Enviar búsqueda
Cargar
Project Cycle Guide
•
2 recomendaciones
•
474 vistas
Título mejorado por IA
Ta Ngoc
Seguir
Empresariales
Tecnología
Denunciar
Compartir
Denunciar
Compartir
1 de 12
Descargar ahora
Descargar para leer sin conexión
Recomendados
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
satish526
Integrated Project Management
Integrated Project Management
Inam Khosa
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control
Pavan Kumar
10 me667 chap2 project management
10 me667 chap2 project management
Pavan Kumar
Chap04 project integration management
Chap04 project integration management
DM's College, Assagao Goa
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
rexcris
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
John Khateeb
Project Management Framework
Project Management Framework
Rahul Sudame
Recomendados
Do it, sf state project lifecycle management (plm) v1.19 091012
Do it, sf state project lifecycle management (plm) v1.19 091012
satish526
Integrated Project Management
Integrated Project Management
Inam Khosa
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control
Pavan Kumar
10 me667 chap2 project management
10 me667 chap2 project management
Pavan Kumar
Chap04 project integration management
Chap04 project integration management
DM's College, Assagao Goa
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
rexcris
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
John Khateeb
Project Management Framework
Project Management Framework
Rahul Sudame
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
Abdullah Ahmed, PMP, RMP
Pmp slide share
Pmp slide share
saleem54
009. project communication management
009. project communication management
Boobalan G
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
SAJJAD KHUDHUR ABBAS
Project-Planning
Project-Planning
Ron Drew
Project Execution and PM Elements
Project Execution and PM Elements
haroldtaylor1113
Chapter 3 Lecture Slides
Chapter 3 Lecture Slides
dotesch
Introduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
Hossam Maghrabi
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Megha Kotak, PMP
Understand PMBoK 5th edition
Understand PMBoK 5th edition
Amr Miqdadi
PMP PMBOK5 project management processes
PMP PMBOK5 project management processes
Abdullah Ahmed, PMP, RMP
PMI Project Management Framework
PMI Project Management Framework
Aarti Dahiya PMP
Eu project managment
Eu project managment
000000000
Zimmerman
Zimmerman
NASAPMC
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Erik Kijne
Project Auditing
Project Auditing
Salih Islam
Planning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle Planning
Emanuele Della Valle
Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016
Sergio Cagol
Telegram for business: scopri come usarlo
Telegram for business: scopri come usarlo
Flavius-Florin Harabor
Academy FPA Telegram e gli openData
Academy FPA Telegram e gli openData
Francesco Piero Paolicelli
Convcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API Overview
ConvComp2016
Más contenido relacionado
La actualidad más candente
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
Abdullah Ahmed, PMP, RMP
Pmp slide share
Pmp slide share
saleem54
009. project communication management
009. project communication management
Boobalan G
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
SAJJAD KHUDHUR ABBAS
Project-Planning
Project-Planning
Ron Drew
Project Execution and PM Elements
Project Execution and PM Elements
haroldtaylor1113
Chapter 3 Lecture Slides
Chapter 3 Lecture Slides
dotesch
Introduction to Software Project Management
Introduction to Software Project Management
Reetesh Gupta
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
Hossam Maghrabi
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Megha Kotak, PMP
Understand PMBoK 5th edition
Understand PMBoK 5th edition
Amr Miqdadi
PMP PMBOK5 project management processes
PMP PMBOK5 project management processes
Abdullah Ahmed, PMP, RMP
PMI Project Management Framework
PMI Project Management Framework
Aarti Dahiya PMP
Eu project managment
Eu project managment
000000000
Zimmerman
Zimmerman
NASAPMC
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Erik Kijne
Project Auditing
Project Auditing
Salih Islam
Planning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle Planning
Emanuele Della Valle
La actualidad más candente
(18)
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
Pmp slide share
Pmp slide share
009. project communication management
009. project communication management
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
Project-Planning
Project-Planning
Project Execution and PM Elements
Project Execution and PM Elements
Chapter 3 Lecture Slides
Chapter 3 Lecture Slides
Introduction to Software Project Management
Introduction to Software Project Management
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Understand PMBoK 5th edition
Understand PMBoK 5th edition
PMP PMBOK5 project management processes
PMP PMBOK5 project management processes
PMI Project Management Framework
PMI Project Management Framework
Eu project managment
Eu project managment
Zimmerman
Zimmerman
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Auditing
Project Auditing
Planning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle Planning
Destacado
Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016
Sergio Cagol
Telegram for business: scopri come usarlo
Telegram for business: scopri come usarlo
Flavius-Florin Harabor
Academy FPA Telegram e gli openData
Academy FPA Telegram e gli openData
Francesco Piero Paolicelli
Convcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API Overview
ConvComp2016
Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016
Flavius-Florin Harabor
Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!
Giorgio Robino
Chat bot - Scopriamo cos'e'
Chat bot - Scopriamo cos'e'
Libera professionista
Chatbot e Conversational Agents
Chatbot e Conversational Agents
Gruppo Pragma S.r.l
Destacado
(8)
Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016
Telegram for business: scopri come usarlo
Telegram for business: scopri come usarlo
Academy FPA Telegram e gli openData
Academy FPA Telegram e gli openData
Convcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API Overview
Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016
Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!
Chat bot - Scopriamo cos'e'
Chat bot - Scopriamo cos'e'
Chatbot e Conversational Agents
Chatbot e Conversational Agents
Similar a Project Cycle Guide
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
ngocjos
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
Ashraf206702
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
Daniel Brody
Project Management - PMI Approach
Project Management - PMI Approach
Zaur Ahmadov, PMP
It Project Management
It Project Management
TJ Rains
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
Toe Myint Naing
Project scheduling
Project scheduling
Carla Fair-Wright
Project Management Process and Its Phases
Project Management Process and Its Phases
Gaurav Sukhija
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
Peter Quintana
Unit 1.pptx
Unit 1.pptx
SahibaSahny
Prince2 Methodology
Prince2 Methodology
Monief Eid,Prince2,Prosci, Lean Six Sigma &ITIL
Program Management
Program Management
Anand Subramaniam
SDLC Process_Document.pptx
SDLC Process_Document.pptx
Sivakumar Pola
Project Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
Making of Stakeholders Delight
Making of Stakeholders Delight
Duraideivamani S, MBA,PMP,SCPM,PRINCE2,CSM,ITIL
Making of Stakeholders Delight
Making of Stakeholders Delight
Duraideivamani S, MBA,PMP,SCPM,PRINCE2,CSM,ITIL
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Subodh Kumar
Introduction to project management
Introduction to project management
Mohamad Ashrafi
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
SN Panigrahi, PMP
Introduction to project management.ppt for
Introduction to project management.ppt for
ItcHcm1
Similar a Project Cycle Guide
(20)
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
Project Management - PMI Approach
Project Management - PMI Approach
It Project Management
It Project Management
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
Project scheduling
Project scheduling
Project Management Process and Its Phases
Project Management Process and Its Phases
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
Unit 1.pptx
Unit 1.pptx
Prince2 Methodology
Prince2 Methodology
Program Management
Program Management
SDLC Process_Document.pptx
SDLC Process_Document.pptx
Project Management Presentation Template.pdf
Project Management Presentation Template.pdf
Making of Stakeholders Delight
Making of Stakeholders Delight
Making of Stakeholders Delight
Making of Stakeholders Delight
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Introduction to project management
Introduction to project management
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
Introduction to project management.ppt for
Introduction to project management.ppt for
Último
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
Riya Pathan
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
Anamaria Contreras
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
ictsugar
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
dollysharma2066
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
ictsugar
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
Peter Ward
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
Rbc Rbcua
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
Kirill Klimov
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
DallasHaselhorst
Cyber Security Training in Office Environment
Cyber Security Training in Office Environment
elijahj01012
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Doge Mining Website
Annual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
KeppelCorporation
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
ictsugar
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
ashishs7044
PSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
Anamaria Contreras
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
richard876048
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
ashishs7044
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
ictsugar
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
Americas Got Grants
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
Seta Wicaksana
Último
(20)
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
Cyber Security Training in Office Environment
Cyber Security Training in Office Environment
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Annual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
PSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
Project Cycle Guide
1.
Project Performance Management
System Project Cycle •Project Identification •Establish Project Team Identification Design PPT A Fact Finding Detailed Design PPT A Inception PPT A Mid Term PPT A Final Project Concept Paper •Project Fact-Finding Mission PPT A Paper •Interdepartmental Review •PPT A Approval •Inception Mission •In-depth project analysis •Mid-term workshop •Detailed project costing, design, evaluation •Final T ripartite Workshop Draft Project Design Report •Hand-over to EA Start-Up PAM Re-design Implement M onitor Closure •Quarterly Implementation Progress Reporting •Completion of project and summary Checklists Project Concept Paper Has each Project Team member contributed to Project Concept Paper? Do DMC and Executing Agency agree with the project impact and outcome? PPTA Paper Do the Terms of Reference clearly expect Consultants to produce a detailed Design and Monitoring Framework? Do the Terms of Reference expect Consultants to produce Problem Trees, and analysis of alternatives? Has each Project Team member contributed to the PPTA paper? Have lessons learned in previous projects been documented f or consultants? Project Design Report PPTA Final Report (Project Design Reports) Draft RRP •Management Review Meeting •Appraisal Mission RRP •Interdepartmental Review PAM •Loan Negotiations •Board Consideration Appraisal (final design) Implementation Key Activities & Documents Awareness Module PPR PCR PPAR Have beneficiaries had input into the design? Have the consultants used analysis tools (problem tree, objectiv es tree, work breakdown structure) to underpin their design? Have indicators been selected with regard to av ailability of indicators f rom the Executing Agency ? Has the consultant carried out an alternatives analysis? Are the indicators defined with baseline and target v alues for the project impacts, outcome and outputs? RRP Has the EA signed off on the Design Report and the PAM? Has the EA conf irmed its MIS can provide the required indicator data? PAM & PPR Have all design changes since inception mission been updated into PAM? Are all reporting requirements incorporated into PAM? © 2005, Asian Development Bank Quick Reference 1A
2.
Project Performance Management
System This is a quick guide to the ADB Project Cycle and key documents in the cycle. It is for continuing reference by attendees to the Awareness Session of the PPMS Training Course. Key Documents- Name and Purpose Sustainability- Likelihood that human institutional and financial resources can support achievement of results and benefits over economic life of the project Institutional Development and other impacts-The extent to which the project has contributed improvements in the enabling environment of the country such that its human, financi al and natural resources may be more effectively used. Terms o f reference for consultants preparing the design PPTA Final Report Prop osed p roject design - seeks OK to proceed with loan processing RRP Report and Recommendation of the President Proj ect design - seeks OK to proceed to loan ne gotiation s and Board approval PAM Project Administration Memorandum Basis for project management i mplementation, monitoring and evaluation du ring impl ementation Implementa tion and development progress flags need for design change PCR Project Completion Report Results ach ieved, using the REESI -and lessons l earned PPAR Project Performance Audit Report The Design and Monitoring Framework* r D ma at nc a So e T u ar R i sk rc e get As s s su a m nd pt io ns Efficiency-Compares achievement of project outcome with use of inputs. Based on implementation perform ance with consideration of the EIRR or cost-effectiveness. PPTA Paper Project Prep aratory Technical Assistance Paper Prep ared by OED - 40% of projects, 2 or 3 years after cl osure - checking against REESI rfo Efficacy-Achievement of outcome as speci fied in the policy impacts, physical, financial and institutional objectives adopted at project approval, or as formally modified during implementation Purp ose a nd rationale of project - seeks OK to pro ceed with PPTA Pe Relevance- Consistency of a project’s impacts, outcomes and outputs with the government’s development strategy, ADB lending strategy and ADB's strategic objectives Assessed for time of approval and also for time at which project is completed Concept Paper PPR Project Performance Report Criteria for Success R E E S I Awareness Module Impact Outcome Outputs Activities Refer to BPHR-OS Training Inputs * Revised format, not yet approved as at January 2005 © 2005, Asian Development Bank Quick Reference 1B
3.
Project Performance Management
System This is a quick guide to the Design Steps, Design and Monitoring Framework and Risks and Assumptions. It is for continuing reference by attendees to the Design Linkages Session of the PPMS Training Course. 6 Design Steps 1 State the Problem 2 Do Problem Tree Analysis Screen Alternatives through REESI Relevance Efficacy (Effectiveness) Efficiency Sustainability Institutional Development Weigh-up the risks of each alternative. Describe in terms of observations or symptoms. Do not describe in terms of a solution “Jumping to solution” “Why-why-why” ? 3 Design Linkages Module Change Problem to Impact, Outcome Restate the problem in positive terms. IMPACT OUTCOME 7 Select preferred alternative. 8 Develop Work Breakdown Structure 9 Identify Inputs required 10 Translate WBS & Solution Tree to Design Framework OUTPUTS 4 Develop Solution Tree ACTIVITIES Outputs and Activities INPUTS 5 Generate Alternatives Refer to BPHR-OS Training 11 12 Identify Risks and Assumptions Identify Risk Responses © 2005, Asian Development Bank Quick Reference 2A
4.
Project Performance Management
System Design Linkages Module Risks & Assumptions High Rate Risks by: Likelihood- how likely is this to occur? Expected impact- i f it did occur, how serious would the consequences be for the achievement of outputs – outcomes- impacts? Response Required Killer Rethink Project Response Required Response Required Response Required Do not include in design Response Required Response Required Risk Matrix What is most likely to go wrong? Assumptions What external conditions exist or behavioural changes by target benefi ciaries are expected ? Essential to the project’s success but beyond its control Likelihood Risks Response Required Medium Low Risk Response Strategies *The Design and Monitoring Framework Avoidance - eliminate the cause of the threat Mitigation - preventive measures - reduce likelihood or impact Acceptance - accept consequences and develop contingency plan Design Summary Low Performance Targets Data Source Medium High Expected Impact Checklist Assumptions & Risks IMPACT Design Summary Impact - Is the Impact stated as the long term vision and links to the CSP? Outcome - Is this stated as the improved situation for the target benefi ciari es and not as a summary of outputs? Are there 2 objectives or less? Outputs-Are these stated as a completed deliverable? Activities-Does this list the key task, steps or stages in the project? Inputs-Have the various resource categories been identifi ed? OUTCOME Is each statement unique in the Design Framework (I.e. statements not repeated at di fferent levels)? OUTPUTS ACTIVITIES *This format still subject to approval – January 2005 Refer to BPHR-OS Training INPUTS Risks and Assumptions Do the Risks and Assumptions relate to the Project Design Summary Statement at the same level? © 2005, Asian Development Bank Quick Reference 2B
5.
Project Performance Management
System This is a quick guide to the Project Performance Reporting (PPRs). It is for continuing reference by attendees to the Reporting Sessions of the PPMS Training Course. PAM – Project Administration Memorandum • contains all project information to allow the Executing Agency (EA) and ADB to monitor project implementation and ev aluate project impacts • PAM’s Design Framework is the basis f or building Project Perf ormance Report (PPR) f ormat. Reporting Module Design Summary Performan ce Targets Data Source IMPACT OUTCOME OUTPUTS Implementation ACTIVITIES *This format still subject to approval – January 2005 PPR – Project Performance Report Start-Up Re-design Implement M onitor Assumptions & Risks INPUTS The Design and Monitoring Framework • an early warning system for ADB management implementation to take corrective actions • identifies objectiv es, key indicators and targets to be monitored ev ery quarter • serves as historical basis for ev aluating project perf ormance Closure Project Completion Report (PCR) iev aluates the rationale f or the project, adequacy of its f ormulation, and clarity and comprehensiv eness of the TOR iev aluates the achievement of the project’s outcome, outputs iev aluates the quality of outputs idescribes project implementation and signif icant changes in project design iidentif ies majors lesson learned irates the performance of the project Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 3A
6.
Project Performance Management
System Design & Monitoring Frame work Impact Outcome PPR Development Objective (DO) Immediate Development Objective Impact and Outcome Assumptions (combined) Impact and Outcome Assumptions (listed separately) Assumptions and Risks ( Assumptions and Risks (separated) listed in same column) Activity Level Not required (can be combined with Data Source Output Level) Not shown in PPR (required in PCR) PPR Rating Scales HS Highly Satisfactory (3 points) Project expect ed to exceed most of its major development objectives S Satisfactory (2 points) Achieve most of its major development objectives PS Partly Satisfactory (1 point) Achieve some of its major development objectives U Unsatisfactory (0 Points) Unlikely to achieve its major development PCR’s Assessment and Recommendations are based on following criteria: REESI + OL •Relevance •Efficacy (effectiveness) achieving Purpose •Efficiency achieving Outputs and Purpose •Sustainability (Preliminary Assessment) •Institutional Development Reporting Module PPR Checklist From PAM to PPR Any design changes or variations since inception mission updated into the PAM? Has the PPR been restated if RRP or PAM was defici ent in its Design Framework? Is baseline data for perform ance indicators available or will it be available before next PPR is due? First PPR Is the PPR content on design (outcome, outputs, assumptions, risk) same as contain in PAM or RRP? Does the first PPR contain monitorable indicators? Do monitorable indicators have target values quoted? Subsequent PPRs Is the rating on immediate development objectives (outcome) consistent with commentary on description of progress, status of indicators, assumptions and risks? Are problems listed with outcome (immediate development objective) consistent with the ratings assigned (HS,S, PS, U)? Are monitorable indicators being reported upon for all outputs? Do the results indicated by monitorable indicators support the ratings assigned to the immediate development objectives? Overall Assessment •“. . . whether the project was implemented as conceived . . . •“. . . Analyze the design and monitoring framework •“. . . and the project performance monitoring and evaluation system, •“and provide an overall project performance rating. . . . ” Lessons Learned and Recommendations © 2005, Asian Development Bank Quick Reference 3B
7.
Project Performance Management
System Design Indicators Module This is a quick guide to Designing Project Monitoring Indicators. It is for continuing reference by attendees to the Design- Indicators Session of the PPMS Training Course. The “SMART Way” for Good Performance A good performance indicator should be: Specific - precise and unambiguous Measurable – quantitative and/or qualitative Achievable - realistic in what is to be achieved Relevant – appropriate to subject at hand Time bound – clearly stated target date Indicators in Design and Monitoring Framework* Design Summary Performance Targets Data Source A Target is an explicit statement of desired Results for an Indicator at a specified point in time Target Statement Target Statement Baseline of xxxxxxxxx at (date) Baseline of xxxxxxxxx at (date) Targets of xxxxxxxxxx at (date) Targets of xxxxxxxxxx at (date) Targets should be expressed in Targets should be expressed in terms of Quantity, terms of Quantity, Quality and Time Quality and Time Assumptions & Risks Using Pre-Designed Indicators: Pros Can be aggregated across similar projects/programs/policies Reduces costs of building multiple unique measurement systems Creates greater harmonization of donor requirements Cons May not address country-speci fic impacts Often viewed as imposed - coming from the Top down Does not promote stakeholder ownership Multiple competing indicators When Selecting Project, Program, or Policy Indicators… Consider several for any one outcome Make sure the interests of multiple stakeholders are considered Know that over time, it is acceptable (and expected) to add new ones and drop old ones IMPACT OUTCOME OUTPUTS ACTIVITIES INPUTS * This format awaiting approval –January 2005 Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 4A
8.
Project Performance Management
System Some Sources of Indicators DMC current indicators and statistical data Similar projects consultant proposals based on similar projects Sector specialists w ithin ADB Country Assistance plans of ADB Other Lending Agencies (World Bank, UNDP etc) Typical Problems with Indicators and Typical Problems with Indicators and Targets Targets indicators selected are not appropriate indicators selected are not appropriate no data available to construct them no data available to construct them lagging- too late for any action lagging- too late for any action focus on less important project elements focus on less important project elements data available but slow and unreliable data available but slow and unreliable no indicators for effects or impacts no indicators for effects or impacts lending agencies operate outside the Govt lending agencies operate outside the Govt information system information system no acceptance of accountability no acceptance of accountability Design Indicators Module Checklist Does every statement in the Design Summary Column of your Design and Monitoring Framework have AT LEAST ONE measurable indicator? Does every indicator have a target that is measurable in terms of Quality, Quantity or Time ? Is each indicator unique? (ie not repeated at higher or lower levels) Is every indicator described well enough so that subsequent monitoring could be carried out with no further information? Does every indicator have at least one source of data, or means for collecting it? Do monitoring mechanisms already exist, or have they been planned for in the budget? Are the sources/ means for collecting data within the projects control? Why Use Proxy Indicators? Use indirect measures (proxies) when data for direct indicators are not available or feasible to collect at regular intervals Example… Number of new tin roofs (or televisions) as a proxy measure of increased household income © 2005, Asian Development Bank Quick Reference 4B
9.
Project Performance Management
System Quality Assurance Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Criteria for Success Relevance- Consistency of a project’s impacts, outcomes and outputs with the government’s development strategy, ADB lending strategy and ADB's strategic objectives Assessed for time of approval and also fo r time at which project is completed Efficacy-Achievement of outcome as speci fied in the policy impacts, physical, financial and institutional objectives adopted at project approval, or as formally modified during implementation Quality Assurance checklist for Directors Before signing off the Design and Monitoring Framework DESIGN LOGIC and MONITORABILITY Does the activity-output-outcome-impact reflect a plausible cause and effect / results chain? Does the Design Framework contain specific indicators and targets that are capable of being used for monitoring? Does the project administration personnel agree? Does the Design Framework contain realistic assumptions and risks – are there any ‘killer’ assumptions or risks mentioned? Efficiency-Compares achievement of project outcome with use of inputs. Based on implementation perform ance with consideration of the EIRR or cost-effectiveness. ROBUST DESIGN APPROACH Sustainability- Likelihood that human institutional and financial resources can support achievement of results and benefits over economic life of the project • Used checklists to ensure QA is applied at each stage of the project design? Institutional Development and other impacts-The extent to which the project has contributed improvements in the enabling environment of the country such that its human, financi al and natural resources may be more effectively used. Has the Mission Leader: • Applied tools of problem, objectives and alternatives analysis to design the project? • Engaged beneficiaries, EA and other stakeholders in the problem definition, consideration of alternatives and final design? • Explicitly considered lessons learned and country implementation performance in finalizing the design? Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 6A
10.
Project Performance Management
System Quality Assurance Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Does the outcome contribute to stated impact? Does the impact relate to a sector outcome in the CSP? Design Summary Performance Targets Data Source Assumption s & Risks IMPACT 3 OUTCOME 2 OUTPUTS Why is this project being done? Who will benefit from using the outputs? What change should occur (such as behaviour of target group?) What will be produced during the project ? Policies, Regulations, Plans, Procedures, Standards, Infrastructure, Skills, Systems, Agency Capacity, Organisational design, Networks, Are all these necessary to be able to achieve the ‘why’ ? 1 ACTIVITIES Do the risks and assumptions relate to the right level – for example – 1 Activities to Outputs 2 Outputs to Outcome 3 Outcome to Impacts INPUTS * This format awaiting approval –January 2005 Are the performance targets shown: Specific Measurable Achievable Relevant Timely Do they have baseline, target values applicable dates? Refer to BPHR-OS Training Are there any ‘killer’ assumptions – and what is the likelihood of the assumptions not holding good? Are risks excluded that can be managed by the project manager or accommodated by the project design? Are the performance indicators available from the EA or the Government’s own information systems? If not, what is being done to ensure the DMC has the skills and systems to track performance both during and after project completion? © 2005, Asian Development Bank Quick Reference 6B
11.
Project Performance Management
System Channel of Effect Effects on the Poor Direct Short Run Indirect Short Run Effects on Other Stakeholder s Indirect Medium Run Mitigation/ Enhancement Activities Access to Labor Markets & Wages Access to Markets and Prices Access to Assets This an alysis contains implicit assumptions, which should be in corporated in the program framewor k Policy/Programs Module This is a quick guide to Design and Monitoring Frameworks for Policy and Programs . It is for continuing reference by attendees to the PPMS Training Course and Director information. Activities, which should be included in the program framewor k Access to Public Serv ices Access to Transfers NET IMPACT Relates to program purpo se The POVERTY IMPACT ASSESSMENT describes how the proposed project design will affect the poor – and in doing so the mitigation and enhancement of effects should form part of the project activities. The analysis of the effects makes ‘assumptions’ such as the likely response to availability of services, new policies, changed prices etc. These need to be build into the DESIGN and MONITORING FRAMEWORK column that provides for assumptions and risks. Refer to BPHR-OS Training Design Sum mar y Performan ce Targets/ Data Source Assumptions and Risks Impact: the expected medium Goal: the expected medium –r un -run impac ts of this and other programs Outc ome: the reas on why this Purpose: the reason why this program is being done —i.e. the expected end ofprogram c hange - -of-program that can be assess ed by the PCR Outputs : the s pecific deli verables of this program (should be capable of measurement or ass essment) Activiti es: the main tas ks required to produce the outputs Inputs © 2005, Asian Development Bank Quick Reference 5A
12.
Project Performance Management
System Policy/Programs Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Policy Area and Activities Tranche 1 Tranche 2 Tranche 3 Policy Area 1 - usually equates with ‘Output’ in the Design and Monitoring Framework Policy Action 1.1 Policy Action 1.2 Policy Area 2 - usually equates with ‘Output’ in the Design and Monitoring Framework Policy Action 2.1 Policy Action 2.2 Etc The POLICY MATRIX describes the policy areas [typically] outputs that will be achieved through initiating a series of actions. These various policy outputs can be entered into the DESIGN and MONITORING FRAMEWORK but that still leaves the Outcome to be defined [why are the outputs necessary – what are the benefits and who benefits] Performance Targets also have to be inserted – other than due dates. Refer to BPHR-OS Training Design and Monitoring Framework Design Summar y Performan ce Targets Refere nce Versio n Data Source Assumptions/ Risks IMP ACT OUTCOME OUTPUTS AC TIVITIES AC TIVITIES INPUTS INPUTS The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank Institute (ADBI), the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. © 2005, Asian Development Bank Quick Reference 5B
Descargar ahora