  1. Government of the Punjab Nahar Wala Minor
  2. Government of the Punjab
  3. Government of the Punjab
  4. Government of the Punjab LOCATION / GOOGLE MAP SAHIBAN DISTY Off-taking RD. 61+640 NAHAR WALA MINOR Tail RD. 27+675 N
  5. Government of the Punjab LAY OUT PLAN Nahar Wala Minor
  6. Government of the Punjab MAJOR ITEMS OF WORK Sr. No Description of items Cost 1 Earth work 18539 2 Concrete work 46.521 3 Data Board (1 No) 0.018 4 Outlets (09 No) 3.065 5 RD Marks (18 No) 0.016 6 Tail Cluster (1 No) 0.074 7 Any other 9.894 Total :- 78.127 (Rs in Million)
  7. Government of the Punjab BENEFITS 1) Seepage loses would be reduced. 2) Safety of canal bank and reduction breaches. 3) Optimum running of the channel with equitable distribution of water from head to tail. 4) Improvement in farm economic. 5) Improvement in Socio-Economic condition. 6) Improvement in public health problems. 7) Control over water logging. 8) Strengthening National Economy. 9) The concrete lining of this minor is of vital importance. It requires every completion to cope with crop water requirement and running of channel with optimum discharge. This will surely increase yield of crops and more area will be brought under cultivation. The irrigators which are deprived off their due share of water from years will get their due share.
  8. Government of the Punjab ANNOTATED REPLY Sr. No. Observations Reply a The estimated cost of the work is Rs. 73.206 million against provision of Rs. 40.1 million in umbrella PC-1. The procuring agency may justify the additional cost over and above the provision made in umbrella PC-1. The provision of Rs. 40.1 million in umbrella PC-1 is tentative cost while actual cost is Rs. 76.762 million estimate cost as per site position. b The length of channel proposed in the instant PC-I is 27365 ft (RD: 0+000 to 27+365) against the provision of 27675 ft (RD: 0+000 to 27+675) in umbrella PC-1. The procuring agency may justify decrease in length for concrete lining with reference to provision made in umbrella PC-1 The length of channel proposed in the instant PC-I is 27365 is correct while umbrella PC-1 of 27675 ft is incorrect and written due to typing mistake. c As this is a perennial channel the procuring agency is required to justify .The non provision of diversion channel. This is non perennial channel. No necessity of diversion channel work can early executed be stipulated time period. d The Procuring Agency may justify/ amend the detail provision of 1% plantation because tree plantation is meant for deposit to Forest Department Deleted
  9. Government of the Punjab ANNOTATED REPLY Sr. No. Observations Reply e As per cross sections, there is road on the left side of the channel, the procuring Agency is required to justify the earth work on left side Earth work on left side of road side already excluded from PC-I. f The Procuring Agency & required to provide clear copy index Plan of The Project Clear Copy attached. g The Procuring Agency is required to justify the lining by providing history of last three years regarding shortage of tail, cuts and breach if any Lining is recommended as the said canal damaged due to flood 2010 causes water losses/dry tail.