Objective
The objective of this project is to generate 35 MW of electricity and export it to the
Ceylon Electricity Board’s Grid. For this purpose, a 70 MW Large Scale Wind and Solar
PV Hybrid system is to be installed at Kankasanthurai in Sri Lanka by KLS Energy Lanka
(Pvt) Ltd as a Large Scale Clean Development Mechanism Project. It will use the wind,
solar energy potential in the North coastal belt of Sri Lanka. The 70 MW system would
consist of 60 MW of wind power plants and 10 MW of solar power plants.

The wind power plant is made of 40 numbers of wind generators each generating
maximum of 1.5 MW. The Solar Power Plant is made of 6 hectares of solar panel with
specific output of 156 W/m2. The estimated annual output of this Large Scale Wind
and Solar PV Hybrid Power Plant is 175,200 MWh which will be exported to the Sri
Lanka electricity grid of Ceylon Electricity Board. This would replace an equal amount
of fossil fuel based power, which avoids emission of 130,068 tCO2e per year.
Progress of the Project
 Notification to UNFCCC              - completed
 Notification to DNA                 - completed
 Preparation of PDD                  - completed
 Preparation of Financial Analysis   - to be completed
 PDD submission for validation       - to be completed
 Validation of the project           - to be completed
 Registration of the project         - to be completed
Consultancy Fee:
                            [Preparation of PIN and PDD]

 S. No.              Payment Schedule               Amount (LKR)         Status
   01.    20% of the payment on up front                500,000.00      Received



   02.
                   Progress of the Project
          80% of the payment on immediately after
          the project registration with UNFCCC
                                                       2,000,000.00
                                                                      To be received




Total                                                  2,500,000.00
[Preparation of Monitoring Report]



   S.                Payment Schedule                    Amount (LKR)          Status
  No.
  01.   50% of the payment on up front                         50,000.00    To be received


                    Progress of the Project
  02. 50% of the payment on completing the
      response of DOE’s clarification
                                                                50,000.00
                                                                            To be received




Total                                                          100,000.00



 • No pending revenue for completed work
 • Revenue from remaining work (LKR)

 •After completing the response of DOE’s clarification - 90,000.00

Más contenido relacionado

Similar a K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka

Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_finalLoren Schwappach
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxIESGATEWiz
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxSantoshkumarGupta67
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Graeme Donaldson
 
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final  dt 27.10.2022.pptxPMDP Presentation Sep-22_Final  dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final dt 27.10.2022.pptxssuserea04ef1
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnercare Inc.
 
ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLRajesh Prasad
 
Rual.lighting.bangaladesh.rered
Rual.lighting.bangaladesh.reredRual.lighting.bangaladesh.rered
Rual.lighting.bangaladesh.reredZaw Aung
 
China Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor PresentationChina Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor PresentationTMX Equicom
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxKheljitSingh
 
Quiz 2-mspm iii1 03-398192-009
Quiz 2-mspm iii1 03-398192-009Quiz 2-mspm iii1 03-398192-009
Quiz 2-mspm iii1 03-398192-009Samiullah Awan
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016sfact
 

Similar a K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka (20)

Ee479 -renewable_system_designs,_inc_-_final
Ee479  -renewable_system_designs,_inc_-_finalEe479  -renewable_system_designs,_inc_-_final
Ee479 -renewable_system_designs,_inc_-_final
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
JICA Solar Project
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
 
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final  dt 27.10.2022.pptxPMDP Presentation Sep-22_Final  dt 27.10.2022.pptx
PMDP Presentation Sep-22_Final dt 27.10.2022.pptx
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Pv system introduction project
Pv system introduction projectPv system introduction project
Pv system introduction project
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
 
ELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNLELAAU, Dankuni executed on very fast track by RVNL
ELAAU, Dankuni executed on very fast track by RVNL
 
Rual.lighting.bangaladesh.rered
Rual.lighting.bangaladesh.reredRual.lighting.bangaladesh.rered
Rual.lighting.bangaladesh.rered
 
China Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor PresentationChina Wind Power - May 2010 Investor Presentation
China Wind Power - May 2010 Investor Presentation
 
Welcome
WelcomeWelcome
Welcome
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptx
 
영문=10mw. fiji
영문=10mw. fiji영문=10mw. fiji
영문=10mw. fiji
 
ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)
 
Quiz 2-mspm iii1 03-398192-009
Quiz 2-mspm iii1 03-398192-009Quiz 2-mspm iii1 03-398192-009
Quiz 2-mspm iii1 03-398192-009
 
KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016KE House Solar Project Highlights Dec 2016
KE House Solar Project Highlights Dec 2016
 
BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012BPP vetted contracts for feb. 2012
BPP vetted contracts for feb. 2012
 

K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka

  • 1. K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka 1. Project Developer : KLS Energy Lanka (Pvt) Ltd 2. Address : No. 22, Queens Road, Colombo 03 3. Contact Person : Mr. Danny Kok 4. Contact Number : 603-2283 3388 5. Date of Agreement Singed : 17th March 2011
  • 2. Objective The objective of this project is to generate 35 MW of electricity and export it to the Ceylon Electricity Board’s Grid. For this purpose, a 70 MW Large Scale Wind and Solar PV Hybrid system is to be installed at Kankasanthurai in Sri Lanka by KLS Energy Lanka (Pvt) Ltd as a Large Scale Clean Development Mechanism Project. It will use the wind, solar energy potential in the North coastal belt of Sri Lanka. The 70 MW system would consist of 60 MW of wind power plants and 10 MW of solar power plants. The wind power plant is made of 40 numbers of wind generators each generating maximum of 1.5 MW. The Solar Power Plant is made of 6 hectares of solar panel with specific output of 156 W/m2. The estimated annual output of this Large Scale Wind and Solar PV Hybrid Power Plant is 175,200 MWh which will be exported to the Sri Lanka electricity grid of Ceylon Electricity Board. This would replace an equal amount of fossil fuel based power, which avoids emission of 130,068 tCO2e per year.
  • 3. Progress of the Project  Notification to UNFCCC - completed  Notification to DNA - completed  Preparation of PDD - completed  Preparation of Financial Analysis - to be completed  PDD submission for validation - to be completed  Validation of the project - to be completed  Registration of the project - to be completed
  • 4. Consultancy Fee: [Preparation of PIN and PDD] S. No. Payment Schedule Amount (LKR) Status 01. 20% of the payment on up front 500,000.00 Received 02. Progress of the Project 80% of the payment on immediately after the project registration with UNFCCC 2,000,000.00 To be received Total 2,500,000.00
  • 5. [Preparation of Monitoring Report] S. Payment Schedule Amount (LKR) Status No. 01. 50% of the payment on up front 50,000.00 To be received Progress of the Project 02. 50% of the payment on completing the response of DOE’s clarification 50,000.00 To be received Total 100,000.00 • No pending revenue for completed work • Revenue from remaining work (LKR) •After completing the response of DOE’s clarification - 90,000.00