Se ha denunciado esta presentación.
Utilizamos tu perfil de LinkedIn y tus datos de actividad para personalizar los anuncios y mostrarte publicidad más relevante. Puedes cambiar tus preferencias de publicidad en cualquier momento.

Ashleigh darlington final major project production diary wb 25.02.13

159 visualizaciones

Publicado el

  • Sé el primero en comentar

  • Sé el primero en recomendar esto

Ashleigh darlington final major project production diary wb 25.02.13

  1. 1. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including Possible Contingency Plans If Problems Anticipated)Mon W/B 07/01/13(Detailed Weekly Summary)Mon W/B 14/01/13 I have now come up with my initial idea and now that I have this I My plan for next week is to explain my initial idea in(Detailed Weekly Summary) have been able to begin filling in my time management timeline as detail which I will write up on a word document then I I know exactly what things I will need to do for: research, pre- will start my research, I firstly want to start by doing production, production and post-production. I have now market research this is where I will begin looking at completed this time management task and uploaded it to my blog, other magazines with the same genre that I have chosen linking it to the label, so that piece of work has now been and then start writing questionnaires that I will hand completed and evidenced. out to the group of people that my magazine is targeting to try and get a better and more clearer idea of what they want to ensure my magazine will meet these things.Mon W/B 21/01/13 I have now finished of my ideas generation mind map and I am half I plan to have this PowerPoint finished and uploaded to(Detailed Weekly Summary) way through a PowerPoint I have done looking at my magazine my blog by next week and then I will start writing my influences and talking about them and showing the research I have proposal for this project. done about them and giving a few ideas of what I will do in my own magazine.Mon W/B 28/01/13 I have not yet finished my PowerPoint I did for my magazine I have now completed my PowerPoint and uploaded it(Detailed Weekly Summary) influences, however this is because I have completed my proposal to my blog. Now for the rest of the week I will be as I prioritised my work and thought the Proposal was more carrying on with my pre-production where I will be important and there for should be done first and now that I have finding images of pages, front covers and contents completed this and uploaded it to my blog I will continue to work pages of Teen Vogue magazine as that is my main on my magazine influences PowerPoint. magazine inspiration and then with these I will be creating a mood board to show what I am going for with my own magazine.Mon W/B 04/02/13 This week I began looking at all other magazines with the same I have created the two mood boards that I planned to(Detailed Weekly Summary) genre of my magazine and gathered images of all the ones that I do this week and have uploaded them both to my blog. liked and put them into a mood board and then from these I Next week is our week off so I am going to book out a picked my favourite and created a separate mood board using just camera and during this week off take most of the
  2. 2. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary images from that mood board. images for my magazine as up to now I have 1 model. I will need quite a few more people however as I am only using one person for my front cover this will do fine for now.Mon W/B 11/02/13 I planned to book out a camera from college and take most of the Because I wasn’t able to take my pictures this week I will(Detailed Weekly Summary) images for my magazine as this is the week we have off from see if I can arrange to do that by next week instead college however, there was another class that had a project that whether it is during the week or at the weekend. had to use all the cameras so there was none left for anyone else, As I will be taking pictures outside of college, during my so instead I wrote up a plan of what images I would take so I could lessons next week I will start creating a thorough not work on anything this week, however I managed to gather questionnaire as part of my market research then I will together who will be my models so I’m ready for the picture hopefully have this done over maybe 2 lessons at the process. most and then hand them out on Thursday and then by the beginning of next week I hope to have the results from them all tallied up and then I will put them on my blog along with the questionnaire I originally created.Mon W/B 18/02/13 I created my questionnaire and in a college break I handed them I now plan to write up a detailed plan of what images I(Detailed Weekly Summary) out around the college, approaching my target audience and got am going to take and where and explain what is going the results and tallied them up then in my next lesson I wrote up onto each page. an analysis talking about my results, why I asked those specific questions and what I will do with them now.Mon W/B 25/02/13(Detailed Weekly Summary)Mon W/B 04/03/13(Detailed Weekly Summary)Mon W/B 11/03/13(Detailed Weekly Summary)Mon W/B 18/03/13(Detailed Weekly Summary)Mon W/B 01/04/13
  3. 3. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction Diary(Detailed Weekly Summary)Mon W/B 08/04/13(Detailed Weekly Summary)Mon W/B 15/04/13(Detailed Weekly Summary) PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including Possible Contingency Plans)

×