Recording at https://youtu.be/gF-XicTOi2M

The project AURES II (Auctions for Renewable Energy Support) investigates design options for renewable energy auctions and gives recommendations on their use.
AURES II has collected data comprising the design elements, as well as the awarded auction prices and realisation rates in a single database based on the renewable energy auctions implemented in the EU. Based on this, our project aims to gain new quantitative insights on how design elements influence auction performance.
This webinar will present the Auction Database and a first, holistic overview of the design elements used in the various countries of the EU.

Recording at https://youtu.be/gF-XicTOi2M

The project AURES II (Auctions for Renewable Energy Support) investigates design options for renewable energy auctions and gives recommendations on their use.
AURES II has collected data comprising the design elements, as well as the awarded auction prices and realisation rates in a single database based on the renewable energy auctions implemented in the EU. Based on this, our project aims to gain new quantitative insights on how design elements influence auction performance.
This webinar will present the Auction Database and a first, holistic overview of the design elements used in the various countries of the EU.

Anuncio
Anuncio

Más Contenido Relacionado

Presentaciones para usted (20)

Similares a AURES II - Renewable energy Auction Database and overview of auction schemes in the EU (20)

Anuncio

Más de Leonardo ENERGY (20)

Más reciente (20)

Anuncio

AURES II - Renewable energy Auction Database and overview of auction schemes in the EU

  1. 1. AURES II Auction Database Renewable energy Auction Database and overview of auction schemes in the EU Leonardo Energy Platform, 12 February 2020 AURES II has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 817619
  2. 2. AURES II: EU funded research collaboration on auctions for renewable energy support 2 Funded by the European Union's Horizon 2020 Framework Programme for research and innovation (2018 – 2021)
  3. 3. 1. Generate and communicate new insights on the applicability, performance, and effects of specific auction designs 2. Provide tailor-made policy support for different types of auction applications 3. Facilitate knowledge exchange between stakeholders AURES II – objectives 3
  4. 4. • Holistic overview on auction designs and outcomes in the EU MS • Comprising data mainly from 2014 – with some exceptions (UK, Ireland, France) • Current database format especially suitable for researchers • Based on database • First quantitative analysis of auction design elements in relation to policy objectives • Econometric analysis on the impact of auction design elements on awarded prices • Currently beta version online  feedback from users is more than welcome! WP3 – Auction Database 4
  5. 5. Auction Database can be found on the AURES II website 5
  6. 6. Landing page provides brief description 6
  7. 7. Database in Excel-format... 7
  8. 8. • Collaboration with DG ENER project • Interactive database foreseen • End of March 2020: first trial version online (for offshore wind) • End of September 2020: final, interactive version online (all technologies) • Different interfaces for various stakeholders • Information and data can be selected and downloaded ...but will be interactive in the near future 8
  9. 9. Database gives details on • General information • Auction design • Participation • Auction outcome • Prices • Volume • Post-Auction Overview Structure 9 General information Auction design Participation Auction outcome Post-Auction Price Rules Award Procedure Prequalification Requirements General Characteristics
  10. 10. General Information 10 Country Year Auction scheme (incl. main regulation) Auction date (deadline) [MM/YEAR] Additional regulation(s) Name of auctioneer Status of the auction General Information Greece 2019 Joint PV/ Wind Tender 2019 (Law No.4414/2016) 04/19 RAE Decision 230/2019 The Greek Regulatory Authority on Energy (RAE) concluded • Cancelled • Concluded • Ongoing • Planned
  11. 11. Auction Design – General Characteristics I 11 Auction design Auction format (static/dynamic) Single- or multi- unit auction If single-unit, project location predefined? [0=no/1=yes] Technology- specific/neutral, project-specific Eligible Technologies total PV Wind Onshore General characteristics dynamic multi-unit auction n/a multi-technology Static: one possibility to place a bid Dynamic:possibility to overbid others • Multiple lines if more than one technology eligible • Total result in top line Single-unit: only one good (e.g. Wind Offshore) Multi-unit: multiple goods (and bidders) awarded
  12. 12. Auction design Eligible Technologies Min restriction for volume bid [kW] Max restriction for volume bid [kW] Cross-border or multi-national auction [0=no/1=yes] If cross-border auction, which partner country/- ies? Auctioned product (budget, electricity, installed capacity) Volume of product [kW if capacity, kWh if electricity, € if budget] total PV 20000 Wind Onshore 50000 0 n/a capacity 600.000,00 General characteristics Auction Design – General Characteristics II 12 Unit dependenton auctioned product
  13. 13. Auction design Financial prequalification [0=no/1=yes] (First Stage) Bid bond [0=no/1=yes] Amount of bid bond [EUR/kW] Performance/ Completion bond [0=no/1=yes] Amount of performance/comp letion bond [EUR/kW] Material prequalification [0=no/1=yes] Type of material prequalification Strictness of material prequalification 10 30 1 Generation license, grid connection agreement high 12,5 37,5 1 Generation license, grid connection agreement high Prequalification requirements 111 Auction Design – Prequalification Requirements 13 Security inorder to participate in the auctionDuewhen awarded • High • Low
  14. 14. Auction Design – Price Rules 14 Auction design Ceiling price [0=no/1=yes] Level of ceiling price [ct/ kWh] Disclosed or not? [0=no/1=yes ] Floor price [0=no/1=yes ] Level of floor price [ct/ kWh] Disclosed or not? [0=no/1=yes ] 0 Price rules 11 64,72 1
  15. 15. Auction Design – Award Procedures I 15 Auction design Award procedure [price/multi- criteria] Same bid price Pricing rule [same price, independent price] Quotas [0=no, 1=yes] Remark on quota Boni/Mali [0=no, 1=yes] Remark on boni/mali independent price Award procedure 0 0price How are bidders awarded when they have the same bid price? Same price: e.g. Uniform pricing Independentprice: e.g. Pay-as-Bid
  16. 16. Auction Design – Award Procedures II 16 Auction design Favourable treatment for specific actors [0=no, 1=yes] Remark on favourable treatment Remuneration scheme Limits on support [0=no, 1=yes] Specific limit Support level adjustment Support duration [years] Award procedure 20 two-sided sliding FIP (CfD) 0 • One-sided sliding FIP • Two-sided FIP • Fixed FIP • Investment grant • FIT • Hybrid support scheme e.g.only up to max. size of projectE.g. Pricedevelopment, inflation taken into account
  17. 17. Participation 17 Submitted volume [kW] Number of submitted bids Qualified submitted volume [kW] Number of qualified bids Highest given bid price [ct/kWh] Lowest given bid price [ct / kWh] 637776 8 637776 8 64,72 53 571176 7 571176 7 64,72 53 66600 1 66600 1 60 60 Participation Exclusionof bidders making mistakes in application or missing prequalifications
  18. 18. Auction Outcome 18 Average awarded Price [ct/ kWh] Highest awarded price [ct / kWh] Lowest awarded price [ct / kWh] Median price [ct / kWh] Adjusted price [ct_2019 / kWh] Awarded volume [kW] Competition [Submitted volume/Auction ed volume] 57,03 64,72 53 58,4 437776 1,06 56,5 64,72 53 371176 60 60 60 66600 Prices Volume Auction outcome Inflation taken into accountAuction volume can be capacity, budget or energy
  19. 19. Post-Auction 19 Realisation period [months] Penalties [0=no/1=yes ] Type of penalty Flexibility for deviation from submitted bid [0=no/1=yes] Level of flexibility Realisation rate 36 36 36 1 annulation of support; bid bonds are retained Post-Auction 1 -10% n/a Possibility to change project slightly
  20. 20. • A total of 148 auction rounds in 19 countries were considered • Exceptions: Belgium, Sweden, Czech Republic, Austria, Romania, Bulgaria, Cyprus, Latvia RES-E auctions widespread across EU 20
  21. 21. 24% 64% 3% 1% 8% Auction-type Multi-technology Technology-specific Project-specific neutral others • Technology-specific auction account for almost two third of all auctions • Of technology-specific auctions: • 42 % PV • 29 % Wind Onshore • 12 % Wind Offshore • 12 % Bioenergy Different technologies are auctioned 22
  22. 22. AuctionedProduct Number of auctions Capacity 94 Budget 22 Electricity 20 Others 12 Total 148 Capacity as the main auctioned product 23
  23. 23. 0 10 20 30 40 50 60 70 FIT fixed FIP Hybrid support scheme investment grant one-sided sliding FIP one-sided sliding FIP & FIT one-sided sliding FIP & investment subsidy two-sided sliding FIP (CfD) others Number of auctions Different renumeration schemes are in use 24
  24. 24. • Prequalification requirements: • Financial: • Material • Realisation periods range depending on technology, on average: • PV: 17 - 26 months • Wind Onshore: 22 – 36 months • Wind Offshore: 51 – 126 months • Bioenergy: 37 – 48 months Auction design elements 25 73% 27% yes no 92% 8% yes no
  25. 25. AURES II has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 817619 Vasilios Anatolitis Fraunhofer ISI vasilios.anatolitis@isi.fraunhofer.de Ann-Katrin Hanke Takon hanke@takon.com, ann-katrin.hanke@kit.edu AURES II Website: http://aures2project.eu/ LinkedIn: AURES II Twitter: @auctions4res Newsletter: http://eepurl.com/gd42zz

×