1. Bus TICKETING Management System
Submitted By:-
Shivani Atre
Mohit Natani
Lokesh Lekhwani
Submitted To:-
Prof. Mandakini Tayade
Guided By:
Asst Prof.Swapnil Gupta
2.
3.
4. Bus ticketing management system is related to the manages timing, fare, routes details etc.
This system is useful in the future for to manage the system of buses in local and rural areas.
This system will also remove the human mistake and two modules we used in our project is login
module and the Bus management (route) modules.
It provides function i.e. Bus maintenance, record maintenance and remainder (information
stores).
5. Motivation:- This Project Is Suggested By Travel Agent. This Project Is Taken For The Purpose That There Is
Lot Of Problem Related To Buses Route, Timing, Ticketing, Trip Details, Bus Details, Bus Stops In Local Areas.
More Importantly To Know The Running Time Of A Particular Bus And We W Ant To Manipulate And
Stores These Information Successfully.
Objective:-the Objective Of Our Project Is To Initialize The Problem Of Time Management, Fare Problems,
Facility Required To Passengers And Most Important Is To Give Them Birth Availability.
Application
•To Increase The Tourism Facility.
•Needs A Lot Of Working Staff And Extra Attention On All The Records.
•Public And Private Transportation Agencies.
Limitation
•More Databases Required And This Is Very Costly Software.
•More Man Power.
•Time Consuming.
•Damage Of Machines Due To Lack Of Attention.
•Lack Of Security Of Data.
14. platform usedVISUAL BASIC:
DEVELOPER:-MICROSOFT
PARADIGM:-OBJECT BASED AND EVENT-DRIV
APPEARED IN:-1991
OS:-MICROSOFT WINDOWS AND MS
Visual basic have some features:-
1.VB is object oriented programming language.
2.VB is a high level language which evolved from the earlier DOS
version called BASIC(Beginner’s ALL-Symbolic Instruction
Code.
3.A programmer can create both simple and complex GUI
application.
4.Programming in VB is a combination of visually arranging
components or control on a form.
15. SDLC
It is also referred as app development life cycle.
The system development life cycle concepts applies to a range of
hardware and software configuration.
It also include some phases:
Analysis
Design
Coding
Testing
17. Processor 400mhz
HARDDISK 5 GB
RAM 2GB
KEYBOARD AND MOUSE
OPERATING SYSTEM WINDOW 98,XP,7,8
FRONT END VISUAL BASIC VERSION 6.0
MS OFFICE TOOLS WORD,POWERPOINT.
Back End:-Ms access
18. FUTURE WORK AND CONCLUSION
1.In future we can add new routes, spots according to
need of company.
2.We can implement our software for online bus ticket
reservation system.
3.We can add unique identification system to identify
our system.