Spam Inc completed a job for a client in 2022. The job cost sheet listed direct materials at $66,000, direct labor at $36,000, total estimated annual manufacturing overhead at $125,000, and total estimated direct labor at $100,000. The company used manufacturing overhead/direct labor as its predetermined overhead allocation base to calculate the cost of finished goods for the job.