NUE 505A Electrical systems safety Assessment preparation
Protection devices
10 -1 1 10 10 2 10 3 4.5 Time (sec) Current (x I RATED ) B Magnetic Section Thermal Section Circuit Breaker Types
10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) 7.5 C Thermal Section New Magnetic operation Circuit Breaker Types
10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) 12 D Thermal Section New Magnetic operation Circuit Breaker Types
RCD,s
Residual Current Device  RCD Safety Switch LOAD N A/s Supply When the circuit is in good condition. (No Earth Faults) (I  active =  I  neutral) = No Flux = No Induced EMF Supply to the Load is Maintained I A I N
RCD with Earth Fault LOAD N A/s Supply  When an Earth Faults occurs. (I  active     I  neutral) = Flux in Core = Induced EMF The fault is Isolated
Safety Switch N A/s Supply Not Earthed A person can receive a shock with a “Safety Switch” installed Another point to consider: An RCD rated at 40Amps will not trip (like a C/B) if say 52Amps will to flow through the device.
3   RCD  3   LOAD  N L1 Supply LOAD L2 L3
3   RCD  1   LOAD  N Supply LOAD A
 
 
 
 
Max Demand Calculations Domestic Lighting
 
 
 
 
Max Demand Calculations Domestic Power
 
 
 
 
Max Demand Calculations Domestic Appliances
 
 
Max Demand Calculations Domestic Multi-phase
 
 
 
Max Demand Calculations Non-Domestic Lighting
A Small motel installation contains the following
 
 
 
Max Demand Calculations Non-Domestic Power
A factory has the following loading, calculate the maximum demand consideration.
 
 
Max Demand Calculations Non-Domestic Appliances
A factory has the following three-phase loads,what would be the loading for a maximum demand calculation.
 
 
Cable selection
 
 
 
 
 
Cable selection based on voltage drop
 
 
 
 
 
 
Voltage drop Single-phase
 
 
 
 
 
Voltage drop Multi-phase
 
 
 
Conductor size based on voltage drop
 
 
 
 
 
 
 
Overall multi-phase voltage drop calculation
 
 
 
Fault loop impedance
AS/NZ 3000:2000 - 1.7.4.3.3 ,[object Object],[object Object],[object Object],[object Object],6.3.3.2.1 6.3.3.2.2 Amendment AS/NZS 3000:2000
The Fault Loop  1. The impedance needs to be low enough, to allow a high enough fault current, to operate the protective device, within a given time period. (6.3.3.2.2)  2. The Earth Loop Impedance is matched to the Protective Device Tripping Characteristics. 3 Phase Supply N/L
Earth System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Earth System 1 Measure the Fault Loop Impedance… ,[object Object],[object Object]
Earth System ♦  Z LOOP  =  Z ACTIVE  + Z EARTH  + Z  NEUTRAL  + Z  TX ♦  All these will limit current and dictate the fault current that will flow. Load N/L 16A MEN Link must be left intact
Earth System AS3000: Wiring Rules
Earth System
10 -1 1 10 10 2 10 3 4 Time (sec) Current (x I RATED ) B Circuit Breaker Types 1x Magnetic Section Thermal Section
10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) Circuit Breaker Types 1x 7.5 C Thermal Section New Magnetic operation
10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) Circuit Breaker Types 1x 12.5 D Thermal Section New Magnetic operation
Earth System Load 16A N/L MEN Link must be left intact
Earth System Load 16A N/L Active Earth MEN Link must be left intact
 
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Earth System 1 Measure the Fault Loop Impedance… ,[object Object],[object Object],2. Calculate the maximum length allowable  for the Final Sub Circuit and come in under that.
Earth System Load 16A N/L With 80% of voltage drop here in a fault,  the FSC must have 80% of the total Fault Loop Impedance. Where the length and CSA of the mains is  not known, we may assume that 80% of the voltage drop under fault conditions will occur in the final sub-circuit (B5.2.1b).
0.8 x V NOM  x CSA ACTIVE  x CSA  EARTH L MAX  =  I TRIP  x    x (CSA ACTIVE  + CSA  EARTH )    = 22.5 x 10 -3   ohm-mm 2 /metre for Copper = 36 x 10 -3  ohm-mm 2 /metre   for Aluminium ,[object Object],[object Object],[object Object],[object Object],(Page 237 AS3000)
 
Earth System 1 Measure the Fault Loop Impedance… ,[object Object],[object Object],2. Calculate the maximum length allowable  for the Final Sub Circuit and come in under that. 3.  Measure the A/A-E impedance. (Compare it to Table 3.2 AS3017)
AS3017: Testing and Inspection Guidlines ,[object Object],[object Object],[object Object],[object Object]
MAIN SWITCHBOARD Load
But what if the cable/CB size is not there on that table?
Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away.  C/B is 400A type “C”.  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away…  7.  Measure the actual loop impedance. MAIN SWITCHBOARD Load Z = V/I A V I    5A
[object Object],[object Object],[object Object],Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away…  Note that including X L  of the cable only  comes into play above 120mm 2 Z R X L
[object Object],[object Object],[object Object],Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away…  ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away…
[object Object],[object Object],[object Object],[object Object],Say, 300mm 2  orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away…  R A  + R E  =  0.0298  X A  + X E  = 0.02065  Z =  0.0362  R ACTIVE R EARTH X ACTIVE X EARTH
4.  Is Loop Z < Maximum Allowable Z? Last Step…: ,[object Object],[object Object],Z =  0.0362  Z = 0.0512 
Remember the last question? Q:  Why do we want a low resistance earth wire?  To CREATE a high enough fault current to trip the protective device. To ensure that we do create a high enough fault current, fault loop impedance must be low enough.
AS3017: Testing and Inspection Guidlines
A Simplified  Circuit We need to look at a complete loop (circuit) 3 Phase Supply The current path includes the: Supply Transformer, Distribution System, Mains, Protection Device, Final Sub-Circuit including the Load N/L
B5.1 Maximum Circuit Length ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3 Phase Supply There will always be more than 80% of the Nominal Voltage AS/NZ3000:2000  B5.2.1 b Zext Zint Zint =  0.8 Uo I a B5.2.1
Isolation, disconnection and reconnection procedures
Safe Isolation   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
MEN Connection
MEN SYSTEM
Recent studies have shown that 95% of electricians do not fully understand the MEN system.  This figure comes from the Electrical Contractors Association of Queensland who were conducting training sessions throughout Queensland during 1998.  They asked electricians to draw a MEN system and explain it. Only 5% could!!! MEN System
MEN Connection Consumer Mains MAIN SWITCHBOARD Circuit Protective Devices Earth Link Neutral Link Main Switch
MEN Connection Circuit Protective Devices Consumer Mains MAIN SWITCHBOARD Neutral Link Main Switch So why do we earth the  neutral at the board?
Load Direct Earthing System 16A Q: Will the  fuse blow? FAULT R TOTAL = 23.5  I FAULT  = V/R = 240/23.5    10A 0.3  0.2  23 
Load MEN Earthing System 0.3  0.2  16A R TOTAL = 1  Q: Will the  fuse blow? 0.5  I FAULT  = V/R = 240/1 = 240A N/L FAULT R RETURN  = 0.5//23      0.5  23 
Q:  Why do we want a low resistance earth wire?  To CREATE a high enough fault current to trip the protective device.
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Earth Link Neutral Link NORMAL LOAD CURRENT Typical  Earth stake to Earth resistance  = 30   - 2k  Main Switch Load Low R Consumer Mains
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Earth Link Neutral Link FAULT CURRENT Main Switch Load A Low Resistance earth  CREATES A high fault current. Low R
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link What are the values given by AS3000 on earth resistance? Main Switch Load
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link 2   maximum 2   maximum Main Switch Load
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link Main Switch < 0.5  (6.3.3.2.2) Load “ The resistance of the protective  earthing conductors shall be  low enough to permit the  passage of current  necessary to operate the  overcurrent protective device” (6.3.3.2.2)
Why Test
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Earth Link Neutral Link Load OPEN  CIRCUIT MEN Connection
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Earth Link Neutral Link NORMAL LOAD CURRENT Everything operates  OK!!! Load
THEREFORE FAULT  CURRENT WILL BE VERY LOW MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT But RESISTANCE TO EARTH IS  USUALLY HIGH. Load
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT AND PROTECTION WILL NOT TRIP. Load
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT NOTE  THAT IF ACTIVE IS SHORTED TO EARTH, ALL EARTHS ARE LIVE!!! Load
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT NOTE  ALSO THAT UNDER NORMAL CONDITIONS EVERYTHING ELSE WILL STILL WORK OK!!! Load
Open Circuit MEN Connection MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains Neutral Link DISTRIBUTION BOARD 3 Circuit Protective  Devices Earthing Bar DISTRIBUTION BOARD  2 Circuit Protective Devices Neutral Link Earthing Bar Main  Earthing  Conductor Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD  1 Main Switch What happens on  Distribution Boards  when the MSB MEN link open-circuits ? AS3000 5.6.6b(iv)
[object Object]
MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link A N LIVEN UP:  -Earth stake -Water pipes -Taps -Sink -Cases of appliances Load
MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains ` Neutral Link DISTRIBUTION BOARD 3 Circuit Protective  Devices Earthing Bar DISTRIBUTION BOARD  2 Circuit Protective Devices Neutral Link Earthing Bar Main  Earthing  Conductor Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD  1 Main Switch What happens on  Distribution Boards  when Main Active  and Main Neutral are swapped? N A
[object Object],[object Object]
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link OPEN  CIRCUIT Neutral Load
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link LOAD CURRENT Load
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link LOAD CURRENT Load
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Lo load Resistance Hi stake - earth Resistance: 30   - 2k  Load Voltages... High Voltage Low Voltage High Voltage  on  Earth System
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Lo load Resistance Hi stake - earth Resistance: 30   - 2k  High Voltage Low Voltage Livens: -Taps, -Sinks -Water pipes -Metal cases of appliances Load Voltages... High Voltage  on  Earth System
Q: What causes “tingles” on taps? MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads
Q: What causes “tingles” on taps? VD N =4V MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads
Q: What causes “tingles” on taps? MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads 4V 0V
Testing
TEST  EQUIPMENT  REQUIRED  (AS3017 1.6.2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
TEST  EQUIPMENT  REQUIRED  (AS3017 1.6.2) ,[object Object],[object Object],[object Object],[object Object],[object Object]
TESTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Step 1: Visual Examination
General Requirements Clause No. What to look for 2.9.6  No exposed live parts.  E.g. no excessive removal of insulation at terminations, terminal covers in place etc. Double insulation maintained where required.  E.g. no single insulation in ceiling above light fittings, no more than 100mm single insulation in wall behind accessories, insulating shrouds installed where required. 1.9 All equipment is approved/compliant with Australian Standards and in good condition.  E.g. no unsafe/damaged or non-compliant equipment installed.
Consumer Mains Clause No. What to look for 3.4.1 Consumers Mains should be able to carry the maximum demand current of the installation with some capacity to spare.  As a guide: 16mm2 (or parallel 6mm2) for overhead mains, 10mm2 for underground mains.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Initial Procedures ,[object Object],[object Object],[object Object]
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light
[object Object],[object Object],[object Object],[object Object],STEP 2: Earth Continuity
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light Known resistance
STEP 3: Insulation Resistance ,[object Object],[object Object],[object Object],[object Object],1. Consumer Mains: Disconnect any service bonding conductor:
STEP 3: Insulation Resistance ,[object Object],[object Object],[object Object],2. Final Subcircuits: With all C/B’s ON or fuse wedges IN, and all switches in the installation ON:
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light
MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light Switched Active
STEP 3: Insulation Resistance ,[object Object]
[object Object],[object Object],[object Object],[object Object],STEP 4: Polarity Tests
STEP 5: Correct Circuit Connections ,[object Object],[object Object]
MEN Connection MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains ` Neutral Link DISTRIBUTION BOARD 3 Circuit Protective  Devices Earthing Bar DISTRIBUTION BOARD  2 Circuit Protective Devices Neutral  Link Earthing Bar Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD  1 Main Switch A N Thank You The End
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety
Electrical Systems Safety

Más contenido relacionado

La actualidad más candente

basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdfThien Phan Bản
 
TRANSFORMERS and LOSSES
TRANSFORMERS and LOSSESTRANSFORMERS and LOSSES
TRANSFORMERS and LOSSESPraveen Kumar
 
Electrical Protection systems in Thermal power stations.ppt
Electrical Protection systems in Thermal power stations.pptElectrical Protection systems in Thermal power stations.ppt
Electrical Protection systems in Thermal power stations.pptNarasimhanRengarajan1
 
Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.SARAVANAN A
 
transmission line
transmission line transmission line
transmission line singh1515
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdfNerupaSharma
 
An introduction to FACTS Technology
An introduction to FACTS TechnologyAn introduction to FACTS Technology
An introduction to FACTS TechnologyAyyarao T S L V
 
Unit-2 Three Phase controlled converter
Unit-2 Three Phase controlled converter Unit-2 Three Phase controlled converter
Unit-2 Three Phase controlled converter johny renoald
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Md Abu Jauad Khan Aliv
 
Understanding and testing_the_abb_red670
Understanding and testing_the_abb_red670Understanding and testing_the_abb_red670
Understanding and testing_the_abb_red670طه محمد
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Mechanical Design of Transmission lines.pptx
Mechanical Design of Transmission lines.pptxMechanical Design of Transmission lines.pptx
Mechanical Design of Transmission lines.pptxkarthik prabhu
 
Underground cables
Underground cablesUnderground cables
Underground cablesAnu71
 
Design of transformer
Design of transformerDesign of transformer
Design of transformerSubrata Dey
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relaydavid roy
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformersZiyaulhaq
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.pptSalim Palayi
 

La actualidad más candente (20)

basic-partial-discharge.pdf
basic-partial-discharge.pdfbasic-partial-discharge.pdf
basic-partial-discharge.pdf
 
TRANSFORMERS and LOSSES
TRANSFORMERS and LOSSESTRANSFORMERS and LOSSES
TRANSFORMERS and LOSSES
 
Electrical Protection systems in Thermal power stations.ppt
Electrical Protection systems in Thermal power stations.pptElectrical Protection systems in Thermal power stations.ppt
Electrical Protection systems in Thermal power stations.ppt
 
Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.Simple SF6 CB Testing for Switchyard Equipment.
Simple SF6 CB Testing for Switchyard Equipment.
 
transmission line
transmission line transmission line
transmission line
 
transformer_design.pdf
transformer_design.pdftransformer_design.pdf
transformer_design.pdf
 
An introduction to FACTS Technology
An introduction to FACTS TechnologyAn introduction to FACTS Technology
An introduction to FACTS Technology
 
Unit-2 Three Phase controlled converter
Unit-2 Three Phase controlled converter Unit-2 Three Phase controlled converter
Unit-2 Three Phase controlled converter
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)
 
Understanding and testing_the_abb_red670
Understanding and testing_the_abb_red670Understanding and testing_the_abb_red670
Understanding and testing_the_abb_red670
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Basic protection and relaying
Basic protection and relayingBasic protection and relaying
Basic protection and relaying
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Lightning arrester
Lightning arresterLightning arrester
Lightning arrester
 
Mechanical Design of Transmission lines.pptx
Mechanical Design of Transmission lines.pptxMechanical Design of Transmission lines.pptx
Mechanical Design of Transmission lines.pptx
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Design of transformer
Design of transformerDesign of transformer
Design of transformer
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relay
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 

Similar a Electrical Systems Safety

Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsJames S Nasby
 
1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docxjackiewalcutt
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdfLiewChiaPing
 
Bsf earthing system calculation-1
Bsf earthing system calculation-1Bsf earthing system calculation-1
Bsf earthing system calculation-1Raymund Cortez
 
Short circuit (wic) testing and parameters.
Short circuit (wic) testing and parameters.Short circuit (wic) testing and parameters.
Short circuit (wic) testing and parameters.Mustafa Ismail
 
Si Intro(100413)
Si Intro(100413)Si Intro(100413)
Si Intro(100413)imsong
 
Introduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.pptIntroduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.pptAhmed Ramadan
 
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxCHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxLiewChiaPing
 
Schneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersSchneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersThorne & Derrick International
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 
Panasonic SA-AK450P SA-AK450PC - Manual de servicio
Panasonic SA-AK450P SA-AK450PC - Manual de servicioPanasonic SA-AK450P SA-AK450PC - Manual de servicio
Panasonic SA-AK450P SA-AK450PC - Manual de servicioAnonimo Goncen
 
Bus ele tech_lib_short_circuit_current_calculations (1)
Bus ele tech_lib_short_circuit_current_calculations (1)Bus ele tech_lib_short_circuit_current_calculations (1)
Bus ele tech_lib_short_circuit_current_calculations (1)ingcortez
 
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...Jobin Abraham
 

Similar a Electrical Systems Safety (20)

Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC Considerations
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Lecture 18
Lecture 18Lecture 18
Lecture 18
 
1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx1. Determine the voltage drop at the motor frame for an earth .docx
1. Determine the voltage drop at the motor frame for an earth .docx
 
DC Component of Fault Current
DC Component of Fault CurrentDC Component of Fault Current
DC Component of Fault Current
 
3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf3_Overcurrent Protection.pdf
3_Overcurrent Protection.pdf
 
Bsf earthing system calculation-1
Bsf earthing system calculation-1Bsf earthing system calculation-1
Bsf earthing system calculation-1
 
Short circuit (wic) testing and parameters.
Short circuit (wic) testing and parameters.Short circuit (wic) testing and parameters.
Short circuit (wic) testing and parameters.
 
Si Intro(100413)
Si Intro(100413)Si Intro(100413)
Si Intro(100413)
 
Introduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.pptIntroduction-to-MV-Design-Guide.ppt
Introduction-to-MV-Design-Guide.ppt
 
Ehv line design
Ehv line designEhv line design
Ehv line design
 
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxCHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
 
Lecture_18.ppt
Lecture_18.pptLecture_18.ppt
Lecture_18.ppt
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
Schneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment DesignersSchneider Technical Guide - Medium Voltage Equipment Designers
Schneider Technical Guide - Medium Voltage Equipment Designers
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
Panasonic SA-AK450P SA-AK450PC - Manual de servicio
Panasonic SA-AK450P SA-AK450PC - Manual de servicioPanasonic SA-AK450P SA-AK450PC - Manual de servicio
Panasonic SA-AK450P SA-AK450PC - Manual de servicio
 
Bus ele tech_lib_short_circuit_current_calculations (1)
Bus ele tech_lib_short_circuit_current_calculations (1)Bus ele tech_lib_short_circuit_current_calculations (1)
Bus ele tech_lib_short_circuit_current_calculations (1)
 
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...
ELECTRICAL POWER SYSTEM - II. symmetrical three phase faults. PREPARED BY : J...
 
Sub station design
Sub station designSub station design
Sub station design
 

Más de Talia Carbis

4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3Talia Carbis
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2Talia Carbis
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 TableTalia Carbis
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2Talia Carbis
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1Talia Carbis
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light DemandTalia Carbis
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3Talia Carbis
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2Talia Carbis
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1Talia Carbis
 
4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution ThreeTalia Carbis
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example ThreeTalia Carbis
 
4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example SingleTalia Carbis
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1Talia Carbis
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5Talia Carbis
 

Más de Talia Carbis (20)

7.4.6 slip
7.4.6 slip7.4.6 slip
7.4.6 slip
 
4.2.1 Better Load
4.2.1 Better Load4.2.1 Better Load
4.2.1 Better Load
 
4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light Demand
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1
 
4.1.4 Step 2
4.1.4 Step 24.1.4 Step 2
4.1.4 Step 2
 
4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution Three
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example Three
 
4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example Single
 
5.4.4 LR Circuits
5.4.4 LR Circuits5.4.4 LR Circuits
5.4.4 LR Circuits
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1
 
14.5.3 Improve
14.5.3 Improve14.5.3 Improve
14.5.3 Improve
 
14.1.2 TRA Power
14.1.2 TRA Power14.1.2 TRA Power
14.1.2 TRA Power
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5
 

Último

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 

Último (20)

Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 

Electrical Systems Safety

  • 1. NUE 505A Electrical systems safety Assessment preparation
  • 2.
  • 4. 10 -1 1 10 10 2 10 3 4.5 Time (sec) Current (x I RATED ) B Magnetic Section Thermal Section Circuit Breaker Types
  • 5. 10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) 7.5 C Thermal Section New Magnetic operation Circuit Breaker Types
  • 6. 10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) 12 D Thermal Section New Magnetic operation Circuit Breaker Types
  • 8. Residual Current Device RCD Safety Switch LOAD N A/s Supply When the circuit is in good condition. (No Earth Faults) (I active = I neutral) = No Flux = No Induced EMF Supply to the Load is Maintained I A I N
  • 9. RCD with Earth Fault LOAD N A/s Supply  When an Earth Faults occurs. (I active  I neutral) = Flux in Core = Induced EMF The fault is Isolated
  • 10. Safety Switch N A/s Supply Not Earthed A person can receive a shock with a “Safety Switch” installed Another point to consider: An RCD rated at 40Amps will not trip (like a C/B) if say 52Amps will to flow through the device.
  • 11. 3  RCD 3  LOAD N L1 Supply LOAD L2 L3
  • 12. 3  RCD 1  LOAD N Supply LOAD A
  • 13.  
  • 14.  
  • 15.  
  • 16.  
  • 17. Max Demand Calculations Domestic Lighting
  • 18.  
  • 19.  
  • 20.  
  • 21.  
  • 22. Max Demand Calculations Domestic Power
  • 23.  
  • 24.  
  • 25.  
  • 26.  
  • 27. Max Demand Calculations Domestic Appliances
  • 28.  
  • 29.  
  • 30. Max Demand Calculations Domestic Multi-phase
  • 31.  
  • 32.  
  • 33.  
  • 34. Max Demand Calculations Non-Domestic Lighting
  • 35. A Small motel installation contains the following
  • 36.  
  • 37.  
  • 38.  
  • 39. Max Demand Calculations Non-Domestic Power
  • 40. A factory has the following loading, calculate the maximum demand consideration.
  • 41.  
  • 42.  
  • 43. Max Demand Calculations Non-Domestic Appliances
  • 44. A factory has the following three-phase loads,what would be the loading for a maximum demand calculation.
  • 45.  
  • 46.  
  • 48.  
  • 49.  
  • 50.  
  • 51.  
  • 52.  
  • 53. Cable selection based on voltage drop
  • 54.  
  • 55.  
  • 56.  
  • 57.  
  • 58.  
  • 59.  
  • 61.  
  • 62.  
  • 63.  
  • 64.  
  • 65.  
  • 67.  
  • 68.  
  • 69.  
  • 70. Conductor size based on voltage drop
  • 71.  
  • 72.  
  • 73.  
  • 74.  
  • 75.  
  • 76.  
  • 77.  
  • 78. Overall multi-phase voltage drop calculation
  • 79.  
  • 80.  
  • 81.  
  • 83.
  • 84. The Fault Loop 1. The impedance needs to be low enough, to allow a high enough fault current, to operate the protective device, within a given time period. (6.3.3.2.2) 2. The Earth Loop Impedance is matched to the Protective Device Tripping Characteristics. 3 Phase Supply N/L
  • 85.
  • 86.
  • 87. Earth System ♦ Z LOOP = Z ACTIVE + Z EARTH + Z NEUTRAL + Z TX ♦ All these will limit current and dictate the fault current that will flow. Load N/L 16A MEN Link must be left intact
  • 88. Earth System AS3000: Wiring Rules
  • 90. 10 -1 1 10 10 2 10 3 4 Time (sec) Current (x I RATED ) B Circuit Breaker Types 1x Magnetic Section Thermal Section
  • 91. 10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) Circuit Breaker Types 1x 7.5 C Thermal Section New Magnetic operation
  • 92. 10 -1 1 10 10 2 10 3 Time (sec) Current (x I RATED ) Circuit Breaker Types 1x 12.5 D Thermal Section New Magnetic operation
  • 93. Earth System Load 16A N/L MEN Link must be left intact
  • 94. Earth System Load 16A N/L Active Earth MEN Link must be left intact
  • 95.  
  • 96.
  • 97.
  • 98. Earth System Load 16A N/L With 80% of voltage drop here in a fault, the FSC must have 80% of the total Fault Loop Impedance. Where the length and CSA of the mains is not known, we may assume that 80% of the voltage drop under fault conditions will occur in the final sub-circuit (B5.2.1b).
  • 99.
  • 100.  
  • 101.
  • 102.
  • 104. But what if the cable/CB size is not there on that table?
  • 105.
  • 106. Say, 300mm 2 orange circ. cable supplying a 415V, 350A, 3-phase motor through underground conduit 140mtrs away… 7. Measure the actual loop impedance. MAIN SWITCHBOARD Load Z = V/I A V I  5A
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112. Remember the last question? Q: Why do we want a low resistance earth wire?  To CREATE a high enough fault current to trip the protective device. To ensure that we do create a high enough fault current, fault loop impedance must be low enough.
  • 113. AS3017: Testing and Inspection Guidlines
  • 114. A Simplified Circuit We need to look at a complete loop (circuit) 3 Phase Supply The current path includes the: Supply Transformer, Distribution System, Mains, Protection Device, Final Sub-Circuit including the Load N/L
  • 115.
  • 116. 3 Phase Supply There will always be more than 80% of the Nominal Voltage AS/NZ3000:2000 B5.2.1 b Zext Zint Zint = 0.8 Uo I a B5.2.1
  • 117. Isolation, disconnection and reconnection procedures
  • 118.
  • 119.  
  • 122. Recent studies have shown that 95% of electricians do not fully understand the MEN system. This figure comes from the Electrical Contractors Association of Queensland who were conducting training sessions throughout Queensland during 1998. They asked electricians to draw a MEN system and explain it. Only 5% could!!! MEN System
  • 123. MEN Connection Consumer Mains MAIN SWITCHBOARD Circuit Protective Devices Earth Link Neutral Link Main Switch
  • 124. MEN Connection Circuit Protective Devices Consumer Mains MAIN SWITCHBOARD Neutral Link Main Switch So why do we earth the neutral at the board?
  • 125. Load Direct Earthing System 16A Q: Will the fuse blow? FAULT R TOTAL = 23.5  I FAULT = V/R = 240/23.5  10A 0.3  0.2  23 
  • 126. Load MEN Earthing System 0.3  0.2  16A R TOTAL = 1  Q: Will the fuse blow? 0.5  I FAULT = V/R = 240/1 = 240A N/L FAULT R RETURN = 0.5//23  0.5  23 
  • 127. Q: Why do we want a low resistance earth wire?  To CREATE a high enough fault current to trip the protective device.
  • 128. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Earth Link Neutral Link NORMAL LOAD CURRENT Typical Earth stake to Earth resistance = 30  - 2k  Main Switch Load Low R Consumer Mains
  • 129. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Earth Link Neutral Link FAULT CURRENT Main Switch Load A Low Resistance earth CREATES A high fault current. Low R
  • 130. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link What are the values given by AS3000 on earth resistance? Main Switch Load
  • 131. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link 2  maximum 2  maximum Main Switch Load
  • 132. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Consumer Mains Earth Link Neutral Link Main Switch < 0.5  (6.3.3.2.2) Load “ The resistance of the protective earthing conductors shall be low enough to permit the passage of current necessary to operate the overcurrent protective device” (6.3.3.2.2)
  • 134. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Earth Link Neutral Link Load OPEN CIRCUIT MEN Connection
  • 135. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Earth Link Neutral Link NORMAL LOAD CURRENT Everything operates OK!!! Load
  • 136. THEREFORE FAULT CURRENT WILL BE VERY LOW MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT But RESISTANCE TO EARTH IS USUALLY HIGH. Load
  • 137. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT AND PROTECTION WILL NOT TRIP. Load
  • 138. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT NOTE THAT IF ACTIVE IS SHORTED TO EARTH, ALL EARTHS ARE LIVE!!! Load
  • 139. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Earth Link Neutral Link FAULT CURRENT NOTE ALSO THAT UNDER NORMAL CONDITIONS EVERYTHING ELSE WILL STILL WORK OK!!! Load
  • 140. Open Circuit MEN Connection MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains Neutral Link DISTRIBUTION BOARD 3 Circuit Protective Devices Earthing Bar DISTRIBUTION BOARD 2 Circuit Protective Devices Neutral Link Earthing Bar Main Earthing Conductor Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD 1 Main Switch What happens on Distribution Boards when the MSB MEN link open-circuits ? AS3000 5.6.6b(iv)
  • 141.
  • 142. MAIN SWITCHBOARD MEN Connection Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link A N LIVEN UP: -Earth stake -Water pipes -Taps -Sink -Cases of appliances Load
  • 143. MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains ` Neutral Link DISTRIBUTION BOARD 3 Circuit Protective Devices Earthing Bar DISTRIBUTION BOARD 2 Circuit Protective Devices Neutral Link Earthing Bar Main Earthing Conductor Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD 1 Main Switch What happens on Distribution Boards when Main Active and Main Neutral are swapped? N A
  • 144.
  • 145. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link OPEN CIRCUIT Neutral Load
  • 146. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link LOAD CURRENT Load
  • 147. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link LOAD CURRENT Load
  • 148. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Lo load Resistance Hi stake - earth Resistance: 30  - 2k  Load Voltages... High Voltage Low Voltage High Voltage on Earth System
  • 149. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Lo load Resistance Hi stake - earth Resistance: 30  - 2k  High Voltage Low Voltage Livens: -Taps, -Sinks -Water pipes -Metal cases of appliances Load Voltages... High Voltage on Earth System
  • 150. Q: What causes “tingles” on taps? MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads
  • 151. Q: What causes “tingles” on taps? VD N =4V MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads
  • 152. Q: What causes “tingles” on taps? MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link All Loads 4V 0V
  • 154.
  • 155.
  • 156.
  • 157.
  • 158. General Requirements Clause No. What to look for 2.9.6 No exposed live parts. E.g. no excessive removal of insulation at terminations, terminal covers in place etc. Double insulation maintained where required. E.g. no single insulation in ceiling above light fittings, no more than 100mm single insulation in wall behind accessories, insulating shrouds installed where required. 1.9 All equipment is approved/compliant with Australian Standards and in good condition. E.g. no unsafe/damaged or non-compliant equipment installed.
  • 159. Consumer Mains Clause No. What to look for 3.4.1 Consumers Mains should be able to carry the maximum demand current of the installation with some capacity to spare. As a guide: 16mm2 (or parallel 6mm2) for overhead mains, 10mm2 for underground mains.
  • 160.
  • 161.
  • 162.
  • 163.
  • 164.
  • 165.
  • 166. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light
  • 167.
  • 168. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light Known resistance
  • 169.
  • 170.
  • 171. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light
  • 172. MAIN SWITCHBOARD Circuit Protective Devices Main Switch Consumer Mains Earth Link Neutral Link Light Switched Active
  • 173.
  • 174.
  • 175.
  • 176. MEN Connection MAIN SWITCHBOARD Circuit Protective Devices Neutral Link Sub Mains Sub Mains ` Neutral Link DISTRIBUTION BOARD 3 Circuit Protective Devices Earthing Bar DISTRIBUTION BOARD 2 Circuit Protective Devices Neutral Link Earthing Bar Sub Mains Circuit Protective Devices Neutral Link Earthing Bar DISTRIBUTION BOARD 1 Main Switch A N Thank You The End