1. <Project Name>
Project Proposal
ITS232
Introduction to Database Management System
SEMEST ERJUNE 2012 – NOVEMBER2012
GROUP: CS1104A/B/C/D
Name 1, student number 1
Name 2, studentnumber 2
Name 3, studentnumber 3
Name 4, student number 4
<Lecturer’s Name>
FSKM, UiTM Pahang
2. ITS232 Project Proposal
Confidential CS1 1 04/A/B/C/D 201 2 Page 2 of 7
Table of Contents
1. Introduction 3
1.1 History of Organization 3
1.2 Organizational Chart 3
1.3 Current System Description 3
1.4 Current System Problem 3
2. Proposed Project Overview 4
2.1 Proposed System Process 4
2.2 Proposed System Objectives 4
2.3 Proposed System Scopes 4
2.4 Proposed System Entity and Attributes 4
3. Project Organization 5
3.1 Organizational Structure 5
3.2 Roles and Responsibilities 5
4. Management Process 6
4.1 Project Plan 6
Appendix 7
3. ITS232 Project Proposal
Confidential CS1 1 04/A/B/C/D 201 2 Page 3 of 7
ITS232 Project Proposal
1. Introduction
1.1 History ofOrganization
Brief the history of the organization (3 – 5 paragraphs).
1.2 Organizational Chart
Provide the hierarchy of the organization (provide diagram in appendix).
1.3 Current System Description
Specify the description of all processes involved in the organization (2 – 3 processes). For a
better understanding, you may provide a flow chart.
1.4 Current System Problem
Specify 2 – 3 current problems faced by the organization (depends on the processes you have
chosen).
4. ITS232 Project Proposal
Confidential CS1 1 04/A/B/C/D 201 2 Page 4 of 7
2. Proposed Project Overview
2.1 Proposed System Process
Provide a process which youpropose based on thecurrent problems above and current system
processes you havechosen as above.For a better understanding, youmay provide a flow chart.
2.2 Proposed System Objectives
What your product/information system (IS) can provide to users based on the processes you
have chosen above.
2.3 Proposed System Scopes
Who are your stakeholders (user ofthe system) and the limitation ofyour product/information
system (IS).
2.4 Proposed System Entity and Attributes
Provide Entity Relationship Diagram (ERD) in appendix.
5. ITS232 Project Proposal
Confidential CS1 1 04/A/B/C/D 201 2 Page 5 of 7
3. Project Organization
3.1 Organizational Structure
Describe the organizational structureofthe project team (Project Manager, DatabaseDesigner,
Programmer 1, Programmer 2, and supervisor among lecturer.
3.2 Roles and Responsibilities
Provide your group member’s formal picture and their responsibilities with job designation.
6. ITS232 Project Proposal
Confidential CS1 1 04/A/B/C/D 201 2 Page 6 of 7
4. Management Process
4.1 Project Plan
Provide a Gantt chart (in appendix) showing the allocation of date to the
project/product/information system phases, identify the major milestones with their
achievement criteria and who are responsibility for each phases.