960
 

Similar a MOM Mission (20)

Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best ppt
Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best pptMars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best ppt
Mars Orbiter Mission (MOM), also called Mangalyaan With Mp4 Video..best ppt
 
Mangalyan{India}
Mangalyan{India}Mangalyan{India}
Mangalyan{India}
 
Mars orbitar misson [mom]
Mars orbitar misson [mom]Mars orbitar misson [mom]
Mars orbitar misson [mom]
 
Mangalyaan
MangalyaanMangalyaan
Mangalyaan
 
National Income of India is given in this video
National Income of India is given in this videoNational Income of India is given in this video
National Income of India is given in this video
 
Indian Mars Orbiter Mission
Indian Mars Orbiter MissionIndian Mars Orbiter Mission
Indian Mars Orbiter Mission
 
MASS ORBIT MISSION PRESENT AND FUTURE
MASS ORBIT MISSION PRESENT AND FUTUREMASS ORBIT MISSION PRESENT AND FUTURE
MASS ORBIT MISSION PRESENT AND FUTURE
 
Mars Orbiter Mission ( MOM ) or Mangalyaan
Mars Orbiter Mission ( MOM ) or Mangalyaan Mars Orbiter Mission ( MOM ) or Mangalyaan
Mars Orbiter Mission ( MOM ) or Mangalyaan
 
India's Mars Orbiter Mission
India's Mars Orbiter MissionIndia's Mars Orbiter Mission
India's Mars Orbiter Mission
 
P.Lokesh Mangalyan.pptx
P.Lokesh Mangalyan.pptxP.Lokesh Mangalyan.pptx
P.Lokesh Mangalyan.pptx
 
Chandrayaan II
Chandrayaan IIChandrayaan II
Chandrayaan II
 
Indian Space Exploration Missions
Indian Space Exploration Missions  Indian Space Exploration Missions
Indian Space Exploration Missions
 
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptxchandrayaan3 India's 3rd successful mission to moon_newww.pptx
chandrayaan3 India's 3rd successful mission to moon_newww.pptx
 
Indian Space Research Organisation
Indian Space Research OrganisationIndian Space Research Organisation
Indian Space Research Organisation
 
M.O.M
M.O.MM.O.M
M.O.M
 
Isro technological advancements
Isro technological advancementsIsro technological advancements
Isro technological advancements
 
mangalyaan-1-638 (15 files merged).pptx
mangalyaan-1-638 (15 files merged).pptxmangalyaan-1-638 (15 files merged).pptx
mangalyaan-1-638 (15 files merged).pptx
 
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptxLVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
LVM3_M3,_OneWeb_India-2_campaign_30-merged_organized.pptx
 
Indian aerospace research
Indian aerospace researchIndian aerospace research
Indian aerospace research
 
Chandrayaan 3
Chandrayaan 3 Chandrayaan 3
Chandrayaan 3
 

Último

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxJanEmmanBrigoli
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 

Último (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 

MOM Mission

  • 2.
  • 3.
  • 4. Established in 1969, ISRO superseded the erstwhile Indian National Committee for Space Research (INCOSPAR). Headquartered in Bangalore, ISRO is under the administrative control of the Department of Space, Government of India. Since its establishment, ISRO has achieved numerous milestones. It built India's first satellite, Aryabhata, which was launched by the Soviet Union on 19 April in 1975. In 1980, Rohini became the first satellite to be placed in orbit by an Indian-made launch vehicle, SLV-3. ISRO subsequently developed two other rockets: the Polar Satellite Launch Vehicle (PSLV) for launching satellites into polar orbits and the Geosynchronous Satellite Launch Vehicle (GSLV) for placing satellites into geostationary orbits.
  • 5. These rockets have launched numerous communications satellites and earth observation satellite. On 22 October in 2008, Chandrayaan-1, India sent its first mission to the Moon. Over the years, ISRO has conducted a variety of operations for both Indian and foreign clients. ISRO's satellite launch capability is mostly provided by indigenous launch vehicles and launch sites. In 2008, ISRO successfully launched its first lunar probe, Chandrayaan-1, while future plans include indigenous development of GSLV, manned space missions, further lunar exploration, mars exploration and interplanetary probes. ISRO has several field installations as assets, and cooperates with the international community as a part of several bilateral and multilateral agreements. 5 November 2013, ISRO launched its Mars Orbiter Mission, which is currently en route to Mars.
  • 6.
  • 7. The Mars Orbiter Mission (MOM), informally called Mangalyaan (Sanskrit: मङ्गलयान, "Mars-Craft"), is a Mars orbiter launched into Earth orbit on 5 November 2013 by the Indian Space Research Organisation (ISRO). It is expected to enter orbit around Mars on 24 September 2014. The mission is a "technology demonstrator" project aiming to develop the technologies required for design, planning, management, and operations of an interplanetary mission.
  • 8. Mars Orbiter Mission is India's first interplanetary mission to planet Mars with an orbiter craft designed to orbit Mars in an elliptical orbit. The Mission is primarily technological mission considering the critical mission operations and stringent requirements on propulsion and other bus systems of spacecraft.
  • 9. The Mars Orbiter Mission probe lifted-off from the First Launch Pad at Satish Dhawan Space Centre SHAR, Sriharikota, Andhra Pradesh, using a Polar Satellite Launch Vehicle (PSLV) rocket C25 at 09:08 UTC (2:38 PM IST) on 5 November 2013. The launch window was approximately 20 days long and started on 28 October 2013. The MOM probe spent about a month in Earth orbit, where it made a series of seven altitude- raising orbital manoeuvres before trans-Mars injection on 30 November 2013 (UTC).
  • 10. Travelling at a speed of 1.55 km per second, Mangalyan crossed half way to Mars on 9 April 2014. It is India's first interplanetary mission and, if successful, ISRO would become the fourth space agency to reach Mars, after the Soviet space program, NASA, and European Space Agency. The spacecraft is being currently monitored from the Spacecraft Control Centre at ISRO Telemetry, Tracking and Command Network (ISTRAC) in Bangalore with support from Indian Deep Space Network (IDSN) antennae at Byalalu.
  • 11.
  • 12. One of the main objectives of the first Indian mission to Mars is to develop the technologies required for design, planning, management and operations of an interplanetary mission. Following are the major objectives of the mission: A. Technological Objectives: 1. Design and realisation of a Mars orbiter with a capability to survive and perform Earth bound manoeuvres, cruise phase of 300 days, Mars orbit insertion / capture, and on-orbit phase around Mars. 2. Deep space communication, navigation, mission planning and management. 3. Incorporate autonomous features to handle contingency situations. B. Scientific Objectives: 1. Exploration of Mars surface features, morphology, mineralogy and Martian atmosphere by indigenous scientific instruments.
  • 13.
  • 14. The MOM mission concept began with a feasibility study in 2010, after the launch of lunar satellite Chandrayaan-1 in 2008. The government of India approved the project on 3 August 2012, after the Indian Space Research Organisation completed ₹1.25 billion (US $21 million) of required studies for the orbiter. The total project cost may be up to ₹4.54 billion (US $77 million). The satellite costs ₹1.53 billion (US$26 million) and the rest of the budget has been attributed to ground stations and relay upgrades that will be used for other ISRO projects. The space agency had initially planned the launch on 28 October 2013 but was postponed to 5 November 2013 following the inability of ISRO's spacecraft tracking ships to take up pre- determined positions due to poor weather in the Pacific Ocean. Launch opportunities for a fuel-saving Hohmann transfer orbit occur about every 26 months, in this case, 2016 and 2018. The
  • 15. Assembly of the PSLV-XL launch vehicle, designated C25, started on 5 August 2013. The mounting of the five scientific instruments was completed at ISRO Satellite Centre, Bangalore, and the finished spacecraft was shipped to Sriharikota on 2 October 2013 for integration to the PSLV-XL launch vehicle. The satellite's development was fast-tracked and completed in a record 15 months. Despite the US federal government shutdown, NASA reaffirmed on 5 October 2013 it would provide communications and navigation support to the mission. ISRO chairman stated in November 2013 that if the MOM and NASA's orbiter MAVEN were successful, they would complement each other in findings and help understand Mars better.
  • 16.
  • 17. Some of the scientists working on the Mars Orbiter Mission project are: 1. K. Radhakrishan – Chairman, ISRO 2. A. S. Kiran Kumar – Director, SAC 3. Mylswamy Annadurai – Programme Director, MOM 4. B. S. Chandrashekar – Director, ISTRAC 5. P. Robert – Operations Director, MOM 6. Subbiah Arunan – Project Director, MOM 7. V. Kesavaraju – Post-Launch Mission Director, MOM 8. P. Ekambaram – Operations Director, MOM 9. P. Kunhikrishnan – Launch Mission Director, PSLV-XL 10. S. K. Shivkumar – Orbiting payload Director, ISAC 11. B. Jayakumar – Launch Vehicle Director, PSLV
  • 18. The lift-off mass was 1,350 kg (2,980 lb), including 852 kg (1,878 lb) of propellant mass. Cuboid in shape of approximately 1.5 m (4 feet 11 inches).
  • 19. The spacecraft's bus is a modified I-1 K structure and propulsion hardware configurations similar to Chandrayaan 1, India's lunar orbiter that operated from 2008 to 2009, with specific improvements and upgrades needed for a Mars mission.[31] The satellite structure is of aluminium and composite fibre reinforced plastic (CFRP) sandwich construction.
  • 20. Electric power is generated by three solar array panels of 1.8 m × 1.4 m (5 ft. 11 in × 4 ft. 7 in) each (7.56 m2 (81.4 sq. ft.) total), for a maximum of 840 W generation in Martian orbit. Electricity is stored in a 36 Ah Li-ion battery. Liquid fuel engine of 440 N thrust is used for orbit raising and insertion in Martian orbit. The orbiter also has eight 22 N thrusters for attitude control or orientation. Two 230 W TWTAs and two coherent transponders. The antenna array consists of a low-gain antenna, a medium-gain antenna and a high-gain antenna. The High-gain antenna system is based on a single 2.2-metre reflector illuminated by a feed at S-band. It is used to transmit and receive the telemetry, tracking, commanding and data to and from the Indian Deep Space Network.
  • 21. LAP Lyman-Alpha Photometer 1.97 kg MSM Methane Sensor For Mars 2.94 kg MENCA Mars Exospheric Neutral Composition Analyser 3.56 kg TIS Thermal Infrared Imaging Spectrometer 3.20 kg MCC Mars Colour Camera 1.27 kg The 15 kg (33 lb) scientific payload consists of five instruments:
  • 22. Lyman-Alpha Photometer (LAP) – a photometer that measures the relative abundance of deuterium and hydrogen from Lyman-alpha emissions in the upper atmosphere. Measuring the deuterium/hydrogen ratio will allow an estimation of the amount of water loss to outer space. Methane Sensor For Mars (MSM) – will measure methane in the atmosphere of Mars, if any, and map its sources. Particle environment studies. Mars Exospheric Neutral Composition Analyser (MENCA) – is a quadruple mass analyser capable of analysing the neutral composition of particles in the exosphere. Surface imaging studies Thermal Infrared Imaging Spectrometer (TIS) – will measure the temperature and emissivity of the Martian surface, allowing for the mapping of surface composition and mineralogy of Mars. Mars Colour Camera (MCC) – will provide images in the visual spectrum, providing context for the other instruments.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. Nov 05, 2013 o PSLV-C25, in its twenty fifth flight successfully launches Mars Orbiter Mission Spacecraft from SDSC SHAR. o PSLV-C25 lifted off at 14:38 hrs. o Automatic sequencing of launch initiated. o Launch authorised by Mission Director for GO at 14:24 hrs. o Mobile Service Tower (MST) withdrawal to final parking (150m) completed. Countdown is normal. o All vehicle systems are switched ON for the final eight and half hour countdown starting at 6:08 hrs (IST). o Second Stage (PS2) Propellant filling operations completed.
  • 29. Nov 04, 2013 • Second Stage (PS2) Propellant filling commenced. • Mobile Service Tower (MST) withdrawal up to 50m is completed. • Mandatory Checks and Preparations for Propellant filling operations of Second Stage (PS2) are in progress. Nov 03, 2013  Propellant filling of PS4 stage and RCT completed.  Mixed Oxides of Nitrogen (MON) filling of PS4 completed at 17:00 hrs. (IST).  Mixed Oxides of Nitrogen (MON) filling of PS4 under progress.  Mono Methyl Hydrazine (MMH) filling of Reaction Control Thrusters (RCT) completed.  Mono Methyl Hydrazine (MMH) filling completed.  Propellant filling operations of Fourth Stage (PS4) are in progress.  The 56 hr. 30 min countdown of Mission commenced at 06:08 hrs. (IST).
  • 30. Nov 02, 2013  All the pre-countdown activities have been completed satisfactorily and the 56 and half hr. countdown of Mission will commence tomorrow at 06:08 hrs. (IST).  Pre-count down activities of Mission commenced at 08:45 hrs. Nov 01, 2013  Launch Authorisation Board has approved & cleared the PSLV- C25/Mars Orbiter Mission launch on Nov 05, 2013 at 14:38 hrs. (IST)  56 and half hr. countdown for launch will begin on Nov 03, 2013 at 06:08 hrs. (IST)
  • 31. Oct 31, 2013  Launch Rehearsal of PSLV-C25/Mars Orbiter Mission has been completed successfully in the afternoon on Oct 31, 2013.  Launch Rehearsal of PSLV-C25/Mars Orbiter Mission commenced at 06:08 hrs. (IST) on Oct 31, 2013 at First Launch Pad, SDSC SHAR.  Vehicle systems powered and health is normal. Oct 30, 2013 • Spacecraft & Launch Vehicle integrated level checks completed. • Preparations for Launch Rehearsal are under progress. Oct 22, 2013 • Spacecraft Integration with the Launcher PSLV-C25 Completed.
  • 32.
  • 33. The 18-metre diameter dish-antenna will be used for communication with craft till April 2014, after which the larger 32-metre antenna will be used. NASA's Deep Space Network is providing position data through its three stations located in Canberra, Madrid and Goldstone on the US West Coast during the non-visible period of ISRO's network. The South African National Space Agency's (SANSA) Hartebeesthoek (HBK) ground station is also providing satellite tracking, telemetry and command services. Additional monitoring is provided by technicians on board two leased ships from the Shipping Corporation of India, SCI Nalanda and SCI Yamuna which are currently in position in the South Pacific near Fiji.
  • 34. PSLV-C25 carrying the Mars Orbiter Mission spacecraft was launched from Sriharikota on 5 November 2013. As originally conceived, ISRO would have launched MOM on its new Geosynchronous Satellite Launch Vehicle (GSLV), but the GSLV has failed twice in two space missions in 2010, ISRO is still sorting out issues with its cryogenic engine, and it was not advisable to wait for the new batch of rockets since that would have delayed the MOM project for at least three years. ISRO had to make a choice between delaying the Mars Orbiter Mission and switching to the less-powerful PSLV. They opted for the latter. There is no way to launch on a direct-to-Mars trajectory with the PSLV as it does not have the power. Instead, ISRO launched it into Earth orbit first and slowly boosted it into an interplanetary trajectory with the help of gravity assist manoeuvres.
  • 35.
  • 36.
  • 37. The Launch Vehicle - PSLV-C25 will inject the Spacecraft into an Elliptical Parking Orbit with a perigee of 250 km and an apogee of 23,500 km. With six Liquid Engine firing, the spacecraft is gradually maneuvered into a hyperbolic trajectory with which it escapes from the Earth’s Sphere of Influence (SOI) and arrives at the Mars Sphere of Influence. When spacecraft reaches nearest point of Mars (Peri-apsis), it is maneuvered in to an elliptical orbit around Mars by firing the Liquid Engine. The spacecraft then moves around the Mars in an orbit with Peri-apsis of 366 km and Apo-apsis of about 80000 km.
  • 38.
  • 39. 1. Geo Centric Phase The spacecraft is injected into an Elliptic Parking Orbit by the launcher. With six main engine burns, the spacecraft is gradually maneuvered into a departure hyperbolic trajectory with which it escapes from the Earth’s Sphere of Influence (SOI) with Earth’s orbital velocity + V boost. The SOI of earth ends at 918347 km from the surface of the earth beyond which the perturbing force on the orbiter is mainly due to the Sun. One primary concern is how to get the spacecraft to Mars, on the least amount of fuel. ISRO uses a method of travel called a Hohmann Transfer Orbit – or a Minimum Energy Transfer Orbit – to send a spacecraft from Earth to Mars with the least amount of fuel possible.
  • 40. 2. Helio Centric Phase The spacecraft leaves Earth in a direction tangential to Earth’s orbit and encounters Mars tangentially to its orbit. The flight path is roughly one half of an ellipse around sun. Eventually it will intersect the orbit of Mars at the exact moment when Mars is there too. This trajectory becomes possible with certain allowances when the relative position of Earth, Mars and Sun form an angle of approximately 44o. Such an arrangement recur periodically at intervals of about 780 days. Minimum energy opportunities for Earth-Mars occur in November 2013, January 2016, May2018 etc.
  • 41. 3. Martian Phase The spacecraft arrives at the Mars Sphere of Influence (around 573473 km from the surface of Mars) in a hyperbolic trajectory. At the time the spacecraft reaches the closest approach to Mars (Periapsis), it is captured into planned orbit around mars by imparting ∆V retro which is called the Mars Orbit Insertion (MOI) manoeuvre. The Earth- Mars trajectory is shown in the above figure. ISRO plans to launch the Mars Orbiter Mission during the November 2013 window utilizing minimum energy transfer opportunity.
  • 42.
  • 43. Mars Orbiter Mission spacecraft being prepared for a prelaunch test at Satish Dhawan Space Centre SHAR, Srihairkota.
  • 44. Loading Spacecraft for Thermovacuum Test in Large Space Simulation Chamber
  • 45. First image of the Earth by Mars Color Camera (MCC) of Mars Orbiter Spacecraft taken o Nov 19, 2013 at 13:50 hrs. (IST) from 67975 km altitude with a resolution of 3.53 km.
  • 46. The Polar Satellite Launch Vehicle, usually known by its abbreviation PSLV is the first operational launch vehicle of ISRO. PSLV is capable of launching 1600 kg satellites in 620 km sun-synchronous polar orbit and 1050 kg satellite in geo-synchronous transfer orbit. In the standard configuration, it measures 44.4 m tall, with a lift off weight of 295 tonnes. PSLV has four stages using solid and liquid propulsion systems alternately. The first stage is one of the largest solid propellant boosters in the world and carries 139 tonnes of propellant. A cluster of six strap-ones attached to the first stage motor, four of which are ignited on the ground and two are air-lit.
  • 47. The reliability rate of PSLV has been superb. There had been 25 continuously successful flights of PSLV, till April 2014 . With its variant configurations, PSLV has proved its multi- payload, multi-mission capability in a single launch and its geosynchronous launch capability. In the Chandrayaan- mission, another variant of PSLV with an extended version of strap-on motors, PSOM-XL, the payload haul was enhanced to 1750 kg in 620 km SSPO. PSLV has rightfully earned the status of workhorse launch vehicle of ISRO. 1. Lift-off weight 295 tonne 2. Pay Load 1600 kg in to 620 km Polar Orbit, 1060 kg in to Geosynchronous Transfer Orbit (GTO) 3. Height 44 metre Typical Parameters of PSLV