Amidst all the talk of diversity in tech, there's one highly-capable group that seems to be curiously overlooked at times. U.S. Military Veterans. In this talk, we'll outline why vets can sometimes find themselves "flying under the radar" in terms of civilian tech opportunities. We'll then discuss the inherent capabilities that military veterans bring to the table. As well as some unique problems they face in their civilian transition. The talk will end with concrete actions we can take to help veterans transition into tech.
Project Description:
You know that the first step in this project was to obtain approval from the board, but first the proposal would have to be finalized including a budget and risk management concerns. Once the board approved the proposal, selecting a component supplier and ordering the drilling equipment could commence. Hiring a certified drilling supervisor and recruitment of the volunteer team could also be initiated upon board approval. Once a component supplier is selected, the well components could be ordered which will then be packaged along with the drilling equipment to be jointly transported to Africa. After the shipment arrives in Africa, another non-profit organization will coordinate the assembly of the well components and test the drilling equipment to ensure everything is ready to go. After this, the partnering organization would also coordinate transporting the assembled well components to the planned well sites. After the volunteer team’s recruitment is complete, the certified drilling supervisor would train the volunteers just prior to travelling together to Africa. Only after the volunteers have arrived and the assembled components have been transported to the planned well sites could the drilling of 100 water wells commence. Rather than shipping the drilling equipment back to Canada, the organization plans to transfer the equipment to a local non-profit organization after the 100 wells have been drilled. Only after all the above activities were completed could the volunteer team travel back and the project audit report be started. In addition to charitable organization financial reporting requirements, the organization plans to document the lessons learned from the project into a formal project audit report as they are interested in conducting similar projects in the future.
In preparation for the upcoming board meeting, you have researched the required activities and determined an estimated cost for each activity along with the activity’s estimated completion time. The list also includes estimated crash costs and crash times, in the event it would be necessary to accelerate a specific activity.
Amidst all the talk of diversity in tech, there's one highly-capable group that seems to be curiously overlooked at times. U.S. Military Veterans. In this talk, we'll outline why vets can sometimes find themselves "flying under the radar" in terms of civilian tech opportunities. We'll then discuss the inherent capabilities that military veterans bring to the table. As well as some unique problems they face in their civilian transition. The talk will end with concrete actions we can take to help veterans transition into tech.
Project Description:
You know that the first step in this project was to obtain approval from the board, but first the proposal would have to be finalized including a budget and risk management concerns. Once the board approved the proposal, selecting a component supplier and ordering the drilling equipment could commence. Hiring a certified drilling supervisor and recruitment of the volunteer team could also be initiated upon board approval. Once a component supplier is selected, the well components could be ordered which will then be packaged along with the drilling equipment to be jointly transported to Africa. After the shipment arrives in Africa, another non-profit organization will coordinate the assembly of the well components and test the drilling equipment to ensure everything is ready to go. After this, the partnering organization would also coordinate transporting the assembled well components to the planned well sites. After the volunteer team’s recruitment is complete, the certified drilling supervisor would train the volunteers just prior to travelling together to Africa. Only after the volunteers have arrived and the assembled components have been transported to the planned well sites could the drilling of 100 water wells commence. Rather than shipping the drilling equipment back to Canada, the organization plans to transfer the equipment to a local non-profit organization after the 100 wells have been drilled. Only after all the above activities were completed could the volunteer team travel back and the project audit report be started. In addition to charitable organization financial reporting requirements, the organization plans to document the lessons learned from the project into a formal project audit report as they are interested in conducting similar projects in the future.
In preparation for the upcoming board meeting, you have researched the required activities and determined an estimated cost for each activity along with the activity’s estimated completion time. The list also includes estimated crash costs and crash times, in the event it would be necessary to accelerate a specific activity.
ascensor o elevador es un sistema de transporte vertical u oblicuo, diseñado...LuisLobatoingaruca
Un ascensor o elevador es un sistema de transporte vertical u oblicuo, diseñado para mover principalmente personas entre diferentes niveles de un edificio o estructura. Cuando está destinado a trasladar objetos grandes o pesados, se le llama también montacargas.
Caso Prático de Análise de Vibrações em Ventilador de ExtraçãoCarlosAroeira1
Caso Prático de Análise de Vibrações em Ventilador de Extração apresentado durante a Reunião do Vibration Institute realizada em Lisboa no dia 24 de maio de 2024
Metodología - Proyecto de ingeniería "Dispensador automático"cristiaansabi19
Esta presentación contiene la metodología del proyecto de la materia "Introducción a la ingeniería". Dicho proyecto es sobre un dispensador de medicamentos automáticos.
Convocatoria de becas de Caja Ingenieros 2024 para cursar el Máster oficial de Ingeniería de Telecomunicacion o el Máster oficial de Ingeniería Informática de la UOC