Tim Bryce THE 99% COMPLETE
SYNDROME
It is an undocumented fact that the last 1% of
anything takes longer than the other 99%.
There are plenty of examples to support this
argument, perhaps none quite as visible as the
progress bars we see on computers. You
know, those little bars telling you how you are
progressing in the installation of software or
the execution of a program. More often than
not, such progress bars seem to race through
the first 99% like a blazing track star, yet when
we get to that last 1% it seems to slow down to
a snail's pace.
I have also witnessed this same phenomenon
in project management situations. As we were
building our office in Florida our contractor
proudly proclaimed he was 99% complete and
we should prepare ourselves to move in.
Interestingly, that last 1% dragged on for days,
weeks, and even a few months, thereby
delaying inspections and prohibiting our move.
In the Information Technology field, it is
difficult to get a realistic picture of how much
work remains on a project. Programmers love
to announce they are 99% complete in writing
their programs, but somehow that last 1%
never seems to come to conclusion. Either
something was wrong in the design of their
software they hadn't anticipated, something
had changed, or gremlins had compounded
their best efforts. Regardless, the project never
ends.
This phenomenon is related to our perspective
on work, specifically, "Is the glass half empty
or half filled?" Instead of focusing on the work
completed, people should be more concerned
with the amount of effort remaining. For
example, instead of asking about percentages,
workers should be constantly evaluating the
amount of effort required to complete
remaining tasks in hours. Only after this is
known should we consider the application of
percentages, not before. Unfortunately, that is
not the mindset in most project environments.
Instead, people tend to consider the amount of
work expended against the original estimate,
not the remaining effort. This is certainly not a
realistic or reliable way of reporting progress.
It is pure fantasy.
Surprisingly, there are still quite a few project
management packages allowing people to post
percentages as opposed to automatically
calculating it based on the estimate of hours
remaining on project tasks which is simply
ludicrous.
So, next time you hear someone claim they are
99% complete with something, it means they still
have a long way to go and the person hasn't got a
clue when it will be completed, but it's
close...maybe. Ask yourself this, when was the last
time you saw the final two minutes of a football
game finish within 120 seconds? I've never seen it
either.
"The last 1% of a project can take as long as the
first 99%." - Bryce's Law
Keep the Faith!

Más contenido relacionado

La actualidad más candente

Hospital E-Token Management(outdoor)
Hospital E-Token Management(outdoor)Hospital E-Token Management(outdoor)
Hospital E-Token Management(outdoor)ANISUR RAHMAN
 
Covid-19 Hospital management system_project_report
Covid-19 Hospital management system_project_reportCovid-19 Hospital management system_project_report
Covid-19 Hospital management system_project_reportRajeshPandey215
 
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...Showrav Mazumder
 
Online library management system
Online library management systemOnline library management system
Online library management systemBharat Kunwar
 
SRS for smart health care system,srs for health system,health management doc...
SRS  for smart health care system,srs for health system,health management doc...SRS  for smart health care system,srs for health system,health management doc...
SRS for smart health care system,srs for health system,health management doc...AnilkumarSingh129
 
Sentiment Analysis of Twitter Data
Sentiment Analysis of Twitter DataSentiment Analysis of Twitter Data
Sentiment Analysis of Twitter DataSumit Raj
 
Blood bank-data-abstract-php-project
Blood bank-data-abstract-php-projectBlood bank-data-abstract-php-project
Blood bank-data-abstract-php-projectnarii
 
Report on Smart Blood Bank project
Report on Smart Blood Bank projectReport on Smart Blood Bank project
Report on Smart Blood Bank projectk Tarun
 
The Final Year Project Process
The Final Year Project ProcessThe Final Year Project Process
The Final Year Project ProcessDamian T. Gordon
 
Hostel management system srs
Hostel management system srsHostel management system srs
Hostel management system srshira akram
 
Library mangement system project srs documentation.doc
Library mangement system project srs documentation.docLibrary mangement system project srs documentation.doc
Library mangement system project srs documentation.docjimmykhan
 
Student Management System
Student Management SystemStudent Management System
Student Management SystemAmit Gandhi
 
Final Year Project Presentation Android base Book Store
Final Year Project Presentation Android base Book StoreFinal Year Project Presentation Android base Book Store
Final Year Project Presentation Android base Book StoreSaad Abbasi
 
ERP on School Management System
ERP on School Management SystemERP on School Management System
ERP on School Management SystemAmit Gandhi
 
Software System Engineering - Chapter 1
Software System Engineering - Chapter 1Software System Engineering - Chapter 1
Software System Engineering - Chapter 1Fadhil Ismail
 

La actualidad más candente (20)

Hospital E-Token Management(outdoor)
Hospital E-Token Management(outdoor)Hospital E-Token Management(outdoor)
Hospital E-Token Management(outdoor)
 
Software design methodologies
Software design methodologiesSoftware design methodologies
Software design methodologies
 
Software design
Software designSoftware design
Software design
 
Covid-19 Hospital management system_project_report
Covid-19 Hospital management system_project_reportCovid-19 Hospital management system_project_report
Covid-19 Hospital management system_project_report
 
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...
Blood Bank Management Information System [Web-Url: http://infobloodbank.somee...
 
Online library management system
Online library management systemOnline library management system
Online library management system
 
SRS for smart health care system,srs for health system,health management doc...
SRS  for smart health care system,srs for health system,health management doc...SRS  for smart health care system,srs for health system,health management doc...
SRS for smart health care system,srs for health system,health management doc...
 
Overview of Mentcare systen - TEST FILE
Overview of Mentcare systen - TEST FILEOverview of Mentcare systen - TEST FILE
Overview of Mentcare systen - TEST FILE
 
Sentiment Analysis of Twitter Data
Sentiment Analysis of Twitter DataSentiment Analysis of Twitter Data
Sentiment Analysis of Twitter Data
 
Blood bank-data-abstract-php-project
Blood bank-data-abstract-php-projectBlood bank-data-abstract-php-project
Blood bank-data-abstract-php-project
 
Report on Smart Blood Bank project
Report on Smart Blood Bank projectReport on Smart Blood Bank project
Report on Smart Blood Bank project
 
Prototype Model
Prototype ModelPrototype Model
Prototype Model
 
The Final Year Project Process
The Final Year Project ProcessThe Final Year Project Process
The Final Year Project Process
 
Hostel management system srs
Hostel management system srsHostel management system srs
Hostel management system srs
 
Library mangement system project srs documentation.doc
Library mangement system project srs documentation.docLibrary mangement system project srs documentation.doc
Library mangement system project srs documentation.doc
 
Student Management System
Student Management SystemStudent Management System
Student Management System
 
Final Year Project Presentation Android base Book Store
Final Year Project Presentation Android base Book StoreFinal Year Project Presentation Android base Book Store
Final Year Project Presentation Android base Book Store
 
ERP on School Management System
ERP on School Management SystemERP on School Management System
ERP on School Management System
 
Software System Engineering - Chapter 1
Software System Engineering - Chapter 1Software System Engineering - Chapter 1
Software System Engineering - Chapter 1
 
Hci
HciHci
Hci
 

Similar a 99 % syndrome

10 key points why a project fails
10 key points why a project fails10 key points why a project fails
10 key points why a project failsTechPro Studio
 
Paper mythical manmonth
Paper   mythical manmonthPaper   mythical manmonth
Paper mythical manmonthVu Hung Nguyen
 
Increasing The Probability Of Success For Your Project
Increasing The Probability Of Success For Your ProjectIncreasing The Probability Of Success For Your Project
Increasing The Probability Of Success For Your ProjectGlen Alleman
 
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013Seedbox
 
The Future of Project Management
The Future of Project ManagementThe Future of Project Management
The Future of Project ManagementOrangescrum
 
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdfSteven Callahan
 
Working from Home - Should You Offer It?
Working from Home - Should You Offer It?Working from Home - Should You Offer It?
Working from Home - Should You Offer It?Talent Point
 
Project portfolio management and what it means for your company
Project portfolio management and what it means for your companyProject portfolio management and what it means for your company
Project portfolio management and what it means for your companywilliamsjohnseoexperts
 
Full-Stack Agile - What's your Cycle Time?
Full-Stack Agile - What's your Cycle Time? Full-Stack Agile - What's your Cycle Time?
Full-Stack Agile - What's your Cycle Time? Ashley-Christian Hardy
 
Wait A Moment? How High Workload Kills Efficiency! - Roman Pickl
Wait A Moment? How High Workload Kills Efficiency! - Roman PicklWait A Moment? How High Workload Kills Efficiency! - Roman Pickl
Wait A Moment? How High Workload Kills Efficiency! - Roman PicklPROIDEA
 
How to Achieve Per-Project Profitability
How to Achieve Per-Project ProfitabilityHow to Achieve Per-Project Profitability
How to Achieve Per-Project Profitabilitywilliamsjohnseoexperts
 
Pre production techniques - resubmission
Pre production techniques - resubmissionPre production techniques - resubmission
Pre production techniques - resubmissionRichardBurnn
 
Software development project management
Software development project managementSoftware development project management
Software development project managementRoni Banerjee
 
How to stay focused with task management software
How to stay focused with task management softwareHow to stay focused with task management software
How to stay focused with task management softwareOrangescrum
 
Leesman Review Issue Leesman Review Issue 17
Leesman Review Issue Leesman Review Issue 17Leesman Review Issue Leesman Review Issue 17
Leesman Review Issue Leesman Review Issue 17Paige Hodsman
 
Recession Survival Toolkit: Business Software to Stay Afloat
Recession Survival Toolkit: Business Software to Stay AfloatRecession Survival Toolkit: Business Software to Stay Afloat
Recession Survival Toolkit: Business Software to Stay AfloatKashish Trivedi
 

Similar a 99 % syndrome (20)

10 key points why a project fails
10 key points why a project fails10 key points why a project fails
10 key points why a project fails
 
Unseen
UnseenUnseen
Unseen
 
Paper mythical manmonth
Paper   mythical manmonthPaper   mythical manmonth
Paper mythical manmonth
 
Critical chain-concepts
Critical chain-conceptsCritical chain-concepts
Critical chain-concepts
 
Increasing The Probability Of Success For Your Project
Increasing The Probability Of Success For Your ProjectIncreasing The Probability Of Success For Your Project
Increasing The Probability Of Success For Your Project
 
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013
Agile Coach Retreat @ Seedbox in Montreal - Sept. 7, 2013
 
The Future of Project Management
The Future of Project ManagementThe Future of Project Management
The Future of Project Management
 
Tpma focus issue 13 (3 q2013)(1)
Tpma focus   issue 13 (3 q2013)(1)Tpma focus   issue 13 (3 q2013)(1)
Tpma focus issue 13 (3 q2013)(1)
 
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf
201207 Tech Decisions: 5 Keys to Fast Successful New Deployments.pdf
 
Working from Home - Should You Offer It?
Working from Home - Should You Offer It?Working from Home - Should You Offer It?
Working from Home - Should You Offer It?
 
Untitled
UntitledUntitled
Untitled
 
Project portfolio management and what it means for your company
Project portfolio management and what it means for your companyProject portfolio management and what it means for your company
Project portfolio management and what it means for your company
 
Full-Stack Agile - What's your Cycle Time?
Full-Stack Agile - What's your Cycle Time? Full-Stack Agile - What's your Cycle Time?
Full-Stack Agile - What's your Cycle Time?
 
Wait A Moment? How High Workload Kills Efficiency! - Roman Pickl
Wait A Moment? How High Workload Kills Efficiency! - Roman PicklWait A Moment? How High Workload Kills Efficiency! - Roman Pickl
Wait A Moment? How High Workload Kills Efficiency! - Roman Pickl
 
How to Achieve Per-Project Profitability
How to Achieve Per-Project ProfitabilityHow to Achieve Per-Project Profitability
How to Achieve Per-Project Profitability
 
Pre production techniques - resubmission
Pre production techniques - resubmissionPre production techniques - resubmission
Pre production techniques - resubmission
 
Software development project management
Software development project managementSoftware development project management
Software development project management
 
How to stay focused with task management software
How to stay focused with task management softwareHow to stay focused with task management software
How to stay focused with task management software
 
Leesman Review Issue Leesman Review Issue 17
Leesman Review Issue Leesman Review Issue 17Leesman Review Issue Leesman Review Issue 17
Leesman Review Issue Leesman Review Issue 17
 
Recession Survival Toolkit: Business Software to Stay Afloat
Recession Survival Toolkit: Business Software to Stay AfloatRecession Survival Toolkit: Business Software to Stay Afloat
Recession Survival Toolkit: Business Software to Stay Afloat
 

Más de Sumit Malhotra (20)

Types of retailing done
Types of retailing doneTypes of retailing done
Types of retailing done
 
Retail communications done
Retail communications doneRetail communications done
Retail communications done
 
Retail
RetailRetail
Retail
 
Retail buying behaviour
Retail buying behaviourRetail buying behaviour
Retail buying behaviour
 
Merchandising
MerchandisingMerchandising
Merchandising
 
What does retailer do
What does retailer doWhat does retailer do
What does retailer do
 
Banking tools
Banking toolsBanking tools
Banking tools
 
Introduction to indian banking
Introduction to indian bankingIntroduction to indian banking
Introduction to indian banking
 
Debt recovery
Debt recoveryDebt recovery
Debt recovery
 
Bank
BankBank
Bank
 
Tata case
Tata caseTata case
Tata case
 
Project cycle
Project cycleProject cycle
Project cycle
 
Intro to ventures
Intro to venturesIntro to ventures
Intro to ventures
 
Dmaic model
Dmaic modelDmaic model
Dmaic model
 
Resistant to change 2 copy (1)
Resistant to change 2   copy (1)Resistant to change 2   copy (1)
Resistant to change 2 copy (1)
 
Location decision
Location decisionLocation decision
Location decision
 
Jit and lean operations
Jit and lean operationsJit and lean operations
Jit and lean operations
 
Introduction to pom
Introduction to pomIntroduction to pom
Introduction to pom
 
Product design
Product designProduct design
Product design
 
Viral
ViralViral
Viral
 

Último

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Último (20)

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

99 % syndrome

  • 1. http://project-management.alltop.com/ Tim Bryce THE 99% COMPLETE SYNDROME It is an undocumented fact that the last 1% of anything takes longer than the other 99%. There are plenty of examples to support this argument, perhaps none quite as visible as the progress bars we see on computers. You know, those little bars telling you how you are progressing in the installation of software or the execution of a program. More often than not, such progress bars seem to race through the first 99% like a blazing track star, yet when we get to that last 1% it seems to slow down to a snail's pace. I have also witnessed this same phenomenon in project management situations. As we were building our office in Florida our contractor proudly proclaimed he was 99% complete and we should prepare ourselves to move in. Interestingly, that last 1% dragged on for days, weeks, and even a few months, thereby delaying inspections and prohibiting our move.
  • 2. In the Information Technology field, it is difficult to get a realistic picture of how much work remains on a project. Programmers love to announce they are 99% complete in writing their programs, but somehow that last 1% never seems to come to conclusion. Either something was wrong in the design of their software they hadn't anticipated, something had changed, or gremlins had compounded their best efforts. Regardless, the project never ends. This phenomenon is related to our perspective on work, specifically, "Is the glass half empty or half filled?" Instead of focusing on the work completed, people should be more concerned with the amount of effort remaining. For example, instead of asking about percentages, workers should be constantly evaluating the amount of effort required to complete remaining tasks in hours. Only after this is known should we consider the application of percentages, not before. Unfortunately, that is not the mindset in most project environments. Instead, people tend to consider the amount of work expended against the original estimate, not the remaining effort. This is certainly not a realistic or reliable way of reporting progress. It is pure fantasy.
  • 3. Surprisingly, there are still quite a few project management packages allowing people to post percentages as opposed to automatically calculating it based on the estimate of hours remaining on project tasks which is simply ludicrous. So, next time you hear someone claim they are 99% complete with something, it means they still have a long way to go and the person hasn't got a clue when it will be completed, but it's close...maybe. Ask yourself this, when was the last time you saw the final two minutes of a football game finish within 120 seconds? I've never seen it either. "The last 1% of a project can take as long as the first 99%." - Bryce's Law Keep the Faith!