Zagazig University – Faculty of Engineering                                  Structural Analysis II
                                                                         Exercise No. 4 (Deflections)
        Dept. of Structural Engineering
                                                                            Virtual Work Method

For the shown Structures, determine the Slope angle and deflection values as mentioned using the Virtual Work
Method due to given load
4.1.
  Rotation at Point B
  Vertical Deflection at d
  Relative rotation at d
  Draw Elastic Curve
4.2.
  Rotation at Point C
  Horizontal Deflection at B
  Vertical Deflection at D
  Relative Movement Between B and C

EI = 10000 t.m2.

4.3.

      Rotation at D
      Horizontal Displacement at B
      Vertical Deflection at G


EI = 12000 t.m2



4.4.
  Rotation at Point D
  Vertical Deflection at E




4.5.
  Horizontal Displacement at D
  Vertical Displacement at E
  Rotation at point C

EI = 10000 t.m2.

4.5.
  Vertical Deflection at C
  Horizontal Deflection at D
  Draw the Elastic Curve


EI = 9000 t.m2.
.


Page : 1 / 1

More Related Content

More from tharwat sakr

Earth 0207-eq.static-egy1993
Earth 0207-eq.static-egy1993Earth 0207-eq.static-egy1993
Earth 0207-eq.static-egy1993
tharwat sakr
 
Earth 0205-response spectrum
Earth 0205-response spectrumEarth 0205-response spectrum
Earth 0205-response spectrum
tharwat sakr
 
Earthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
Earthquake Engineering 2012 Lecture 0103 Measures of EarthquakesEarthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
Earthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
tharwat sakr
 
Earthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
Earthquake Engineering 2012 Lecture 0102 Nature of EarthquakesEarthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
Earthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
tharwat sakr
 
Earthquake Engineering 2012 Lecture 0101 Introduction
Earthquake Engineering 2012 Lecture 0101 IntroductionEarthquake Engineering 2012 Lecture 0101 Introduction
Earthquake Engineering 2012 Lecture 0101 Introduction
tharwat sakr
 
Civil02 sheet-02[2012]
Civil02 sheet-02[2012]Civil02 sheet-02[2012]
Civil02 sheet-02[2012]
tharwat sakr
 
Civil02 sheet-01[2012]rev01
Civil02 sheet-01[2012]rev01Civil02 sheet-01[2012]rev01
Civil02 sheet-01[2012]rev01
tharwat sakr
 
Civil02 sheet-01[2012]
Civil02 sheet-01[2012]Civil02 sheet-01[2012]
Civil02 sheet-01[2012]
tharwat sakr
 

More from tharwat sakr (19)

Earth 0207-eq.static-egy1993
Earth 0207-eq.static-egy1993Earth 0207-eq.static-egy1993
Earth 0207-eq.static-egy1993
 
Earth 0205-response spectrum
Earth 0205-response spectrumEarth 0205-response spectrum
Earth 0205-response spectrum
 
Earthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
Earthquake Engineering 2012 Lecture 0103 Measures of EarthquakesEarthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
Earthquake Engineering 2012 Lecture 0103 Measures of Earthquakes
 
Earthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
Earthquake Engineering 2012 Lecture 0102 Nature of EarthquakesEarthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
Earthquake Engineering 2012 Lecture 0102 Nature of Earthquakes
 
Earthquake Engineering 2012 Lecture 0101 Introduction
Earthquake Engineering 2012 Lecture 0101 IntroductionEarthquake Engineering 2012 Lecture 0101 Introduction
Earthquake Engineering 2012 Lecture 0101 Introduction
 
[Ths]2012 defl-01
[Ths]2012 defl-01[Ths]2012 defl-01
[Ths]2012 defl-01
 
[Ths]2012 deter-indeter
[Ths]2012 deter-indeter[Ths]2012 deter-indeter
[Ths]2012 deter-indeter
 
[Ths]2012 bd-00-civil structures
[Ths]2012 bd-00-civil structures[Ths]2012 bd-00-civil structures
[Ths]2012 bd-00-civil structures
 
Civil02 sheet-03[2012]
Civil02 sheet-03[2012]Civil02 sheet-03[2012]
Civil02 sheet-03[2012]
 
Civil02 sheet-02[2012]
Civil02 sheet-02[2012]Civil02 sheet-02[2012]
Civil02 sheet-02[2012]
 
Civil02 sheet-01[2012]rev01
Civil02 sheet-01[2012]rev01Civil02 sheet-01[2012]rev01
Civil02 sheet-01[2012]rev01
 
Civil02 sheet-01[2012]
Civil02 sheet-01[2012]Civil02 sheet-01[2012]
Civil02 sheet-01[2012]
 
Earth 2011-lec-06
Earth 2011-lec-06Earth 2011-lec-06
Earth 2011-lec-06
 
Earth 2011-ass-02
Earth 2011-ass-02Earth 2011-ass-02
Earth 2011-ass-02
 
Earth 2011-lec-02
Earth 2011-lec-02Earth 2011-lec-02
Earth 2011-lec-02
 
Earthquake Engineering 2011 Ass-01
Earthquake Engineering 2011 Ass-01Earthquake Engineering 2011 Ass-01
Earthquake Engineering 2011 Ass-01
 
Earthquake Engineering 2011 lec-01
Earthquake Engineering  2011 lec-01Earthquake Engineering  2011 lec-01
Earthquake Engineering 2011 lec-01
 
H Igh Rise 02 Lateral Load Systems 01
H Igh Rise 02 Lateral Load Systems 01H Igh Rise 02 Lateral Load Systems 01
H Igh Rise 02 Lateral Load Systems 01
 
H igh rise-01-introduction
H igh rise-01-introductionH igh rise-01-introduction
H igh rise-01-introduction
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Recently uploaded (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 

Civil02 sheet-04[2012]

  • 1. Zagazig University – Faculty of Engineering Structural Analysis II Exercise No. 4 (Deflections) Dept. of Structural Engineering Virtual Work Method For the shown Structures, determine the Slope angle and deflection values as mentioned using the Virtual Work Method due to given load 4.1.  Rotation at Point B  Vertical Deflection at d  Relative rotation at d  Draw Elastic Curve 4.2.  Rotation at Point C  Horizontal Deflection at B  Vertical Deflection at D  Relative Movement Between B and C EI = 10000 t.m2. 4.3.  Rotation at D  Horizontal Displacement at B  Vertical Deflection at G EI = 12000 t.m2 4.4.  Rotation at Point D  Vertical Deflection at E 4.5.  Horizontal Displacement at D  Vertical Displacement at E  Rotation at point C EI = 10000 t.m2. 4.5.  Vertical Deflection at C  Horizontal Deflection at D  Draw the Elastic Curve EI = 9000 t.m2. . Page : 1 / 1