GPRS/EGPRS Download Throughput Improved
For TTSL Orissa Project
1. BVC Flow Control(BSC)................................................................................................................3
2. GPRS Cell Options(Cell)................................................................................................................5
3. SIGNAL_EUTBF : Support signaling uplink extended TBF(BSC)..............................................7
4. EXT_UTBF: Support extended uplink TBF(Cell).........................................................................8
Copyright, 2009 ZTE Corporation.
5. Cell Reselecting Hysteresis Level(Cell).........................................................................................9
6. Edge Params(Cell)...........................................................................................................................9
7. GPRS MAX initial access signal level..........................................................................................11
8 The parameter of GPRS Property1(BSC Level) changed..............................................................11
9 The parameter of EDGE Property(BSC Level) changed...............................................................12
10 The parameter of Site Bandwidth Limit(Cell Level) changed....................................................13
11. UPPB-DSP Congestion audit......................................................................................................14
12. The PDTCH Configuration(Cell Level) Moved.........................................................................18
13. The PDTCH Configuration(Cell Level) changed for 3 PDTCHs..............................................19
14. The Throughput Improved for 3 PDTCHs..................................................................................22
15. The PDTCH Configuration(Cell Level) changed for 2 PDTCHs..............................................23
16. The Throughput Improved for 2 PDTCHs..................................................................................25
17. Test Conclusion of EGPRS Download Throughput...................................................................27
Copyright, 2009 ZTE Corporation.
1. BVC Flow Control(BSC)
BVCFlowCtrl: BVC Flow Control Supported
BVC flow control occurs on Gb interface between SGSN and BSS, and only on downlinks. BSS
provides control parameters and SGSN executes, to avoid one BVC on BSS to abandon some LLC
data because of discard some LLC data blocks due to overtime caused from grouping channel as
too busy and to avoid new downlink LLC data because of memory resource limitations.
BSSGP counts the current leaking rate of BVC periodically (including short ;;statistics and
long statistics). BVCFlowCtrl originates unconditionally if long statistics timer stops, SGSN
acknowledgement is necessary, and if discrepant range of adjacent leaking rates is over
CellFcThs. BVCFlowCtrl originates and SGSN confirmation is necessary if short statistics timer
overflows and discrepant range of adjacent leaking rates is over CellFcThs.
1). FlowCtrlMode: Flow Control Mode
There are two Modes to determine the SGSN flow control of different providers.
 Mode 1: Report flow control parameters according to actual traffic on radio interface counted
at BSC
 Mode 2: Report flow control parameters according to max traffic that the cell can provide
Suggestion value: Normally, we use Mode 2.
2). FlowCtlMode2Para:Parameter of Flow Control Mode2
BSC reports flow control parameters according to max traffic that the cell can provide. Max value
depends on channels configured. Counting formula: channels * max traffic that every channel
can provide. This parameter is max traffic that every channel can provide, with the unit of 100
bps.
Value range: 10 ~ 1000
Default value: 214
Copyright, 2009 ZTE Corporation.
The Normal Value of FlowCtlMode2Para for EGPRS as below
Code
Set
Throughput
per TS
FlowCtlMode2Para
MCS
-1
8.8 kbps 88
MCS
-2
11.2 kbps 112
MCS
-3
14.8 kbps 148
MCS
-4
17.6 kbps 176
MCS
-5
22.4 kbps 224
MCS
-6
29.6 kbps 296
MCS
-7
44.8 kbps 448
MCS
-8
56.4 kbps 564
MCS
-9
59.2 kbps 592
The Normal Value of FlowCtlMode2Para for GPRS as below
Co
de
Set
Through
put per
TS
FlowCtlMode2
Para
CS-
1
9.05 kbps 90
CS-
2
13.4 kbps 134
CS-
3
15.6 kbps 156
CS-
4
21.4 kbps 214
Suggestion value: for EGPRS set to 800.
Copyright, 2009 ZTE Corporation.
2. GPRS Cell Options(Cell)
1). T3192: T3192 timer
T3192 is used at MS side. During the packet downlink transmission, if RLC data block is the final
downlink data block to be transmitted, the network sends the RLC data block with the Final Block
Identifier (FBI) domain as 1. It contains an effective RRBP field to initialize the release of the
downlink TBF.
In acknowledged mode, the MS sends PACKET DOWNLINK ACK/NACK message whose FBI
domain is 1 on the uplink block specified by the RRBP domain.
In the unacknowledged mode, the MS sends PACKET CONTROL ACK message on the uplink
block specified by the RRBP domain. Then MS starts the T3192 timer. When T3192 stops, the
system releases the resources, stops listening to the PDCCH channel, and turns to listen the paging
channel.
If a MS receives PACKET DOWNLINK ASSIGNMENT or PACKET TIMESLOT
RECONFIGURE message from the network within the protection period of the T3192 timer, it
stops T3192 and transfer to the packet transmission status.
Value range:{ 500, 1000, 1500,0,80,120,160,200}
Default value: 500ms
Timer value must be less than the protection timer T3193 of the downlink TBF at the network
side, in order to ensure TFI uniqueness of MS at the same time.
Suggestion value: 1500ms for T3192, 1520ms for T3193
Copyright, 2009 ZTE Corporation.
2). DrxTimeMax: Non-DRX Mode Holding Time
This parameter belongs to GPRS cell option and is used at MS side.
When the MS changes from the packet BUSY mode to the packet IDLE mode, it should first enter
the Non-Drx mode. The DRX_TIMER_MAX parameters determine the maximum time length
for MS to stay in the Non-DRx mode.
Under the Non-Drx mode status, MS establish TBF link take short time than Drx mode status,
refer to GSM04.60-12.24
Value range: {1 s , 2 s, 4 s , 8 s , 16 s , 32 s , 64 s }
Default value: 2 s
Suggestion value: 4s
3). BsCvMax: Max Blocks Transmission in Each TS
This parameter belongs to GPRS cell option and is used at MS side.
BsCvMax indicates the value of BsCvMax parameter of Max Blocks Transmission in each TS.
This parameter determines the following:
 Time length of T3198 timer used by MS. This time length is equal to the time represented by
BsCvMax.
 Time length of T3200 used by MS in Non-Drx mode. This time length = 4 × time represented
by BsCvMax.
 Value of N3104max = (3 × (BsCvMax+3) × Number of timeslots assigned in the uplink).
All uplink data blocks sent by MS contain the COUNT DOWN VALUE (CV) field. The network
can use this field to calculate the data blocks to be sent on current uplink TBF.
Value range:
Default value: 15
Suggestion
value: some MS
Copyright, 2009 ZTE Corporation.
Value Meaning
0 Time length of one block
1 Time length of one block
… …
15 Time length of 15 blocks
can only support 0-12, so change 15 to 9.
3. SIGNAL_EUTBF : Support signaling
uplink extended TBF(BSC)
This parameter represents whether BSC supports signaling uplink extended TBF. Normally, the
uplink signaling message transmission was finished, uplink TBF link was released immediately to
free TFI resource. Uplink signaling extended TBF enabled can hold the link and TFI resource for
some time, if MS needs transmission signaling again, it can use the TFI resource. The uplink TBF
established constantly will affect downlink throughput.
Value range: Check/Uncheck
Check: Support signaling uplink extended TBF Uncheck: Does not support signaling uplink
extended TBF
Default value: Uncheck,
Suggestion value: Check
Copyright, 2009 ZTE Corporation.
4. EXT_UTBF: Support extended uplink
TBF(Cell)
This parameter represents whether extended uplink TBF is supported in the cell.
If support extended uplink TBF, after uplink TBF link have sent last RLC data block, the link
don’t release for short time, if there have data to send, the link will be used, new TBF link
establishment is not necessary, it save the time to load data.
Value range: Check/Uncheck
Check: extended uplink TBF is active in cell; Uncheck: extended uplink TBF is not active in cell
Default value: Uncheck,
Suggestion value: Check
Copyright, 2009 ZTE Corporation.
5. Cell Reselecting Hysteresis Level(Cell)
If Mobile is in data service and does Cell Reselection, the MS will stop data transmission about 4-
10seconds. In order to decrease cell reselection, need to increase the ReselHysteresis parameter to
avoid cell reselection frequently.
6. Edge Params(Cell)
1). Support EGPRS_PACKET_CHANNEL_REQUEST Access Program
(EGPRSPacketChReq)
If Cell supports EGPRS_PACKET_CHANNEL_REQUEST Access Program, EGPRS mobile can
set up packet access program on RACH or PRACH(if PBCCH is configured)
Enabled this function can improve uplink throughput.
Value range: Check/Uncheck
Check: EGPRS_PACKET_CHANNEL_REQUEST Access Program is active in cell; Uncheck:
EGPRS_PACKET_CHANNEL_REQUEST Access Program is not active in cell
Copyright, 2009 ZTE Corporation.
Default value: Uncheck,
Suggestion value: Check
2). EGPRS Phone Quality Measure Mode (LinkQuaMeaMode)
LinkQuaMeaMode indicates the measurement report mode of EGPRS MS in the cell. EGPRS
measurement could be performed based on each impulse, which is to measure by the granularity
of BURST. The feature of rapid EGPRS measurement makes the network side be able to respond
the change of radio environment quickly.
EGPRS MS have two kinds of report mode, based on BURST or based on TBF.
Reporting parameters based on BURST are MEAN_BEP_TNx ( 0-7) (error bit rate per time
slot)and I_LEVEL_TN(0-7).
Reporting parameters based on TBF are MEAN_BEP (average error bit rate of the radio block)
and CV_BEP (variance coefficient of radio block error bit rate).
Value range: 0-3.
0. Report MEAN_BEP and CV_BEP
1. Only report I_LEVEL_TN(0-7)
2. Only report MEAN_BEP_TNx(0-7)
3. Report MEAN_BEP_TNx(0-7)and I_LEVEL_TN(0-7)
Default value: 2
In report mode, 0 means report based on TBF, 1~3 means report based on timeslot(BURST).
Currently in report based on timeslot, omission of report occurs at some terminals, which seriously
affects adjustment of coding mode(MCS1-9)
Suggestion: 0 based on TBF report mode.
3). Average filter period for uplink/downlink BEP
In EGPRS system, EGPRS MS will determine to report the MEAN_REP_AV (average error bit
rate of the radio block) and CV_BEP_AV (variance coefficient of radio block error bit rate) under
the whole TBF, or the measurement data per time slot MEAN_BEP_TNx (0-7).
The specification defines the formula of these measurement data (refer to GSM05.08 10.2.3.2.1).
There is an oblivion factor e, whose value is defined by average period of BEP filter.
Average filter period for BEP calculation is an oblivion factor e, it is the weight of measurement
report, the value is more, and the reliability of BEP is high.
Value Range: Average filter period for downlink BEP {0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13,14,
15}, Average filter period for uplink BEP {0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10}
Default value: both are 4 blocks.
Suggestion value: both are 10 blocks.
Copyright, 2009 ZTE Corporation.
7. GPRS MAX initial access signal level
GPRS MAX initial access signal level set to 5 for GSM900MHz, set to 2 for DCS1800MHz.
Suggestion value: Changing it from 5 to 2.
8 The parameter of GPRS Property1(BSC
Level) changed
Copyright, 2009 ZTE Corporation.
9 The parameter of EDGE Property(BSC
Level) changed
In order to improve the GPRSEGPRS throughput, we suggest changing below parameter to
BSC.
The group parameter of EDGE Property is as below. (Notes: these parameter are only
available for iBSC, for V2 BSC they are not working).
RS: Uplink throughput weight value at Gb interface, the dynamic Abis adjustment parameter.
RR: Downlink throughput weight value at Gb interface, the dynamic Abis adjustment
parameter.
RA: Weight value of EGPRS MS accessing request times, the dynamic Abis adjustment
parameter.
RM: Weight value of high-bandwidth request times, the dynamic Abis adjustment parameter.
RB: Weight value of the highest bandwidth usage, the dynamic Abis adjustment parameter.
RG and RE: This parameter defines weights of GPRS carrier proportion,
RS+RR+RA+RM+RB+RG+RE must be equal to 100
Copyright, 2009 ZTE Corporation.
Figure: Edge Property parameters
10 The parameter of Site Bandwidth
Limit(Cell Level) changed
In order to give effective control, we will change the Site parameter of Bandwidth Limit(kb)
as below.
Copyright, 2009 ZTE Corporation.
Figure: Site Bandwidth Limit parameter.
11. UPPB-DSP Congestion audit
Normally, we can use below formula to check GPRS/EGPRS congestion.
1). RR Resource(PDTCH) Congestion Rate
(C901170008+ C901170037+ C901180008+ C901180037+ C901190016+ C901190065+
C901200016+ C901200065)*100/(C900040108+C900040112+C900040114+ C900040118+
C900040120+ C900040126 + C900040128+ C900040134)
([Number of GPRS DL TBF establishment failure due to RR congestion]+[Number of GPRS DL
TBF resource reallocation failure due to RR congestion for LLC transmission]+[Number of
EGPRS DL TBF establishment failure due to RR congestion]+[Number of EGPRS DL TBF
resource reallocation failure due to RR congestion for LLC transmission]+[Number of GPRS UL
TBF establishment failure due to RR congestion]+[Number of GPRS UL TBF resource
reallocation failure due to RR congestion for resource request]+[Number of EGPRS UL TBF
establishment failure due to RR congestion]+[Number of EGPRS UL TBF resource reallocation
failure due to RR congestion for resource request])/([Number of GPRS DL TBF establishment
requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC transmission]+
Copyright, 2009 ZTE Corporation.
[Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF resource
reallocation requests due to LLC transmission]+[Number of GPRS UL TBF establishment
requests]+[Number of GPRS UL TBF resource reallocation requests for resource request]+
[Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF resource
reallocation requests for resource request])
2). Abis Resource Congestion Rate
(C901170007+ C901170036+ C901180007+ C901180036+ C901190015+ C901190064+
C901200015+ C901200064)*100/(C900040108+C900040112+C900040114+ C900040118+
C900040120+ C900040126 + C900040128+ C900040134)
([Number of GPRS DL TBF establishment failure due to Abis congestion]+[Number of GPRS DL
TBF resource reallocation failure due to Abis congestion for LLC transmission]+[Number of
EGPRS DL TBF establishment failure due to Abis congestion]+[Number of EGPRS DL TBF
resource reallocation failure due to Abis congestion for LLC transmission]+[Number of GPRS UL
TBF establishment failure due to Abis congestion]+[Number of GPRS UL TBF resource
reallocation failure due to Abis congestion for resource request]+[Number of EGPRS UL TBF
establishment failure due to Abis congestion]+[Number of EGPRS UL TBF resource reallocation
failure due to Abis congestion for resource request])/([Number of GPRS DL TBF establishment
requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC transmission]+
[Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF resource
reallocation requests due to LLC transmission]+[Number of GPRS UL TBF establishment
requests]+[Number of GPRS UL TBF resource reallocation requests for resource request]+
[Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF resource
reallocation requests for resource request])
3). UPPB DSP Resource Congestion Rate
One UPPB have 14 DSP Units, the maximum process capacity of each DSP is 160 Abis TS of
16kbps( one DSP = 160*16kbps), if enable GPRS CS3/4, one DSP can support maximum 80
dynamic and static channels, if open EDGE service, one DSP can support maximum 40 dynamic
and static channels.
If DSP overload, some PDTCH will not be occupied, that means you have configured 4 static
PDTCH channels, you can only occupy less than 4 PDTCH channels.
Suggestion: there can configure 10 to 15 sectors to one DSP in UPPB board.
(C901170009+ C901170038+ C901180009+ C901180038+ C901190017+ C901190066+
C901200017+ C901200066)*100/(C900040108+C900040112+C900040114+ C900040118+
C900040120+ C900040126 + C900040128+ C900040134)
([Number of GPRS DL TBF establishment failure due to UPPB-DSP channel congestion]+
[Number of GPRS DL TBF resource reallocation failure due to UPPB-DSP channel congestion for
LLC transmission]+[Number of EGPRS DL TBF establishment failure due to UPPB-DSP channel
congestion]+[Number of EGPRS DL TBF resource reallocation failure due to UPPB-DSP channel
congestion for LLC transmission]+[Number of GPRS UL TBF establishment failure due to
Copyright, 2009 ZTE Corporation.
UPPB-DSP channel congestion]+[Number of GPRS UL TBF resource reallocation failure due to
UPPB-DSP channel congestion for resource request]+[Number of EGPRS UL TBF establishment
failure due to UPPB-DSP channel congestion]+[Number of EGPRS UL TBF resource reallocation
failure due to UPPB-DSP channel congestion for resource request])/([Number of GPRS DL TBF
establishment requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC
transmission]+[Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF
resource reallocation requests due to LLC transmission]+[Number of GPRS UL TBF
establishment requests]+[Number of GPRS UL TBF resource reallocation requests for resource
request]+[Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF
resource reallocation requests for resource request])
4) The Max Simultaneous Existing TBF numbers
C901000048 Downlink Max GPRS TBF Number of Simultaneous Establishment
C901000050 Downlink Max EGPRS TBF Number of Simultaneous Establishment
C901010046 Uplink Max GPRS TBF Number of Simultaneous Establishment
C901010048 Uplink Max EGPRS TBF Number of Simultaneous Establishment
5) PDTCH Utillization
C900040140/ C900040136
We had defined above formula and exported performance data, and found the UPPB-DSP have
congestion for some cells.
BSC ID SITE ID Bts ID local cell
ID
UPPB DSP
Resource
Congestio
n Rate%
Belong to
DSP No
1 8 2 30172 5.81% 11
1 48 1 30461 50.00% 11
1 116 1 30851 7.69% 9
1 22 1 30351 12.50% 10
1 39 2 30522 5.88% 11
1 89 3 30933 6.67% 14
1 24 3 30233 8.57% 10
1 142 1 30911 5.88% 9
1 151 3 31173 11.76% 9
1 24 3 30233 5.95% 10
1 21 3 30593 12.82% 10
1 43 3 30513 7.69% 11
1 48 3 30463 5.56% 11
1 21 3 30593 18.18% 10
1 40 4 30384 12.50% 11
1 71 3 33243 20.00% 13
1 77 3 33043 5.26% 11
1 21 3 30593 8.45% 10
Copyright, 2009 ZTE Corporation.
1 24 3 30233 9.88% 10
1 208 1 43361 9.68% 13
1 118 3 30663 6.38% 9
1 141 2 31162 9.52% 9
1 8 3 30173 11.36% 11
1 21 3 30593 17.24% 10
1 74 2 33422 25.00% 13
1 120 2 30992 5.26% 9
1 144 3 33573 6.12% 9
1 8 2 30172 10.34% 11
1 35 1 30341 8.11% 11
1 38 1 30061 16.00% 11
1 39 1 30521 9.09% 11
1 43 3 30513 6.67% 11
1 6 1 30211 5.56% 11
1 27 2 31582 6.25% 11
1 47 3 30453 7.14% 11
1 6 1 30211 8.70% 11
1 90 1 30811 12.50% 14
1 24 3 30233 5.88% 10
1 128 3 30713 8.33% 9
1 162 1 33561 6.25% 9
From OMCR we can export Network Planning Data table, and fond DSP No. the cell belong to.
From above table, we can statistic how many sectors connected to the DSP.
DSP NO. Total Sector
Numbers
0 1
Copyright, 2009 ZTE Corporation.
9 75
10 68
11 67
12 19
13 71
14 55
15 6
16 97
17 20
18 21
19 13
20 33
21 12
22 1
From above table, we know the DSP 9,10,11,13,14 and 16 have more sectors connected to them.
The DSP 16 have 97 cells connected to it, because there have a few subscriber to use GPRS
service, so there haven’t DSP congestion.
So we suggest move above DSP congestion cells to DSP 15,19,21,22 to balance the DSP
process loading.
As below, we changed the configuration of DSP, the DSP congestion is improved.
12. The PDTCH Configuration(Cell Level)
Moved
The Dynamic TS property used to provide more PDTCH to support data transmit, if the TCH
channel is enough to support voice service, the system will shift to dynamic TCH timeslots to
PDTCH. The shift action will happen at the before or back TCHs at the static PDTCH channel.
If you configure as below figuration, the system only shift the before dynamic TCH timeslots
to PDTCH, for this case, some shift actions will failure, because the USF flag bit can’t be moved
to other PDTCHs.
Copyright, 2009 ZTE Corporation.
Figure: the Dynamic TS property only can shift forth TCH to PDTCH.
So we suggest move the static PDTCH to the middle between the TCHs with Dynamic TS,
the system is easy to shift the back or forth TCHs with dynamic TS property to PDTCH. The
configuration is as below.
Figure: the Dynamic TS property can shift both the back or forth TCH to PDTCH.
13. The PDTCH Configuration(Cell Level)
changed for 3 PDTCHs
Because the modulations of GPRS(CS-1 to CS-4) and EGPRS(MCS-1 to MCS-4) are
GMSK, and EGPRS(MCS-5 to MCS-6) is with 8-PSK modulation. The 8-PSK gives the EGPRS
high throughput, if EGPRS and GPRS are same with GMSK, the throughput of EGPRS will be
lower than the GPRS.
Table: the Modulation and Bit Rate of GPRS and EGPRS.
Modulative
Mode
Coding
scheme
modulation RLC
Blks/Ra
dio Blk
FEC
Code
Rate
User
bits/20ms
bit Rate (bps) Family
GPRS CS-1 GMSK 1 0.45 160 8,000 -
CS-2 1 0.65 240 12,000 -
CS-3 1 0.75 288 14,400 -
Copyright, 2009 ZTE Corporation.
CS-4 1 1 400 20,000 -
EGPRS MCS-1 1 0.53 176 8,800 C
MCS-2 1 0.66 224 11,200 B
MCS-3 1 0.85 296 14,800 A
MCS-4 1 1 352 17,600 C
MCS-5 8-PSK 1 0.38 448 22,400 B
MCS-6 1 0.49 592 29,600 A
MCS-7 2 0.76 448+448 44,800 B
MCS-8 2 0.92 544+544 54,400 A
MCS-9 2 1 592+592 59,200 A
We configure the PDTCH to the site with both GPRS and EGPRS supported, if they shared
the PDTCH, the modulation of data coding will use GMSK to transfer data, that means the
subscriber with 8-PSK will change its modulation to GMSK, so the throughput of the subscriber
with 8-PSK will be decreased. The configuration is just as below.
Figure: the subscribers of both GPRS and EGPRS will share the PDTCH to transfer data.
Because the PS Service Preference Property is set to No Preference, the subscribers of both
GPRS and EGPRS will share the PDTCH to transmit data, the modulation will use GMSK to code
data, the throughput will be lower.
So we must change the configuration to support GPRS and EGPRS subscribers separately, the
subscribers to occupy the different PDTCH, just like below two figurations.
Copyright, 2009 ZTE Corporation.
Figure: the subscribers of EGPRS occupy the PDTCH with EDGE Dedicated Property.
Above figuration indicates the subscribers of EGPRS will occupy the PDTCH with EDGE
Dedicated Property. If the C/I is enough better to support the 8-PSK coding, the coding set of data
transfer will use MCS-5 to MCS-9, so the throughput will be increased.
In order to support the GPRS subscribers, we will configure the GPRS preference PDTCH to it,
just like below figuration.
Figure: the subscribers of GPRS occupy the PDTCH with GPRS Preference Property.
So there have 3 PDTCH to support data transfer, the 2 PDTCHs are with EDGE dedicated and 1
PDTCH is with GPRS preference property in one sector.
Copyright, 2009 ZTE Corporation.
14. The Throughput Improved for 3
PDTCHs
After adjust above parameters and reconfiguration, the Mean Rate of EGPRS LLC DownLink
Throughput of summarization from 7:00 to 24:00 by Cell is improved as below.
Mean Rate of EGPRS LLC DL throughput(kbps)BSC9
10000
35000
60000
85000
110000
135000
160000
185000
210000
10-Jun11-Jun12-Jun13-Jun14-Jun15-Jun16-Jun17-Jun18-Jun19-Jun20-Jun
Mean Rate of EGPRS LLC DL
throughput(kbps)
137102133549136841143349143093120059168660175706161752200255
2010-
6-10
2010-
6-11
2010-
6-12
2010-
6-13
2010-
6-14
2010-
6-16
2010-
6-17
2010-
6-18
2010-
6-19
2010-
6-20
Figure: BSC9 of Mean Rate of EGPRS LLC Downlink Throughput improved.
Copyright, 2009 ZTE Corporation.
Mean Rate of EGPRS LLC DL throughput(kbps)BSC7
150000
155000
160000
165000
170000
175000
180000
185000
190000
195000
200000
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
Mean Rate of EGPRS LLC DL
throughput(kbps)
181297 185345 178324 185145 180824 147880 187513 196694 192351 197421
2010-
6-10
2010-
6-11
2010-
6-12
2010-
6-13
2010-
6-14
2010-
6-16
2010-
6-17
2010-
6-18
2010-
6-19
2010-
6-20
Figure: BSC7 of Mean Rate of EGPRS LLC Downlink Throughput improved.
15. The PDTCH Configuration(Cell Level)
changed for 2 PDTCHs
Before we have added one more PDTCH to support data with GPRS preference property in
one sector, so one TCH is decreased to support voice call in one sector. In order to avoid the
customer have complaint for the TCH decreased, we have changed one PDTCH with EDGE
dedicated channel to TCH channel. So in one sector there has only 2 PDTCH support data transfer,
the configurations are as below.
Before changing, in one sector there have 2 PDTCH support EDGE mobile and 1 PDTCH
support GPRS mobile.
Copyright, 2009 ZTE Corporation.
Figure: in one sector there have 2 PDTCH support EGDE mobile and 1PDTCH support GPRS
mobile.
After changing, in one sector there have only 1 PDTCH support EDGE mobile and 1 PDTCH
support GPRS mobile.
Copyright, 2009 ZTE Corporation.
Figure: in one sector there have only 1 PDTCH support EGDE mobile and 1PDTCH support
GPRS mobile.
16. The Throughput Improved for 2
PDTCHs
After changing from 3 PDTCH channels to 2 PDTCH channels in one sector, the Mean Rate of
EGPRS LLC DownLink Throughput of summarization from 7:00 to 24:00 by Cell is same as
below.
Copyright, 2009 ZTE Corporation.
Mean Rate of EGPRS LLC DL throughput(kbps)BSC9
100000
110000
120000
130000
140000
150000
160000
170000
180000
190000
200000
210000
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
Mean Rate of EGPRS LLC DL
throughput(kbps)
137102 133549 136841 143349 143093 120059 168660 175706 161752 200255 167678 166143 160242 161366 162500
2010-
6- 10
2010-
6- 11
2010-
6- 12
2010-
6- 13
2010-
6- 14
2010-
6- 16
2010-
6- 17
2010-
6- 18
2010-
6- 19
2010-
6- 20
2010-
6- 21
2010-
6- 22
2010-
6- 23
2010-
6- 24
2010-
6- 25
Figure: BSC9 of Mean Rate of EGPRS LLC Downlink Throughput.
Mean Rate of EGPRS LLC DL throughput(kbps)B8
165000
170000
175000
180000
185000
190000
195000
200000
205000
210000
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
Mean Rate of EGPRS LLC DL
throughput(kbps)
181954188208181190194658193982189402199302187748199171199804204267204806195568196447
10- 6-
11
10- 6-
12
10- 6-
13
10- 6-
14
10- 6-
16
10- 6-
17
10- 6-
18
10- 6-
19
10- 6-
20
10- 6-
21
10- 6-
22
10- 6-
23
10- 6-
24
10-6-
25
Figure: BSC8 of Mean Rate of EGPRS LLC Downlink Throughput.
Mean Rate of EGPRS LLC DL throughput(kbps)BSC7
150000
155000
160000
165000
170000
175000
180000
185000
190000
195000
200000
10-Jun
11-Jun
12-Jun
13-Jun
14-Jun
15-Jun
16-Jun
17-Jun
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
Mean Rate of EGPRS LLC DL
throughput( kbps)
181297185345178324185145180824147880187513196694192351197421188743189510182875189102197509
2010-
6- 10
2010-
6- 11
2010-
6- 12
2010-
6- 13
2010-
6- 14
2010-
6- 16
2010-
6- 17
2010-
6- 18
2010-
6- 19
2010-
6- 20
2010-
6- 21
2010-
6- 22
2010-
6- 23
2010-
6- 24
2010-
6- 25
Figure: BSC7 of Mean Rate of EGPRS LLC Downlink Throughput.
Copyright, 2009 ZTE Corporation.
Mean Rate of EGPRS LLC DL throughput(kbps)BSC6
150000
170000
190000
210000
230000
250000
270000
18-Jun
19-Jun
20-Jun
21-Jun
22-Jun
23-Jun
24-Jun
25-Jun
Mean Rate of EGPRS LLC DL
throughput(kbps)
190840. 77 239575. 66 257611. 73 251368. 63 246125. 03 244249. 74 236479. 53 244116. 71
2010- 6- 18 2010- 6- 19 2010- 6- 20 2010- 6- 21 2010- 6- 22 2010- 6- 23 2010- 6- 24 2010- 6- 25
Figure: BSC6 of Mean Rate of EGPRS LLC Downlink Throughput.
17. Test Conclusion of EGPRS Download
Throughput
After changing above parameters and balance the DSP configuration, we have got best download
throughput.
Copyright, 2009 ZTE Corporation.
Copyright, 2009 ZTE Corporation.

More Related Content

What's hot

DC-HSPA and Carrier Aggregation
DC-HSPA and Carrier AggregationDC-HSPA and Carrier Aggregation
DC-HSPA and Carrier AggregationYasser Monier
 
GPRS Technology
GPRS TechnologyGPRS Technology
GPRS TechnologyMadhu Bala
 
Hsupa (enhanced uplink)
Hsupa (enhanced uplink)Hsupa (enhanced uplink)
Hsupa (enhanced uplink)Praveen Kumar
 
GPRS(General Packet Radio Service)
GPRS(General Packet Radio Service)GPRS(General Packet Radio Service)
GPRS(General Packet Radio Service)Jay Nagar
 
Mobile Comm. - 3G Questions 4
Mobile Comm. - 3G Questions 4Mobile Comm. - 3G Questions 4
Mobile Comm. - 3G Questions 4Yasir Azmat
 
HSDPA(High Speed Downlink Packet Access)
HSDPA(High Speed Downlink Packet Access)HSDPA(High Speed Downlink Packet Access)
HSDPA(High Speed Downlink Packet Access)Akshay Wagh
 
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...RESHAN FARAZ
 
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.Editor IJMTER
 

What's hot (19)

c1 & c2 values
c1 & c2 values c1 & c2 values
c1 & c2 values
 
DC-HSPA and Carrier Aggregation
DC-HSPA and Carrier AggregationDC-HSPA and Carrier Aggregation
DC-HSPA and Carrier Aggregation
 
GPRS Technology
GPRS TechnologyGPRS Technology
GPRS Technology
 
Hsupa (enhanced uplink)
Hsupa (enhanced uplink)Hsupa (enhanced uplink)
Hsupa (enhanced uplink)
 
GPRS
GPRSGPRS
GPRS
 
HSPA Essentials
HSPA EssentialsHSPA Essentials
HSPA Essentials
 
GPRS(General Packet Radio Service)
GPRS(General Packet Radio Service)GPRS(General Packet Radio Service)
GPRS(General Packet Radio Service)
 
Hsdpa principles
Hsdpa principlesHsdpa principles
Hsdpa principles
 
Hspa and hsdpa
Hspa and hsdpaHspa and hsdpa
Hspa and hsdpa
 
Gprs ppt
Gprs pptGprs ppt
Gprs ppt
 
Mobile Comm. - 3G Questions 4
Mobile Comm. - 3G Questions 4Mobile Comm. - 3G Questions 4
Mobile Comm. - 3G Questions 4
 
Gprs architecture ppt
Gprs architecture pptGprs architecture ppt
Gprs architecture ppt
 
GPRS : Architecture and Applications
GPRS : Architecture and ApplicationsGPRS : Architecture and Applications
GPRS : Architecture and Applications
 
GPRS Introduction
GPRS IntroductionGPRS Introduction
GPRS Introduction
 
HIGH SPEED NETWORKS
HIGH SPEED NETWORKSHIGH SPEED NETWORKS
HIGH SPEED NETWORKS
 
Hspa systems 002
Hspa systems 002Hspa systems 002
Hspa systems 002
 
HSDPA(High Speed Downlink Packet Access)
HSDPA(High Speed Downlink Packet Access)HSDPA(High Speed Downlink Packet Access)
HSDPA(High Speed Downlink Packet Access)
 
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...
Rm literature survey_on_scheduling_and_resource_allocation_for_ieee_80211ax_p...
 
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.MANET, Unicast Routing Protocol, Multicast Routing Protocol.
MANET, Unicast Routing Protocol, Multicast Routing Protocol.
 

Viewers also liked

052412 Slovenian
052412   Slovenian052412   Slovenian
052412 SlovenianVogelDenise
 
Hungarian Right of REVOLUTION & Political CORRUPTION
Hungarian   Right of REVOLUTION & Political CORRUPTIONHungarian   Right of REVOLUTION & Political CORRUPTION
Hungarian Right of REVOLUTION & Political CORRUPTIONVogelDenise
 
072712 usa ku klux klan runned government - italian
072712 usa ku klux klan runned government - italian072712 usa ku klux klan runned government - italian
072712 usa ku klux klan runned government - italianVogelDenise
 
Korean Right of REVOLUTION & Political CORRUPTION
Korean   Right of REVOLUTION & Political CORRUPTIONKorean   Right of REVOLUTION & Political CORRUPTION
Korean Right of REVOLUTION & Political CORRUPTIONVogelDenise
 
052412 Chinese (simple)
052412   Chinese (simple)052412   Chinese (simple)
052412 Chinese (simple)VogelDenise
 
06/06/12 - NOTICE OF LAWSUIT To Page Kruger & Holland
06/06/12 - NOTICE OF LAWSUIT To Page Kruger &  Holland 06/06/12 - NOTICE OF LAWSUIT To Page Kruger &  Holland
06/06/12 - NOTICE OF LAWSUIT To Page Kruger & Holland VogelDenise
 
062112 italian (eeoc response)
062112 italian (eeoc response)062112 italian (eeoc response)
062112 italian (eeoc response)VogelDenise
 
062112 georgian (supreme court)
062112   georgian (supreme court)062112   georgian (supreme court)
062112 georgian (supreme court)VogelDenise
 
062112 greek (supreme court)
062112   greek (supreme court)062112   greek (supreme court)
062112 greek (supreme court)VogelDenise
 
062112 turkish (eeoc response)
062112 turkish (eeoc response)062112 turkish (eeoc response)
062112 turkish (eeoc response)VogelDenise
 
052412 Icelandic
052412   Icelandic052412   Icelandic
052412 IcelandicVogelDenise
 
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)VogelDenise
 
THAI hillary clinton stingers
THAI   hillary clinton stingersTHAI   hillary clinton stingers
THAI hillary clinton stingersVogelDenise
 
070512 PUBLIC REBUKE (azerbaijani)
070512   PUBLIC REBUKE (azerbaijani)070512   PUBLIC REBUKE (azerbaijani)
070512 PUBLIC REBUKE (azerbaijani)VogelDenise
 
060812 EEOC Response (DANISH)
060812   EEOC Response (DANISH)060812   EEOC Response (DANISH)
060812 EEOC Response (DANISH)VogelDenise
 
04/14/13 PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer
04/14/13  PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer04/14/13  PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer
04/14/13 PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmerVogelDenise
 
Lithuanian Right of REVOLUTION & Political CORRUPTION
Lithuanian   Right of REVOLUTION & Political CORRUPTIONLithuanian   Right of REVOLUTION & Political CORRUPTION
Lithuanian Right of REVOLUTION & Political CORRUPTIONVogelDenise
 

Viewers also liked (20)

052412 Slovenian
052412   Slovenian052412   Slovenian
052412 Slovenian
 
Hungarian Right of REVOLUTION & Political CORRUPTION
Hungarian   Right of REVOLUTION & Political CORRUPTIONHungarian   Right of REVOLUTION & Political CORRUPTION
Hungarian Right of REVOLUTION & Political CORRUPTION
 
072712 usa ku klux klan runned government - italian
072712 usa ku klux klan runned government - italian072712 usa ku klux klan runned government - italian
072712 usa ku klux klan runned government - italian
 
Korean Right of REVOLUTION & Political CORRUPTION
Korean   Right of REVOLUTION & Political CORRUPTIONKorean   Right of REVOLUTION & Political CORRUPTION
Korean Right of REVOLUTION & Political CORRUPTION
 
052412 Latvian
052412   Latvian052412   Latvian
052412 Latvian
 
052412 Chinese (simple)
052412   Chinese (simple)052412   Chinese (simple)
052412 Chinese (simple)
 
Frankford Avenue Main Break 1.8.13 Update Photos
Frankford Avenue Main Break 1.8.13 Update PhotosFrankford Avenue Main Break 1.8.13 Update Photos
Frankford Avenue Main Break 1.8.13 Update Photos
 
06/06/12 - NOTICE OF LAWSUIT To Page Kruger & Holland
06/06/12 - NOTICE OF LAWSUIT To Page Kruger &  Holland 06/06/12 - NOTICE OF LAWSUIT To Page Kruger &  Holland
06/06/12 - NOTICE OF LAWSUIT To Page Kruger & Holland
 
062112 italian (eeoc response)
062112 italian (eeoc response)062112 italian (eeoc response)
062112 italian (eeoc response)
 
062112 georgian (supreme court)
062112   georgian (supreme court)062112   georgian (supreme court)
062112 georgian (supreme court)
 
062112 greek (supreme court)
062112   greek (supreme court)062112   greek (supreme court)
062112 greek (supreme court)
 
062112 turkish (eeoc response)
062112 turkish (eeoc response)062112 turkish (eeoc response)
062112 turkish (eeoc response)
 
052412 Persian
052412   Persian052412   Persian
052412 Persian
 
052412 Icelandic
052412   Icelandic052412   Icelandic
052412 Icelandic
 
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)
TURKISH YOUTH UNION CONFRONTS UNITED STATES MILITARY TERRORIST REGIME (TURKISH)
 
THAI hillary clinton stingers
THAI   hillary clinton stingersTHAI   hillary clinton stingers
THAI hillary clinton stingers
 
070512 PUBLIC REBUKE (azerbaijani)
070512   PUBLIC REBUKE (azerbaijani)070512   PUBLIC REBUKE (azerbaijani)
070512 PUBLIC REBUKE (azerbaijani)
 
060812 EEOC Response (DANISH)
060812   EEOC Response (DANISH)060812   EEOC Response (DANISH)
060812 EEOC Response (DANISH)
 
04/14/13 PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer
04/14/13  PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer04/14/13  PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer
04/14/13 PUBLIC NOTICE (03/11/13 FAX TO BARACK OBAMA) - khmer
 
Lithuanian Right of REVOLUTION & Political CORRUPTION
Lithuanian   Right of REVOLUTION & Political CORRUPTIONLithuanian   Right of REVOLUTION & Political CORRUPTION
Lithuanian Right of REVOLUTION & Political CORRUPTION
 

Similar to Ttsl orissa-egprs-download-throughput-improved-new

Cell load KPIs in support of event triggered Cellular Yield Maximization
Cell load KPIs in support of event triggered Cellular Yield MaximizationCell load KPIs in support of event triggered Cellular Yield Maximization
Cell load KPIs in support of event triggered Cellular Yield MaximizationAsoka Korale
 
Edge throughput enhancement
Edge throughput enhancementEdge throughput enhancement
Edge throughput enhancementsmhassan159
 
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...Elizabeth Williams
 
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKS
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKSENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKS
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKScscpconf
 
Q & A for 3G Optimization
Q & A for 3G Optimization Q & A for 3G Optimization
Q & A for 3G Optimization l3p15
 
NetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioNetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioVishal Sharma
 
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsn
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 WsnAnfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsn
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsniosrjce
 
Overview Of Gsm Cellular Network & Operations
Overview Of Gsm Cellular Network & OperationsOverview Of Gsm Cellular Network & Operations
Overview Of Gsm Cellular Network & OperationsDeepak Sharma
 
Dt interview que
Dt interview queDt interview que
Dt interview queArun Kumar
 
43096827 gsm-timers
43096827 gsm-timers43096827 gsm-timers
43096827 gsm-timersSanwari Lal
 
Phasor data concentrator
Phasor data concentratorPhasor data concentrator
Phasor data concentratorPanditNitesh
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTESofian .
 

Similar to Ttsl orissa-egprs-download-throughput-improved-new (20)

Cell load KPIs in support of event triggered Cellular Yield Maximization
Cell load KPIs in support of event triggered Cellular Yield MaximizationCell load KPIs in support of event triggered Cellular Yield Maximization
Cell load KPIs in support of event triggered Cellular Yield Maximization
 
Narrowband IoT
Narrowband IoTNarrowband IoT
Narrowband IoT
 
Ijebea14 238
Ijebea14 238Ijebea14 238
Ijebea14 238
 
Edge throughput enhancement
Edge throughput enhancementEdge throughput enhancement
Edge throughput enhancement
 
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...
A Heuristic Algorithm For The Resource Assignment Problem In Satellite Teleco...
 
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKS
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKSENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKS
ENHANCEMENT OF TCP FAIRNESS IN IEEE 802.11 NETWORKS
 
Q & A for 3G Optimization
Q & A for 3G Optimization Q & A for 3G Optimization
Q & A for 3G Optimization
 
Session.pptx
Session.pptxSession.pptx
Session.pptx
 
Zigbee 802-15-4
Zigbee 802-15-4Zigbee 802-15-4
Zigbee 802-15-4
 
NetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radioNetSIm Technology Library- Cognitive radio
NetSIm Technology Library- Cognitive radio
 
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsn
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 WsnAnfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsn
Anfis Based Soft Gts Mechanism For Ieee 802.15.4 Wsn
 
GSM Module
GSM ModuleGSM Module
GSM Module
 
Overview Of Gsm Cellular Network & Operations
Overview Of Gsm Cellular Network & OperationsOverview Of Gsm Cellular Network & Operations
Overview Of Gsm Cellular Network & Operations
 
Gsm1368
Gsm1368Gsm1368
Gsm1368
 
B010630409
B010630409B010630409
B010630409
 
Bsc configuration
Bsc configurationBsc configuration
Bsc configuration
 
Dt interview que
Dt interview queDt interview que
Dt interview que
 
43096827 gsm-timers
43096827 gsm-timers43096827 gsm-timers
43096827 gsm-timers
 
Phasor data concentrator
Phasor data concentratorPhasor data concentrator
Phasor data concentrator
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTE
 

Recently uploaded

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Ttsl orissa-egprs-download-throughput-improved-new

  • 1. GPRS/EGPRS Download Throughput Improved For TTSL Orissa Project 1. BVC Flow Control(BSC)................................................................................................................3 2. GPRS Cell Options(Cell)................................................................................................................5 3. SIGNAL_EUTBF : Support signaling uplink extended TBF(BSC)..............................................7 4. EXT_UTBF: Support extended uplink TBF(Cell).........................................................................8 Copyright, 2009 ZTE Corporation.
  • 2. 5. Cell Reselecting Hysteresis Level(Cell).........................................................................................9 6. Edge Params(Cell)...........................................................................................................................9 7. GPRS MAX initial access signal level..........................................................................................11 8 The parameter of GPRS Property1(BSC Level) changed..............................................................11 9 The parameter of EDGE Property(BSC Level) changed...............................................................12 10 The parameter of Site Bandwidth Limit(Cell Level) changed....................................................13 11. UPPB-DSP Congestion audit......................................................................................................14 12. The PDTCH Configuration(Cell Level) Moved.........................................................................18 13. The PDTCH Configuration(Cell Level) changed for 3 PDTCHs..............................................19 14. The Throughput Improved for 3 PDTCHs..................................................................................22 15. The PDTCH Configuration(Cell Level) changed for 2 PDTCHs..............................................23 16. The Throughput Improved for 2 PDTCHs..................................................................................25 17. Test Conclusion of EGPRS Download Throughput...................................................................27 Copyright, 2009 ZTE Corporation.
  • 3. 1. BVC Flow Control(BSC) BVCFlowCtrl: BVC Flow Control Supported BVC flow control occurs on Gb interface between SGSN and BSS, and only on downlinks. BSS provides control parameters and SGSN executes, to avoid one BVC on BSS to abandon some LLC data because of discard some LLC data blocks due to overtime caused from grouping channel as too busy and to avoid new downlink LLC data because of memory resource limitations. BSSGP counts the current leaking rate of BVC periodically (including short ;;statistics and long statistics). BVCFlowCtrl originates unconditionally if long statistics timer stops, SGSN acknowledgement is necessary, and if discrepant range of adjacent leaking rates is over CellFcThs. BVCFlowCtrl originates and SGSN confirmation is necessary if short statistics timer overflows and discrepant range of adjacent leaking rates is over CellFcThs. 1). FlowCtrlMode: Flow Control Mode There are two Modes to determine the SGSN flow control of different providers.  Mode 1: Report flow control parameters according to actual traffic on radio interface counted at BSC  Mode 2: Report flow control parameters according to max traffic that the cell can provide Suggestion value: Normally, we use Mode 2. 2). FlowCtlMode2Para:Parameter of Flow Control Mode2 BSC reports flow control parameters according to max traffic that the cell can provide. Max value depends on channels configured. Counting formula: channels * max traffic that every channel can provide. This parameter is max traffic that every channel can provide, with the unit of 100 bps. Value range: 10 ~ 1000 Default value: 214 Copyright, 2009 ZTE Corporation.
  • 4. The Normal Value of FlowCtlMode2Para for EGPRS as below Code Set Throughput per TS FlowCtlMode2Para MCS -1 8.8 kbps 88 MCS -2 11.2 kbps 112 MCS -3 14.8 kbps 148 MCS -4 17.6 kbps 176 MCS -5 22.4 kbps 224 MCS -6 29.6 kbps 296 MCS -7 44.8 kbps 448 MCS -8 56.4 kbps 564 MCS -9 59.2 kbps 592 The Normal Value of FlowCtlMode2Para for GPRS as below Co de Set Through put per TS FlowCtlMode2 Para CS- 1 9.05 kbps 90 CS- 2 13.4 kbps 134 CS- 3 15.6 kbps 156 CS- 4 21.4 kbps 214 Suggestion value: for EGPRS set to 800. Copyright, 2009 ZTE Corporation.
  • 5. 2. GPRS Cell Options(Cell) 1). T3192: T3192 timer T3192 is used at MS side. During the packet downlink transmission, if RLC data block is the final downlink data block to be transmitted, the network sends the RLC data block with the Final Block Identifier (FBI) domain as 1. It contains an effective RRBP field to initialize the release of the downlink TBF. In acknowledged mode, the MS sends PACKET DOWNLINK ACK/NACK message whose FBI domain is 1 on the uplink block specified by the RRBP domain. In the unacknowledged mode, the MS sends PACKET CONTROL ACK message on the uplink block specified by the RRBP domain. Then MS starts the T3192 timer. When T3192 stops, the system releases the resources, stops listening to the PDCCH channel, and turns to listen the paging channel. If a MS receives PACKET DOWNLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message from the network within the protection period of the T3192 timer, it stops T3192 and transfer to the packet transmission status. Value range:{ 500, 1000, 1500,0,80,120,160,200} Default value: 500ms Timer value must be less than the protection timer T3193 of the downlink TBF at the network side, in order to ensure TFI uniqueness of MS at the same time. Suggestion value: 1500ms for T3192, 1520ms for T3193 Copyright, 2009 ZTE Corporation.
  • 6. 2). DrxTimeMax: Non-DRX Mode Holding Time This parameter belongs to GPRS cell option and is used at MS side. When the MS changes from the packet BUSY mode to the packet IDLE mode, it should first enter the Non-Drx mode. The DRX_TIMER_MAX parameters determine the maximum time length for MS to stay in the Non-DRx mode. Under the Non-Drx mode status, MS establish TBF link take short time than Drx mode status, refer to GSM04.60-12.24 Value range: {1 s , 2 s, 4 s , 8 s , 16 s , 32 s , 64 s } Default value: 2 s Suggestion value: 4s 3). BsCvMax: Max Blocks Transmission in Each TS This parameter belongs to GPRS cell option and is used at MS side. BsCvMax indicates the value of BsCvMax parameter of Max Blocks Transmission in each TS. This parameter determines the following:  Time length of T3198 timer used by MS. This time length is equal to the time represented by BsCvMax.  Time length of T3200 used by MS in Non-Drx mode. This time length = 4 × time represented by BsCvMax.  Value of N3104max = (3 × (BsCvMax+3) × Number of timeslots assigned in the uplink). All uplink data blocks sent by MS contain the COUNT DOWN VALUE (CV) field. The network can use this field to calculate the data blocks to be sent on current uplink TBF. Value range: Default value: 15 Suggestion value: some MS Copyright, 2009 ZTE Corporation. Value Meaning 0 Time length of one block 1 Time length of one block … … 15 Time length of 15 blocks
  • 7. can only support 0-12, so change 15 to 9. 3. SIGNAL_EUTBF : Support signaling uplink extended TBF(BSC) This parameter represents whether BSC supports signaling uplink extended TBF. Normally, the uplink signaling message transmission was finished, uplink TBF link was released immediately to free TFI resource. Uplink signaling extended TBF enabled can hold the link and TFI resource for some time, if MS needs transmission signaling again, it can use the TFI resource. The uplink TBF established constantly will affect downlink throughput. Value range: Check/Uncheck Check: Support signaling uplink extended TBF Uncheck: Does not support signaling uplink extended TBF Default value: Uncheck, Suggestion value: Check Copyright, 2009 ZTE Corporation.
  • 8. 4. EXT_UTBF: Support extended uplink TBF(Cell) This parameter represents whether extended uplink TBF is supported in the cell. If support extended uplink TBF, after uplink TBF link have sent last RLC data block, the link don’t release for short time, if there have data to send, the link will be used, new TBF link establishment is not necessary, it save the time to load data. Value range: Check/Uncheck Check: extended uplink TBF is active in cell; Uncheck: extended uplink TBF is not active in cell Default value: Uncheck, Suggestion value: Check Copyright, 2009 ZTE Corporation.
  • 9. 5. Cell Reselecting Hysteresis Level(Cell) If Mobile is in data service and does Cell Reselection, the MS will stop data transmission about 4- 10seconds. In order to decrease cell reselection, need to increase the ReselHysteresis parameter to avoid cell reselection frequently. 6. Edge Params(Cell) 1). Support EGPRS_PACKET_CHANNEL_REQUEST Access Program (EGPRSPacketChReq) If Cell supports EGPRS_PACKET_CHANNEL_REQUEST Access Program, EGPRS mobile can set up packet access program on RACH or PRACH(if PBCCH is configured) Enabled this function can improve uplink throughput. Value range: Check/Uncheck Check: EGPRS_PACKET_CHANNEL_REQUEST Access Program is active in cell; Uncheck: EGPRS_PACKET_CHANNEL_REQUEST Access Program is not active in cell Copyright, 2009 ZTE Corporation.
  • 10. Default value: Uncheck, Suggestion value: Check 2). EGPRS Phone Quality Measure Mode (LinkQuaMeaMode) LinkQuaMeaMode indicates the measurement report mode of EGPRS MS in the cell. EGPRS measurement could be performed based on each impulse, which is to measure by the granularity of BURST. The feature of rapid EGPRS measurement makes the network side be able to respond the change of radio environment quickly. EGPRS MS have two kinds of report mode, based on BURST or based on TBF. Reporting parameters based on BURST are MEAN_BEP_TNx ( 0-7) (error bit rate per time slot)and I_LEVEL_TN(0-7). Reporting parameters based on TBF are MEAN_BEP (average error bit rate of the radio block) and CV_BEP (variance coefficient of radio block error bit rate). Value range: 0-3. 0. Report MEAN_BEP and CV_BEP 1. Only report I_LEVEL_TN(0-7) 2. Only report MEAN_BEP_TNx(0-7) 3. Report MEAN_BEP_TNx(0-7)and I_LEVEL_TN(0-7) Default value: 2 In report mode, 0 means report based on TBF, 1~3 means report based on timeslot(BURST). Currently in report based on timeslot, omission of report occurs at some terminals, which seriously affects adjustment of coding mode(MCS1-9) Suggestion: 0 based on TBF report mode. 3). Average filter period for uplink/downlink BEP In EGPRS system, EGPRS MS will determine to report the MEAN_REP_AV (average error bit rate of the radio block) and CV_BEP_AV (variance coefficient of radio block error bit rate) under the whole TBF, or the measurement data per time slot MEAN_BEP_TNx (0-7). The specification defines the formula of these measurement data (refer to GSM05.08 10.2.3.2.1). There is an oblivion factor e, whose value is defined by average period of BEP filter. Average filter period for BEP calculation is an oblivion factor e, it is the weight of measurement report, the value is more, and the reliability of BEP is high. Value Range: Average filter period for downlink BEP {0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13,14, 15}, Average filter period for uplink BEP {0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10} Default value: both are 4 blocks. Suggestion value: both are 10 blocks. Copyright, 2009 ZTE Corporation.
  • 11. 7. GPRS MAX initial access signal level GPRS MAX initial access signal level set to 5 for GSM900MHz, set to 2 for DCS1800MHz. Suggestion value: Changing it from 5 to 2. 8 The parameter of GPRS Property1(BSC Level) changed Copyright, 2009 ZTE Corporation.
  • 12. 9 The parameter of EDGE Property(BSC Level) changed In order to improve the GPRSEGPRS throughput, we suggest changing below parameter to BSC. The group parameter of EDGE Property is as below. (Notes: these parameter are only available for iBSC, for V2 BSC they are not working). RS: Uplink throughput weight value at Gb interface, the dynamic Abis adjustment parameter. RR: Downlink throughput weight value at Gb interface, the dynamic Abis adjustment parameter. RA: Weight value of EGPRS MS accessing request times, the dynamic Abis adjustment parameter. RM: Weight value of high-bandwidth request times, the dynamic Abis adjustment parameter. RB: Weight value of the highest bandwidth usage, the dynamic Abis adjustment parameter. RG and RE: This parameter defines weights of GPRS carrier proportion, RS+RR+RA+RM+RB+RG+RE must be equal to 100 Copyright, 2009 ZTE Corporation.
  • 13. Figure: Edge Property parameters 10 The parameter of Site Bandwidth Limit(Cell Level) changed In order to give effective control, we will change the Site parameter of Bandwidth Limit(kb) as below. Copyright, 2009 ZTE Corporation.
  • 14. Figure: Site Bandwidth Limit parameter. 11. UPPB-DSP Congestion audit Normally, we can use below formula to check GPRS/EGPRS congestion. 1). RR Resource(PDTCH) Congestion Rate (C901170008+ C901170037+ C901180008+ C901180037+ C901190016+ C901190065+ C901200016+ C901200065)*100/(C900040108+C900040112+C900040114+ C900040118+ C900040120+ C900040126 + C900040128+ C900040134) ([Number of GPRS DL TBF establishment failure due to RR congestion]+[Number of GPRS DL TBF resource reallocation failure due to RR congestion for LLC transmission]+[Number of EGPRS DL TBF establishment failure due to RR congestion]+[Number of EGPRS DL TBF resource reallocation failure due to RR congestion for LLC transmission]+[Number of GPRS UL TBF establishment failure due to RR congestion]+[Number of GPRS UL TBF resource reallocation failure due to RR congestion for resource request]+[Number of EGPRS UL TBF establishment failure due to RR congestion]+[Number of EGPRS UL TBF resource reallocation failure due to RR congestion for resource request])/([Number of GPRS DL TBF establishment requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC transmission]+ Copyright, 2009 ZTE Corporation.
  • 15. [Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF resource reallocation requests due to LLC transmission]+[Number of GPRS UL TBF establishment requests]+[Number of GPRS UL TBF resource reallocation requests for resource request]+ [Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF resource reallocation requests for resource request]) 2). Abis Resource Congestion Rate (C901170007+ C901170036+ C901180007+ C901180036+ C901190015+ C901190064+ C901200015+ C901200064)*100/(C900040108+C900040112+C900040114+ C900040118+ C900040120+ C900040126 + C900040128+ C900040134) ([Number of GPRS DL TBF establishment failure due to Abis congestion]+[Number of GPRS DL TBF resource reallocation failure due to Abis congestion for LLC transmission]+[Number of EGPRS DL TBF establishment failure due to Abis congestion]+[Number of EGPRS DL TBF resource reallocation failure due to Abis congestion for LLC transmission]+[Number of GPRS UL TBF establishment failure due to Abis congestion]+[Number of GPRS UL TBF resource reallocation failure due to Abis congestion for resource request]+[Number of EGPRS UL TBF establishment failure due to Abis congestion]+[Number of EGPRS UL TBF resource reallocation failure due to Abis congestion for resource request])/([Number of GPRS DL TBF establishment requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC transmission]+ [Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF resource reallocation requests due to LLC transmission]+[Number of GPRS UL TBF establishment requests]+[Number of GPRS UL TBF resource reallocation requests for resource request]+ [Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF resource reallocation requests for resource request]) 3). UPPB DSP Resource Congestion Rate One UPPB have 14 DSP Units, the maximum process capacity of each DSP is 160 Abis TS of 16kbps( one DSP = 160*16kbps), if enable GPRS CS3/4, one DSP can support maximum 80 dynamic and static channels, if open EDGE service, one DSP can support maximum 40 dynamic and static channels. If DSP overload, some PDTCH will not be occupied, that means you have configured 4 static PDTCH channels, you can only occupy less than 4 PDTCH channels. Suggestion: there can configure 10 to 15 sectors to one DSP in UPPB board. (C901170009+ C901170038+ C901180009+ C901180038+ C901190017+ C901190066+ C901200017+ C901200066)*100/(C900040108+C900040112+C900040114+ C900040118+ C900040120+ C900040126 + C900040128+ C900040134) ([Number of GPRS DL TBF establishment failure due to UPPB-DSP channel congestion]+ [Number of GPRS DL TBF resource reallocation failure due to UPPB-DSP channel congestion for LLC transmission]+[Number of EGPRS DL TBF establishment failure due to UPPB-DSP channel congestion]+[Number of EGPRS DL TBF resource reallocation failure due to UPPB-DSP channel congestion for LLC transmission]+[Number of GPRS UL TBF establishment failure due to Copyright, 2009 ZTE Corporation.
  • 16. UPPB-DSP channel congestion]+[Number of GPRS UL TBF resource reallocation failure due to UPPB-DSP channel congestion for resource request]+[Number of EGPRS UL TBF establishment failure due to UPPB-DSP channel congestion]+[Number of EGPRS UL TBF resource reallocation failure due to UPPB-DSP channel congestion for resource request])/([Number of GPRS DL TBF establishment requests]+[Number of GPRS DL TBF resource reallocation requests due to LLC transmission]+[Number of EGPRS DL TBF establishment requests]+[Number of EGPRS DL TBF resource reallocation requests due to LLC transmission]+[Number of GPRS UL TBF establishment requests]+[Number of GPRS UL TBF resource reallocation requests for resource request]+[Number of EGPRS UL TBF establishment requests]+[Number of EGPRS UL TBF resource reallocation requests for resource request]) 4) The Max Simultaneous Existing TBF numbers C901000048 Downlink Max GPRS TBF Number of Simultaneous Establishment C901000050 Downlink Max EGPRS TBF Number of Simultaneous Establishment C901010046 Uplink Max GPRS TBF Number of Simultaneous Establishment C901010048 Uplink Max EGPRS TBF Number of Simultaneous Establishment 5) PDTCH Utillization C900040140/ C900040136 We had defined above formula and exported performance data, and found the UPPB-DSP have congestion for some cells. BSC ID SITE ID Bts ID local cell ID UPPB DSP Resource Congestio n Rate% Belong to DSP No 1 8 2 30172 5.81% 11 1 48 1 30461 50.00% 11 1 116 1 30851 7.69% 9 1 22 1 30351 12.50% 10 1 39 2 30522 5.88% 11 1 89 3 30933 6.67% 14 1 24 3 30233 8.57% 10 1 142 1 30911 5.88% 9 1 151 3 31173 11.76% 9 1 24 3 30233 5.95% 10 1 21 3 30593 12.82% 10 1 43 3 30513 7.69% 11 1 48 3 30463 5.56% 11 1 21 3 30593 18.18% 10 1 40 4 30384 12.50% 11 1 71 3 33243 20.00% 13 1 77 3 33043 5.26% 11 1 21 3 30593 8.45% 10 Copyright, 2009 ZTE Corporation.
  • 17. 1 24 3 30233 9.88% 10 1 208 1 43361 9.68% 13 1 118 3 30663 6.38% 9 1 141 2 31162 9.52% 9 1 8 3 30173 11.36% 11 1 21 3 30593 17.24% 10 1 74 2 33422 25.00% 13 1 120 2 30992 5.26% 9 1 144 3 33573 6.12% 9 1 8 2 30172 10.34% 11 1 35 1 30341 8.11% 11 1 38 1 30061 16.00% 11 1 39 1 30521 9.09% 11 1 43 3 30513 6.67% 11 1 6 1 30211 5.56% 11 1 27 2 31582 6.25% 11 1 47 3 30453 7.14% 11 1 6 1 30211 8.70% 11 1 90 1 30811 12.50% 14 1 24 3 30233 5.88% 10 1 128 3 30713 8.33% 9 1 162 1 33561 6.25% 9 From OMCR we can export Network Planning Data table, and fond DSP No. the cell belong to. From above table, we can statistic how many sectors connected to the DSP. DSP NO. Total Sector Numbers 0 1 Copyright, 2009 ZTE Corporation.
  • 18. 9 75 10 68 11 67 12 19 13 71 14 55 15 6 16 97 17 20 18 21 19 13 20 33 21 12 22 1 From above table, we know the DSP 9,10,11,13,14 and 16 have more sectors connected to them. The DSP 16 have 97 cells connected to it, because there have a few subscriber to use GPRS service, so there haven’t DSP congestion. So we suggest move above DSP congestion cells to DSP 15,19,21,22 to balance the DSP process loading. As below, we changed the configuration of DSP, the DSP congestion is improved. 12. The PDTCH Configuration(Cell Level) Moved The Dynamic TS property used to provide more PDTCH to support data transmit, if the TCH channel is enough to support voice service, the system will shift to dynamic TCH timeslots to PDTCH. The shift action will happen at the before or back TCHs at the static PDTCH channel. If you configure as below figuration, the system only shift the before dynamic TCH timeslots to PDTCH, for this case, some shift actions will failure, because the USF flag bit can’t be moved to other PDTCHs. Copyright, 2009 ZTE Corporation.
  • 19. Figure: the Dynamic TS property only can shift forth TCH to PDTCH. So we suggest move the static PDTCH to the middle between the TCHs with Dynamic TS, the system is easy to shift the back or forth TCHs with dynamic TS property to PDTCH. The configuration is as below. Figure: the Dynamic TS property can shift both the back or forth TCH to PDTCH. 13. The PDTCH Configuration(Cell Level) changed for 3 PDTCHs Because the modulations of GPRS(CS-1 to CS-4) and EGPRS(MCS-1 to MCS-4) are GMSK, and EGPRS(MCS-5 to MCS-6) is with 8-PSK modulation. The 8-PSK gives the EGPRS high throughput, if EGPRS and GPRS are same with GMSK, the throughput of EGPRS will be lower than the GPRS. Table: the Modulation and Bit Rate of GPRS and EGPRS. Modulative Mode Coding scheme modulation RLC Blks/Ra dio Blk FEC Code Rate User bits/20ms bit Rate (bps) Family GPRS CS-1 GMSK 1 0.45 160 8,000 - CS-2 1 0.65 240 12,000 - CS-3 1 0.75 288 14,400 - Copyright, 2009 ZTE Corporation.
  • 20. CS-4 1 1 400 20,000 - EGPRS MCS-1 1 0.53 176 8,800 C MCS-2 1 0.66 224 11,200 B MCS-3 1 0.85 296 14,800 A MCS-4 1 1 352 17,600 C MCS-5 8-PSK 1 0.38 448 22,400 B MCS-6 1 0.49 592 29,600 A MCS-7 2 0.76 448+448 44,800 B MCS-8 2 0.92 544+544 54,400 A MCS-9 2 1 592+592 59,200 A We configure the PDTCH to the site with both GPRS and EGPRS supported, if they shared the PDTCH, the modulation of data coding will use GMSK to transfer data, that means the subscriber with 8-PSK will change its modulation to GMSK, so the throughput of the subscriber with 8-PSK will be decreased. The configuration is just as below. Figure: the subscribers of both GPRS and EGPRS will share the PDTCH to transfer data. Because the PS Service Preference Property is set to No Preference, the subscribers of both GPRS and EGPRS will share the PDTCH to transmit data, the modulation will use GMSK to code data, the throughput will be lower. So we must change the configuration to support GPRS and EGPRS subscribers separately, the subscribers to occupy the different PDTCH, just like below two figurations. Copyright, 2009 ZTE Corporation.
  • 21. Figure: the subscribers of EGPRS occupy the PDTCH with EDGE Dedicated Property. Above figuration indicates the subscribers of EGPRS will occupy the PDTCH with EDGE Dedicated Property. If the C/I is enough better to support the 8-PSK coding, the coding set of data transfer will use MCS-5 to MCS-9, so the throughput will be increased. In order to support the GPRS subscribers, we will configure the GPRS preference PDTCH to it, just like below figuration. Figure: the subscribers of GPRS occupy the PDTCH with GPRS Preference Property. So there have 3 PDTCH to support data transfer, the 2 PDTCHs are with EDGE dedicated and 1 PDTCH is with GPRS preference property in one sector. Copyright, 2009 ZTE Corporation.
  • 22. 14. The Throughput Improved for 3 PDTCHs After adjust above parameters and reconfiguration, the Mean Rate of EGPRS LLC DownLink Throughput of summarization from 7:00 to 24:00 by Cell is improved as below. Mean Rate of EGPRS LLC DL throughput(kbps)BSC9 10000 35000 60000 85000 110000 135000 160000 185000 210000 10-Jun11-Jun12-Jun13-Jun14-Jun15-Jun16-Jun17-Jun18-Jun19-Jun20-Jun Mean Rate of EGPRS LLC DL throughput(kbps) 137102133549136841143349143093120059168660175706161752200255 2010- 6-10 2010- 6-11 2010- 6-12 2010- 6-13 2010- 6-14 2010- 6-16 2010- 6-17 2010- 6-18 2010- 6-19 2010- 6-20 Figure: BSC9 of Mean Rate of EGPRS LLC Downlink Throughput improved. Copyright, 2009 ZTE Corporation.
  • 23. Mean Rate of EGPRS LLC DL throughput(kbps)BSC7 150000 155000 160000 165000 170000 175000 180000 185000 190000 195000 200000 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun Mean Rate of EGPRS LLC DL throughput(kbps) 181297 185345 178324 185145 180824 147880 187513 196694 192351 197421 2010- 6-10 2010- 6-11 2010- 6-12 2010- 6-13 2010- 6-14 2010- 6-16 2010- 6-17 2010- 6-18 2010- 6-19 2010- 6-20 Figure: BSC7 of Mean Rate of EGPRS LLC Downlink Throughput improved. 15. The PDTCH Configuration(Cell Level) changed for 2 PDTCHs Before we have added one more PDTCH to support data with GPRS preference property in one sector, so one TCH is decreased to support voice call in one sector. In order to avoid the customer have complaint for the TCH decreased, we have changed one PDTCH with EDGE dedicated channel to TCH channel. So in one sector there has only 2 PDTCH support data transfer, the configurations are as below. Before changing, in one sector there have 2 PDTCH support EDGE mobile and 1 PDTCH support GPRS mobile. Copyright, 2009 ZTE Corporation.
  • 24. Figure: in one sector there have 2 PDTCH support EGDE mobile and 1PDTCH support GPRS mobile. After changing, in one sector there have only 1 PDTCH support EDGE mobile and 1 PDTCH support GPRS mobile. Copyright, 2009 ZTE Corporation.
  • 25. Figure: in one sector there have only 1 PDTCH support EGDE mobile and 1PDTCH support GPRS mobile. 16. The Throughput Improved for 2 PDTCHs After changing from 3 PDTCH channels to 2 PDTCH channels in one sector, the Mean Rate of EGPRS LLC DownLink Throughput of summarization from 7:00 to 24:00 by Cell is same as below. Copyright, 2009 ZTE Corporation.
  • 26. Mean Rate of EGPRS LLC DL throughput(kbps)BSC9 100000 110000 120000 130000 140000 150000 160000 170000 180000 190000 200000 210000 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun Mean Rate of EGPRS LLC DL throughput(kbps) 137102 133549 136841 143349 143093 120059 168660 175706 161752 200255 167678 166143 160242 161366 162500 2010- 6- 10 2010- 6- 11 2010- 6- 12 2010- 6- 13 2010- 6- 14 2010- 6- 16 2010- 6- 17 2010- 6- 18 2010- 6- 19 2010- 6- 20 2010- 6- 21 2010- 6- 22 2010- 6- 23 2010- 6- 24 2010- 6- 25 Figure: BSC9 of Mean Rate of EGPRS LLC Downlink Throughput. Mean Rate of EGPRS LLC DL throughput(kbps)B8 165000 170000 175000 180000 185000 190000 195000 200000 205000 210000 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun Mean Rate of EGPRS LLC DL throughput(kbps) 181954188208181190194658193982189402199302187748199171199804204267204806195568196447 10- 6- 11 10- 6- 12 10- 6- 13 10- 6- 14 10- 6- 16 10- 6- 17 10- 6- 18 10- 6- 19 10- 6- 20 10- 6- 21 10- 6- 22 10- 6- 23 10- 6- 24 10-6- 25 Figure: BSC8 of Mean Rate of EGPRS LLC Downlink Throughput. Mean Rate of EGPRS LLC DL throughput(kbps)BSC7 150000 155000 160000 165000 170000 175000 180000 185000 190000 195000 200000 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun Mean Rate of EGPRS LLC DL throughput( kbps) 181297185345178324185145180824147880187513196694192351197421188743189510182875189102197509 2010- 6- 10 2010- 6- 11 2010- 6- 12 2010- 6- 13 2010- 6- 14 2010- 6- 16 2010- 6- 17 2010- 6- 18 2010- 6- 19 2010- 6- 20 2010- 6- 21 2010- 6- 22 2010- 6- 23 2010- 6- 24 2010- 6- 25 Figure: BSC7 of Mean Rate of EGPRS LLC Downlink Throughput. Copyright, 2009 ZTE Corporation.
  • 27. Mean Rate of EGPRS LLC DL throughput(kbps)BSC6 150000 170000 190000 210000 230000 250000 270000 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun Mean Rate of EGPRS LLC DL throughput(kbps) 190840. 77 239575. 66 257611. 73 251368. 63 246125. 03 244249. 74 236479. 53 244116. 71 2010- 6- 18 2010- 6- 19 2010- 6- 20 2010- 6- 21 2010- 6- 22 2010- 6- 23 2010- 6- 24 2010- 6- 25 Figure: BSC6 of Mean Rate of EGPRS LLC Downlink Throughput. 17. Test Conclusion of EGPRS Download Throughput After changing above parameters and balance the DSP configuration, we have got best download throughput. Copyright, 2009 ZTE Corporation.
  • 28. Copyright, 2009 ZTE Corporation.