Project Performance Management System
Project Cycle

•Project Identification
•Establish Project Team

Identification

Design

PPT A Fact
Finding

Detailed
Design

PPT A Inception
PPT A Mid Term

PPT A Final

Project Concept Paper

•Project Fact-Finding Mission
PPT A Paper
•Interdepartmental Review
•PPT A Approval
•Inception Mission
•In-depth project analysis
•Mid-term workshop
•Detailed project costing,
design, evaluation
•Final T ripartite Workshop

Draft Project Design
Report

•Hand-over to EA

Start-Up

PAM

Re-design

Implement
M onitor

Closure

•Quarterly
Implementation
Progress Reporting
•Completion of project
and summary

Checklists
Project Concept Paper
Has each Project Team member contributed to Project
Concept Paper?
Do DMC and Executing Agency agree with the project
impact and outcome?
PPTA Paper
Do the Terms of Reference clearly expect Consultants
to produce a detailed Design and Monitoring Framework?
Do the Terms of Reference expect Consultants to
produce Problem Trees, and analysis of alternatives?
Has each Project Team member contributed to the
PPTA paper?
Have lessons learned in previous projects been
documented f or consultants?

Project Design Report
PPTA Final Report (Project Design Reports)
Draft RRP

•Management Review Meeting
•Appraisal Mission
RRP
•Interdepartmental Review
PAM
•Loan Negotiations
•Board Consideration

Appraisal
(final design)

Implementation

Key Activities & Documents

Awareness Module

PPR

PCR
PPAR

Have beneficiaries had input into the design?
Have the consultants used analysis tools (problem tree,
objectiv es tree, work breakdown structure) to underpin their
design?
Have indicators been selected with regard to av ailability
of indicators f rom the Executing Agency ?
Has the consultant carried out an alternatives analysis?
Are the indicators defined with baseline and target
v alues for the project impacts, outcome and outputs?
RRP
Has the EA signed off on the Design Report and the
PAM?
Has the EA conf irmed its MIS can provide the required
indicator data?
PAM & PPR
Have all design changes since inception mission been
updated into PAM?
Are all reporting requirements incorporated into PAM?
© 2005, Asian Development Bank

Quick Reference 1A
Project Performance Management System
This is a quick guide to the ADB Project Cycle
and key documents in the cycle. It is for
continuing reference by attendees to the
Awareness Session of the PPMS Training
Course.

Key Documents- Name and Purpose

Sustainability- Likelihood that human institutional and financial
resources can support achievement of results and benefits over
economic life of the project
Institutional Development and other impacts-The extent to which
the project has contributed improvements in the enabling
environment of the country such that its human, financi al and
natural resources may be more effectively used.

Terms o f reference for consultants preparing
the design

PPTA Final Report

Prop osed p roject design - seeks OK to proceed
with loan processing

RRP Report and Recommendation
of the President

Proj ect design - seeks OK to proceed to loan
ne gotiation s and Board approval

PAM Project Administration
Memorandum

Basis for project management i mplementation, monitoring and evaluation
du ring impl ementation
Implementa tion and development progress flags need for design change

PCR Project Completion Report

Results ach ieved, using the REESI -and lessons
l earned

PPAR Project Performance Audit
Report

The Design and
Monitoring
Framework*

r
D ma
at
nc
a
So e T
u ar
R
i sk rc e get
As s
s
su a
m nd
pt
io
ns

Efficiency-Compares achievement of project outcome with use
of inputs. Based on implementation perform ance with
consideration of the EIRR or cost-effectiveness.

PPTA Paper Project Prep aratory
Technical Assistance Paper

Prep ared by OED - 40% of projects, 2 or 3 years
after cl osure - checking against REESI

rfo

Efficacy-Achievement of outcome as speci fied in the policy
impacts, physical, financial and institutional objectives adopted at
project approval, or as formally modified during implementation

Purp ose a nd rationale of project - seeks OK to
pro ceed with PPTA

Pe

Relevance- Consistency of a project’s impacts, outcomes and
outputs with the government’s development strategy, ADB lending
strategy and ADB's strategic objectives
Assessed for time of approval and also for time at which project is
completed

Concept Paper

PPR Project Performance Report

Criteria for Success

R
E
E
S
I

Awareness Module

Impact
Outcome
Outputs
Activities

Refer to BPHR-OS Training

Inputs

* Revised format, not yet approved as at January 2005

© 2005, Asian Development Bank

Quick Reference 1B
Project Performance Management System
This is a quick guide to the Design Steps, Design and
Monitoring Framework and Risks and Assumptions. It is for
continuing reference by attendees to the Design Linkages
Session of the PPMS Training Course.

6

Design Steps

1

State the Problem

2

Do Problem Tree Analysis

Screen Alternatives through REESI
Relevance
Efficacy (Effectiveness)
Efficiency
Sustainability
Institutional Development
Weigh-up the risks of each alternative.

Describe in terms of observations or symptoms.
Do not describe in terms of a solution “Jumping to solution”

“Why-why-why”

?
3

Design Linkages Module

Change Problem to Impact,
Outcome
Restate the problem in positive
terms.

IMPACT
OUTCOME

7 Select preferred alternative.
8 Develop Work Breakdown Structure
9 Identify Inputs required
10 Translate WBS & Solution Tree to Design Framework
OUTPUTS

4

Develop Solution Tree
ACTIVITIES

Outputs and Activities

INPUTS

5

Generate Alternatives

Refer to BPHR-OS Training

11
12

Identify Risks and Assumptions
Identify Risk Responses
© 2005, Asian Development Bank

Quick Reference 2A
Project Performance Management System

Design Linkages Module

Risks & Assumptions

High

Rate Risks by:
Likelihood- how likely is this to
occur?
Expected impact- i f it did occur, how
serious would the consequences be for
the achievement of outputs –
outcomes- impacts?

Response
Required

Killer
Rethink
Project

Response
Required

Response
Required

Response
Required

Do not
include in
design

Response
Required

Response
Required

Risk Matrix

What is most likely to go wrong?

Assumptions
What external conditions exist or behavioural changes
by target benefi ciaries are expected ?
Essential to the project’s success but beyond its
control

Likelihood

Risks

Response
Required

Medium

Low

Risk Response Strategies

*The Design and
Monitoring Framework

Avoidance - eliminate the cause of the threat
Mitigation - preventive measures - reduce likelihood or
impact
Acceptance - accept consequences and develop
contingency plan

Design
Summary

Low

Performance
Targets

Data Source

Medium

High

Expected Impact

Checklist

Assumptions
& Risks

IMPACT

Design Summary
Impact - Is the Impact stated as the long term vision and links
to the CSP?
Outcome - Is this stated as the improved situation for the target
benefi ciari es and not as a summary of outputs?
Are there 2 objectives or less?
Outputs-Are these stated as a completed deliverable?
Activities-Does this list the key task, steps or stages in the
project?
Inputs-Have the various resource categories been identifi ed?

OUTCOME

Is each statement unique in the Design Framework (I.e.
statements not repeated at di fferent levels)?

OUTPUTS
ACTIVITIES
*This format still subject to approval – January 2005

Refer to BPHR-OS Training

INPUTS

Risks and Assumptions
Do the Risks and Assumptions relate to the Project Design
Summary Statement at the same level?
© 2005, Asian Development Bank

Quick Reference 2B
Project Performance Management System
This is a quick guide to the Project
Performance Reporting (PPRs). It is
for continuing reference by
attendees to the Reporting Sessions
of the PPMS Training Course.

PAM – Project Administration
Memorandum
• contains all project information to allow
the Executing Agency (EA) and ADB to
monitor project implementation and
ev aluate project impacts
• PAM’s Design Framework is the basis
f or building Project Perf ormance Report
(PPR) f ormat.

Reporting Module
Design
Summary

Performan ce

Targets

Data
Source

IMPACT
OUTCOME
OUTPUTS

Implementation

ACTIVITIES
*This format still subject to approval – January 2005

PPR – Project Performance Report

Start-Up
Re-design

Implement
M onitor

Assumptions
& Risks

INPUTS

The Design and Monitoring Framework

• an early warning system for ADB
management implementation to take
corrective actions
• identifies objectiv es, key indicators and
targets to be monitored ev ery quarter
• serves as historical basis for
ev aluating project perf ormance

Closure
Project Completion Report (PCR)
iev aluates the rationale f or the project,
adequacy of its f ormulation, and clarity
and comprehensiv eness of the TOR
iev aluates the achievement of the
project’s outcome, outputs
iev aluates the quality of outputs
idescribes project implementation and
signif icant changes in project design
iidentif ies majors lesson learned
irates the performance of the project

Refer to BPHR-OS Training

© 2005, Asian Development Bank

Quick Reference 3A
Project Performance Management System
Design & Monitoring Frame work
Impact
Outcome

PPR

Development Objective (DO)
Immediate Development Objective
Impact and Outcome Assumptions
(combined)

Impact and Outcome
Assumptions (listed
separately)
Assumptions and Risks ( Assumptions and Risks (separated)
listed in same column)
Activity Level Not required (can be combined with
Data Source

Output Level)
Not shown in PPR (required in
PCR)

PPR Rating Scales
HS Highly Satisfactory (3 points)
Project expect ed to exceed most of its major development objectives
S Satisfactory (2 points)
Achieve most of its major development objectives
PS Partly Satisfactory (1 point)
Achieve some of its major development objectives
U Unsatisfactory (0 Points)
Unlikely to achieve its major development

PCR’s Assessment and Recommendations are based on
following criteria:
REESI + OL
•Relevance
•Efficacy (effectiveness) achieving Purpose
•Efficiency achieving Outputs and Purpose
•Sustainability (Preliminary Assessment)
•Institutional Development

Reporting Module

PPR Checklist
From PAM to PPR
Any design changes or variations since inception mission updated into the
PAM?
Has the PPR been restated if RRP or PAM was defici ent in its Design
Framework?
Is baseline data for perform ance indicators available or will it be available
before next PPR is due?
First PPR
Is the PPR content on design (outcome, outputs, assumptions, risk) same as
contain in PAM or RRP?
Does the first PPR contain monitorable indicators?
Do monitorable indicators have target values quoted?
Subsequent PPRs
Is the rating on immediate development objectives (outcome) consistent with
commentary on description of progress, status of indicators, assumptions and
risks?
Are problems listed with outcome (immediate development objective)
consistent with the ratings assigned (HS,S, PS, U)?
Are monitorable indicators being reported upon for all outputs?
Do the results indicated by monitorable indicators support the ratings assigned
to the immediate development objectives?

Overall Assessment
•“. . . whether the project was implemented as conceived . . .
•“. . . Analyze the design and monitoring framework
•“. . . and the project performance monitoring and evaluation
system,
•“and provide an overall project performance rating. . . . ”
Lessons Learned and Recommendations
© 2005, Asian Development Bank

Quick Reference 3B
Project Performance Management System

Design Indicators Module

This is a quick guide to Designing Project Monitoring Indicators. It is
for continuing reference by attendees to the Design- Indicators
Session of the PPMS Training Course.

The “SMART Way” for Good
Performance
A good performance indicator should be:

Specific - precise and unambiguous
Measurable – quantitative and/or qualitative
Achievable - realistic in what is to be achieved
Relevant – appropriate to subject at hand
Time bound – clearly stated target date

Indicators in Design and
Monitoring Framework*

Design
Summary

Performance
Targets

Data Source

A

Target is an explicit statement
of desired Results for an
Indicator at a specified point
in time

Target Statement
Target Statement

Baseline of xxxxxxxxx at (date)
Baseline of xxxxxxxxx at (date)
Targets of xxxxxxxxxx at (date)
Targets of xxxxxxxxxx at (date)
Targets should be expressed in
Targets should be expressed in
terms of Quantity,
terms of Quantity,

Quality and Time
Quality and Time

Assumptions
& Risks

Using Pre-Designed Indicators:
Pros
Can be aggregated across similar
projects/programs/policies
Reduces costs of building multiple unique
measurement systems
Creates greater harmonization of donor
requirements
Cons
May not address country-speci fic impacts
Often viewed as imposed - coming from the
Top down
Does not promote stakeholder ownership
Multiple competing indicators

When Selecting Project,
Program, or Policy Indicators…
Consider several for any one outcome
Make sure the interests of multiple
stakeholders are considered
Know that over time, it is acceptable (and
expected) to add new ones and drop old
ones

IMPACT
OUTCOME
OUTPUTS
ACTIVITIES

INPUTS

* This format awaiting approval –January 2005
Refer to BPHR-OS Training

© 2005, Asian Development Bank

Quick Reference 4A
Project Performance Management System
Some Sources of Indicators
DMC current indicators and statistical data
Similar projects
consultant proposals based on similar projects
Sector specialists w ithin ADB
Country Assistance plans of ADB
Other Lending Agencies (World Bank, UNDP etc)

Typical Problems with Indicators and
Typical Problems with Indicators and
Targets
Targets
indicators selected are not appropriate
indicators selected are not appropriate
no data available to construct them
no data available to construct them
lagging- too late for any action
lagging- too late for any action
focus on less important project elements
focus on less important project elements
data available but slow and unreliable
data available but slow and unreliable
no indicators for effects or impacts
no indicators for effects or impacts
lending agencies operate outside the Govt
lending agencies operate outside the Govt
information system
information system
no acceptance of accountability
no acceptance of accountability

Design Indicators Module
Checklist
Does every statement in the Design Summary Column of
your Design and Monitoring Framework have AT LEAST
ONE measurable indicator?
Does every indicator have a target that is measurable in
terms of Quality, Quantity or Time ?
Is each indicator unique? (ie not repeated at higher or lower
levels)
Is every indicator described well enough so that subsequent
monitoring could be carried out with no further information?
Does every indicator have at least one source of data, or
means for collecting it?
Do monitoring mechanisms already exist, or have they been
planned for in the budget?
Are the sources/ means for collecting data within the
projects control?

Why Use Proxy Indicators?
Use indirect measures (proxies) when data for direct
indicators are not available or feasible to collect at
regular intervals
Example…
Number of new tin roofs (or televisions) as a proxy
measure of increased household income

© 2005, Asian Development Bank

Quick Reference 4B
Project Performance Management System Quality Assurance Module
This is a quick guide to Quality Assurance for Projects
– Loans and Technical Assistance. It is for continuing
reference by attendees to the PPMS Training Course
and Director information.

Criteria for Success
Relevance- Consistency of a project’s impacts, outcomes and
outputs with the government’s development strategy, ADB lending
strategy and ADB's strategic objectives
Assessed for time of approval and also fo r time at which project is
completed
Efficacy-Achievement of outcome as speci fied in the policy
impacts, physical, financial and institutional objectives adopted at
project approval, or as formally modified during implementation

Quality Assurance checklist for Directors
Before signing off the Design and Monitoring Framework
DESIGN LOGIC and MONITORABILITY
Does the activity-output-outcome-impact reflect a plausible cause
and effect / results chain?
Does the Design Framework contain specific indicators and
targets that are capable of being used for monitoring? Does
the project administration personnel agree?
Does the Design Framework contain realistic assumptions and
risks – are there any ‘killer’ assumptions or risks mentioned?

Efficiency-Compares achievement of project outcome with use
of inputs. Based on implementation perform ance with
consideration of the EIRR or cost-effectiveness.

ROBUST DESIGN APPROACH

Sustainability- Likelihood that human institutional and financial
resources can support achievement of results and benefits over
economic life of the project

• Used checklists to ensure QA is applied at each stage of the
project design?

Institutional Development and other impacts-The extent to which
the project has contributed improvements in the enabling
environment of the country such that its human, financi al and
natural resources may be more effectively used.

Has the Mission Leader:

• Applied tools of problem, objectives and alternatives analysis
to design the project?
• Engaged beneficiaries, EA and other stakeholders in the
problem definition, consideration of alternatives and final
design?
• Explicitly considered lessons learned and country
implementation performance in finalizing the design?

Refer to BPHR-OS Training

© 2005, Asian Development Bank

Quick Reference 6A
Project Performance Management System Quality Assurance Module
This is a quick guide to Quality Assurance for Projects – Loans and
Technical Assistance. It is for continuing reference by attendees to
the PPMS Training Course and Director information.

Does the outcome contribute to
stated impact?
Does the impact relate to a sector
outcome in the CSP?

Design
Summary

Performance
Targets

Data Source

Assumption
s & Risks

IMPACT

3

OUTCOME

2

OUTPUTS

Why is this project being done?
Who will benefit from using the
outputs?
What change should occur (such
as behaviour of target group?)

What will be produced during the
project ?
Policies, Regulations, Plans,
Procedures, Standards,
Infrastructure, Skills, Systems,
Agency Capacity, Organisational
design, Networks,
Are all these necessary to be able
to achieve the ‘why’ ?

1
ACTIVITIES

Do the risks and
assumptions relate to the
right level – for example –
1 Activities to Outputs
2 Outputs to Outcome
3 Outcome to Impacts

INPUTS

* This format awaiting approval –January 2005

Are the performance targets
shown:

Specific
Measurable
Achievable
Relevant
Timely
Do they have baseline, target
values applicable dates?

Refer to BPHR-OS Training

Are there any ‘killer’
assumptions – and what is
the likelihood of the
assumptions not holding
good?

Are risks excluded that can
be managed by the project
manager or accommodated
by the project design?

Are the performance
indicators available from the
EA or the Government’s own
information systems?
If not, what is being done to
ensure the DMC has the skills
and systems to track
performance both during and
after project completion?

© 2005, Asian Development Bank

Quick Reference 6B
Project Performance Management System
Channel of
Effect

Effects on the Poor
Direct
Short
Run

Indirect
Short
Run

Effects on Other
Stakeholder s

Indirect
Medium
Run

Mitigation/
Enhancement
Activities

Access to
Labor Markets
& Wages
Access to
Markets and
Prices
Access to
Assets

This an alysis contains implicit assumptions,
which should be in corporated in the program
framewor k

Policy/Programs Module
This is a quick guide to Design and Monitoring
Frameworks for Policy and Programs . It is for
continuing reference by attendees to the PPMS
Training Course and Director information.

Activities,
which should
be included in
the program
framewor k

Access to
Public Serv ices
Access to
Transfers

NET IMPACT

Relates to program purpo se

The POVERTY IMPACT
ASSESSMENT describes how the
proposed project design will affect the
poor – and in doing so the mitigation
and enhancement of effects should form
part of the project activities.
The analysis of the effects makes
‘assumptions’ such as the likely
response to availability of services, new
policies, changed prices etc. These
need to be build into the DESIGN and
MONITORING FRAMEWORK
column that provides for assumptions
and risks.
Refer to BPHR-OS Training

Design Sum mar y

Performan ce
Targets/

Data Source

Assumptions
and Risks

Impact: the expected medium
Goal: the expected medium –r un
-run
impac ts of this and other programs
Outc ome: the reas on why this
Purpose: the reason why this
program is being done
—i.e. the
expected end ofprogram c hange
- -of-program
that can be assess ed by the PCR
Outputs : the s pecific deli verables of
this program (should be capable of
measurement or ass essment)
Activiti es: the main tas ks required to
produce the outputs

Inputs

© 2005, Asian Development Bank

Quick Reference 5A
Project Performance Management System

Policy/Programs Module
This is a quick guide to Quality Assurance for
Projects – Loans and Technical Assistance. It is for
continuing reference by attendees to the PPMS
Training Course and Director information.

Policy Area and Activities

Tranche 1

Tranche 2

Tranche 3

Policy Area 1 - usually equates with ‘Output’ in the Design and Monitoring Framework
Policy Action 1.1
Policy Action 1.2
Policy Area 2 - usually equates with ‘Output’ in the Design and Monitoring Framework
Policy Action 2.1
Policy Action 2.2
Etc

The POLICY MATRIX describes the
policy areas [typically] outputs that will
be achieved through initiating a series
of actions.
These various policy outputs can be
entered into the DESIGN and
MONITORING FRAMEWORK but
that still leaves the Outcome to be
defined [why are the outputs necessary
– what are the benefits and who
benefits]
Performance Targets also have to be
inserted – other than due dates.

Refer to BPHR-OS Training

Design and Monitoring Framework
Design
Summar y

Performan ce
Targets

Refere nce
Versio n

Data Source

Assumptions/
Risks

IMP ACT
OUTCOME
OUTPUTS
AC TIVITIES
AC TIVITIES

INPUTS
INPUTS

The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of the Asian
Development Bank Institute (ADBI), the Asian Development Bank (ADB), or its Board of Directors, or the governments they
represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any
consequences of their use. Terminology used may not necessarily be consistent with ADB official terms.

© 2005, Asian Development Bank

Quick Reference 5B

Más contenido relacionado

La actualidad más candente

Pmp slide share
Pmp slide sharePmp slide share
Pmp slide sharesaleem54
 
009. project communication management
009. project communication management009. project communication management
009. project communication managementBoobalan G
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 
Project-Planning
Project-PlanningProject-Planning
Project-PlanningRon Drew
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elementsharoldtaylor1113
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project ManagementReetesh Gupta
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...Megha Kotak, PMP
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th editionAmr Miqdadi
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
Eu project managment
Eu project managmentEu project managment
Eu project managment000000000
 
Zimmerman
ZimmermanZimmerman
ZimmermanNASAPMC
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 
Project Auditing
Project AuditingProject Auditing
Project AuditingSalih Islam
 
Planning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle PlanningPlanning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle PlanningEmanuele Della Valle
 

La actualidad más candente (18)

PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 
Pmp slide share
Pmp slide sharePmp slide share
Pmp slide share
 
009. project communication management
009. project communication management009. project communication management
009. project communication management
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project-Planning
Project-PlanningProject-Planning
Project-Planning
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elements
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...Project lifecycle management @ Pharma Project Management Conference - 2014, M...
Project lifecycle management @ Pharma Project Management Conference - 2014, M...
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th edition
 
PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
Eu project managment
Eu project managmentEu project managment
Eu project managment
 
Zimmerman
ZimmermanZimmerman
Zimmerman
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Project Auditing
Project AuditingProject Auditing
Project Auditing
 
Planning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle PlanningPlanning Phase Part I - Project Phases and Lifecycle Planning
Planning Phase Part I - Project Phases and Lifecycle Planning
 

Destacado

Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016Sergio Cagol
 
Telegram for business: scopri come usarlo
Telegram for business: scopri come usarloTelegram for business: scopri come usarlo
Telegram for business: scopri come usarloFlavius-Florin Harabor
 
Convcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API OverviewConvcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API OverviewConvComp2016
 
Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016Flavius-Florin Harabor
 
Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!Giorgio Robino
 

Destacado (8)

Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016Dalla crisi dei social network all'emergere dei Bot #bto2016
Dalla crisi dei social network all'emergere dei Bot #bto2016
 
Telegram for business: scopri come usarlo
Telegram for business: scopri come usarloTelegram for business: scopri come usarlo
Telegram for business: scopri come usarlo
 
Academy FPA Telegram e gli openData
Academy FPA Telegram e gli openDataAcademy FPA Telegram e gli openData
Academy FPA Telegram e gli openData
 
Convcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API OverviewConvcomp2016: Telegram Bot API Overview
Convcomp2016: Telegram Bot API Overview
 
Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016Telegram for Business Smau Milano 2016
Telegram for Business Smau Milano 2016
 
Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!Il Conversational Computing e la rivoluzione dei Chatbot!
Il Conversational Computing e la rivoluzione dei Chatbot!
 
Chat bot - Scopriamo cos'e'
Chat bot - Scopriamo cos'e'Chat bot - Scopriamo cos'e'
Chat bot - Scopriamo cos'e'
 
Chatbot e Conversational Agents
Chatbot e Conversational AgentsChatbot e Conversational Agents
Chatbot e Conversational Agents
 

Similar a Project Cycle Guide

2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adbngocjos
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxAshraf206702
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology OverviewDaniel Brody
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI ApproachZaur Ahmadov, PMP
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1Toe Myint Naing
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangePeter Quintana
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptxSivakumar Pola
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdfapoorvaguptaspn27
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...SN Panigrahi, PMP
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt forItcHcm1
 

Similar a Project Cycle Guide (20)

2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview@CIOBRODY PMO Methodology Overview
@CIOBRODY PMO Methodology Overview
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI Approach
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
CAPM Exam preparation - series 1
CAPM Exam preparation - series 1CAPM Exam preparation - series 1
CAPM Exam preparation - series 1
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Program Management
Program ManagementProgram Management
Program Management
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptx
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
Making of Stakeholders Delight
Making of Stakeholders DelightMaking of Stakeholders Delight
Making of Stakeholders Delight
 
Making of Stakeholders Delight
Making of Stakeholders Delight Making of Stakeholders Delight
Making of Stakeholders Delight
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt for
 

Último

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 

Último (20)

Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 

Project Cycle Guide

  • 1. Project Performance Management System Project Cycle •Project Identification •Establish Project Team Identification Design PPT A Fact Finding Detailed Design PPT A Inception PPT A Mid Term PPT A Final Project Concept Paper •Project Fact-Finding Mission PPT A Paper •Interdepartmental Review •PPT A Approval •Inception Mission •In-depth project analysis •Mid-term workshop •Detailed project costing, design, evaluation •Final T ripartite Workshop Draft Project Design Report •Hand-over to EA Start-Up PAM Re-design Implement M onitor Closure •Quarterly Implementation Progress Reporting •Completion of project and summary Checklists Project Concept Paper Has each Project Team member contributed to Project Concept Paper? Do DMC and Executing Agency agree with the project impact and outcome? PPTA Paper Do the Terms of Reference clearly expect Consultants to produce a detailed Design and Monitoring Framework? Do the Terms of Reference expect Consultants to produce Problem Trees, and analysis of alternatives? Has each Project Team member contributed to the PPTA paper? Have lessons learned in previous projects been documented f or consultants? Project Design Report PPTA Final Report (Project Design Reports) Draft RRP •Management Review Meeting •Appraisal Mission RRP •Interdepartmental Review PAM •Loan Negotiations •Board Consideration Appraisal (final design) Implementation Key Activities & Documents Awareness Module PPR PCR PPAR Have beneficiaries had input into the design? Have the consultants used analysis tools (problem tree, objectiv es tree, work breakdown structure) to underpin their design? Have indicators been selected with regard to av ailability of indicators f rom the Executing Agency ? Has the consultant carried out an alternatives analysis? Are the indicators defined with baseline and target v alues for the project impacts, outcome and outputs? RRP Has the EA signed off on the Design Report and the PAM? Has the EA conf irmed its MIS can provide the required indicator data? PAM & PPR Have all design changes since inception mission been updated into PAM? Are all reporting requirements incorporated into PAM? © 2005, Asian Development Bank Quick Reference 1A
  • 2. Project Performance Management System This is a quick guide to the ADB Project Cycle and key documents in the cycle. It is for continuing reference by attendees to the Awareness Session of the PPMS Training Course. Key Documents- Name and Purpose Sustainability- Likelihood that human institutional and financial resources can support achievement of results and benefits over economic life of the project Institutional Development and other impacts-The extent to which the project has contributed improvements in the enabling environment of the country such that its human, financi al and natural resources may be more effectively used. Terms o f reference for consultants preparing the design PPTA Final Report Prop osed p roject design - seeks OK to proceed with loan processing RRP Report and Recommendation of the President Proj ect design - seeks OK to proceed to loan ne gotiation s and Board approval PAM Project Administration Memorandum Basis for project management i mplementation, monitoring and evaluation du ring impl ementation Implementa tion and development progress flags need for design change PCR Project Completion Report Results ach ieved, using the REESI -and lessons l earned PPAR Project Performance Audit Report The Design and Monitoring Framework* r D ma at nc a So e T u ar R i sk rc e get As s s su a m nd pt io ns Efficiency-Compares achievement of project outcome with use of inputs. Based on implementation perform ance with consideration of the EIRR or cost-effectiveness. PPTA Paper Project Prep aratory Technical Assistance Paper Prep ared by OED - 40% of projects, 2 or 3 years after cl osure - checking against REESI rfo Efficacy-Achievement of outcome as speci fied in the policy impacts, physical, financial and institutional objectives adopted at project approval, or as formally modified during implementation Purp ose a nd rationale of project - seeks OK to pro ceed with PPTA Pe Relevance- Consistency of a project’s impacts, outcomes and outputs with the government’s development strategy, ADB lending strategy and ADB's strategic objectives Assessed for time of approval and also for time at which project is completed Concept Paper PPR Project Performance Report Criteria for Success R E E S I Awareness Module Impact Outcome Outputs Activities Refer to BPHR-OS Training Inputs * Revised format, not yet approved as at January 2005 © 2005, Asian Development Bank Quick Reference 1B
  • 3. Project Performance Management System This is a quick guide to the Design Steps, Design and Monitoring Framework and Risks and Assumptions. It is for continuing reference by attendees to the Design Linkages Session of the PPMS Training Course. 6 Design Steps 1 State the Problem 2 Do Problem Tree Analysis Screen Alternatives through REESI Relevance Efficacy (Effectiveness) Efficiency Sustainability Institutional Development Weigh-up the risks of each alternative. Describe in terms of observations or symptoms. Do not describe in terms of a solution “Jumping to solution” “Why-why-why” ? 3 Design Linkages Module Change Problem to Impact, Outcome Restate the problem in positive terms. IMPACT OUTCOME 7 Select preferred alternative. 8 Develop Work Breakdown Structure 9 Identify Inputs required 10 Translate WBS & Solution Tree to Design Framework OUTPUTS 4 Develop Solution Tree ACTIVITIES Outputs and Activities INPUTS 5 Generate Alternatives Refer to BPHR-OS Training 11 12 Identify Risks and Assumptions Identify Risk Responses © 2005, Asian Development Bank Quick Reference 2A
  • 4. Project Performance Management System Design Linkages Module Risks & Assumptions High Rate Risks by: Likelihood- how likely is this to occur? Expected impact- i f it did occur, how serious would the consequences be for the achievement of outputs – outcomes- impacts? Response Required Killer Rethink Project Response Required Response Required Response Required Do not include in design Response Required Response Required Risk Matrix What is most likely to go wrong? Assumptions What external conditions exist or behavioural changes by target benefi ciaries are expected ? Essential to the project’s success but beyond its control Likelihood Risks Response Required Medium Low Risk Response Strategies *The Design and Monitoring Framework Avoidance - eliminate the cause of the threat Mitigation - preventive measures - reduce likelihood or impact Acceptance - accept consequences and develop contingency plan Design Summary Low Performance Targets Data Source Medium High Expected Impact Checklist Assumptions & Risks IMPACT Design Summary Impact - Is the Impact stated as the long term vision and links to the CSP? Outcome - Is this stated as the improved situation for the target benefi ciari es and not as a summary of outputs? Are there 2 objectives or less? Outputs-Are these stated as a completed deliverable? Activities-Does this list the key task, steps or stages in the project? Inputs-Have the various resource categories been identifi ed? OUTCOME Is each statement unique in the Design Framework (I.e. statements not repeated at di fferent levels)? OUTPUTS ACTIVITIES *This format still subject to approval – January 2005 Refer to BPHR-OS Training INPUTS Risks and Assumptions Do the Risks and Assumptions relate to the Project Design Summary Statement at the same level? © 2005, Asian Development Bank Quick Reference 2B
  • 5. Project Performance Management System This is a quick guide to the Project Performance Reporting (PPRs). It is for continuing reference by attendees to the Reporting Sessions of the PPMS Training Course. PAM – Project Administration Memorandum • contains all project information to allow the Executing Agency (EA) and ADB to monitor project implementation and ev aluate project impacts • PAM’s Design Framework is the basis f or building Project Perf ormance Report (PPR) f ormat. Reporting Module Design Summary Performan ce Targets Data Source IMPACT OUTCOME OUTPUTS Implementation ACTIVITIES *This format still subject to approval – January 2005 PPR – Project Performance Report Start-Up Re-design Implement M onitor Assumptions & Risks INPUTS The Design and Monitoring Framework • an early warning system for ADB management implementation to take corrective actions • identifies objectiv es, key indicators and targets to be monitored ev ery quarter • serves as historical basis for ev aluating project perf ormance Closure Project Completion Report (PCR) iev aluates the rationale f or the project, adequacy of its f ormulation, and clarity and comprehensiv eness of the TOR iev aluates the achievement of the project’s outcome, outputs iev aluates the quality of outputs idescribes project implementation and signif icant changes in project design iidentif ies majors lesson learned irates the performance of the project Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 3A
  • 6. Project Performance Management System Design & Monitoring Frame work Impact Outcome PPR Development Objective (DO) Immediate Development Objective Impact and Outcome Assumptions (combined) Impact and Outcome Assumptions (listed separately) Assumptions and Risks ( Assumptions and Risks (separated) listed in same column) Activity Level Not required (can be combined with Data Source Output Level) Not shown in PPR (required in PCR) PPR Rating Scales HS Highly Satisfactory (3 points) Project expect ed to exceed most of its major development objectives S Satisfactory (2 points) Achieve most of its major development objectives PS Partly Satisfactory (1 point) Achieve some of its major development objectives U Unsatisfactory (0 Points) Unlikely to achieve its major development PCR’s Assessment and Recommendations are based on following criteria: REESI + OL •Relevance •Efficacy (effectiveness) achieving Purpose •Efficiency achieving Outputs and Purpose •Sustainability (Preliminary Assessment) •Institutional Development Reporting Module PPR Checklist From PAM to PPR Any design changes or variations since inception mission updated into the PAM? Has the PPR been restated if RRP or PAM was defici ent in its Design Framework? Is baseline data for perform ance indicators available or will it be available before next PPR is due? First PPR Is the PPR content on design (outcome, outputs, assumptions, risk) same as contain in PAM or RRP? Does the first PPR contain monitorable indicators? Do monitorable indicators have target values quoted? Subsequent PPRs Is the rating on immediate development objectives (outcome) consistent with commentary on description of progress, status of indicators, assumptions and risks? Are problems listed with outcome (immediate development objective) consistent with the ratings assigned (HS,S, PS, U)? Are monitorable indicators being reported upon for all outputs? Do the results indicated by monitorable indicators support the ratings assigned to the immediate development objectives? Overall Assessment •“. . . whether the project was implemented as conceived . . . •“. . . Analyze the design and monitoring framework •“. . . and the project performance monitoring and evaluation system, •“and provide an overall project performance rating. . . . ” Lessons Learned and Recommendations © 2005, Asian Development Bank Quick Reference 3B
  • 7. Project Performance Management System Design Indicators Module This is a quick guide to Designing Project Monitoring Indicators. It is for continuing reference by attendees to the Design- Indicators Session of the PPMS Training Course. The “SMART Way” for Good Performance A good performance indicator should be: Specific - precise and unambiguous Measurable – quantitative and/or qualitative Achievable - realistic in what is to be achieved Relevant – appropriate to subject at hand Time bound – clearly stated target date Indicators in Design and Monitoring Framework* Design Summary Performance Targets Data Source A Target is an explicit statement of desired Results for an Indicator at a specified point in time Target Statement Target Statement Baseline of xxxxxxxxx at (date) Baseline of xxxxxxxxx at (date) Targets of xxxxxxxxxx at (date) Targets of xxxxxxxxxx at (date) Targets should be expressed in Targets should be expressed in terms of Quantity, terms of Quantity, Quality and Time Quality and Time Assumptions & Risks Using Pre-Designed Indicators: Pros Can be aggregated across similar projects/programs/policies Reduces costs of building multiple unique measurement systems Creates greater harmonization of donor requirements Cons May not address country-speci fic impacts Often viewed as imposed - coming from the Top down Does not promote stakeholder ownership Multiple competing indicators When Selecting Project, Program, or Policy Indicators… Consider several for any one outcome Make sure the interests of multiple stakeholders are considered Know that over time, it is acceptable (and expected) to add new ones and drop old ones IMPACT OUTCOME OUTPUTS ACTIVITIES INPUTS * This format awaiting approval –January 2005 Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 4A
  • 8. Project Performance Management System Some Sources of Indicators DMC current indicators and statistical data Similar projects consultant proposals based on similar projects Sector specialists w ithin ADB Country Assistance plans of ADB Other Lending Agencies (World Bank, UNDP etc) Typical Problems with Indicators and Typical Problems with Indicators and Targets Targets indicators selected are not appropriate indicators selected are not appropriate no data available to construct them no data available to construct them lagging- too late for any action lagging- too late for any action focus on less important project elements focus on less important project elements data available but slow and unreliable data available but slow and unreliable no indicators for effects or impacts no indicators for effects or impacts lending agencies operate outside the Govt lending agencies operate outside the Govt information system information system no acceptance of accountability no acceptance of accountability Design Indicators Module Checklist Does every statement in the Design Summary Column of your Design and Monitoring Framework have AT LEAST ONE measurable indicator? Does every indicator have a target that is measurable in terms of Quality, Quantity or Time ? Is each indicator unique? (ie not repeated at higher or lower levels) Is every indicator described well enough so that subsequent monitoring could be carried out with no further information? Does every indicator have at least one source of data, or means for collecting it? Do monitoring mechanisms already exist, or have they been planned for in the budget? Are the sources/ means for collecting data within the projects control? Why Use Proxy Indicators? Use indirect measures (proxies) when data for direct indicators are not available or feasible to collect at regular intervals Example… Number of new tin roofs (or televisions) as a proxy measure of increased household income © 2005, Asian Development Bank Quick Reference 4B
  • 9. Project Performance Management System Quality Assurance Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Criteria for Success Relevance- Consistency of a project’s impacts, outcomes and outputs with the government’s development strategy, ADB lending strategy and ADB's strategic objectives Assessed for time of approval and also fo r time at which project is completed Efficacy-Achievement of outcome as speci fied in the policy impacts, physical, financial and institutional objectives adopted at project approval, or as formally modified during implementation Quality Assurance checklist for Directors Before signing off the Design and Monitoring Framework DESIGN LOGIC and MONITORABILITY Does the activity-output-outcome-impact reflect a plausible cause and effect / results chain? Does the Design Framework contain specific indicators and targets that are capable of being used for monitoring? Does the project administration personnel agree? Does the Design Framework contain realistic assumptions and risks – are there any ‘killer’ assumptions or risks mentioned? Efficiency-Compares achievement of project outcome with use of inputs. Based on implementation perform ance with consideration of the EIRR or cost-effectiveness. ROBUST DESIGN APPROACH Sustainability- Likelihood that human institutional and financial resources can support achievement of results and benefits over economic life of the project • Used checklists to ensure QA is applied at each stage of the project design? Institutional Development and other impacts-The extent to which the project has contributed improvements in the enabling environment of the country such that its human, financi al and natural resources may be more effectively used. Has the Mission Leader: • Applied tools of problem, objectives and alternatives analysis to design the project? • Engaged beneficiaries, EA and other stakeholders in the problem definition, consideration of alternatives and final design? • Explicitly considered lessons learned and country implementation performance in finalizing the design? Refer to BPHR-OS Training © 2005, Asian Development Bank Quick Reference 6A
  • 10. Project Performance Management System Quality Assurance Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Does the outcome contribute to stated impact? Does the impact relate to a sector outcome in the CSP? Design Summary Performance Targets Data Source Assumption s & Risks IMPACT 3 OUTCOME 2 OUTPUTS Why is this project being done? Who will benefit from using the outputs? What change should occur (such as behaviour of target group?) What will be produced during the project ? Policies, Regulations, Plans, Procedures, Standards, Infrastructure, Skills, Systems, Agency Capacity, Organisational design, Networks, Are all these necessary to be able to achieve the ‘why’ ? 1 ACTIVITIES Do the risks and assumptions relate to the right level – for example – 1 Activities to Outputs 2 Outputs to Outcome 3 Outcome to Impacts INPUTS * This format awaiting approval –January 2005 Are the performance targets shown: Specific Measurable Achievable Relevant Timely Do they have baseline, target values applicable dates? Refer to BPHR-OS Training Are there any ‘killer’ assumptions – and what is the likelihood of the assumptions not holding good? Are risks excluded that can be managed by the project manager or accommodated by the project design? Are the performance indicators available from the EA or the Government’s own information systems? If not, what is being done to ensure the DMC has the skills and systems to track performance both during and after project completion? © 2005, Asian Development Bank Quick Reference 6B
  • 11. Project Performance Management System Channel of Effect Effects on the Poor Direct Short Run Indirect Short Run Effects on Other Stakeholder s Indirect Medium Run Mitigation/ Enhancement Activities Access to Labor Markets & Wages Access to Markets and Prices Access to Assets This an alysis contains implicit assumptions, which should be in corporated in the program framewor k Policy/Programs Module This is a quick guide to Design and Monitoring Frameworks for Policy and Programs . It is for continuing reference by attendees to the PPMS Training Course and Director information. Activities, which should be included in the program framewor k Access to Public Serv ices Access to Transfers NET IMPACT Relates to program purpo se The POVERTY IMPACT ASSESSMENT describes how the proposed project design will affect the poor – and in doing so the mitigation and enhancement of effects should form part of the project activities. The analysis of the effects makes ‘assumptions’ such as the likely response to availability of services, new policies, changed prices etc. These need to be build into the DESIGN and MONITORING FRAMEWORK column that provides for assumptions and risks. Refer to BPHR-OS Training Design Sum mar y Performan ce Targets/ Data Source Assumptions and Risks Impact: the expected medium Goal: the expected medium –r un -run impac ts of this and other programs Outc ome: the reas on why this Purpose: the reason why this program is being done —i.e. the expected end ofprogram c hange - -of-program that can be assess ed by the PCR Outputs : the s pecific deli verables of this program (should be capable of measurement or ass essment) Activiti es: the main tas ks required to produce the outputs Inputs © 2005, Asian Development Bank Quick Reference 5A
  • 12. Project Performance Management System Policy/Programs Module This is a quick guide to Quality Assurance for Projects – Loans and Technical Assistance. It is for continuing reference by attendees to the PPMS Training Course and Director information. Policy Area and Activities Tranche 1 Tranche 2 Tranche 3 Policy Area 1 - usually equates with ‘Output’ in the Design and Monitoring Framework Policy Action 1.1 Policy Action 1.2 Policy Area 2 - usually equates with ‘Output’ in the Design and Monitoring Framework Policy Action 2.1 Policy Action 2.2 Etc The POLICY MATRIX describes the policy areas [typically] outputs that will be achieved through initiating a series of actions. These various policy outputs can be entered into the DESIGN and MONITORING FRAMEWORK but that still leaves the Outcome to be defined [why are the outputs necessary – what are the benefits and who benefits] Performance Targets also have to be inserted – other than due dates. Refer to BPHR-OS Training Design and Monitoring Framework Design Summar y Performan ce Targets Refere nce Versio n Data Source Assumptions/ Risks IMP ACT OUTCOME OUTPUTS AC TIVITIES AC TIVITIES INPUTS INPUTS The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank Institute (ADBI), the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. © 2005, Asian Development Bank Quick Reference 5B