Manual Testing
Q. What is Software Testing??
Ans. Validating the application if all the client’s requirements are implemented or not…
Q. Why do we need a specialist Tester??
Ans. Developers can’t do systematic and complete Testing. Developers will assume few things to be working fine as they
are owners of the work..
Q. How testing is helpful for a company??
Ans. i. To make sure all client requirements are implemented.
ii. If we collect Metrics from the project, it would be helpful for successful planning and execution of next project.
Q. What is Test Metrics??
Ans. The data/statistics collected from the project about the How it is executed/What went well/What went wrong..
i.e About i. Defect Metrics
ii. Schedule Metrics
iii. Effort Metrics (Man hours/ Man days)

Project Life Cycle (SDLC)

1.
2.
3.
4.
5.
6.
7.

Business Req Collection {Business Analyst or Senior Project members}
Feasibility Analysis {Leads/Manager}
System Requirement Collection { Business Analyst or Senior Project members }
Design {Architects, Developers}
Coding {Developers}
Testing {Testers}
Release & Maintenance {Rel- Testers, Main- Develoeprs&Testers}
Technical
Business Requirement
Feasibility Analysis

Schedule
Financial

System Requirement Collection
Project Plan

UI
System Requirement
Functional Requirement

Functional
Security
Performance
Environment

UI Design (Screen Design)
Database Design
High Level Design
Application Design
Low Level Design

Design

Coding & Unit Testing
Traceability

Matrix

(Build

Release)

Testing

Problems
Release & Maintenance Phase
Change Request
Test Life Cycle:

Req Documents:
1. BRS
2. SRS (System Requirement Specs)
3. Functional Requ Specs (Optional… the same data can be managed using SRS only)
4. Usecase
Q. What is the diff b/w SRS and a Usecase??
Ans. SRS will be one doc for one project which will have the detailed information about all the project
requirements. Usecase document is the detailed information about one requirement. i.e One project will have
multiple usecases.
Q. What will be the content of a UseCase Doc??
Ans. Req Description, Users, Triggered Event, Pre Conditions, Flow, Alternative Flows, Exceptional Flow,
Success Criteria.
Q. What do we call the Database Design Doc??
Ans. E-R Diagram (Entity Relationship Diagram)
Q. What do we do in High level Design??
Ans. 1. Architecture of the project is identified. (1-Tier, 2-Tier, 3-Tier.. n-Tier)
2. Modularization of the project is done.
Q. Who is responsible for Release and maintenance??
Ans. Tester will be responsible for Release.
Developer, Testers will be part of Maintenance.
Q. What is Enhancement project??
Ans. The project which is already developed, tested and in use but we need to add few new features.
TEST PLAN
Test plan is a document which maintains information like What to test, When to test and How to test.
We use Requirements and Project Plan as the inputs for test Plan preparation.
Test Plan Template:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.

Title
Revision History
Objective of the Document
Scope of the Document – Work Allocation will not be there in TP.
Objective of Testing – Quality Deliverable and Metric collection plan??
Brief Description of the Project
Test Environment ( This is identified from System Requ)
Critical Functionalities
Functionality not to be tested – 3rd party involvement / Enhancement project
Test data requirement and collection
Automation Analysis
Test Strategy ( What phases of testing to be used in project, sequence of testings, I/P and Exit Criteria)
Training Plan( Technical/ Domain/ Softskill)
Effort Estimation ( Effort will be represented in Man Hours.. it can be calculated using Function Point
Analysis/Work Breakdown structure )
Resource Requirement ( HR/SW/HW)
Scheduling ( Detailed schedule for all phases of Testing)
Input Criteria (What inputs are required and how they Should be??)
Exit Criteria (What deliverables testers need to provide and how they should be??)
Acceptance Criteria
Test Suspension & Resumption Criteria ( Suspen – Show Stopper or any core functional bug)
Test Completion Criteria ( When all test cases are pass , when the available time is over)
Test Deliverables (Test plan, test case Doc, Traceability Matrix, Test results, Bugs, Application, User Guides etc )
Standards to be followed
Bug Classifications ( i.e based on Severity and Priority)
Bug Tracking ( We identify the tool to be sued for bug communication)
Test Metrics (We don’t collect Metrics here but we identify what Metrics to be collected??)
Documents Referred
Severity: How the Bug is affecting the functionality or Req or Application

Input Criteria: 1. Documents: Only reviewed docs are acceptable inputs.
2. Application: Unit Tested application along with Release Notes and Installation document will
be the acceptable input.
Unit Testing: A quick testing done by developer to make sure that the application is ready for thorough Testing.
Release Notes: A document with info as: Features implemented in current release.
Changes w.r.t previous release
Any known issues in the current release.
Input Criteria is also called as Entry Criteria.

Exit Criteria: 1. Documents: Only reviewed docs are acceptable deliverables
2. Application: Application meeting acceptance criteria.

Acceptance Criteria: This is defined by client at the time of project agreements. It is the set of rules defined by
client under which he would accept the application.
Q. What is an Error/Bug/Defect?
Error: Any deviation from requirement is called as error.
Bug: If the error is identified in Testing, it will be called as Bug
Defect: If the error is not identified in the testing but it is identified in production/client usage, it will be called as
defect.

Severity: How the bug is affecting the functionality or requirement or application. It is always assigned by a
Tester.

1. Critical
2. High
Severity
3. Medium
4. Low
Show Stopper (S1)
Functional

Critical

(S2)
Completely (S2)

Regular Functionality
Bug

Partially (S3)

Non Functional (S4)

Priority: How the bug is affecting the release or testing or Business. It is generally assigned by Lead or Business Analyst.
In exceptional cases, Testers may assign this value too.
1. Critical

Show Stopper

2. High

Next Release fixers

3. Medium

Delayed

4. Low

Like to have

Priority

Q. What do you test in a Coffee Vending Machine??
Q. What are the uses of a Pen other than Writing??
Testcase :
a. Systematic
b. Simple
c. Complete
d. No Duplicates

Coffee Vending Machine:
1. Packaging
2. Whether a User manual exists or not??
3. What is the size/color/shape/ .. all Look and Feel
4. Power (What are the connection type, voltage, socket type etc..)
5. If Voltage is less than min??
6. If Voltage is more than Max??
7. When system is switched on. What is the time taken to get ready?? ( Is it displaying a message saying pls
wait..)
8. What happens if contents are empty??
9. What happens if contents are not sufficient??
10. What happens if it is insufficient funds??
11. What happens if it is not a coin??
12. Test the selections?? i.e Coffee/Tea/Milk/Hot water etc..
13. What is the quantity??
14. What is the quality i.e Mixture
15. What is the temp??
16. How much time it is taking to give a cup of coffee??
17.
18.
19.
20.
21.
22.
23.

How much time is the wait time at the beginning??
How is the flow of the coffee??
What happens if the coffee cup if full??
What happens if I insert a coin and then again insert a coin??
Incomplete Transactions??
How do people identify what is coffee button/tea button?? ( labels and pictures)
Availability of stand/empty cup holder/Overflow Tray..

Uses of Pen:
1. Pointer
2. Ruler
3. Insulator
4. Paper Binder
5. Book Mark
6. Advertisement media
7. Stress reliever
8. Collection
9. Ear Bud
10. Good Gift Item
11. Show Piece
12. Punching tool
13. Paper weight

EX : 1

Name
Age
Email
Conf Email
DOB
SAVE

TestCase:
1.
2.
3.
4.
5.
6.
7.

DELETE

If all the controls are there or not??
Look and feel of them?
Cursor should be in name
Min and Max size of inputs
Mandatory Check
Type of allowed inputs
If age allows ABC??

CLEAR
8. Will Save button click save the data or not??
9. What happens if I click on Delete?
9.1 What happens if I have only one matching record?
9.2 What happens if I have multiple matching records?
9.3 What happens if we don’t have any matching records?
10. What happens if I click on Clear?
We should not write random test cases/ we should not miss any test cases..
Types of test cases:

1. User Interface UI: Test cases for Look and feel
UI Elements: Colors, Fonts, Shape, Spelling, Grammar, Alignments, Visibility, Enable, disable etc……
1. Usability : {User Friendly support application}
a.
Default cursor focus
b.
Tab & Order (Tab should be implemented and tab order should be left to right in down word
Direction.)
c.
Default Submit Button: For default submit button on click of enter key the button with
positive action should be triggered.
d.
Shortcut keys ( Save – Alt+S; Delete – Alt+D)
e.
Tool Tips ( Messages during mouse over action)
2. Validation: Validations are implemented to avoid invalid data processing.
Ex: Age should not allow ABC etc..
3. Functionality : Test cases for all possible conditions of the functional requirements.
EX : 2

Name
Age
Email
Conf Email
DOB
SAVE

DELETE

CLEAR

Note: From the above screen Tab should move in only in input fields. All are mandatory fields complete data write all
possible test cases.
Domain: The set of acceptable inputs of an input field.
Validation for DOB:
1. Should be in MMDDYYYY format
2. MM should not be greater than 12, date should not be greater than 31, year should be from 1850 to 2400
3. Data-Month Validations.
4. It should not be future date.
5. Age and DOB should be matching.
Validation of Age: (Years)
1. Should be from 0-150
2. No spl chars, no alphabets except space, period.

Testing Methodologies (Approach): There are three methodologies
1. Black Box Testing
2. White Box Testing
3. Gray Box Testing (Not IMP)
1. Black Box Testing: Testing the application by using the test cases that are developed using requirements and design.
Black box test is also called as Functional Testing. (Opaque Testing)
It doesn’t require any programming knowledge or any knowledge in the project implementation.
2. White Box Testing: Testing the application by using the test cases that are developed from code is called as white box
testing. It is also called as Structural Testing. (Glass Box)
Code is used for writing Test Cases but not to test the code. Testing will be carried out on Application only.
3. Gray Box Testing: It is the extension of black box testing ie we test the application by using some of the settings and
configuration information for simulating different test case conditions.
Qes : How do you test if a software is installed in your system are not.
Ans : Using registry information we verify if the software is intalled or not.
Registry HLM Microsoft IE Current Version

Req: An application which should allow X,Y as inputs and it should display Y,X.
Design:
Code1: x,y, z
Z=y;
y=x;
x=z;
Code2: x, y
X=x+y;
y=x-y;
x=x-y;
Code3 : x, y
X= x*y;
y=x/y;
x=x/y;

Testing Techniques:
1. White Box:
1. Statement Coverage
2. Condition Coverage
3. Loop Coverage
4. Branch Coverage
5. Path Coverage
1. Statement Coverage: Every line of code need to have at least one test case.
2. Condition Coverage: All the conditions in the code need to be tested.
3. Loop Coverage: All the possible loops in the program need to be tested to make sure that there are no
infinite loops.
4. Branch Coverage: All possible braches of the program flow need to be tested.
5. Path Coverage: All individual paths of program need to be covered with one test case at least. The
possible paths are identified using the Program Flow diagram.
Advantage:
1. You know the internals, so you can write detailed testcases.
Limitations:
1. Testers should be knowledgeable in Coding.
2. If any requirement is missing in code, we can’t identify it.
2. Black Box:
1. Boundary Value Analysis: Testing the Boundaries and adjacent values of the inputs. The limits of the
domain are called as Boundaries.
Domain: The set of acceptable inputs for any input field is called as Domain.
Eg1: Age

Min -1, Min, Min+1 , Max-1,Max, Max+1 (-1,0,1,149,150,151)
Eg2: Marks (-1, 0, 1, 34, 35, 36, 49, 50, 51, 59, 60, 61, 99, 100, 101)
Eg3: Income Tax ( -100 Cr 100001
150001
250001
EG4: Height ( 0.99, 1, 1.01
4.99, 5, 5.01 )

1000Cr)

2. Equivalence Class Partitioning: This is not a testing technique but it is a sampling technique. i.e we
can pick required no of samples with in the given range at equal intervals.
Eg: 4 samples b/w 150001 to 250001
170001, 190001, 210001, 230001
Equivalence classes are taken in Positive range as well negative ranges also.
3. Error Guessing: With exp and knowledge, we will write test cases for the possible errors.
Assignement:
1. Write the test cases for Self Info page?
2. Write the test cases for below form..
Req: X1, Y1 are mandatory input fields which accept values from 0 to 10. Z1 is an output field. After
entering X1, Y1 on click on generate button, a random integer in between X1 and Y1 should be generated
and populated in Z1.
White Box Testing Sample Prog:
1. int a,b;
2. If (a>b)
3. printf (“A is Big”);
4. else
5. printf(“B is Big””);
Statement Coverage:
TC1: a=4, b=5 Steps/Expected Result …. Coverage: { 1, 2, 4, 5}
TC2: a=5, b=4 Coverage ….. { 1,2,3}
Condition Coverage:
What are the no condition stmt in prog? Ans. 1 condition stmt
TC1: a=3, b=4
TC2: a=3, b=3
TC3: a=4, b=3
Ex3:
Req: A, B are the mandatory input fields, which accept values from 0-10. C is an output field. After
entering valid values in to A, B, on click on Generate button, a random integer in between A, B should be
generated and displayed in C.
Test Case Template:
Test
Case ID

Test Case
Title

Steps Or Input
Repro

Expected
Results

Actual
Result

Status

Req ID

Module

Author

Remarks

Ex:
Test Case
ID

Test Case Title

TC_001

Application Launch

1. Click on YM Shortcut in desktop
/Programs Menu

YM Should be opened

TC_002

Login Function

1. Open YM
2. Enter ABC and click on Login button

An error msg should
be displaced saying
Enter " Use Name &
Password"

Steps Or Input Report

Expected Results
TC_003

TC_004

TC_005

Login Function

1. Open YM
2. Enter ABC login button
3.Click on login button

An error msg should
be displaced saying
Enter " Use Name &
Password"

Login Function

1. Open YM
2. Enter ABC as login and XYZ as
password. Which is a wrong password
3.Click on login button

An error msg should
be displaced saying
Please verify your
credentials and try
again.

Messaging

1. Open YM
2. Enter ABC login and XYZ as
password and click OK.
3.Select on a friend who is online and
double click

A popup window
should be displayed
with to address as
friend address

Note :
1. Open YM
2.Select a friend who is online and
double click

Test Case Characteristics:
Test case should be:
1. Simple
2. Detailed
3. Systematic
4. Independent
5. No Duplicates
6. Complete Testcases

More Related Content

What's hot

Istqb intro with question answer for exam preparation
Istqb intro with question answer for exam preparationIstqb intro with question answer for exam preparation
Istqb intro with question answer for exam preparationKevalkumar Shah
 
Tutorial of web application load testing in selinium
Tutorial of web application load testing in seliniumTutorial of web application load testing in selinium
Tutorial of web application load testing in seliniumKevalkumar Shah
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answersMaria FutureThoughts
 
Manual testing interview question by INFOTECH
Manual testing interview question by INFOTECHManual testing interview question by INFOTECH
Manual testing interview question by INFOTECHPravinsinh
 
Software Testing Interview Q&A – part 1
Software Testing Interview Q&A – part 1Software Testing Interview Q&A – part 1
Software Testing Interview Q&A – part 1Khoa Bui
 
Interview questions
Interview questionsInterview questions
Interview questionssivareddyeda
 
QA interview questions and answers
QA interview questions and answersQA interview questions and answers
QA interview questions and answersMehul Chauhan
 
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Computer Trainings Online
 
Automation testing interview pdf org
Automation testing interview pdf orgAutomation testing interview pdf org
Automation testing interview pdf orgTestbytes
 
Qa interview questions and answers for placements
Qa interview questions and answers for placementsQa interview questions and answers for placements
Qa interview questions and answers for placementsGaruda Trainings
 
201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)Javier Gonzalez-Sanchez
 
Best Practices In Exploratory Testing
Best Practices In Exploratory TestingBest Practices In Exploratory Testing
Best Practices In Exploratory Testing99tests
 
Lesson 4...Bug Life Cycle
Lesson 4...Bug Life CycleLesson 4...Bug Life Cycle
Lesson 4...Bug Life Cyclebhushan Nehete
 
Manual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersManual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersSachin Gupta
 
Manual testing interview questions
Manual testing interview questionsManual testing interview questions
Manual testing interview questionsBABAR MANZAR
 
Unit 1 basic concepts of testing & quality
Unit 1   basic concepts of testing & qualityUnit 1   basic concepts of testing & quality
Unit 1 basic concepts of testing & qualityravikhimani1984
 
Testing softvamp techno solutions technical interview questions 2 years expe...
Testing  softvamp techno solutions technical interview questions 2 years expe...Testing  softvamp techno solutions technical interview questions 2 years expe...
Testing softvamp techno solutions technical interview questions 2 years expe...SoftvampTechnoSoluti
 
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance
 
Qa mockup interview for automation testing
Qa mockup interview for automation testingQa mockup interview for automation testing
Qa mockup interview for automation testingKadharBashaJ
 

What's hot (19)

Istqb intro with question answer for exam preparation
Istqb intro with question answer for exam preparationIstqb intro with question answer for exam preparation
Istqb intro with question answer for exam preparation
 
Tutorial of web application load testing in selinium
Tutorial of web application load testing in seliniumTutorial of web application load testing in selinium
Tutorial of web application load testing in selinium
 
38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers38475471 qa-and-software-testing-interview-questions-and-answers
38475471 qa-and-software-testing-interview-questions-and-answers
 
Manual testing interview question by INFOTECH
Manual testing interview question by INFOTECHManual testing interview question by INFOTECH
Manual testing interview question by INFOTECH
 
Software Testing Interview Q&A – part 1
Software Testing Interview Q&A – part 1Software Testing Interview Q&A – part 1
Software Testing Interview Q&A – part 1
 
Interview questions
Interview questionsInterview questions
Interview questions
 
QA interview questions and answers
QA interview questions and answersQA interview questions and answers
QA interview questions and answers
 
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
Latest Manual Testing Interview Questions and Answers 2015 - H2kinfosys
 
Automation testing interview pdf org
Automation testing interview pdf orgAutomation testing interview pdf org
Automation testing interview pdf org
 
Qa interview questions and answers for placements
Qa interview questions and answers for placementsQa interview questions and answers for placements
Qa interview questions and answers for placements
 
201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)201008 Software Testing Notes (part 1/2)
201008 Software Testing Notes (part 1/2)
 
Best Practices In Exploratory Testing
Best Practices In Exploratory TestingBest Practices In Exploratory Testing
Best Practices In Exploratory Testing
 
Lesson 4...Bug Life Cycle
Lesson 4...Bug Life CycleLesson 4...Bug Life Cycle
Lesson 4...Bug Life Cycle
 
Manual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answersManual software-testing-interview-questions-with-answers
Manual software-testing-interview-questions-with-answers
 
Manual testing interview questions
Manual testing interview questionsManual testing interview questions
Manual testing interview questions
 
Unit 1 basic concepts of testing & quality
Unit 1   basic concepts of testing & qualityUnit 1   basic concepts of testing & quality
Unit 1 basic concepts of testing & quality
 
Testing softvamp techno solutions technical interview questions 2 years expe...
Testing  softvamp techno solutions technical interview questions 2 years expe...Testing  softvamp techno solutions technical interview questions 2 years expe...
Testing softvamp techno solutions technical interview questions 2 years expe...
 
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
 
Qa mockup interview for automation testing
Qa mockup interview for automation testingQa mockup interview for automation testing
Qa mockup interview for automation testing
 

Similar to Test process - Important Concepts

Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx14941
 
manual-testing
manual-testingmanual-testing
manual-testingKanak Mane
 
Software Testing interview - Q&A and tips
Software Testing interview - Q&A and tipsSoftware Testing interview - Q&A and tips
Software Testing interview - Q&A and tipsPankaj Dubey
 
Software testing for biginners
Software testing for biginnersSoftware testing for biginners
Software testing for biginnersSriman Eshwar
 
Less01 1 introduction_module
Less01 1 introduction_moduleLess01 1 introduction_module
Less01 1 introduction_moduleSuresh Mishra
 
Iseb, ISTQB Static Testing
Iseb, ISTQB Static TestingIseb, ISTQB Static Testing
Iseb, ISTQB Static Testingonsoftwaretest
 
Manual testing interview questions by infotech
Manual testing interview questions by infotech Manual testing interview questions by infotech
Manual testing interview questions by infotech suhasreddy1
 
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01Anshuman Rai
 
Info manual testing questions
Info manual testing questionsInfo manual testing questions
Info manual testing questionsSandeep
 
Software testing introduction
Software testing introductionSoftware testing introduction
Software testing introductionSriman Eshwar
 
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptxabhivastrad007
 
Test Report Preparation
Test Report PreparationTest Report Preparation
Test Report PreparationDucat India
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2Yogindernath Gupta
 
Reporting On The Testing Process
Reporting On The Testing ProcessReporting On The Testing Process
Reporting On The Testing Processgavhays
 
ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3Chandukar
 
Top 20 software testing interview questions for sdet
Top 20 software testing interview questions for sdetTop 20 software testing interview questions for sdet
Top 20 software testing interview questions for sdetDevLabs Alliance
 
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance
 
ISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam PracticeISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam PracticeYogindernath Gupta
 

Similar to Test process - Important Concepts (20)

Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx
 
manual-testing
manual-testingmanual-testing
manual-testing
 
Software Testing interview - Q&A and tips
Software Testing interview - Q&A and tipsSoftware Testing interview - Q&A and tips
Software Testing interview - Q&A and tips
 
Software testing for biginners
Software testing for biginnersSoftware testing for biginners
Software testing for biginners
 
stlc
stlcstlc
stlc
 
Less01 1 introduction_module
Less01 1 introduction_moduleLess01 1 introduction_module
Less01 1 introduction_module
 
Iseb, ISTQB Static Testing
Iseb, ISTQB Static TestingIseb, ISTQB Static Testing
Iseb, ISTQB Static Testing
 
Manual testing interview questions by infotech
Manual testing interview questions by infotech Manual testing interview questions by infotech
Manual testing interview questions by infotech
 
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01
Manualtestinginterviewquestionbyinfotech 100901071035-phpapp01
 
Info manual testing questions
Info manual testing questionsInfo manual testing questions
Info manual testing questions
 
Software testing introduction
Software testing introductionSoftware testing introduction
Software testing introduction
 
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
1779905011SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS.pptx
 
Test Report Preparation
Test Report PreparationTest Report Preparation
Test Report Preparation
 
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2ISTQB / ISEB Foundation Exam Practice - 2
ISTQB / ISEB Foundation Exam Practice - 2
 
Reporting On The Testing Process
Reporting On The Testing ProcessReporting On The Testing Process
Reporting On The Testing Process
 
ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3ISTQB Foundation - Chapter 3
ISTQB Foundation - Chapter 3
 
Ooad
OoadOoad
Ooad
 
Top 20 software testing interview questions for sdet
Top 20 software testing interview questions for sdetTop 20 software testing interview questions for sdet
Top 20 software testing interview questions for sdet
 
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
DevLabs Alliance Top 20 Software Testing Interview Questions for SDET - by De...
 
ISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam PracticeISTQB / ISEB Foundation Exam Practice
ISTQB / ISEB Foundation Exam Practice
 

More from Sunil Kumar Gunasekaran

Sample Technical Requirement Document (TRD)
Sample Technical Requirement Document (TRD)Sample Technical Requirement Document (TRD)
Sample Technical Requirement Document (TRD)Sunil Kumar Gunasekaran
 
Sql commands worked out in sql plus with screen shots
Sql commands worked out in sql plus with screen shotsSql commands worked out in sql plus with screen shots
Sql commands worked out in sql plus with screen shotsSunil Kumar Gunasekaran
 
Business Requirements Document for Acounts Payable System
Business Requirements Document for Acounts Payable SystemBusiness Requirements Document for Acounts Payable System
Business Requirements Document for Acounts Payable SystemSunil Kumar Gunasekaran
 
Test Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredTest Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredSunil Kumar Gunasekaran
 
PERL for QA - Important Commands and applications
PERL for QA - Important Commands and applicationsPERL for QA - Important Commands and applications
PERL for QA - Important Commands and applicationsSunil Kumar Gunasekaran
 
JAVA Notes - All major concepts covered with examples
JAVA Notes - All major concepts covered with examplesJAVA Notes - All major concepts covered with examples
JAVA Notes - All major concepts covered with examplesSunil Kumar Gunasekaran
 
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...Java programs - bubble sort, iterator, linked list, hash set, reverse string,...
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...Sunil Kumar Gunasekaran
 
Fitnesse user acceptance test - Presentation
Fitnesse   user acceptance test - PresentationFitnesse   user acceptance test - Presentation
Fitnesse user acceptance test - PresentationSunil Kumar Gunasekaran
 

More from Sunil Kumar Gunasekaran (20)

CQL - Cassandra commands Notes
CQL - Cassandra commands NotesCQL - Cassandra commands Notes
CQL - Cassandra commands Notes
 
Java J2EE Complete Syllabus Checklist
Java J2EE Complete Syllabus ChecklistJava J2EE Complete Syllabus Checklist
Java J2EE Complete Syllabus Checklist
 
Amazon search test case document
Amazon search test case documentAmazon search test case document
Amazon search test case document
 
Actual test case document
Actual test case documentActual test case document
Actual test case document
 
Sample Technical Requirement Document (TRD)
Sample Technical Requirement Document (TRD)Sample Technical Requirement Document (TRD)
Sample Technical Requirement Document (TRD)
 
Sql reference from w3 schools
Sql reference from w3 schools Sql reference from w3 schools
Sql reference from w3 schools
 
Sql commands worked out in sql plus with screen shots
Sql commands worked out in sql plus with screen shotsSql commands worked out in sql plus with screen shots
Sql commands worked out in sql plus with screen shots
 
Wells fargo banking system ER Diagram
Wells fargo banking system ER DiagramWells fargo banking system ER Diagram
Wells fargo banking system ER Diagram
 
Business Requirements Document for Acounts Payable System
Business Requirements Document for Acounts Payable SystemBusiness Requirements Document for Acounts Payable System
Business Requirements Document for Acounts Payable System
 
Automation Testing Syllabus - Checklist
Automation Testing Syllabus - ChecklistAutomation Testing Syllabus - Checklist
Automation Testing Syllabus - Checklist
 
Unix short
Unix shortUnix short
Unix short
 
Unix made easy
Unix made easyUnix made easy
Unix made easy
 
Testing http methods using Telnet
Testing http methods using TelnetTesting http methods using Telnet
Testing http methods using Telnet
 
Test Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredTest Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts covered
 
Scrum writeup - Agile
Scrum writeup - Agile Scrum writeup - Agile
Scrum writeup - Agile
 
Scrum, V Model and RUP Models Overview
Scrum, V Model and RUP Models OverviewScrum, V Model and RUP Models Overview
Scrum, V Model and RUP Models Overview
 
PERL for QA - Important Commands and applications
PERL for QA - Important Commands and applicationsPERL for QA - Important Commands and applications
PERL for QA - Important Commands and applications
 
JAVA Notes - All major concepts covered with examples
JAVA Notes - All major concepts covered with examplesJAVA Notes - All major concepts covered with examples
JAVA Notes - All major concepts covered with examples
 
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...Java programs - bubble sort, iterator, linked list, hash set, reverse string,...
Java programs - bubble sort, iterator, linked list, hash set, reverse string,...
 
Fitnesse user acceptance test - Presentation
Fitnesse   user acceptance test - PresentationFitnesse   user acceptance test - Presentation
Fitnesse user acceptance test - Presentation
 

Recently uploaded

4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 

Recently uploaded (20)

FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 

Test process - Important Concepts

  • 1. Manual Testing Q. What is Software Testing?? Ans. Validating the application if all the client’s requirements are implemented or not… Q. Why do we need a specialist Tester?? Ans. Developers can’t do systematic and complete Testing. Developers will assume few things to be working fine as they are owners of the work.. Q. How testing is helpful for a company?? Ans. i. To make sure all client requirements are implemented. ii. If we collect Metrics from the project, it would be helpful for successful planning and execution of next project. Q. What is Test Metrics?? Ans. The data/statistics collected from the project about the How it is executed/What went well/What went wrong.. i.e About i. Defect Metrics ii. Schedule Metrics iii. Effort Metrics (Man hours/ Man days) Project Life Cycle (SDLC) 1. 2. 3. 4. 5. 6. 7. Business Req Collection {Business Analyst or Senior Project members} Feasibility Analysis {Leads/Manager} System Requirement Collection { Business Analyst or Senior Project members } Design {Architects, Developers} Coding {Developers} Testing {Testers} Release & Maintenance {Rel- Testers, Main- Develoeprs&Testers}
  • 2. Technical Business Requirement Feasibility Analysis Schedule Financial System Requirement Collection Project Plan UI System Requirement Functional Requirement Functional Security Performance Environment UI Design (Screen Design) Database Design High Level Design Application Design Low Level Design Design Coding & Unit Testing Traceability Matrix (Build Release) Testing Problems Release & Maintenance Phase Change Request
  • 3. Test Life Cycle: Req Documents: 1. BRS 2. SRS (System Requirement Specs) 3. Functional Requ Specs (Optional… the same data can be managed using SRS only) 4. Usecase Q. What is the diff b/w SRS and a Usecase?? Ans. SRS will be one doc for one project which will have the detailed information about all the project requirements. Usecase document is the detailed information about one requirement. i.e One project will have multiple usecases. Q. What will be the content of a UseCase Doc?? Ans. Req Description, Users, Triggered Event, Pre Conditions, Flow, Alternative Flows, Exceptional Flow, Success Criteria. Q. What do we call the Database Design Doc?? Ans. E-R Diagram (Entity Relationship Diagram) Q. What do we do in High level Design?? Ans. 1. Architecture of the project is identified. (1-Tier, 2-Tier, 3-Tier.. n-Tier) 2. Modularization of the project is done.
  • 4. Q. Who is responsible for Release and maintenance?? Ans. Tester will be responsible for Release. Developer, Testers will be part of Maintenance. Q. What is Enhancement project?? Ans. The project which is already developed, tested and in use but we need to add few new features. TEST PLAN Test plan is a document which maintains information like What to test, When to test and How to test. We use Requirements and Project Plan as the inputs for test Plan preparation. Test Plan Template: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. Title Revision History Objective of the Document Scope of the Document – Work Allocation will not be there in TP. Objective of Testing – Quality Deliverable and Metric collection plan?? Brief Description of the Project Test Environment ( This is identified from System Requ) Critical Functionalities Functionality not to be tested – 3rd party involvement / Enhancement project Test data requirement and collection Automation Analysis Test Strategy ( What phases of testing to be used in project, sequence of testings, I/P and Exit Criteria) Training Plan( Technical/ Domain/ Softskill) Effort Estimation ( Effort will be represented in Man Hours.. it can be calculated using Function Point Analysis/Work Breakdown structure ) Resource Requirement ( HR/SW/HW) Scheduling ( Detailed schedule for all phases of Testing) Input Criteria (What inputs are required and how they Should be??) Exit Criteria (What deliverables testers need to provide and how they should be??) Acceptance Criteria Test Suspension & Resumption Criteria ( Suspen – Show Stopper or any core functional bug) Test Completion Criteria ( When all test cases are pass , when the available time is over) Test Deliverables (Test plan, test case Doc, Traceability Matrix, Test results, Bugs, Application, User Guides etc ) Standards to be followed Bug Classifications ( i.e based on Severity and Priority) Bug Tracking ( We identify the tool to be sued for bug communication) Test Metrics (We don’t collect Metrics here but we identify what Metrics to be collected??) Documents Referred
  • 5. Severity: How the Bug is affecting the functionality or Req or Application Input Criteria: 1. Documents: Only reviewed docs are acceptable inputs. 2. Application: Unit Tested application along with Release Notes and Installation document will be the acceptable input. Unit Testing: A quick testing done by developer to make sure that the application is ready for thorough Testing. Release Notes: A document with info as: Features implemented in current release. Changes w.r.t previous release Any known issues in the current release. Input Criteria is also called as Entry Criteria. Exit Criteria: 1. Documents: Only reviewed docs are acceptable deliverables 2. Application: Application meeting acceptance criteria. Acceptance Criteria: This is defined by client at the time of project agreements. It is the set of rules defined by client under which he would accept the application. Q. What is an Error/Bug/Defect? Error: Any deviation from requirement is called as error. Bug: If the error is identified in Testing, it will be called as Bug Defect: If the error is not identified in the testing but it is identified in production/client usage, it will be called as defect. Severity: How the bug is affecting the functionality or requirement or application. It is always assigned by a Tester. 1. Critical 2. High Severity 3. Medium 4. Low
  • 6. Show Stopper (S1) Functional Critical (S2) Completely (S2) Regular Functionality Bug Partially (S3) Non Functional (S4) Priority: How the bug is affecting the release or testing or Business. It is generally assigned by Lead or Business Analyst. In exceptional cases, Testers may assign this value too. 1. Critical Show Stopper 2. High Next Release fixers 3. Medium Delayed 4. Low Like to have Priority Q. What do you test in a Coffee Vending Machine?? Q. What are the uses of a Pen other than Writing?? Testcase : a. Systematic b. Simple c. Complete d. No Duplicates Coffee Vending Machine: 1. Packaging 2. Whether a User manual exists or not?? 3. What is the size/color/shape/ .. all Look and Feel 4. Power (What are the connection type, voltage, socket type etc..) 5. If Voltage is less than min?? 6. If Voltage is more than Max?? 7. When system is switched on. What is the time taken to get ready?? ( Is it displaying a message saying pls wait..) 8. What happens if contents are empty?? 9. What happens if contents are not sufficient?? 10. What happens if it is insufficient funds?? 11. What happens if it is not a coin?? 12. Test the selections?? i.e Coffee/Tea/Milk/Hot water etc.. 13. What is the quantity?? 14. What is the quality i.e Mixture 15. What is the temp?? 16. How much time it is taking to give a cup of coffee??
  • 7. 17. 18. 19. 20. 21. 22. 23. How much time is the wait time at the beginning?? How is the flow of the coffee?? What happens if the coffee cup if full?? What happens if I insert a coin and then again insert a coin?? Incomplete Transactions?? How do people identify what is coffee button/tea button?? ( labels and pictures) Availability of stand/empty cup holder/Overflow Tray.. Uses of Pen: 1. Pointer 2. Ruler 3. Insulator 4. Paper Binder 5. Book Mark 6. Advertisement media 7. Stress reliever 8. Collection 9. Ear Bud 10. Good Gift Item 11. Show Piece 12. Punching tool 13. Paper weight EX : 1 Name Age Email Conf Email DOB SAVE TestCase: 1. 2. 3. 4. 5. 6. 7. DELETE If all the controls are there or not?? Look and feel of them? Cursor should be in name Min and Max size of inputs Mandatory Check Type of allowed inputs If age allows ABC?? CLEAR
  • 8. 8. Will Save button click save the data or not?? 9. What happens if I click on Delete? 9.1 What happens if I have only one matching record? 9.2 What happens if I have multiple matching records? 9.3 What happens if we don’t have any matching records? 10. What happens if I click on Clear? We should not write random test cases/ we should not miss any test cases.. Types of test cases: 1. User Interface UI: Test cases for Look and feel UI Elements: Colors, Fonts, Shape, Spelling, Grammar, Alignments, Visibility, Enable, disable etc…… 1. Usability : {User Friendly support application} a. Default cursor focus b. Tab & Order (Tab should be implemented and tab order should be left to right in down word Direction.) c. Default Submit Button: For default submit button on click of enter key the button with positive action should be triggered. d. Shortcut keys ( Save – Alt+S; Delete – Alt+D) e. Tool Tips ( Messages during mouse over action) 2. Validation: Validations are implemented to avoid invalid data processing. Ex: Age should not allow ABC etc.. 3. Functionality : Test cases for all possible conditions of the functional requirements. EX : 2 Name Age Email Conf Email DOB SAVE DELETE CLEAR Note: From the above screen Tab should move in only in input fields. All are mandatory fields complete data write all possible test cases. Domain: The set of acceptable inputs of an input field. Validation for DOB: 1. Should be in MMDDYYYY format 2. MM should not be greater than 12, date should not be greater than 31, year should be from 1850 to 2400 3. Data-Month Validations. 4. It should not be future date. 5. Age and DOB should be matching.
  • 9. Validation of Age: (Years) 1. Should be from 0-150 2. No spl chars, no alphabets except space, period. Testing Methodologies (Approach): There are three methodologies 1. Black Box Testing 2. White Box Testing 3. Gray Box Testing (Not IMP) 1. Black Box Testing: Testing the application by using the test cases that are developed using requirements and design. Black box test is also called as Functional Testing. (Opaque Testing) It doesn’t require any programming knowledge or any knowledge in the project implementation. 2. White Box Testing: Testing the application by using the test cases that are developed from code is called as white box testing. It is also called as Structural Testing. (Glass Box) Code is used for writing Test Cases but not to test the code. Testing will be carried out on Application only. 3. Gray Box Testing: It is the extension of black box testing ie we test the application by using some of the settings and configuration information for simulating different test case conditions. Qes : How do you test if a software is installed in your system are not. Ans : Using registry information we verify if the software is intalled or not. Registry HLM Microsoft IE Current Version Req: An application which should allow X,Y as inputs and it should display Y,X. Design:
  • 10. Code1: x,y, z Z=y; y=x; x=z; Code2: x, y X=x+y; y=x-y; x=x-y; Code3 : x, y X= x*y; y=x/y; x=x/y; Testing Techniques: 1. White Box: 1. Statement Coverage 2. Condition Coverage 3. Loop Coverage 4. Branch Coverage 5. Path Coverage 1. Statement Coverage: Every line of code need to have at least one test case. 2. Condition Coverage: All the conditions in the code need to be tested. 3. Loop Coverage: All the possible loops in the program need to be tested to make sure that there are no infinite loops. 4. Branch Coverage: All possible braches of the program flow need to be tested. 5. Path Coverage: All individual paths of program need to be covered with one test case at least. The possible paths are identified using the Program Flow diagram. Advantage: 1. You know the internals, so you can write detailed testcases. Limitations: 1. Testers should be knowledgeable in Coding. 2. If any requirement is missing in code, we can’t identify it. 2. Black Box: 1. Boundary Value Analysis: Testing the Boundaries and adjacent values of the inputs. The limits of the domain are called as Boundaries. Domain: The set of acceptable inputs for any input field is called as Domain. Eg1: Age Min -1, Min, Min+1 , Max-1,Max, Max+1 (-1,0,1,149,150,151)
  • 11. Eg2: Marks (-1, 0, 1, 34, 35, 36, 49, 50, 51, 59, 60, 61, 99, 100, 101) Eg3: Income Tax ( -100 Cr 100001 150001 250001 EG4: Height ( 0.99, 1, 1.01 4.99, 5, 5.01 ) 1000Cr) 2. Equivalence Class Partitioning: This is not a testing technique but it is a sampling technique. i.e we can pick required no of samples with in the given range at equal intervals. Eg: 4 samples b/w 150001 to 250001 170001, 190001, 210001, 230001 Equivalence classes are taken in Positive range as well negative ranges also. 3. Error Guessing: With exp and knowledge, we will write test cases for the possible errors. Assignement: 1. Write the test cases for Self Info page? 2. Write the test cases for below form.. Req: X1, Y1 are mandatory input fields which accept values from 0 to 10. Z1 is an output field. After entering X1, Y1 on click on generate button, a random integer in between X1 and Y1 should be generated and populated in Z1. White Box Testing Sample Prog: 1. int a,b; 2. If (a>b) 3. printf (“A is Big”); 4. else 5. printf(“B is Big””); Statement Coverage: TC1: a=4, b=5 Steps/Expected Result …. Coverage: { 1, 2, 4, 5} TC2: a=5, b=4 Coverage ….. { 1,2,3} Condition Coverage: What are the no condition stmt in prog? Ans. 1 condition stmt TC1: a=3, b=4 TC2: a=3, b=3 TC3: a=4, b=3 Ex3:
  • 12. Req: A, B are the mandatory input fields, which accept values from 0-10. C is an output field. After entering valid values in to A, B, on click on Generate button, a random integer in between A, B should be generated and displayed in C. Test Case Template: Test Case ID Test Case Title Steps Or Input Repro Expected Results Actual Result Status Req ID Module Author Remarks Ex: Test Case ID Test Case Title TC_001 Application Launch 1. Click on YM Shortcut in desktop /Programs Menu YM Should be opened TC_002 Login Function 1. Open YM 2. Enter ABC and click on Login button An error msg should be displaced saying Enter " Use Name & Password" Steps Or Input Report Expected Results
  • 13. TC_003 TC_004 TC_005 Login Function 1. Open YM 2. Enter ABC login button 3.Click on login button An error msg should be displaced saying Enter " Use Name & Password" Login Function 1. Open YM 2. Enter ABC as login and XYZ as password. Which is a wrong password 3.Click on login button An error msg should be displaced saying Please verify your credentials and try again. Messaging 1. Open YM 2. Enter ABC login and XYZ as password and click OK. 3.Select on a friend who is online and double click A popup window should be displayed with to address as friend address Note : 1. Open YM 2.Select a friend who is online and double click Test Case Characteristics: Test case should be: 1. Simple 2. Detailed 3. Systematic 4. Independent 5. No Duplicates 6. Complete Testcases