Multi-Use Path Facility along the
  Las Cruces Outfall Channel
        Contract Award

      City of Las Cruces
     Project No. 11-12-312
N

MULTI USE PATH FACILITY ALONG THE LAS CRUCES OUTFALL   W       E



  CHANNNEL FROM TRIVIZ TRAIL TO THE LLORONA TRAIL          S
Background
• Project was submitted to and ranked in the top five
  by the MPO Policy Committee for FY 2010.

• July 2010, the City was notified by the NMDOT of
  the funding award for the construction of the trail
  along the LC Outfall Channel form North Triviz Dr.
  to La Llorona Trail.

• The trail will be a 4.25 mile east-west bicycle and
  pedestrian facility that would bridge the north end of
  the Triviz multi-use pathway with the north end of
  the La Llorona multi-purpose pathway at the Rio
  Grande.
Background Cont.
• A special use permit was needed with EBID since
  portions of the Las Cruces Outfall Channel are under
  their jurisdiction.

• The Las Cruces Outfall Channel Trail Project falls
  under three goals on the City of Las Cruces Strategic
  Plan: 2.36, 2.37 & 3.13.

• The trail was also included in Transport 2040 Plan.
Proposed Loop
Trails
Background Cont.
• April, 2011 City Council approved the Cooperative
  Agreement from NMDOT that required the City to
  provide a 25% match.

  NMDOT Grant (75%) …………….$758,418.00
  City’s match (25%) …………….$252,806.00
                          1,001,224.00

• Project had to be submitted to NMDOT by August
  15, 2011 to make the federal fiscal year authorization
  time line.

• On September 20, 2011 FHWA officially approved
  the project for advertisement.
Project Information

• The project will consist of a 10’ wide asphalt
  surface
• Erosion control
• Striping
• Signage
• Bollards
• Crosswalks with advance warning.
• The path will accommodate both pedestrian and
  bicycle traffic.
Project Information Cont.

• Bids Received: 7

• Eng. Est. ….……..                $1,355,213.40

• Low Bid …………..                     $997,169.40
   – Burn Construction Company, Inc.
   – 26.4% Below Engineers Estimate

• Funding Source: NMDOT, 2005 Public Improvement,
  Flood Control and Park Development funds

• Contract Duration: 120 Working Days.
Project Expenditure Summary

   State Street Improvements (4212)   $     758,418.00
   2005 Public Improvement (4023)     $     135,000.00
   Park Development (4106)            $     100,000.00
   Flood Control (4400)               $     129,020.81
   Total Project                          $1,122,438.81


Matching funds required $252,806. Funding is
available from previously completed projects with
remaining balances.
Council Options
          Multi-Use Path Facility Project

• Option 1
  – Award contract to Burn Construction Company, Inc.
  – $997,169.40
  – $1,122,438.81 w/ Tax & Contingency
• Option 2
  – Reject and Re bid the project
• Option 3
  – Reject and Re scope the project
• Option 4
  – Reject and Abandon the project for a later date
Project Expenditure Summary

   State Street Improvements (4212)   $     758,418.00
   2005 Public Improvement (4023)     $     135,000.00
   Park Development (4106)            $     100,000.00
   Flood Control (4400)               $     129,020.81
   Total Project                          $1,122,438.81


The matching funds ($252,806) and the funds above
the required match amount ($111,214.81) are
available in Funds 4106,4023,& 4400. Funding is
available from previously completed projects with
remaining balances.
Typical Cross Section
PROPOSED IMPROVEMENTS
 SIMILAR TO TRIVIZ AVE PATH




New 10 foot wide asphalt multi-use path
similar to the asphalt path along Triviz
Dr.
Radio Controlled/Solar LED
Crosswalk Flashing Beacon




        (typical applications)
Signing & Amenities
TYPICAL REMOVABLE BOLLARDS




TYPICAL HAND RAILS




            TYPICAL BARRICADES

Más contenido relacionado

La actualidad más candente

Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationCity of College Station
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRTCrosstown TO
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Wallace Roberts & Todd
 
Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Waterfront for All
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyCity of College Station
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationCity of College Station
 
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Toronto Public Consultation Unit
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21CramondandBarntonCom
 
Irsdc layout planning + form based code presentation RAILOPOLIS
Irsdc layout planning + form based code presentation RAILOPOLISIrsdc layout planning + form based code presentation RAILOPOLIS
Irsdc layout planning + form based code presentation RAILOPOLISTOD India
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectWRI Ross Center for Sustainable Cities
 

La actualidad más candente (20)

Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer Presentation
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation Nov 21 2018 Bathurst Quay Update Presentation
Nov 21 2018 Bathurst Quay Update Presentation
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
Thoroughfare Plan Update
Thoroughfare Plan UpdateThoroughfare Plan Update
Thoroughfare Plan Update
 
Shops at University Town Center
Shops at University Town CenterShops at University Town Center
Shops at University Town Center
 
Presentation Master
Presentation MasterPresentation Master
Presentation Master
 
Medical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park PropertyMedical District Trunk Line Easement on Park Property
Medical District Trunk Line Easement on Park Property
 
University Town Center Rezoning
University Town Center RezoningUniversity Town Center Rezoning
University Town Center Rezoning
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer Presentation
 
Six Points Reconfiguration - Community Update June, 2013
Six Points Reconfiguration - Community Update June, 2013Six Points Reconfiguration - Community Update June, 2013
Six Points Reconfiguration - Community Update June, 2013
 
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
Church Avenue Realignment
Church Avenue RealignmentChurch Avenue Realignment
Church Avenue Realignment
 
Irsdc layout planning + form based code presentation RAILOPOLIS
Irsdc layout planning + form based code presentation RAILOPOLISIrsdc layout planning + form based code presentation RAILOPOLIS
Irsdc layout planning + form based code presentation RAILOPOLIS
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 

Similar a 20120201 061327 multi-use_trail_bid_award

Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsJames Chuck
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)City of Midland
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 
San Angelo City Council 10-15-13 red arroyo project update
San Angelo City Council 10-15-13 red arroyo project updateSan Angelo City Council 10-15-13 red arroyo project update
San Angelo City Council 10-15-13 red arroyo project updateCity of San Angelo Texas
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study finalkday1
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010Daniel X. O'Neil
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012Fairfax County
 

Similar a 20120201 061327 multi-use_trail_bid_award (20)

Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
San Angelo City Council 10-15-13 red arroyo project update
San Angelo City Council 10-15-13 red arroyo project updateSan Angelo City Council 10-15-13 red arroyo project update
San Angelo City Council 10-15-13 red arroyo project update
 
CDOT South Loop Chicago Overview
CDOT South Loop Chicago OverviewCDOT South Loop Chicago Overview
CDOT South Loop Chicago Overview
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study final
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Wellborn Community Plan
Wellborn Community PlanWellborn Community Plan
Wellborn Community Plan
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
 

20120201 061327 multi-use_trail_bid_award

  • 1. Multi-Use Path Facility along the Las Cruces Outfall Channel Contract Award City of Las Cruces Project No. 11-12-312
  • 2. N MULTI USE PATH FACILITY ALONG THE LAS CRUCES OUTFALL W E CHANNNEL FROM TRIVIZ TRAIL TO THE LLORONA TRAIL S
  • 3. Background • Project was submitted to and ranked in the top five by the MPO Policy Committee for FY 2010. • July 2010, the City was notified by the NMDOT of the funding award for the construction of the trail along the LC Outfall Channel form North Triviz Dr. to La Llorona Trail. • The trail will be a 4.25 mile east-west bicycle and pedestrian facility that would bridge the north end of the Triviz multi-use pathway with the north end of the La Llorona multi-purpose pathway at the Rio Grande.
  • 4. Background Cont. • A special use permit was needed with EBID since portions of the Las Cruces Outfall Channel are under their jurisdiction. • The Las Cruces Outfall Channel Trail Project falls under three goals on the City of Las Cruces Strategic Plan: 2.36, 2.37 & 3.13. • The trail was also included in Transport 2040 Plan.
  • 6. Background Cont. • April, 2011 City Council approved the Cooperative Agreement from NMDOT that required the City to provide a 25% match. NMDOT Grant (75%) …………….$758,418.00 City’s match (25%) …………….$252,806.00 1,001,224.00 • Project had to be submitted to NMDOT by August 15, 2011 to make the federal fiscal year authorization time line. • On September 20, 2011 FHWA officially approved the project for advertisement.
  • 7. Project Information • The project will consist of a 10’ wide asphalt surface • Erosion control • Striping • Signage • Bollards • Crosswalks with advance warning. • The path will accommodate both pedestrian and bicycle traffic.
  • 8. Project Information Cont. • Bids Received: 7 • Eng. Est. ….…….. $1,355,213.40 • Low Bid ………….. $997,169.40 – Burn Construction Company, Inc. – 26.4% Below Engineers Estimate • Funding Source: NMDOT, 2005 Public Improvement, Flood Control and Park Development funds • Contract Duration: 120 Working Days.
  • 9. Project Expenditure Summary State Street Improvements (4212) $ 758,418.00 2005 Public Improvement (4023) $ 135,000.00 Park Development (4106) $ 100,000.00 Flood Control (4400) $ 129,020.81 Total Project $1,122,438.81 Matching funds required $252,806. Funding is available from previously completed projects with remaining balances.
  • 10. Council Options Multi-Use Path Facility Project • Option 1 – Award contract to Burn Construction Company, Inc. – $997,169.40 – $1,122,438.81 w/ Tax & Contingency • Option 2 – Reject and Re bid the project • Option 3 – Reject and Re scope the project • Option 4 – Reject and Abandon the project for a later date
  • 11. Project Expenditure Summary State Street Improvements (4212) $ 758,418.00 2005 Public Improvement (4023) $ 135,000.00 Park Development (4106) $ 100,000.00 Flood Control (4400) $ 129,020.81 Total Project $1,122,438.81 The matching funds ($252,806) and the funds above the required match amount ($111,214.81) are available in Funds 4106,4023,& 4400. Funding is available from previously completed projects with remaining balances.
  • 13. PROPOSED IMPROVEMENTS SIMILAR TO TRIVIZ AVE PATH New 10 foot wide asphalt multi-use path similar to the asphalt path along Triviz Dr.
  • 14. Radio Controlled/Solar LED Crosswalk Flashing Beacon (typical applications)
  • 16. TYPICAL REMOVABLE BOLLARDS TYPICAL HAND RAILS TYPICAL BARRICADES